CN217234652U - Building engineering water supply pipe fixing device - Google Patents
Building engineering water supply pipe fixing device Download PDFInfo
- Publication number
- CN217234652U CN217234652U CN202220159201.6U CN202220159201U CN217234652U CN 217234652 U CN217234652 U CN 217234652U CN 202220159201 U CN202220159201 U CN 202220159201U CN 217234652 U CN217234652 U CN 217234652U
- Authority
- CN
- China
- Prior art keywords
- snap ring
- clamping ring
- water supply
- fixing device
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model provides a building engineering water supply pipeline fixing device, include: the mounting base is symmetrically provided with fixing bolt holes at two sides of the mounting base, the middle part of the mounting base is provided with the first snap ring, one side of the first snap ring and one side of the second snap ring of the utility model are connected through the movable hinge, the other side is fixed through the fastening bolt, only the fastening bolt at one side needs to be fixed during mounting, thereby saving a great deal of mounting time, a first support rod and a second support rod are arranged on the first snap ring and the second snap ring, the first support rod and the second support rod are pushed inwards by the acting force of the first spring and the second spring, the water inlet pipe is fixed, the water inlet pipe is suitable for water inlet pipes with different diameters, the position of the connecting rod can be adjusted through a hand wheel, so that the elasticity of the first adjusting spring is adjusted to be suitable for fixing different water inlet pipes, the protection effect is achieved, and the damage to the water inlet pipes due to overlarge fastening force is avoided.
Description
Technical Field
The utility model relates to a building engineering equipment technical field, in particular to building engineering water supply pipeline fixing device.
Background
In the building engineering construction, the installation and the fixation of the water supply pipeline of the building engineering are a vital work, which not only ensures the water quantity needed in the high-rise construction, but also is more important for the residents to live normally in the future. Compared with the traditional pipeline, the water supply pipeline has the advantages of light weight, corrosion resistance, small water flow resistance, energy conservation, rapidness in installation, low manufacturing cost and the like, is greatly popularized and applied, and has remarkable benefits.
The existing water inlet pipeline fixing device has certain defects, is relatively troublesome to install, wastes time, and causes damage to a water inlet pipe due to too large fastening force.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned not enough among the prior art, the utility model provides a building engineering water supply pipe fixing device.
In order to achieve the above object, the utility model adopts the following technical scheme:
a fixing device for a water supply pipeline of constructional engineering comprises: the mounting base is symmetrically provided with fixing bolt holes at two sides of the mounting base, a first snap ring is arranged in the middle of the mounting base, one side of the first snap ring is provided with a movable hinge, a second snap ring is arranged above the first snap ring, a first through hole is formed in the second snap ring, a connecting rod is arranged in the first through hole, a groove is formed in the connecting rod, a first spring is arranged in the groove, a first supporting rod is arranged in the groove, a first limiting plate is arranged at one side, close to the bottom of the groove, of the first supporting rod, an anti-skid plate is arranged at one end, far away from the first limiting plate, of the first supporting rod, a limiting block is arranged on the inner wall of the groove, close to an opening, a hand wheel is arranged at one end, far away from the first supporting rod, of the connecting rod, a second through hole is symmetrically formed in the first snap ring, a second supporting rod is arranged in the second through hole, one end of the second supporting rod is provided with a second limiting plate, a second spring is sleeved on the second supporting rod, and an anti-skid plate is arranged at one end, far away from the second limiting plate, of the second supporting rod.
As an improvement, the first clamping ring and the second clamping ring are symmetrically provided with fixing blocks at one side far away from the movable hinge, fastening bolt holes are formed in the fixing blocks, fastening bolts are arranged inside the fastening bolt holes, and the first clamping ring and the second clamping ring are fixed through the fastening bolts.
As an improvement, the first clamping ring and the second clamping ring are fixedly connected through the movable hinge.
As an improvement, the antiskid plates are located on the inner sides of the first clamping ring and the second clamping ring, and the antiskid plates are made of rubber materials.
As an improvement, the spring is located between the anti-skid plate and the first snap ring.
The beneficial effects of the utility model are that:
the utility model discloses a one side of first snap ring and second snap ring makes and carries out the connection through the activity hinge, the opposite side is fixed through fastening bolt, only need during the installation the fastening bolt of fixed one side can, a large amount of installation time has been saved, there are bracing piece one and bracing piece two on first snap ring and second snap ring, effort through spring one and spring two, push bracing piece one and bracing piece two to inboard, fix the inlet tube, be applicable to the inlet tube of different diameters, and can adjust the position of connecting rod through the hand wheel, so that the elasticity of regulating spring one, with the fixing of being suitable for different inlet tubes, the effect that has the protection to it, it is too big to avoid fastening power, cause the damage to the inlet tube.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A in FIG. 1;
fig. 3 is an enlarged schematic view of a portion B in fig. 1.
Reference numerals comparison table:
1. installing a base; 2. fixing bolt holes; 3. a first snap ring; 4. a living hinge; 5. a second snap ring; 6. a second through hole; 7. a fixed block; 8. fastening bolt holes; 9. fastening a bolt; 10. a first through hole; 11. a connecting rod; 12. a groove; 13. a first spring; 14. a first supporting rod; 15. an anti-skid plate; 16. a second supporting rod; 17. a second spring; 18. a second limiting plate; 19. a first limiting plate; 20. a limiting block; 21. a handwheel.
Detailed Description
In order to make the content of the present invention more clearly understood, the technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the attached drawings in the embodiment of the present invention. In which like parts are designated by like reference numerals. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
As shown in fig. 1, a fixing device for a water supply pipe in construction engineering comprises: the base 1 is mounted.
The anti-skidding type mounting base is characterized in that fixing bolt holes 2 are symmetrically formed in two sides of the mounting base 1, a first clamping ring 3 is arranged in the middle of the mounting base 1, a movable hinge 4 is arranged on one side of the first clamping ring 3, a second clamping ring 5 is arranged above the first clamping ring 3, a first through hole 10 is formed in the middle of the second clamping ring 5, a connecting rod 11 is arranged inside the first through hole 10, a groove 12 is formed inside the connecting rod 11, a first spring 13 is arranged inside the groove 12, a first supporting rod 14 is arranged inside the groove 12, a first limiting plate 19 is arranged on one side, close to the bottom of the groove 12, of the first supporting rod 14, an anti-skidding plate 15 is arranged at one end, away from the first limiting plate 19, of the first supporting rod 14, a limiting block 20 is arranged on the inner wall of the groove 12 and close to an opening, and a hand wheel 21 is arranged at one end, away from the first supporting rod 14, of the connecting rod 11, the symmetry is equipped with two through-holes 6 on the first snap ring 3, the inside of two through-holes 6 is equipped with two bracing pieces 16, the one end of two bracing pieces 16 is equipped with two limiting plates 18, the cover is equipped with two springs 17 on two bracing pieces 16, two 16 keeping away from of bracing piece the one end of two limiting plates 18 is equipped with antiskid ribbed tile 15.
Referring to fig. 1, the first snap ring 3 and the second snap ring 5 are separated from one side of the movable hinge 4 and are symmetrically provided with fixing blocks 7, the fixing blocks 7 are provided with fastening bolt holes 8, fastening bolts 9 are arranged inside the fastening bolt holes 8, the first snap ring 3 and the second snap ring 5 are fixed through the fastening bolts 9, and the first snap ring 3 and the second snap ring 5 are fixedly connected with the movable hinge 4.
The utility model discloses at its during operation, open first snap ring 3 and second snap ring 5, there is living hinge 4 to connect one side, puts into the inlet tube in first snap ring 3 and second snap ring 5, and rethread fastening bolt 9 is fixed.
Referring to fig. 1, the anti-slip plate 15 is located on the inner side of the first snap ring 3 and the second snap ring 5, the anti-slip plate 15 is made of rubber, and the second spring 17 is located between the anti-slip plate 15 and the first snap ring 3.
The utility model discloses at its during operation, bracing piece one 14 and bracing piece two 16 remove to the inboard of first snap ring 3 and second snap ring 5 under the effect of spring one 13 and spring two 17 respectively, fix the inboard inlet tube, and antiskid ribbed tile 15 contacts with the surface of inlet tube, can effectively prevent the slip of inlet tube to and protect the surface of inlet tube.
The utility model discloses at its during operation, will install base 1 and fix through fastening bolt and bottom surface, open first snap ring 3 and second snap ring 5, put into the inlet tube, fasten through fastening bolt 9, adjust the position of connecting rod 11, the fastening degree of an adjusting spring 13 through hand wheel 21.
The above description is only for the preferred embodiment of the present invention and should not be taken as limiting the scope of the present invention, and any modifications, equivalent replacements, and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. A fixing device for a water supply pipeline in constructional engineering is characterized by comprising: the mounting base (1), fixing bolt holes (2) are symmetrically arranged on two sides of the mounting base (1), a first clamping ring (3) is arranged in the middle of the mounting base (1), a movable hinge (4) is arranged on one side of the first clamping ring (3), a second clamping ring (5) is arranged above the first clamping ring (3), a first through hole (10) is arranged in the middle of the second clamping ring (5), a connecting rod (11) is arranged inside the first through hole (10), a groove (12) is arranged inside the connecting rod (11), a first spring (13) is arranged inside the groove (12), a first support rod (14) is arranged inside the groove (12), a first limiting plate (19) is arranged on one side, close to the bottom of the groove (12), of the first support rod (14), and an anti-skid plate (15) is arranged at one end, far away from the first limiting plate (19), of the first support rod (14), be close to the opening part on the inner wall of recess (12) and be equipped with stopper (20), keep away from connecting rod (11) the one end of bracing piece (14) is equipped with hand wheel (21), the symmetry is equipped with through-hole two (6) on first snap ring (3), the inside of through-hole two (6) is equipped with bracing piece two (16), the one end of bracing piece two (16) is equipped with limiting plate two (18), the cover is equipped with spring two (17) on bracing piece two (16), keep away from bracing piece two (16) the one end of limiting plate two (18) is equipped with antiskid ribbed tile (15).
2. The fixing device for the water supply pipeline in the building engineering is characterized in that fixing blocks (7) are symmetrically arranged on one sides, far away from the movable hinge (4), of the first clamping ring (3) and the second clamping ring (5), fastening bolt holes (8) are formed in the fixing blocks (7), fastening bolts (9) are arranged inside the fastening bolt holes (8), and the first clamping ring (3) and the second clamping ring (5) are fixed through the fastening bolts (9).
3. A water supply pipe fixing device for building engineering according to claim 2, characterized in that the first snap ring (3) and the second snap ring (5) are fixedly connected through the movable hinge (4).
4. A fixing device for a water supply pipe in building engineering according to claim 3, characterized in that the anti-skid plate (15) is located inside the first snap ring (3) and the second snap ring (5), and the material of the anti-skid plate (15) is rubber.
5. A fixing device for a water supply pipe in building engineering according to claim 1, characterized in that the second spring (17) is located between the anti-skid plate (15) and the first snap ring (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220159201.6U CN217234652U (en) | 2022-01-21 | 2022-01-21 | Building engineering water supply pipe fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220159201.6U CN217234652U (en) | 2022-01-21 | 2022-01-21 | Building engineering water supply pipe fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217234652U true CN217234652U (en) | 2022-08-19 |
Family
ID=82831712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220159201.6U Active CN217234652U (en) | 2022-01-21 | 2022-01-21 | Building engineering water supply pipe fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217234652U (en) |
-
2022
- 2022-01-21 CN CN202220159201.6U patent/CN217234652U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN217234652U (en) | Building engineering water supply pipe fixing device | |
CN106838474A (en) | A kind of pipeline elevator with regulatory function | |
CN213509665U (en) | Auxiliary device for mounting curtain wall | |
CN214460954U (en) | Support arrangement of adjustable water pipe slope | |
CN213498851U (en) | Pipeline strutting arrangement for municipal construction | |
CN213117763U (en) | Quick-assembly fixing fastener for water pipe for building | |
CN212156073U (en) | Building engineering water supply pipe fixing device | |
CN210164223U (en) | Inserted lift scaffold fixing device | |
CN214314101U (en) | Power distribution cabinet mounting structure | |
CN208571982U (en) | A kind of solar panels supporting structure of novel maintenance easy to install | |
CN215617697U (en) | Positioner is used in production of PPR pipe | |
CN219734625U (en) | Pipe network slotting and pipe burying device | |
CN214534826U (en) | Safety device for hydraulic and hydroelectric engineering | |
CN218944191U (en) | H-shaped steel safety flat net suspension device | |
CN213177273U (en) | Anti-seismic support with loading capacity | |
CN219465986U (en) | Clamping device suitable for cast iron pipe fitting processing | |
CN214662793U (en) | Rotary joint support | |
CN215410531U (en) | Municipal administration is pipeline fixing device for water supply and drainage | |
CN212691043U (en) | Mounting and fixing device for building drain pipe | |
CN220228096U (en) | Anti-seismic bracket hoop | |
CN214044853U (en) | Adjustable bridge | |
CN213839852U (en) | Top-hung support for water pipe | |
CN216552352U (en) | Flexible cut-off device | |
CN220029308U (en) | Auxiliary device for quickly installing lock nut | |
CN220703021U (en) | Hoisting mechanism and hydropower station thrust bearing oil cooler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |