CN217247202U - Tunnel construction effluent treatment plant - Google Patents
Tunnel construction effluent treatment plant Download PDFInfo
- Publication number
- CN217247202U CN217247202U CN202220134104.1U CN202220134104U CN217247202U CN 217247202 U CN217247202 U CN 217247202U CN 202220134104 U CN202220134104 U CN 202220134104U CN 217247202 U CN217247202 U CN 217247202U
- Authority
- CN
- China
- Prior art keywords
- purification
- purifying cylinder
- cylinder
- tunnel construction
- thick bamboo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to the technical field of wastewater purification, in particular to a tunnel construction wastewater purification device, which comprises a first purification cylinder; one side of first purifying cylinder is provided with the second purifying cylinder, and the draw-in groove has all been seted up to the top and the bottom of first purifying cylinder one side to the top and the equal fixedly connected with fixture block in bottom of second purifying cylinder one side, and the fixed slot has all been seted up to one side of first purifying cylinder and second purifying cylinder inner wall, and the inside joint of fixed slot has the filter screen, and the relative one side of first purifying cylinder and second purifying cylinder is the unclosed setting, draw-in groove and fixture block looks adaptation, and fixed slot and filter screen looks adaptation. The utility model discloses can clear up or change the filter screen fast convenient in tunnel construction waste water purification process, and be convenient for clear up the impurity of reserving after the clarification plant is inside filters, better faster assurance filtration and purification of tunnel construction waste water, excellent in use effect is fit for promoting.
Description
Technical Field
The utility model relates to a waste water purification technology field especially relates to a tunnel construction effluent treatment plant.
Background
The waste water is also called sewage, the water which is generated in a certain production and living process of human and has lost use value or can not be utilized, the waste water is discharged into the environment to cause water pollution, tunnel construction is common in our lives, and the waste water is generated in the tunnel construction process.
Tunnel construction waste water need purify, can filter in the purification process, is difficult to clear up or change the filter screen fast convenient in tunnel construction waste water purification process now, and is not convenient for clear up the impurity of reserving after the clarification plant is inside filtered, is difficult to better faster filtration and the purification of assurance tunnel construction waste water.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems existing in the background technology, the utility model provides a tunnel construction wastewater purification device, which comprises a first purification cylinder; one side of first purifying cylinder is provided with the second purifying cylinder, and the draw-in groove has all been seted up to the top and the bottom of first purifying cylinder one side to the top and the equal fixedly connected with fixture block in bottom of second purifying cylinder one side, the fixed slot has all been seted up to one side of first purifying cylinder and second purifying cylinder inner wall, and the inside joint of fixed slot has the filter screen, and the relative one side of first purifying cylinder and second purifying cylinder is the unclosed setting.
Preferably, the clamping groove is matched with the clamping block, and the fixing groove is matched with the filter screen.
Preferably, the first purification cylinder and the second purification cylinder are in contact on opposite sides.
Preferably, the front surface and the back surface of the first purifying cylinder are fixedly connected with sealing gaskets, and the sealing gaskets are contacted with one side opposite to the second purifying cylinder.
Preferably, one side of the first purifying cylinder is fixedly connected with a handle, and the bottom of one side of the second purifying cylinder is communicated with a transverse pipe.
Preferably, the top of a first purification section of thick bamboo and a second purification section of thick bamboo has all been seted up and has been stabilized the groove to the inside joint in stable groove has the steady piece.
Preferably, the top fixedly connected with diaphragm of stabilizing block to the bottom of diaphragm and the top homogeneous phase contact of first purification section of thick bamboo and second purification section of thick bamboo, the inside of diaphragm is run through there is fixed pipe, and first purification section of thick bamboo and second purification section of thick bamboo are run through and are extended to the inside of first purification section of thick bamboo and second purification section of thick bamboo to the bottom of fixed pipe.
Compared with the prior art, the above technical scheme of the utility model following profitable technological effect has: through the setting of first purifying cylinder, second purifying cylinder, draw-in groove, fixture block, fixed slot, filter screen, sealed pad, handle, violently pipe, stable groove, stabilizing block, diaphragm and fixed pipe, can clear up or change the filter screen fast convenient in tunnel construction waste water purification process, and be convenient for clear up the impurity of reserving after the clarification plant internal filtration, better faster assurance the filtration and the purification of tunnel construction waste water, excellent in use effect is fit for promoting.
Drawings
FIG. 1 is a schematic structural view of a tunnel construction wastewater purification apparatus according to a first embodiment;
FIG. 2 is a sectional view showing the structure of the first purification cartridge of FIG. 1;
FIG. 3 is an enlarged view of a portion A of FIG. 2;
FIG. 4 is a schematic view of a portion of the enlarged structure at B of FIG. 2;
fig. 5 is a partially enlarged structural view of the part C of fig. 2.
Reference numerals are as follows: 1. a first purification cartridge; 2. a second purification cartridge; 3. a card slot; 4. a clamping block; 5. fixing grooves; 6. filtering with a screen; 7. a gasket; 8. a handle; 9. a transverse tube; 10. a stabilizing slot; 11. a stabilization block; 12. a transverse plate; 13. and fixing the tube.
Detailed Description
Example one
As shown in fig. 1-4, the utility model provides a tunnel construction wastewater purification device, which comprises a first purification cylinder 1; a second purifying cylinder 2 is arranged on one side of a first purifying cylinder 1, a clamping groove 3 is respectively arranged on the top and the bottom of one side of the first purifying cylinder 1, a clamping block 4 is fixedly connected with the top and the bottom of one side of the second purifying cylinder 2, a fixing groove 5 is respectively arranged on one side of the inner wall of the first purifying cylinder 1 and one side of the inner wall of the second purifying cylinder 2, a filter screen 6 is clamped in the fixing groove 5, one side of the first purifying cylinder 1 opposite to the second purifying cylinder 2 is not sealed, the clamping groove 3 is matched with the clamping block 4, the fixing groove 5 is matched with the filter screen 6, one side of the first purifying cylinder 1 opposite to the second purifying cylinder 2 is contacted, sealing gaskets 7 are fixedly connected on the front surface and the back surface of the first purifying cylinder 1, the sealing gaskets 7 are contacted with one side of the second purifying cylinder 2, a handle 8 is fixedly connected on one side of the first purifying cylinder 1, and a transverse pipe 9 is communicated with the bottom of one side of the second purifying cylinder 2, a valve is arranged inside the transverse pipe 9.
In this embodiment, with diaphragm 12 upwards pulling, it breaks away from stabilized groove 10 to drive stabilized block 11, dismantle diaphragm 12 and first purifying cylinder 1 and second purifying cylinder 2, then pulling handle 8 drives first purifying cylinder 1 to the side motion, it breaks away from to drive fixture block 4 and draw-in groove 3, dismantle first purifying cylinder 1 and second purifying cylinder 2, filter screen 6 breaks away from 5 inside fixed slots, thereby can be fast convenient clear up or change filter screen 6, and can be convenient for clear up the impurity of reserving after the inside filtration of clarification plant from one side of first purifying cylinder 1 and second purifying cylinder 2.
Example two
As shown in fig. 1, fig. 2 and fig. 5, compared with the first embodiment, the present invention further includes a stabilizing groove 10 formed at the top of each of the first purifying cylinder 1 and the second purifying cylinder 2, and a stabilizing block 11 is clamped inside the stabilizing groove 10, a transverse plate 12 is fixedly connected to the top of the stabilizing block 11, the bottom of the transverse plate 12 is in contact with the top of each of the first purifying cylinder 1 and the second purifying cylinder 2, a fixing tube 13 penetrates through the inside of the transverse plate 12, the bottom end of the fixing tube 13 penetrates through the first purifying cylinder 1 and the second purifying cylinder 2 and extends to the inside of the first purifying cylinder 1 and the second purifying cylinder 2, and the fixing tube 13 is set up by the first purifying cylinder 1, the second purifying cylinder 2, the clamping groove 3, the clamping block 4, the fixing groove 5, the filter screen 6, the sealing gasket 7, the handle 8, the transverse tube 9, the stabilizing groove 10, the stabilizing block 11, the transverse plate 12 and the fixing tube 13, can be in tunnel construction waste water purification process quick convenient clear up or change filter screen 6, and be convenient for clear up the impurity of reserving after the clarification plant internal filtration, better faster assurance the filtration and the purification of tunnel construction waste water, excellent in use effect is fit for promoting.
In this embodiment, through inserting stabilizing block 11 in stabilizing groove 10 to install diaphragm 12 and first purifying cylinder 1 and second purifying cylinder 2, make diaphragm 12 carry out spacing fixed to first purifying cylinder 1 and second purifying cylinder 2, thereby increase the stability after first purifying cylinder 1 and second purifying cylinder 2 install, pour into first purifying cylinder 1 and second purifying cylinder 2 with waste water through fixed pipe 13, flow through violently managing 9 after filtering through filter screen 6.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited thereto, and various changes can be made without departing from the gist of the present invention within the scope of knowledge possessed by those skilled in the art.
Claims (7)
1. A tunnel construction wastewater purification device is characterized by comprising a first purification cylinder (1); one side of first purification section of thick bamboo (1) is provided with second purification section of thick bamboo (2), draw-in groove (3) have all been seted up to the top and the bottom of first purification section of thick bamboo (1) one side to the top and the equal fixedly connected with fixture block (4) in bottom of second purification section of thick bamboo (2) one side, fixed slot (5) have all been seted up to one side of first purification section of thick bamboo (1) and second purification section of thick bamboo (2) inner wall, and the inside joint of fixed slot (5) has filter screen (6), and one side that first purification section of thick bamboo (1) and second purification section of thick bamboo (2) are the unclosed setting.
2. The tunnel construction wastewater purification device according to claim 1, wherein the clamping groove (3) is adapted to the clamping block (4), and the fixing groove (5) is adapted to the filter screen (6).
3. A tunnel construction wastewater purification apparatus as claimed in claim 1, wherein the first purification cartridge (1) and the second purification cartridge (2) are in contact on opposite sides thereof.
4. A tunnel construction wastewater purification apparatus as claimed in claim 1, characterized in that a gasket (7) is fixedly connected to both the front and back surfaces of the first purification cartridge (1), and the gasket (7) is in contact with the opposite side of the second purification cartridge (2).
5. The tunnel construction wastewater purification device according to claim 1, wherein a handle (8) is fixedly connected to one side of the first purification cylinder (1), and a horizontal pipe (9) is communicated with the bottom of one side of the second purification cylinder (2).
6. The tunnel construction wastewater purification device according to claim 1, wherein a stabilization groove (10) is opened at the top of each of the first purification cylinder (1) and the second purification cylinder (2), and a stabilization block (11) is clamped inside the stabilization groove (10).
7. The tunnel construction wastewater purification device according to claim 6, wherein a transverse plate (12) is fixedly connected to the top of the stabilizing block (11), the bottom of the transverse plate (12) is in contact with the tops of the first purification cylinder (1) and the second purification cylinder (2), a fixing pipe (13) penetrates through the inside of the transverse plate (12), and the bottom end of the fixing pipe (13) penetrates through the first purification cylinder (1) and the second purification cylinder (2) and extends to the inside of the first purification cylinder (1) and the second purification cylinder (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220134104.1U CN217247202U (en) | 2022-01-19 | 2022-01-19 | Tunnel construction effluent treatment plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220134104.1U CN217247202U (en) | 2022-01-19 | 2022-01-19 | Tunnel construction effluent treatment plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217247202U true CN217247202U (en) | 2022-08-23 |
Family
ID=82897560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220134104.1U Active CN217247202U (en) | 2022-01-19 | 2022-01-19 | Tunnel construction effluent treatment plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217247202U (en) |
-
2022
- 2022-01-19 CN CN202220134104.1U patent/CN217247202U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205550051U (en) | Formula milipore filter structure is rolled up to multistage | |
CN217247202U (en) | Tunnel construction effluent treatment plant | |
CN110339720B (en) | Vertical cross flow filtering integrated device based on hollow fiber membrane | |
CN210419580U (en) | Wastewater treatment ultrafiltration device | |
CN218357854U (en) | Water purifier with conveniently replaced filter element | |
CN204543774U (en) | A kind of muddy water purifier | |
CN204767712U (en) | Novel aqueous cleaning device | |
CN205953610U (en) | Special membrane filter equipment of sewage treatment system | |
CN220597181U (en) | River course sewage purification device | |
CN216395407U (en) | Sewage treatment plant is used in degreased wool production | |
CN214020128U (en) | Water purifying device with reverse osmosis membrane element | |
CN216336956U (en) | AO biological denitrification high salt waste water treatment pH equalizing basin | |
CN110204149A (en) | Water and air distributing is aerated Multifunctional filter tube, Multifunctional filter tube filter tank and method for treating water | |
CN205216331U (en) | Bag -type filtering apparatus for water treatment | |
CN220424763U (en) | Sewage filtering environment-friendly equipment | |
CN203602423U (en) | Circular ultrafiltration device capable of decontaminating deeply | |
CN215626943U (en) | Cleaning equipment for garbage leachate treatment ultrafiltration device | |
CN211688395U (en) | Membrane method fluorine water purification device that removes | |
CN215539090U (en) | Environmental pollution treatment agent filtration equipment | |
CN212127627U (en) | Efficient filtering device of reverse osmosis equipment | |
CN220520271U (en) | A fast-assembling formula MBR membrane frame for sewage water purifies | |
CN219186147U (en) | Laboratory wastewater filtering device | |
CN220513851U (en) | RO reverse osmosis membrane water purification treatment device | |
CN215712408U (en) | Building engineering waste water centralized treatment device | |
CN220405264U (en) | Be used for water purifier intelligent tap |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |