CN217230040U - Engineering construction wisdom building site informatization tower crane monitoring facilities - Google Patents

Engineering construction wisdom building site informatization tower crane monitoring facilities Download PDF

Info

Publication number
CN217230040U
CN217230040U CN202220641093.6U CN202220641093U CN217230040U CN 217230040 U CN217230040 U CN 217230040U CN 202220641093 U CN202220641093 U CN 202220641093U CN 217230040 U CN217230040 U CN 217230040U
Authority
CN
China
Prior art keywords
main part
tower crane
spacing
building site
crane monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220641093.6U
Other languages
Chinese (zh)
Inventor
吴星蓉
王建平
吴小燕
周磊
秦萍
魏宏亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yang Zhongshu
Original Assignee
Gansu Construction Investment Science And Technology Research And Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Construction Investment Science And Technology Research And Development Co ltd filed Critical Gansu Construction Investment Science And Technology Research And Development Co ltd
Priority to CN202220641093.6U priority Critical patent/CN217230040U/en
Application granted granted Critical
Publication of CN217230040U publication Critical patent/CN217230040U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model belongs to the technical field of the wisdom building site, especially, be an engineering construction wisdom building site informationization tower crane monitoring facilities, comprising a main body, the lower extreme of main part is provided with and is used for the spacing indiscriminate line frame of putting that prevents of pencil, the lower extreme of main part still is provided with and is used for supporting the bottom plate of putting the line frame. The bottom plate is arranged at the lower end of the main body, the wiring harness is placed in the jacket in order, the wiring harness is further wound on the outer side of the shaft sleeve, redundant wiring harnesses can be stored and prevented from being scattered, the operation is simple, the space occupied by the wiring harness can be greatly reduced, other operations are prevented from being influenced, and the using effect is improved; can drive the slide through the pulling link and slide in the inside of spacing seat, can be with the lower extreme of main part ejecting regulation use angle forward this moment, further can drive spacer pin automatic re-setting in the inside of locating hole through the spring and fix the slide, easy operation can be convenient be fixed in different use angles with the main part.

