CN217247202U - Tunnel construction effluent treatment plant - Google Patents

Tunnel construction effluent treatment plant Download PDF

Info

Publication number
CN217247202U
CN217247202U CN202220134104.1U CN202220134104U CN217247202U CN 217247202 U CN217247202 U CN 217247202U CN 202220134104 U CN202220134104 U CN 202220134104U CN 217247202 U CN217247202 U CN 217247202U
Authority
CN
China
Prior art keywords
purification
purifying cylinder
cylinder
tunnel construction
thick bamboo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220134104.1U
Other languages
Chinese (zh)
Inventor
卢林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Chenzhou Highway And Bridge Construction Co ltd
Original Assignee
Hunan Chenzhou Highway And Bridge Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Chenzhou Highway And Bridge Construction Co ltd filed Critical Hunan Chenzhou Highway And Bridge Construction Co ltd
Priority to CN202220134104.1U priority Critical patent/CN217247202U/en
Application granted granted Critical
Publication of CN217247202U publication Critical patent/CN217247202U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to the technical field of wastewater purification, in particular to a tunnel construction wastewater purification device, which comprises a first purification cylinder; one side of first purifying cylinder is provided with the second purifying cylinder, and the draw-in groove has all been seted up to the top and the bottom of first purifying cylinder one side to the top and the equal fixedly connected with fixture block in bottom of second purifying cylinder one side, and the fixed slot has all been seted up to one side of first purifying cylinder and second purifying cylinder inner wall, and the inside joint of fixed slot has the filter screen, and the relative one side of first purifying cylinder and second purifying cylinder is the unclosed setting, draw-in groove and fixture block looks adaptation, and fixed slot and filter screen looks adaptation. The utility model discloses can clear up or change the filter screen fast convenient in tunnel construction waste water purification process, and be convenient for clear up the impurity of reserving after the clarification plant is inside filters, better faster assurance filtration and purification of tunnel construction waste water, excellent in use effect is fit for promoting.

Description

Tunnel construction effluent treatment plant
Technical Field
The utility model relates to a waste water purification technology field especially relates to a tunnel construction effluent treatment plant.
Background
The waste water is also called sewage, the water which is generated in a certain production and living process of human and has lost use value or can not be utilized, the waste water is discharged into the environment to cause water pollution, tunnel construction is common in our lives, and the waste water is generated in the tunnel construction process.
Tunnel construction waste water need purify, can filter in the purification process, is difficult to clear up or change the filter screen fast convenient in tunnel construction waste water purification process now, and is not convenient for clear up the impurity of reserving after the clarification plant is inside filtered, is difficult to better faster filtration and the purification of assurance tunnel construction waste water.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems existing in the background technology, the utility model provides a tunnel construction wastewater purification device, which comprises a first purification cylinder; one side of first purifying cylinder is provided with the second purifying cylinder, and the draw-in groove has all been seted up to the top and the bottom of first purifying cylinder one side to the top and the equal fixedly connected with fixture block in bottom of second purifying cylinder one side, the fixed slot has all been seted up to one side of first purifying cylinder and second purifying cylinder inner wall, and the inside joint of fixed slot has the filter screen, and the relative one side of first purifying cylinder and second purifying cylinder is the unclosed setting.
Preferably, the clamping groove is matched with the clamping block, and the fixing groove is matched with the filter screen.
Preferably, the first purification cylinder and the second purification cylinder are in contact on opposite sides.
Preferably, the front surface and the back surface of the first purifying cylinder are fixedly connected with sealing gaskets, and the sealing gaskets are contacted with one side opposite to the second purifying cylinder.
Preferably, one side of the first purifying cylinder is fixedly connected with a handle, and the bottom of one side of the second purifying cylinder is communicated with a transverse pipe.
Preferably, the top of a first purification section of thick bamboo and a second purification section of thick bamboo has all been seted up and has been stabilized the groove to the inside joint in stable groove has the steady piece.
Preferably, the top fixedly connected with diaphragm of stabilizing block to the bottom of diaphragm and the top homogeneous phase contact of first purification section of thick bamboo and second purification section of thick bamboo, the inside of diaphragm is run through there is fixed pipe, and first purification section of thick bamboo and second purification section of thick bamboo are run through and are extended to the inside of first purification section of thick bamboo and second purification section of thick bamboo to the bottom of fixed pipe.
Compared with the prior art, the above technical scheme of the utility model following profitable technological effect has: through the setting of first purifying cylinder, second purifying cylinder, draw-in groove, fixture block, fixed slot, filter screen, sealed pad, handle, violently pipe, stable groove, stabilizing block, diaphragm and fixed pipe, can clear up or change the filter screen fast convenient in tunnel construction waste water purification process, and be convenient for clear up the impurity of reserving after the clarification plant internal filtration, better faster assurance the filtration and the purification of tunnel construction waste water, excellent in use effect is fit for promoting.
Drawings
FIG. 1 is a schematic structural view of a tunnel construction wastewater purification apparatus according to a first embodiment;
FIG. 2 is a sectional view showing the structure of the first purification cartridge of FIG. 1;
FIG. 3 is an enlarged view of a portion A of FIG. 2;
FIG. 4 is a schematic view of a portion of the enlarged structure at B of FIG. 2;
fig. 5 is a partially enlarged structural view of the part C of fig. 2.
Reference numerals are as follows: 1. a first purification cartridge; 2. a second purification cartridge; 3. a card slot; 4. a clamping block; 5. fixing grooves; 6. filtering with a screen; 7. a gasket; 8. a handle; 9. a transverse tube; 10. a stabilizing slot; 11. a stabilization block; 12. a transverse plate; 13. and fixing the tube.
Detailed Description
Example one
As shown in fig. 1-4, the utility model provides a tunnel construction wastewater purification device, which comprises a first purification cylinder 1; a second purifying cylinder 2 is arranged on one side of a first purifying cylinder 1, a clamping groove 3 is respectively arranged on the top and the bottom of one side of the first purifying cylinder 1, a clamping block 4 is fixedly connected with the top and the bottom of one side of the second purifying cylinder 2, a fixing groove 5 is respectively arranged on one side of the inner wall of the first purifying cylinder 1 and one side of the inner wall of the second purifying cylinder 2, a filter screen 6 is clamped in the fixing groove 5, one side of the first purifying cylinder 1 opposite to the second purifying cylinder 2 is not sealed, the clamping groove 3 is matched with the clamping block 4, the fixing groove 5 is matched with the filter screen 6, one side of the first purifying cylinder 1 opposite to the second purifying cylinder 2 is contacted, sealing gaskets 7 are fixedly connected on the front surface and the back surface of the first purifying cylinder 1, the sealing gaskets 7 are contacted with one side of the second purifying cylinder 2, a handle 8 is fixedly connected on one side of the first purifying cylinder 1, and a transverse pipe 9 is communicated with the bottom of one side of the second purifying cylinder 2, a valve is arranged inside the transverse pipe 9.
In this embodiment, with diaphragm 12 upwards pulling, it breaks away from stabilized groove 10 to drive stabilized block 11, dismantle diaphragm 12 and first purifying cylinder 1 and second purifying cylinder 2, then pulling handle 8 drives first purifying cylinder 1 to the side motion, it breaks away from to drive fixture block 4 and draw-in groove 3, dismantle first purifying cylinder 1 and second purifying cylinder 2, filter screen 6 breaks away from 5 inside fixed slots, thereby can be fast convenient clear up or change filter screen 6, and can be convenient for clear up the impurity of reserving after the inside filtration of clarification plant from one side of first purifying cylinder 1 and second purifying cylinder 2.
Example two
As shown in fig. 1, fig. 2 and fig. 5, compared with the first embodiment, the present invention further includes a stabilizing groove 10 formed at the top of each of the first purifying cylinder 1 and the second purifying cylinder 2, and a stabilizing block 11 is clamped inside the stabilizing groove 10, a transverse plate 12 is fixedly connected to the top of the stabilizing block 11, the bottom of the transverse plate 12 is in contact with the top of each of the first purifying cylinder 1 and the second purifying cylinder 2, a fixing tube 13 penetrates through the inside of the transverse plate 12, the bottom end of the fixing tube 13 penetrates through the first purifying cylinder 1 and the second purifying cylinder 2 and extends to the inside of the first purifying cylinder 1 and the second purifying cylinder 2, and the fixing tube 13 is set up by the first purifying cylinder 1, the second purifying cylinder 2, the clamping groove 3, the clamping block 4, the fixing groove 5, the filter screen 6, the sealing gasket 7, the handle 8, the transverse tube 9, the stabilizing groove 10, the stabilizing block 11, the transverse plate 12 and the fixing tube 13, can be in tunnel construction waste water purification process quick convenient clear up or change filter screen 6, and be convenient for clear up the impurity of reserving after the clarification plant internal filtration, better faster assurance the filtration and the purification of tunnel construction waste water, excellent in use effect is fit for promoting.
In this embodiment, through inserting stabilizing block 11 in stabilizing groove 10 to install diaphragm 12 and first purifying cylinder 1 and second purifying cylinder 2, make diaphragm 12 carry out spacing fixed to first purifying cylinder 1 and second purifying cylinder 2, thereby increase the stability after first purifying cylinder 1 and second purifying cylinder 2 install, pour into first purifying cylinder 1 and second purifying cylinder 2 with waste water through fixed pipe 13, flow through violently managing 9 after filtering through filter screen 6.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited thereto, and various changes can be made without departing from the gist of the present invention within the scope of knowledge possessed by those skilled in the art.

Claims (7)

1. A tunnel construction wastewater purification device is characterized by comprising a first purification cylinder (1); one side of first purification section of thick bamboo (1) is provided with second purification section of thick bamboo (2), draw-in groove (3) have all been seted up to the top and the bottom of first purification section of thick bamboo (1) one side to the top and the equal fixedly connected with fixture block (4) in bottom of second purification section of thick bamboo (2) one side, fixed slot (5) have all been seted up to one side of first purification section of thick bamboo (1) and second purification section of thick bamboo (2) inner wall, and the inside joint of fixed slot (5) has filter screen (6), and one side that first purification section of thick bamboo (1) and second purification section of thick bamboo (2) are the unclosed setting.
2. The tunnel construction wastewater purification device according to claim 1, wherein the clamping groove (3) is adapted to the clamping block (4), and the fixing groove (5) is adapted to the filter screen (6).
3. A tunnel construction wastewater purification apparatus as claimed in claim 1, wherein the first purification cartridge (1) and the second purification cartridge (2) are in contact on opposite sides thereof.
4. A tunnel construction wastewater purification apparatus as claimed in claim 1, characterized in that a gasket (7) is fixedly connected to both the front and back surfaces of the first purification cartridge (1), and the gasket (7) is in contact with the opposite side of the second purification cartridge (2).
5. The tunnel construction wastewater purification device according to claim 1, wherein a handle (8) is fixedly connected to one side of the first purification cylinder (1), and a horizontal pipe (9) is communicated with the bottom of one side of the second purification cylinder (2).
6. The tunnel construction wastewater purification device according to claim 1, wherein a stabilization groove (10) is opened at the top of each of the first purification cylinder (1) and the second purification cylinder (2), and a stabilization block (11) is clamped inside the stabilization groove (10).
7. The tunnel construction wastewater purification device according to claim 6, wherein a transverse plate (12) is fixedly connected to the top of the stabilizing block (11), the bottom of the transverse plate (12) is in contact with the tops of the first purification cylinder (1) and the second purification cylinder (2), a fixing pipe (13) penetrates through the inside of the transverse plate (12), and the bottom end of the fixing pipe (13) penetrates through the first purification cylinder (1) and the second purification cylinder (2) and extends to the inside of the first purification cylinder (1) and the second purification cylinder (2).
CN202220134104.1U 2022-01-19 2022-01-19 Tunnel construction effluent treatment plant Active CN217247202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220134104.1U CN217247202U (en) 2022-01-19 2022-01-19 Tunnel construction effluent treatment plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220134104.1U CN217247202U (en) 2022-01-19 2022-01-19 Tunnel construction effluent treatment plant

Publications (1)

Publication Number Publication Date
CN217247202U true CN217247202U (en) 2022-08-23

Family

ID=82897560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220134104.1U Active CN217247202U (en) 2022-01-19 2022-01-19 Tunnel construction effluent treatment plant

Country Status (1)

Country Link
CN (1) CN217247202U (en)

Similar Documents

Publication Publication Date Title
CN205550051U (en) Formula milipore filter structure is rolled up to multistage
CN217247202U (en) Tunnel construction effluent treatment plant
CN110339720B (en) Vertical cross flow filtering integrated device based on hollow fiber membrane
CN210419580U (en) Wastewater treatment ultrafiltration device
CN218357854U (en) Water purifier with conveniently replaced filter element
CN204543774U (en) A kind of muddy water purifier
CN204767712U (en) Novel aqueous cleaning device
CN205953610U (en) Special membrane filter equipment of sewage treatment system
CN220597181U (en) River course sewage purification device
CN216395407U (en) Sewage treatment plant is used in degreased wool production
CN214020128U (en) Water purifying device with reverse osmosis membrane element
CN216336956U (en) AO biological denitrification high salt waste water treatment pH equalizing basin
CN110204149A (en) Water and air distributing is aerated Multifunctional filter tube, Multifunctional filter tube filter tank and method for treating water
CN205216331U (en) Bag -type filtering apparatus for water treatment
CN220424763U (en) Sewage filtering environment-friendly equipment
CN203602423U (en) Circular ultrafiltration device capable of decontaminating deeply
CN215626943U (en) Cleaning equipment for garbage leachate treatment ultrafiltration device
CN211688395U (en) Membrane method fluorine water purification device that removes
CN215539090U (en) Environmental pollution treatment agent filtration equipment
CN212127627U (en) Efficient filtering device of reverse osmosis equipment
CN220520271U (en) A fast-assembling formula MBR membrane frame for sewage water purifies
CN219186147U (en) Laboratory wastewater filtering device
CN220513851U (en) RO reverse osmosis membrane water purification treatment device
CN215712408U (en) Building engineering waste water centralized treatment device
CN220405264U (en) Be used for water purifier intelligent tap

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant