CN217240138U - A bury traditional thread binding putting for hydraulic and hydroelectric engineering construction - Google Patents
A bury traditional thread binding putting for hydraulic and hydroelectric engineering construction Download PDFInfo
- Publication number
- CN217240138U CN217240138U CN202220025187.0U CN202220025187U CN217240138U CN 217240138 U CN217240138 U CN 217240138U CN 202220025187 U CN202220025187 U CN 202220025187U CN 217240138 U CN217240138 U CN 217240138U
- Authority
- CN
- China
- Prior art keywords
- frame
- fixed mounting
- hydraulic
- pushing
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 230000007246 mechanism Effects 0.000 claims abstract description 9
- 238000005096 rolling process Methods 0.000 claims description 23
- 238000003825 pressing Methods 0.000 claims description 18
- 230000006837 decompression Effects 0.000 claims description 3
- 238000009933 burial Methods 0.000 claims 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims 2
- 238000004804 winding Methods 0.000 abstract description 10
- 230000009471 action Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Hydraulic Turbines (AREA)
Abstract
The utility model provides a thread burying device for hydraulic and hydroelectric engineering construction, which comprises a bottom plate, wherein a winding frame is fixedly arranged on one side of the top of the bottom plate, a handrail is fixedly arranged on one side of the top of the winding frame, the middle part of the winding frame is rotatably connected with a winding shaft, a switch panel is fixedly arranged on one side of the winding frame, a storage battery is arranged at the bottom of one side of the winding frame, a pushing mechanism is fixedly arranged on one side of the top of the bottom plate, and a thread arranging frame is fixedly arranged on the other side of the top of the winding frame, utilize fastening bolt to fix the line ball frame, carry out the line ball to the electric wire, the electric wire of being convenient for is laid.
Description
Technical Field
The utility model belongs to the technical field of hydraulic and hydroelectric engineering construction equipment, concretely relates to bury line device for hydraulic and hydroelectric engineering construction.
Background
Hydraulic engineering works have many similarities to the construction of general civil engineering works such as roads, railways, bridges, housing buildings, and the like. For example: the main construction objects are mainly earthwork, stone, concrete, metal structures, electromechanical equipment installation and other projects.
The existing hydraulic engineering construction line burying process is easy to move when an electric wire is laid, and is inconvenient for positioning the electric wire, so that the electric wire line is not beneficial to laying the electric wire due to deviation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bury line device for hydraulic and hydroelectric engineering construction aims at solving among the prior art hydraulic engineering construction and buries the line in-process, and the electric wire is moved easily when laying, is not convenient for to the electric wire location, leads to the electric wire circuit deviation to appear, is unfavorable for the problem that the electric wire was laid.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a bury traditional thread binding putting for hydraulic and hydroelectric engineering construction, includes the bottom plate, bottom plate top one side fixed mounting rolling frame, rolling frame top one side fixed mounting has the handrail, rolling frame middle part rotates and is connected with the rolling axle, rolling frame avris fixed mounting has flush mounting plate of switch, rolling frame one side bottom of inclining is equipped with the battery, bottom plate top one side fixed mounting has pushing mechanism, rolling frame top opposite side fixed mounting has the reason line frame.
In order to make and promote the electric wire, as the utility model relates to a bury line device preferred for hydraulic and hydroelectric engineering construction, it includes fixed mounting in the pushing frame of bottom plate top one side to push the mechanism, it rotates and is connected with first roller bearing to push a frame top, it has step motor to push a frame side fixed mounting, the step motor output runs through and pushes a frame side fixed mounting and push the roller bearing.
In order to make and prevent that the electric wire from droing, conduct the utility model relates to a bury line device is preferred for hydraulic and hydroelectric engineering construction, it is equipped with a plurality of pushing wheels to push the roller bearing surface, it is equipped with anti-skidding rubber to push the wheel surface.
In order to make the change push the wheel position, as the utility model relates to a bury line device preferred for hydraulic and hydroelectric engineering construction, push and push wheel both sides and be equipped with the sleeve pipe, the nut is installed to sleeve pipe one end screw thread.
In order to make and fix a position the electric wire, conduct the utility model relates to a bury line device is preferred for hydraulic and hydroelectric engineering construction, a plurality of annular spacing grooves have been seted up on first roller bearing surface.
In order to make and reduce the pre-buried height of electric wire, conduct the utility model relates to a bury line device preferred for hydraulic and hydroelectric engineering construction, reason line frame top both sides are rotated and are connected with the pressure line frame, pressure line frame middle part is rotated and is connected with the pressure line axle, the pressure line frame rotates the junction with reason line frame and is equipped with fastening bolt.
In order to make the vibrations that reduce the bottom plate and receive, as the utility model relates to a bury line device preferred for hydraulic and hydroelectric engineering construction, bottom plate bottom four corners fixed mounting has the telescopic link, telescopic link bottom fixed mounting has the universal wheel, telescopic link outer wall cover is equipped with relief spring.
In order to make step motor normal operating, as the utility model relates to a bury line device and be preferred for hydraulic and hydroelectric engineering construction, step motor and flush mounting plate electric connection of switch, flush mounting plate and battery electric connection.
Compared with the prior art, the beneficial effects of the utility model are that:
1) the electric wires are positioned through the arranged annular limiting groove and the pushing wheel, the stepping motor rotates the pushing roller to push the electric wires, the position of the pushing roller is changed through sliding the sleeve, and the sleeve is fixed on the pushing roller through the nut, so that the pushing roller can push the electric wires with different sizes;
2) the lifting angle of the line ball frame is changed through the line ball frame, the line ball frame is fixed through the fastening bolts, the line ball frame is penetrated through the electric wire, the electric wire is pressed, the electric wire is laid conveniently, the universal wheel at the bottom of the handrail moving bottom plate enables the equipment to move, when the universal wheel moves, the telescopic rod is contracted and rebounded under the action of the pressure reducing spring, the vibration received when the bottom plate moves is reduced, and the electric wire is laid stably.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the telescopic rod structure of the present invention;
FIG. 3 is a schematic view of the pushing mechanism of the present invention;
fig. 4 is a schematic view of the pushing wheel structure of the present invention.
In the figure: 1. a base plate; 2. a winding frame; 3. a handrail; 4. a winding shaft; 5. a switch panel; 6. a storage battery; 7. a pushing mechanism; 71. a pushing frame; 72. a first roller; 73. a stepping motor; 74. pushing the roller; 75. a pushing wheel; 76. a sleeve; 77. a nut; 78. an annular limiting groove; 8. a wire arranging frame; 9. a wire pressing frame; 10. a bobbin pressing shaft; 11. fastening a bolt; 12. a telescopic rod; 13. a universal wheel; 14. a pressure relief spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides the following technical solutions: the utility model provides a device of sunkening cord for hydraulic and hydroelectric engineering construction, includes bottom plate 1, 1 top one side fixed mounting rolling frame 2 of bottom plate, 2 top one side fixed mounting of rolling frame have handrail 3, 2 middle parts of rolling frame are rotated and are connected with rolling axle 4, 2 one side fixed mounting of rolling frame have flush mounting plate of switch 5, 2 one side bottoms of rolling frame are equipped with battery 6, 1 top one side fixed mounting of bottom plate has pushing mechanism 7, 2 top opposite sides fixed mounting of rolling frame have reason line frame 8.
Preferably: the pushing mechanism 7 comprises a pushing frame 71 fixedly mounted on one side of the top of the bottom plate 1, a first roller 72 is rotatably connected to the top of the pushing frame 71, a stepping motor 73 is fixedly mounted on one side of the pushing frame 71, and a pushing roller 74 is fixedly mounted on one side of the stepping motor 73, which penetrates through the pushing frame 71.
In a specific use, the electric wire is placed on the surface of the pushing wheel 75, and the stepping motor 73 rotates the pushing wheel 75 on the pushing roller 74 to smoothly discharge the electric wire.
Preferably, the following components: the surface of the pushing roller 74 is provided with a plurality of pushing wheels 75, and the surface of the pushing wheel 75 is provided with anti-skid rubber.
When the electric wire pushing wheel is used specifically, the anti-slip rubber on the surface of the pushing wheel 75 prevents the electric wire from falling off.
Preferably, the following components: two sides of the pushing wheel 75 are provided with sleeves 76, and one end of each sleeve 76 is provided with a nut 77 in a threaded manner.
When the wire pushing device is used specifically, the position of the pushing roller 74 is changed by sliding the sleeve 76, and the sleeve 76 is fixed on the pushing roller 74 through the nut 77, so that the pushing roller 74 can push wires of different sizes.
Preferably: the first roller 72 has a plurality of annular retaining grooves 78 formed in the surface thereof.
When the electric wire locating device is used specifically, an electric wire penetrates through the annular limiting groove 78 and is in contact with the surface of the pushing wheel 75, and the electric wire is located.
Preferably: wire pressing frames 9 are rotatably connected to two sides of the top of the wire arranging frame 8, wire pressing shafts 10 are rotatably connected to the middle of the wire pressing frames 9, and fastening bolts 11 are arranged at the rotating connection positions of the wire pressing frames 9 and the wire arranging frame 8.
During the specific use, rotate wire pressing frame 9 and adjust the lifting angle of wire pressing frame 9 to fastening bolt 11 is fixed wire pressing frame 9, passes wire pressing axle 10 with the electric wire, carries out the line ball to the electric wire, and the electric wire of being convenient for is laid.
Preferably: the bottom of the bottom plate 1 is fixedly provided with telescopic rods 12 at four corners, the bottom of each telescopic rod 12 is fixedly provided with universal wheels 13, and the outer wall of each telescopic rod 12 is sleeved with a pressure reducing spring 14.
During the specific use, when universal wheel 13 removed, telescopic link 12 contracts under the effect of decompression spring 14 and kick-backs, reduces the vibrations that receive when bottom plate 1 removed, and is more stable when making the electric wire lay.
Preferably: the stepping motor 73 is electrically connected to the switch panel 5, and the switch panel 5 is electrically connected to the battery 6.
When the stepping motor 73 is used specifically, the stepping motor 73 can be controlled by the switch panel 5.
The working principle is as follows: the electric wire wound on the winding shaft 4 is placed on the surface of the pushing wheel 75 and penetrates through the annular limiting groove 78, the electric wire is positioned, the stepping motor 73 rotates the pushing roller 74 to push the electric wire, the position of the pushing roller 74 is changed through the sliding sleeve 76, the sleeve 76 is fixed on the pushing roller 74 through the nut 77, the pushing roller 74 can push the electric wires with different sizes, the wire pressing frame 9 is rotated and the lifting angle of the wire pressing frame 9 is adjusted, the wire pressing frame 9 is fixed through the fastening bolt 11, the electric wire penetrates through the wire pressing shaft 10 to press the electric wire, the electric wire is convenient to lay, the equipment is moved by moving the universal wheel 13 at the bottom of the bottom plate 1 through the handrail 3, when the universal wheel 13 moves, the telescopic rod 12 contracts and rebounds under the action of the decompression spring 14, the vibration received when the bottom plate 1 moves is reduced, and the electric wire is more stable when being laid.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (8)
1. The utility model provides a bury line device for hydraulic and hydroelectric engineering construction, includes bottom plate (1), its characterized in that: bottom plate (1) top one side fixed mounting rolling frame (2), rolling frame (2) top one side fixed mounting has handrail (3), rolling frame (2) middle part is rotated and is connected with rolling axle (4), rolling frame (2) one side fixed mounting has flush mounting plate of switch (5), rolling frame (2) one side bottom of inclining is equipped with battery (6), bottom plate (1) top one side fixed mounting has pushing mechanism (7), rolling frame (2) top opposite side fixed mounting has reason line frame (8).
2. The line burying device for the construction of the water conservancy and hydropower engineering according to claim 1, characterized in that: push mechanism (7) including fixed mounting in pushing frame (71) of bottom plate (1) top one side, it is connected with first roller bearing (72) to push frame (71) top rotation, push frame (71) one side fixed mounting have step motor (73), step motor (73) output runs through and pushes frame (71) one side fixed mounting and push roller bearing (74).
3. A thread burial device for hydraulic and hydroelectric engineering construction according to claim 2, wherein: the surface of the pushing rolling shaft (74) is provided with a plurality of pushing wheels (75), and the surface of each pushing wheel (75) is provided with anti-skid rubber.
4. A thread burial device for hydraulic and hydroelectric engineering construction according to claim 3, wherein: the two sides of the pushing wheel (75) are provided with sleeves (76), and one end of each sleeve (76) is provided with a nut (77) in a threaded mode.
5. A thread burial device for hydraulic and hydroelectric engineering construction according to claim 2, wherein: a plurality of annular limiting grooves (78) are formed in the surface of the first rolling shaft (72).
6. The line burying device for the construction of the water conservancy and hydropower engineering according to claim 1, characterized in that: wire pressing frames (9) are rotatably connected to two sides of the top of the wire arranging frame (8), wire pressing shafts (10) are rotatably connected to the middle of the wire pressing frames (9), and fastening bolts (11) are arranged at the rotating connection positions of the wire pressing frames (9) and the wire arranging frame (8).
7. The line burying device for the construction of the hydraulic and hydroelectric engineering according to claim 1, characterized in that: bottom plate (1) bottom four corners fixed mounting has telescopic link (12), telescopic link (12) bottom fixed mounting has universal wheel (13), telescopic link (12) outer wall cover is equipped with decompression spring (14).
8. A thread burial device for hydraulic and hydroelectric engineering construction according to claim 2, wherein: the stepping motor (73) is electrically connected with the switch panel (5), and the switch panel (5) is electrically connected with the storage battery (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220025187.0U CN217240138U (en) | 2022-01-06 | 2022-01-06 | A bury traditional thread binding putting for hydraulic and hydroelectric engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220025187.0U CN217240138U (en) | 2022-01-06 | 2022-01-06 | A bury traditional thread binding putting for hydraulic and hydroelectric engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217240138U true CN217240138U (en) | 2022-08-19 |
Family
ID=82828891
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220025187.0U Active CN217240138U (en) | 2022-01-06 | 2022-01-06 | A bury traditional thread binding putting for hydraulic and hydroelectric engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217240138U (en) |
-
2022
- 2022-01-06 CN CN202220025187.0U patent/CN217240138U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN217240138U (en) | A bury traditional thread binding putting for hydraulic and hydroelectric engineering construction | |
CN210768592U (en) | Drilling equipment for building foundation reinforcement | |
CN214994186U (en) | Ground flattening device for municipal works construction | |
CN215009307U (en) | Special cable erection device for building electromechanical installation | |
CN212452447U (en) | Water conservancy construction building bearing structure | |
CN209963649U (en) | Low-voltage cable laying support | |
CN210134433U (en) | Construction management is with consolidating bearing structure | |
CN211761320U (en) | Retractable reinforcing bar processing platform | |
CN219576505U (en) | Fixed support structure of electric pipeline for municipal works | |
CN209844374U (en) | Supporting device for electric power installation | |
CN219867100U (en) | Electromechanical device installation device | |
CN112499364B (en) | Pay-off is used in construction of power transmission and distribution power consumption electric engineering | |
CN216553737U (en) | Transformer substation's primary equipment overhauls with preventing that personnel from stepping on supplementary insulating ladder empty | |
CN216617072U (en) | Auxiliary mounting device for telegraph pole | |
CN211976426U (en) | Telescopic triangular support | |
CN218976182U (en) | A bury line device for hydraulic and hydroelectric engineering | |
CN220623368U (en) | Installation fixing device for environmental protection equipment | |
CN213831840U (en) | Supporting device for building electrical equipment | |
CN217920883U (en) | Cable erecting device for building electromechanical installation | |
CN220754140U (en) | Movable support assembly for outdoor power station box | |
CN215807196U (en) | Can reduce municipal works of vibrations and use hank mill | |
CN218095148U (en) | Electric automation equipment installation device for building electrical engineering | |
CN212553720U (en) | Integral pneumatic bottom laying tool | |
CN211619628U (en) | Rotary fixed pulley bracket | |
CN220469956U (en) | Support protection device for geotechnical engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240218 Address after: No.71-5-2401 Xinjinci Road, Wanbailin District, Taiyuan City, Shanxi Province, 030000 Patentee after: Shanxi Guoyu Construction Group Co.,Ltd. Country or region after: China Address before: No. 68-3, Xiangdong Street, Xiangfang District, Harbin City, Heilongjiang Province, 150000 Patentee before: Gao Shangshang Country or region before: China |