Description

Engineering construction wisdom building site informationization tower crane monitoring facilities
Technical Field
The utility model belongs to the technical field of the wisdom building site, concretely relates to engineering construction wisdom building site informationization tower crane monitoring facilities.
Background
The tower crane is the most commonly used hoisting equipment on the building site, is also called "tower crane", with the extension (height) of a lesson, is used for hanging the raw and other materials of construction such as reinforcing bar, stupefied, concrete, steel pipe of construction usefulness, and the tower crane is the essential equipment on the building site, can use an engineering construction wisdom building site informatization tower crane monitoring facilities in the use of tower crane often.
More pencil need be connected when original equipment is used, and the pencil is longer and the driver's cabin inner space is limited, makes the pencil winding influence other operations use easily, and equipment is fixed can't adapt to different working angle and use comparatively inconveniently when using.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an engineering construction wisdom building site informatization tower crane monitoring facilities, for solving the above-mentioned problem that exists among the prior art, the utility model provides an engineering construction wisdom building site informatization tower crane monitoring facilities has can conveniently accomodate the pencil and prevent in disorder and can be fixed in different work angle convenient to use's characteristics with equipment.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an engineering construction wisdom building site informatization tower crane monitoring facilities, includes the main part, the lower extreme of main part is provided with and is used for the spacing indiscriminate line frame of putting that prevents of pencil, the lower extreme of main part still is provided with the bottom plate that is used for supporting the line frame of putting, the front end of bottom plate is provided with the spacing backup pad in both ends that is used for putting the line frame, the inside of backup pad is provided with the spacing frame that is used for accomodating the pencil, the outside cover of spacing frame is equipped with and is used for driving the rotatory axle sleeve that makes it receive and release of pencil, the rear end of main part is provided with and is used for forming the base that supports to the main part, upper end one side of base is provided with and is used for the spacing connecting plate of upper end position with the main part.
As the utility model discloses an engineering construction wisdom building site information-based tower crane monitoring facilities preferred technical scheme, the rear end of main part is provided with and is used for forming the axle bed of being connected with the connecting plate rotation, the lower extreme position that is close to of main part rear end rotates to be connected in the link that is used for adjusting the use angle of main part.
As the utility model discloses a preferred technical scheme of engineering construction wisdom building site information-based tower crane monitoring facilities, the one end of link is provided with and is used for the spacing slide of link, the both ends position of the inboard of base is provided with and is used for the spacing seat of slide.
As the utility model discloses an engineering construction wisdom building site information-based tower crane monitoring facilities preferred technical scheme, the inboard equidistant locating hole that is used for being fixed in different positions with the slide of having seted up of base, the inside of slide is provided with and is used for the block to connect in the inside of locating hole with the spacer pin that the locating hole is fixed.
As the utility model discloses a preferred technical scheme of engineering construction wisdom building site information-based tower crane monitoring facilities, the one end outside cover of spacer pin is equipped with and is used for driving spacer pin automatic re-setting's spring, one side of slide is provided with and is used for spacing box with spacer pin and spring.
As the utility model discloses a preferred technical scheme of engineering construction wisdom building site information-based tower crane monitoring facilities, one side equidistant of putting the line frame is provided with many places and is used for the clamp cover with the pencil centre gripping.
Compared with the prior art, the beneficial effects of the utility model are that: the bottom plate is arranged at the lower end of the main body, and the wire harness is placed in the clamping sleeve, so that the wire harness can be placed in order, the wire harness is further wound on the outer side of the shaft sleeve, redundant wire harnesses can be stored and prevented from being scattered, the operation is simple, the space occupied by the wire harness can be greatly reduced, other operations are prevented from being influenced, and the using effect is improved; can drive the slide through the pulling link and slide in the inside of spacing seat, can be with the lower extreme of main part ejecting regulation application angle forward this moment, further can drive spacer pin automatic re-setting in the inside of locating hole through the spring and fix the slide, easy operation can be convenient be fixed in different application angles with the main part.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the overall appearance structure of the present invention;
FIG. 2 is a schematic view of the rear end of the main body according to the present invention;
FIG. 3 is a schematic view of the connecting portion of the base and the main body according to the present invention;
fig. 4 is a schematic view of a part a of the present invention;
FIG. 5 is a schematic view of a part of the structure of the wire rack of the present invention;
in the figure: 1. a main body; 2. a wire placing frame; 3. a base plate; 4. a support plate; 5. a limiting frame; 6. a shaft sleeve; 7. a base; 8. a connecting plate; 9. a shaft seat; 10. a connecting frame; 11. a slide plate; 12. a limiting seat; 13. positioning holes; 14. a spacing pin; 15. a spring; 16. a limiting box; 17. and a jacket.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides the following technical solutions: the utility model provides an engineering construction wisdom building site information-based tower crane monitoring facilities, including main part 1, the lower extreme of main part 1 is provided with and is used for the spacing indiscriminate line frame 2 of putting that prevents of pencil, the lower extreme of main part 1 still is provided with the bottom plate 3 that is used for supporting line frame 2, the front end of bottom plate 3 is provided with and is used for the spacing backup pad 4 in both ends with putting line frame 2, the inside of backup pad 4 is provided with the spacing frame 5 that is used for accomodating the pencil, the outside cover of spacing frame 5 is equipped with and is used for driving the rotatory axle sleeve 6 that makes it receive and release of pencil, the rear end of main part 1 is provided with and is used for forming the base 7 that supports main part 1, upper end one side of base 7 is provided with and is used for the spacing connecting plate 8 of the upper end position of main part 1, well axle sleeve 6 is used for accomodating the unnecessary part of pencil.
Specifically, the rear end of main part 1 is provided with the axle bed 9 that is used for forming the rotation with connecting plate 8 and is connected, and the position that is close to the lower extreme position of main part 1 rear end rotates and connects in the link 10 that is used for adjusting the use angle of main part 1, and the one end of link 10 forms the rotation with the axle bed 9 that is close to the lower extreme position in main part 1 rear end for the sleeve structure in this embodiment and is connected.
Specifically, one end of the connecting frame 10 is provided with a sliding plate 11 for limiting the connecting frame 10, two end positions of the inner side of the base 7 are provided with limiting seats 12 for limiting the sliding plate 11, and two ends of the sliding plate 11 are slidably connected inside the limiting seats 12 in this embodiment.
Specifically, a plurality of positioning holes 13 for fixing the sliding plate 11 at different positions are formed at equal intervals on the inner side of the base 7, and a limit pin 14 for being engaged with the positioning holes 13 to fix the positioning holes 13 is arranged inside the sliding plate 11.
Specifically, the outside cover of one end of spacer pin 14 is equipped with and is used for driving spacer pin 14 automatic re-setting's spring 15, and one side of slide 11 is provided with and is used for spacing box 16 with spacer pin 14 and spring 15, and the inside in spacing box 16 is connected to spring 15's one end in this embodiment.
Specifically, a plurality of jackets 17 for clamping the wire harness are arranged on one side of the wire placing frame 2 at equal intervals, and in this embodiment, the jackets 17 are made of rubber and have certain elasticity.
The utility model discloses a theory of operation and use flow: the utility model discloses a set up bottom plate 3 and form the support to putting the line frame 2 and spacing 5 that set up in the front end of bottom plate 3 at the lower extreme of main part 1, lay the pencil in the inside of the clamp cover 17 of putting the front end of line frame 2 and can make it put neatly, further twine the pencil in the outside of the lower extreme axle sleeve 6 of putting the line frame 2 and can take in the pencil of unnecessary part and prevent to scatter, the space that the pencil occupies can be greatly reduced to easy operation, avoid influencing other operations and improve the result of use; set up in the link 10 of main part 1 rear end through the pulling and can drive the slide 11 that sets up in link 10 one end and slide in the inboard spacing seat 12 of base 7, utilize the rotation of slide 11 to push out the regulation angle of use forward with the lower extreme of main part 1 this moment, further utilization sets up in the elasticity of the inside spring 15 of slide 11 one side spacing box 16, can drive and set up in the inside automatic re-setting of slide 11 in locating hole 13 inside with slide 11 fixed, easy operation can be convenient be fixed in different use angles with main part 1, and utilize spring 15 still can reduce the shock amplitude that the tower crane brought to main part 1 and improve the stability of connecting.

Claims (6)

1. The utility model provides an information-based tower crane monitoring facilities in engineering construction wisdom building site, its characterized in that: including main part (1), the lower extreme of main part (1) is provided with and is used for the spacing wire frame (2) of putting in disorder of preventing of pencil, the lower extreme of main part (1) still is provided with bottom plate (3) that are used for supporting wire frame (2) of putting, the front end of bottom plate (3) is provided with and is used for the spacing backup pad (4) in both ends of putting wire frame (2), the inside of backup pad (4) is provided with spacing frame (5) that are used for accomodating the pencil, the outside cover of spacing frame (5) is equipped with and is used for driving the rotatory axle sleeve (6) that make it receive and release of pencil, the rear end of main part (1) is provided with and is used for forming base (7) that support main part (1), the upper end one side of base (7) is provided with and is used for the spacing connecting plate (8) of the upper end position of main part (1).
2. The intelligent building site informatization tower crane monitoring equipment for engineering construction according to claim 1, characterized in that: the rear end of the main body (1) is provided with a shaft seat (9) which is used for forming rotary connection with the connecting plate (8), and the position, close to the lower end, of the rear end of the main body (1) is rotatably connected with a connecting frame (10) used for adjusting the use angle of the main body (1).
3. The intelligent construction site informatization tower crane monitoring equipment according to claim 2, characterized in that: one end of the connecting frame (10) is provided with a sliding plate (11) used for limiting the connecting frame (10), and two end positions of the inner side of the base (7) are provided with limiting seats (12) used for limiting the sliding plate (11).
4. The intelligent engineering construction site informatization tower crane monitoring equipment according to claim 3, characterized in that: the inner side of the base (7) is provided with a plurality of positioning holes (13) at equal intervals for fixing the sliding plate (11) at different positions, and the sliding plate (11) is internally provided with limit pins (14) for being clamped and connected in the positioning holes (13) to fix the positioning holes (13).
5. The intelligent construction site informatization tower crane monitoring equipment according to claim 4, characterized in that: the limiting device is characterized in that a spring (15) used for driving the limiting pin (14) to automatically reset is sleeved on the outer side of one end of the limiting pin (14), and a limiting box (16) used for limiting the limiting pin (14) and the spring (15) is arranged on one side of the sliding plate (11).
6. The intelligent building site informatization tower crane monitoring equipment for engineering construction according to claim 1, characterized in that: and a plurality of clamping sleeves (17) for clamping the wiring harness are arranged on one side of the wire placing frame (2) at equal intervals.
CN202220641093.6U 2022-03-23 2022-03-23 Engineering construction wisdom building site informatization tower crane monitoring facilities Active CN217230040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220641093.6U CN217230040U (en) 2022-03-23 2022-03-23 Engineering construction wisdom building site informatization tower crane monitoring facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220641093.6U CN217230040U (en) 2022-03-23 2022-03-23 Engineering construction wisdom building site informatization tower crane monitoring facilities

Publications (1)

Publication Number Publication Date
CN217230040U true CN217230040U (en) 2022-08-19

Family

ID=82842647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220641093.6U Active CN217230040U (en) 2022-03-23 2022-03-23 Engineering construction wisdom building site informatization tower crane monitoring facilities

Country Status (1)

Country Link
CN (1) CN217230040U (en)

Similar Documents

Publication Publication Date Title
CN217230040U (en) Engineering construction wisdom building site informatization tower crane monitoring facilities
DE102018107565A1 (en) METHOD FOR RAISING A POSSIBLE AND LIFTABLE ELEMENT AND CRANE
CN209024048U (en) A kind of high stability tubing derrick crane
CN201236114Y (en) Small-sized swing machine
CN206645639U (en) Heavy pay off rack
CN219950045U (en) Spool hanging frame for clothing processing
CN210944610U (en) Steel wire rope twisting prevention device
CN216638656U (en) Communication optical cable construction hoist device
JP4011659B2 (en) How to hang back tension wire rope in luffing jib back tension device
CN209913374U (en) Cable laying device with adjustable height
US2502815A (en) Pole top gin and auxiliary crossarm
CN213197979U (en) 4-axis dragon door structure koto processing equipment
CN213202185U (en) Auxiliary tool for installing and hanging additional line of contact net
CN203359779U (en) Vertical steel cylinder lifting appliance for vertical lathe
CN217867630U (en) Gearbox hoisting tool
CN220964285U (en) Cable anti-falling hanger
CN209757798U (en) Suspension type adjusting goods shelf
CN219906577U (en) High-performance network security machine equipment convenient for wire arrangement
CN210795352U (en) Adjustable anti-toppling paying-off pulley
CN214755205U (en) Wiring auxiliary device for comprehensive wiring engineering
CN215942874U (en) Tool storage rack for mold production
CN220185079U (en) Well junk grappling tool
CN220662103U (en) File folder special for control desk of motor train with Fuxing number
CN220950834U (en) Promote connection platform of hoist and mount thing stability
CN220549893U (en) Fastening clamp for construction engineering hoisting machinery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240611

Address after: 237000 Zhongshi Street Health School Neighborhood Committee, Jin'an District, Lu'an City, Anhui Province

Patentee after: Yang Zhongshu

Country or region after: China

Address before: 730050 25th floor, 575 Xijin East Road, Qilihe district, Lanzhou City, Gansu Province

Patentee before: GANSU CONSTRUCTION INVESTMENT SCIENCE AND TECHNOLOGY RESEARCH AND DEVELOPMENT CO.,LTD.

Country or region before: China