CN217231885U - Temporary slope protection structure for traffic engineering construction management - Google Patents

Temporary slope protection structure for traffic engineering construction management Download PDF

Info

Publication number
CN217231885U
CN217231885U CN202220320373.7U CN202220320373U CN217231885U CN 217231885 U CN217231885 U CN 217231885U CN 202220320373 U CN202220320373 U CN 202220320373U CN 217231885 U CN217231885 U CN 217231885U
Authority
CN
China
Prior art keywords
plate
engineering construction
traffic engineering
slope protection
construction management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220320373.7U
Other languages
Chinese (zh)
Inventor
任虎
张岩
马世洲
孙娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220320373.7U priority Critical patent/CN217231885U/en
Application granted granted Critical
Publication of CN217231885U publication Critical patent/CN217231885U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a traffic engineering construction management is with interim slope protection structure, including the hang plate, still include adjustment mechanism, adjustment mechanism is installed to the inside wall of hang plate, adjustment mechanism comprises guard plate, bolt, nut and the combination of clamp groove, the clamp groove has been seted up to the one end of hang plate, the inside wall in clamp groove passes through bolted connection with the lateral wall of guard plate, the lateral wall threaded connection of bolt has the nut. The size of the adjustable mechanism can be adjusted, and slopes with different sizes can be protected; and the fixing structure is convenient for people to fix the structure, so that the use by the people is convenient.

Description

Temporary slope protection structure for traffic engineering construction management
Technical Field
The utility model relates to an interim slope protection structure technical field, in particular to traffic engineering construction management is with interim slope protection structure.
Background
In the course of traffic engineering construction, need carry out interim bank protection to the operation area that does not complete the completion usually to avoid the pedestrian to trample, add the slope protection structure simultaneously and can avoid the soil landslide.
However, the existing soil slope protection structure can not absorb the moisture in the soil during the actual use, so that the moisture in the soil can easily permeate into the slope protection structure, the slope protection structure can not reliably protect the soil due to the increase of the dead weight caused by the absorption of the moisture, and the actual use is not facilitated.
It is therefore desirable to upgrade and transform on the basis of existing temporary slope protection structures to overcome the existing problems and deficiencies.
Patent No. 201822080010.7 discloses a traffic engineering construction management is with interim slope protection structure belongs to traffic engineering technical field, including protecting the slope body and connecting plate, the connecting plate is located one side of protecting the slope body, and connecting plate and slope protection body fixed connection, the one end fixedly connected with soil layer of protecting the slope body, the inboard evenly distributed of protecting the slope body has the slotted hole, the inboard of slotted hole all is equipped with the recess grabs the board, the equal fixedly connected with bradyseism spring in one side of recess grabs the board, and the one end of bradyseism spring all with slope protection body fixed connection. This kind of traffic engineering construction management is with interim slope protection structure stable in structure, and grab the board through slotted hole and recess and can make this equipment can real-time absorption soil moisture that oozes to make the partial moisture in the soil can flow into hollow recess and grab the inboard inside, make this equipment can effectually combine together with soil, avoid slope protection structure to take place the landing.
This traffic engineering construction management is with interim slope protection structure has following drawback: 1. the structure cannot adjust the size, so that the slope protection of different sizes is inconvenient; 2. the inconvenient personnel of this structure are fixed and lead to the inconvenient personnel of structure to use. Therefore, a temporary slope protection structure for traffic engineering construction management is provided.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims at providing a temporary slope protection structure for traffic engineering construction management, which can adjust the size through an adjusting mechanism and can protect slopes with different sizes; and the fixing structure is convenient for personnel to fix the structure, the personnel use the structure conveniently, and the problems in the background technology can be effectively solved.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a traffic engineering construction management is with interim slope protection structure, includes the hang plate, still includes adjustment mechanism, adjustment mechanism is installed to the inside wall of hang plate, adjustment mechanism comprises guard plate, bolt, nut and the combination of clamp groove, the clamp groove has been seted up to the one end of hang plate, the inside wall in clamp groove passes through bolted connection with the lateral wall of guard plate, the lateral wall threaded connection of bolt has the nut.
Further, still include fixed establishment, fixed establishment is installed to the other end of hang plate, and fixed establishment makes things convenient for fixed to the structure.
Further, fixed establishment comprises bottom plate, handle, ripple pole and conical head combination, the bottom plate is installed to the other end of hang plate, the lateral wall threaded connection of bottom plate has the ripple pole, the conical head is installed to the other end of ripple pole, the handle is installed to the one end of ripple pole, and is fixed with ground through the ripple pole is convenient.
Furthermore, the bottom of bottom plate is installed the pulley, conveniently removes the structure.
Furthermore, the outer side wall of the protection plate is provided with a sliding groove, and the bolt penetrates through the sliding groove and is conveniently connected with the inclined plate and the protection plate.
Compared with the prior art, the utility model discloses following beneficial effect has: 1. the adjusting mechanism is installed on the inner side wall of the inclined plate, the adjusting mechanism is composed of a protection plate, a bolt, a nut and a clamping groove in a combined mode, a clamping groove is formed in one end of the inclined plate, one end of the protection plate is located in the clamping groove, the protection plate can move in one end of the inclined plate, the bolt penetrates through the inclined plate, a sliding groove is formed in the outer side wall of the protection plate, the bolt penetrates through the sliding groove, the sliding groove can be limited by the bolt, when a person protects a slope, the protection plate and the inclined plate are protected from the slope by pulling the protection plate, the nut is connected to the outer side wall of the bolt in a threaded mode, the nut is fastened, the protection plate can be fixed in the inclined plate by the nut in a pressing mode, and therefore slopes of different sizes can be protected conveniently;
2. fixing mechanism is installed to the other end of hang plate, fixing mechanism is by the bottom plate, a handle, ripple pole and conical head combination constitute, the bottom plate is installed to the other end of hang plate, when personnel are fixed to the structure, place the bottom plate in ground department, because the lateral wall threaded connection of bottom plate has the ripple pole, the handle is installed to the one end of ripple pole, thereby personnel rotate the handle, make the ripple pole rotate at the lateral wall of bottom plate, the conical head is installed to the other end of ripple pole, thereby insert ground department with the conical head, personnel rotate the handle, make the ripple pole rotate at the lateral wall on ground, thereby the convenience is fixed the structure, make things convenient for personnel to use.
Drawings
Fig. 1 is the utility model relates to a traffic engineering construction management is with interim slope protection structure's overall structure schematic diagram.
Fig. 2 is the utility model relates to a traffic engineering construction management is with interim bank protection structure's adjustment mechanism schematic diagram.
In the figure: 1. an inclined plate; 2. a fixing mechanism; 201. a base plate; 202. a handle; 203. a corrugated rod; 204. a conical head; 3. a pulley; 4. an adjustment mechanism; 401. a protection plate; 402. a bolt; 403. a nut; 404. a clamping groove; 5. a chute.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-2, a temporary slope protection structure for traffic engineering construction management includes an inclined plate 1 and an adjusting mechanism 4, the adjusting mechanism 4 is installed on the inner side wall of the inclined plate 1, the adjusting mechanism 4 is formed by combining a protection plate 401, a bolt 402, a nut 403 and a clamping groove 404, the clamping groove 404 is formed at one end of the inclined plate 1, the inner side wall of the clamping groove 404 is connected with the outer side wall of the protection plate 401 through the bolt 402, and the nut 403 is connected to the outer side wall of the bolt 402 through a thread.
Wherein, still include fixed establishment 2, fixed establishment 2 is installed to the other end of hang plate 1, and fixed establishment 2 is convenient to the structure fixed.
Wherein, fixed establishment 2 comprises bottom plate 201, handle 202, ripple pole 203 and conical head 204 combination, bottom plate 201 is installed to the other end of hang plate 1, the lateral wall threaded connection of bottom plate 201 has ripple pole 203, conical head 204 is installed to the other end of ripple pole 203, handle 202 is installed to the one end of ripple pole 203, and is convenient fixed with ground through ripple pole 203.
Wherein, pulley 3 is installed to the bottom of bottom plate 201, and the convenience is to the structure removal.
Wherein, spout 5 has all been seted up to the lateral wall of guard plate 401, and bolt 402 runs through spout 5, conveniently is connected with hang plate 1 and guard plate 401.
It should be noted that, the utility model relates to a temporary slope protection structure for traffic engineering construction management, in operation, the inside wall of the inclined plate 1 is provided with the adjusting mechanism 4, the adjusting mechanism 4 is composed of a protection plate 401, a bolt 402, a nut 403 and a clamping groove 404, one end of the inclined plate 1 is provided with the clamping groove 404, one end of the protection plate 401 is located in the clamping groove 404, so that the protection plate 401 can move in one end of the inclined plate 1, the bolt 402 runs through the inclined plate 1, because the outside wall of the protection plate 401 is provided with the chute 5, the bolt 402 runs through the chute 5, so that the bolt 402 can limit the chute 5, when a person protects a slope, by pulling the protection plate 401, the protection plate 401 and the inclined plate 1 are protected from the slope, the outside wall of the bolt 402 is in threaded connection with the nut 403, so as to fasten the nut 403, so that the nut 403 extrudes the outside wall of the inclined plate 1, can fix protection plate 401 in hang plate 1, thereby the convenience is protected not unidimensional slope, fixed establishment 2 is installed to the other end of hang plate 1, fixed establishment 2 is by bottom plate 201, handle 202, corrugated rod 203 and conical head 204 combination constitute, bottom plate 201 is installed to the other end of hang plate 1, when personnel are fixed to the structure, place bottom plate 201 in ground department, because the lateral wall threaded connection of bottom plate 201 has corrugated rod 203, handle 202 is installed to the one end of corrugated rod 203, thereby personnel rotate handle 202, make corrugated rod 203 rotate at the lateral wall of bottom plate 201, conical head 204 is installed to the other end of corrugated rod 203, thereby insert ground department with conical head 204, personnel rotate handle 202, make corrugated rod 203 rotate at the lateral wall on ground, thereby the convenience is fixed the structure, make things convenient for personnel to use.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a traffic engineering construction management is with interim slope protection structure, includes hang plate (1), its characterized in that still includes adjustment mechanism (4), adjustment mechanism (4) are installed to the inside wall of hang plate (1), adjustment mechanism (4) comprise protection plate (401), bolt (402), nut (403) and clamp groove (404) combination, clamp groove (404) have been seted up to the one end of hang plate (1), the inside wall that presss from both sides groove (404) passes through bolt (402) with the lateral wall of protection plate (401) and is connected, the lateral wall threaded connection of bolt (402) has nut (403).
2. The temporary slope protection structure for traffic engineering construction management according to claim 1, characterized in that: the device is characterized by further comprising a fixing mechanism (2), wherein the fixing mechanism (2) is installed at the other end of the inclined plate (1).
3. The temporary slope protection structure for traffic engineering construction management according to claim 2, characterized in that: fixed establishment (2) are by bottom plate (201), handle (202), ripple pole (203) and awl head (204) combination constitution, bottom plate (201) are installed to the other end of hang plate (1), the lateral wall threaded connection of bottom plate (201) has ripple pole (203), awl head (204) are installed to the other end of ripple pole (203), handle (202) are installed to the one end of ripple pole (203).
4. The temporary slope protection structure for traffic engineering construction management according to claim 3, characterized in that: and a pulley (3) is arranged at the bottom of the bottom plate (201).
5. The temporary slope protection structure for traffic engineering construction management according to claim 1, characterized in that: the outer side wall of the protection plate (401) is provided with sliding grooves (5), and the bolts (402) penetrate through the sliding grooves (5).
CN202220320373.7U 2022-02-17 2022-02-17 Temporary slope protection structure for traffic engineering construction management Active CN217231885U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220320373.7U CN217231885U (en) 2022-02-17 2022-02-17 Temporary slope protection structure for traffic engineering construction management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220320373.7U CN217231885U (en) 2022-02-17 2022-02-17 Temporary slope protection structure for traffic engineering construction management

Publications (1)

Publication Number Publication Date
CN217231885U true CN217231885U (en) 2022-08-19

Family

ID=82836071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220320373.7U Active CN217231885U (en) 2022-02-17 2022-02-17 Temporary slope protection structure for traffic engineering construction management

Country Status (1)

Country Link
CN (1) CN217231885U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117248544A (en) * 2023-11-07 2023-12-19 正军项目管理集团有限公司 Temporary slope protection device for engineering construction management

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117248544A (en) * 2023-11-07 2023-12-19 正军项目管理集团有限公司 Temporary slope protection device for engineering construction management
CN117248544B (en) * 2023-11-07 2024-05-07 正军项目管理集团有限公司 Temporary slope protection device for engineering construction management

Similar Documents

Publication Publication Date Title
CN217231885U (en) Temporary slope protection structure for traffic engineering construction management
CN107675624B (en) Universal assembled telescopic buttress for disc buckle type cat ladder
CN210088332U (en) Visual burglar alarm system camera installation device
CN206522590U (en) A kind of multi-functional monitoring device mounting bracket
CN211472309U (en) Anti-collision traffic guardrail capable of being rapidly disassembled
CN210798486U (en) Electric power construction rail
CN206592476U (en) A kind of pilot lifting mechanism counter weight device
CN216617149U (en) Rail guard and long fence of rail guard with adjustable length
CN207665653U (en) A kind of trees stealth support system
CN206722514U (en) One kind communication drag-line angle steel tower
CN208777691U (en) A kind of fixed device of the anti-bank of aluminum alloy mould plate
CN220476333U (en) Positioning mechanism for grab rail of mower
CN212406193U (en) Multifunctional safety protection device for high-rise building construction
CN207752637U (en) A kind of road traffic speed intelligent monitoring device
CN206448351U (en) A kind of well lid with warning cone
CN213026764U (en) Anti-drop's track signal connection line installation device
CN205990780U (en) One kind is safe, easy-to-dismount to face frontier defense protection unit
CN219513989U (en) Power station fixing device
CN216305355U (en) All-steel climbing frame wall-attached support device
CN216043028U (en) Safety device for preventing pile hole from falling into pile hole
CN218035885U (en) Sampling device is used in hydraulic engineering reconnaissance
CN204089035U (en) A kind of transmission line pole tower ascent aid
CN220889792U (en) Guardrail for construction
CN211393638U (en) Crawler crane pull rod length-adjustable structure
CN213233193U (en) Traffic warning post convenient to dismouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant