CN217215721U - Building machine electrical pipeline construction equipment - Google Patents

Building machine electrical pipeline construction equipment Download PDF

Info

Publication number
CN217215721U
CN217215721U CN202221094489.XU CN202221094489U CN217215721U CN 217215721 U CN217215721 U CN 217215721U CN 202221094489 U CN202221094489 U CN 202221094489U CN 217215721 U CN217215721 U CN 217215721U
Authority
CN
China
Prior art keywords
built
construction device
pipeline
flat cable
servo motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221094489.XU
Other languages
Chinese (zh)
Inventor
许弘凯
吕鑫
王德贤
郭镔
宋亮
李艺高
潘鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202221094489.XU priority Critical patent/CN217215721U/en
Application granted granted Critical
Publication of CN217215721U publication Critical patent/CN217215721U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides a building electromechanical pipeline construction device, which comprises a flat cable ferrule, a soft rubber pad is fixedly arranged in the middle of the upper end and the lower end of the inner wall of the flat cable ferrule, the surface of the soft rubber pad is connected with a cover frame, the left side and the right side of the inner part of the cover frame are connected with spring rings, a plurality of pipelines can be arranged in the middle at the same time by utilizing a plurality of semicircular notches on the surface of a memory cotton block at one time through a built-in inserting plate connected with the spring rings of the upper end and the lower end of the inner wall of the flat cable ferrule, the built-in inserting plate can be adjusted up and down, the inner wall of a sliding notch can move up and down to carry out fitting clamping according to the size of the actual pipeline, the construction device is more practical and convenient, a moving wheel can be driven to drive an auxiliary wheel to move up and down in the pipeline through a second servo motor on the outer surface of the flat cable ferrule, and a first servo motor at the bottom of the flat cable ferrule can drive a rotating rod to drive an embedded sliding block, the size of the whole adjusting device is convenient for meeting pipelines with different sizes.

Description

Building machine electrical pipeline construction equipment
Technical Field
The utility model relates to a pipeline construction winding displacement technical field especially relates to a building machine electric pipeline construction equipment.
Background
The building electromechanical engineering is an important component in the building engineering and mainly comprises a water supply and drainage system, a power supply system, an air conditioning and ventilation system, a weak current system, a fire fighting system and an intelligent system, wherein the quality of the electromechanical engineering directly influences the overall quality of the building engineering, the operation effect is included, whether energy is saved or not, whether the building is practical or not when the building is really put into use or not is judged, and in the construction process of the modern building electromechanical engineering, the pipeline arrangement work is required according to the actual terrain.
The pipeline line engineering uses pipes, pipe fittings, valves, etc. to connect the pipeline starting station, intermediate station and terminal station to form the pipeline transportation line engineering, including pipeline assembling and laying, installation of pipeline valves and pipe fittings, pipeline anticorrosion and building of pipeline auxiliary structures, etc. the pipeline line engineering construction procedure is to first select the route and design the line diagram, and then to conduct the pipeline construction.
However, in the existing electromechanical pipeline construction process, electric wires needing to be arranged are difficult to be fixed in the middle in a pipeline, an auxiliary support frame is generally required to be installed, the workload is high, the efficiency is slow, and the installed auxiliary support frame cannot move on the inner wall of the pipeline, so that troubles are brought to subsequent wire arrangement, and therefore, a building electromechanical pipeline construction device is necessary to be provided to solve the technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a building electromechanical pipeline construction equipment has solved current electromechanical pipeline work progress, hardly carries out fixed placed in the middle to the electric wire that needs arrange in the pipeline, and the auxiliary stand of installation can not be at the problem that pipe inner wall removed.
In order to solve the technical problem, the utility model provides a pair of building electromechanical pipeline construction equipment, include: arranging a wire ferrule;
the flexible rubber pad is fixedly arranged at the middle position of the upper end and the lower end of the inner wall of the flat cable ferrule, the surfaces of the flexible rubber pads are connected with cover frames, the left side and the right side of the interior of each cover frame are connected with spring rings, and the surfaces of the spring rings are connected with built-in inserting plates;
the sliding groove mouth, the sliding groove mouth set up in the left and right sides of the last lower extreme of winding displacement lasso is located everywhere, the left and right sides of built-in picture peg all be connected with the protruding knot that the sliding groove mouth corresponds each other, the whole symmetrical structure from top to bottom that is of built-in picture peg, the inside of built-in picture peg all is provided with the semicircle notch that many places were used for the pipeline to arrange the installation.
Preferably, the equal fixed mounting in inner wall surface of built-in picture peg has the cotton piece of memory, turn right from a left side and set gradually many places semicircular groove opening on the surface of the cotton piece of memory, semicircular groove opening's inner wall surface all corresponds and is connected with the guard ring, built-in picture peg passes through both sides protruding knot can sliding groove opening's inner wall reciprocates and changes the centre gripping degree.
Preferably, the upper side of the flat cable ferrule is fixedly provided with a first servo motor through an arc connecting plate, the upper surface of the first servo motor is connected with a sleeve frame, and open slots are formed in two sides of the sleeve frame.
Preferably, the inside underrun of cover frame is connected with the screw thread drive bull stick through the output of cover frame, the inside of cover frame is passed through screw thread drive bull stick installs embedded sliding block, the both sides of embedded sliding block all are connected with spacing lug.
Preferably, the middle position of the upper surface of the embedded sliding block is connected with a hollow sleeve, the hollow sleeve is integrally sleeved on the outer surface of the thread driving rotating rod, and the upper surface of the hollow sleeve is connected with a U-shaped sleeve frame.
Preferably, the outer surface of the U-shaped sleeve frame is connected with a second servo motor, and the inner part of the U-shaped sleeve frame is connected with a moving wheel through the output end of the second servo motor.
Preferably, the left side and the right side of the lower part of the outer surface of the flat cable ferrule are both connected with auxiliary supports, and the structures of the auxiliary supports are the same as those of the sleeve frame.
Preferably, the outer surface of the auxiliary support is movably provided with auxiliary wheels.
Compared with the prior art, the utility model provides a pair of building electromechanical pipeline construction equipment has following beneficial effect:
the utility model provides a building machine electric pipeline construction equipment, through the built-in picture peg that lower extreme spring ring is connected on winding displacement lasso inner wall, many places semicircle notch that can the cotton piece surface of disposable memory is arranged a plurality of pipelines simultaneously between two parties, and can adjust built-in picture peg from top to bottom, reciprocate at the inner wall of sliding groove and can laminate the centre gripping according to the size of actual pipeline, and is more practical convenient, second servo motor through winding displacement lasso surface, can drive and remove the wheel and drive the auxiliary wheel and remove in the inside of pipeline, make things convenient for the winding displacement construction, and can drive the embedded sliding block of screw drive bull stick drive through the first servo motor of cover frame bottom and reciprocate, the holistic size of adjusting device, conveniently satisfy not unidimensional pipeline.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of a building electromechanical pipeline construction device provided by the present invention;
fig. 2 is a schematic structural diagram of a cable ferrule of a construction machine electrical pipeline construction device provided by the present invention;
fig. 3 is a schematic structural diagram of a jacket frame of a building electromechanical pipeline construction device provided by the present invention;
fig. 4 is a schematic structural diagram of a second embodiment of the construction device for building electrical pipelines according to the present invention.
Reference numbers in the figures: 1. the device comprises a flat cable ferrule, 2, a sliding groove opening, 3, a soft rubber cushion, 4, a spring ring, 5, a cover frame, 6, a built-in inserting plate, 7, a memory cotton block, 8, a semicircular groove opening, 9, a protective ring, 10, a convex buckle, 11, an arc connecting plate, 12, a first servo motor, 13, a cover frame, 14, a thread driving rotating rod, 15, an embedded sliding block, 16, a hollow sleeve, 17, a U-shaped cover frame, 18, a second servo motor, 19, a moving wheel, 20, an auxiliary support, 21, an auxiliary wheel, 22, a connecting sleeve plate, 23, a socket sleeve frame, 24, a T-shaped inserting block, 25, a power supply box, 26 and a lighting lamp.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
First embodiment
Please refer to fig. 1, fig. 2 and fig. 3 in combination, wherein fig. 1 is a schematic structural diagram of a first embodiment of a building electrical pipeline construction device according to the present invention; fig. 2 is a schematic structural diagram of a cable ferrule of a construction machine electrical pipeline construction device provided by the present invention; fig. 3 is a schematic structural diagram of a cable ferrule of the construction machine electrical pipeline construction device provided by the present invention. A construction device for electric pipelines of buildings comprises: a flat cable ferrule 1;
the flexible rubber pad 2 is fixedly arranged at the middle position of the upper end and the lower end of the inner wall of the flat cable ferrule 1, the surface of the flexible rubber pad 2 is connected with a cover frame 5, the left side and the right side of the interior of the cover frame 5 are connected with spring rings 4, and the surface of each spring ring 4 is connected with a built-in inserting plate 6;
the wire arranging sleeve comprises sliding notches 2, the sliding notches 2 are arranged at the four positions of the left side and the right side of the upper end and the lower end of a wire arranging sleeve ring 1, the left side and the right side of a built-in inserting plate 6 are connected with convex buckles 10 corresponding to the sliding notches 2, the built-in inserting plate 6 is of an up-down symmetrical structure, and a plurality of semicircular notches 8 used for arranging and installing pipelines are arranged inside the built-in inserting plate 6.
The equal fixed mounting in inner wall surface of built-in picture peg 6 has the cotton piece 7 of memory, and the surface of the cotton piece 7 of memory is all turned right from a left side and is set gradually many places semicircle notch 8, and the inner wall surface of semicircle notch 8 all corresponds and is connected with guard ring 9, and built-in picture peg 6 can reciprocate at the inner wall of sliding groove opening 2 through the protruding knot 10 of both sides and change the clamping degree.
The upper side of the flat cable ferrule 1 is fixedly provided with a first servo motor 12 through an arc connecting plate 11, the upper surface of the first servo motor 12 is connected with a sleeve frame 13, and open slots are formed in two sides of the sleeve frame 13.
The inside underrun of cover frame 13 is connected with screw thread drive bull stick 14 through the output of cover frame 13, and embedded sliding block 15 is installed through screw thread drive bull stick 14 in the inside of cover frame 13, and embedded sliding block 15's both sides all are connected with spacing lug.
The middle position of the upper surface of the embedded sliding block 15 is connected with a hollow sleeve 16, the hollow sleeve 16 is integrally sleeved on the outer surface of the thread driving rotating rod 14, and the upper surface of the hollow sleeve 16 is connected with a U-shaped sleeve frame 17.
The outer surface of the U-shaped sleeve frame 17 is connected with a second servo motor 18, and the inside of the U-shaped sleeve frame 17 is connected with a moving wheel 19 through the output end of the second servo motor 18.
The left side and the right side of the lower part of the outer surface of the flat cable ferrule 1 are both connected with auxiliary supports 20, and the structures of the auxiliary supports 20 are the same as the structure of the sleeve frame 13.
The outer surface of the auxiliary bracket 20 is movably provided with an auxiliary wheel 21.
The utility model provides a pair of building electromechanical pipeline construction equipment's theory of operation as follows: when using, through built-in picture peg 6 that lower extreme spring ring 4 connects on the 1 inner wall of winding displacement lasso, can once only utilize 8 mouths of many places half slot on the cotton piece 7 surface of memory to arrange a plurality of pipelines simultaneously placed in the middle, and can adjust built-in picture peg 6 from top to bottom, reciprocate at the inner wall of sliding groove mouth 2 and can laminate the centre gripping according to the size of actual pipeline, and is more practical convenient, second servo motor 18 through 1 surface of winding displacement lasso, can drive and remove wheel 19 and drive auxiliary wheel 21 and remove in the inside of pipeline, make things convenient for the winding displacement construction, and can drive screw thread drive bull stick 14 through the first servo motor 12 of cover frame 13 bottom and drive embedded sliding block 15 and reciprocate, the holistic size of adjusting device, conveniently satisfy not unidimensional pipeline.
Compared with the prior art, the utility model provides a pair of building electromechanical pipeline construction equipment has following beneficial effect:
through the built-in picture peg that the lower extreme spring coil is connected on winding displacement lasso inner wall, can once only utilize many places semicircle notch on memory cotton piece surface to arrange a plurality of pipelines simultaneously between two parties, and can adjust built-in picture peg from top to bottom, reciprocate at the inner wall of sliding groove and can laminate the centre gripping according to the size of actual pipeline, it is more practical convenient, second servo motor through winding displacement lasso surface, can drive and remove the wheel and drive the inside removal of auxiliary wheel at the pipeline, make things convenient for the winding displacement construction, and can drive the embedded sliding block of screw drive bull stick drive through the first servo motor of cover frame bottom and reciprocate, the holistic size of adjusting device, conveniently satisfy not unidimensional pipeline.
Second embodiment
Referring to fig. 4, fig. 4 is a schematic structural diagram of a second embodiment of a building electrical pipeline construction device according to the present invention. Based on the building electromechanical pipeline construction device provided by the first embodiment of the application, the second embodiment of the application provides another building electromechanical pipeline construction device. The second embodiment is only a preferred mode of the first embodiment, and the implementation of the second embodiment does not affect the implementation of the first embodiment alone.
Specifically, the second embodiment of the present application provides a construction device for building electrical pipelines, which is different in that a connection sleeve plate 22 is connected to an upper side surface of the flat cable ferrule 1.
The upper surface of connecting sleeve board 22 is connected with socket cover frame 23, the inside of socket cover frame 23 is inserted and is installed T type inserted block 24, the upper surface of T type inserted block 24 is connected with power pack 25, the front side surface of power pack 25 is provided with light 26.
The working principle is as follows: when the flat cable ferrule is used, the T-shaped plug block 24 can be inserted and installed through the socket sleeve frame 23 on the upper side surface of the flat cable ferrule 1, and the interior of a pipeline is illuminated by the illuminating lamp 26, so that construction is further facilitated.
Has the advantages that: the socket sleeve frame on the upper side surface of the flat cable ferrule can be inserted with the T-shaped insertion block, and the lighting lamp is used for lighting the inside of the pipeline, so that the construction is further facilitated.
The above-mentioned only be the embodiment of the present invention, not consequently the restriction of the patent scope of the present invention, all utilize the equivalent structure or equivalent flow transform made of the content of the specification and the attached drawings, or directly or indirectly use in other relevant technical fields, all including in the same way the patent protection scope of the present invention.

Claims (8)

1. A construction device for electric pipelines of buildings, comprising: arranging a wire ferrule;
the flexible rubber pad is fixedly arranged at the middle position of the upper end and the lower end of the inner wall of the flat cable ferrule, the surfaces of the flexible rubber pads are connected with cover frames, the left side and the right side of the interior of each cover frame are connected with spring rings, and the surfaces of the spring rings are connected with built-in inserting plates;
the sliding groove mouth, the sliding groove mouth set up in the left and right sides of the last lower extreme of winding displacement lasso is located everywhere, the left and right sides of built-in picture peg all be connected with the protruding knot that the sliding groove mouth corresponds each other, the whole symmetrical structure from top to bottom that is of built-in picture peg, the inside of built-in picture peg all is provided with the semicircle notch that many places were used for the pipeline to arrange the installation.
2. The building electromechanical pipeline construction device according to claim 1, characterized in that the inner wall surface of the built-in insertion plate is fixedly provided with a memory cotton block, the surface of the memory cotton block is provided with a plurality of semicircular notches from left to right in sequence, the inner wall surface of each semicircular notch is correspondingly connected with a protection ring, the built-in insertion plate passes through two sides of the convex buckle, and the inner wall of the sliding notch can move up and down to change the clamping degree.
3. The construction device for the electric pipelines of the building as claimed in claim 1, wherein the upper side of the flat cable ferrule is fixedly provided with a first servo motor through an arc connecting plate, the upper surface of the first servo motor is connected with a sleeve frame, and both sides of the sleeve frame are provided with open slots.
4. The building electromechanical pipeline construction device according to claim 3, wherein a thread driving rotating rod is connected to the bottom surface of the inside of the sleeve frame through an output end of the sleeve frame, an embedded sliding block is installed inside the sleeve frame through the thread driving rotating rod, and both sides of the embedded sliding block are connected with limiting convex blocks.
5. The building electromechanical pipeline construction device according to claim 4, wherein a hollow sleeve is connected to a middle position of an upper surface of the embedded sliding block, the hollow sleeve is integrally sleeved on an outer surface of the thread driving rotating rod, and a U-shaped sleeve frame is connected to an upper surface of the hollow sleeve.
6. The building electromechanical pipeline construction device according to claim 5, wherein a second servo motor is connected to an outer surface of the U-shaped sleeve frame, and a moving wheel is connected to an inner portion of the U-shaped sleeve frame through an output end of the second servo motor.
7. The construction device for the electric pipeline of the building as claimed in claim 3, wherein the cable ferrule has auxiliary brackets attached to both the left and right sides of the lower portion of the outer surface thereof, and the auxiliary brackets have the same structure as the frame.
8. The building electromechanical pipeline construction device according to claim 7, wherein the auxiliary wheels are movably mounted on the outer surface of each auxiliary support.
CN202221094489.XU 2022-05-09 2022-05-09 Building machine electrical pipeline construction equipment Expired - Fee Related CN217215721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221094489.XU CN217215721U (en) 2022-05-09 2022-05-09 Building machine electrical pipeline construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221094489.XU CN217215721U (en) 2022-05-09 2022-05-09 Building machine electrical pipeline construction equipment

Publications (1)

Publication Number Publication Date
CN217215721U true CN217215721U (en) 2022-08-16

Family

ID=82777831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221094489.XU Expired - Fee Related CN217215721U (en) 2022-05-09 2022-05-09 Building machine electrical pipeline construction equipment

Country Status (1)

Country Link
CN (1) CN217215721U (en)

Similar Documents

Publication Publication Date Title
CN217215721U (en) Building machine electrical pipeline construction equipment
CN210694662U (en) Magnetic starter structure for controlling cloth discharging machine
CN109616952B (en) Convenient laying system and method for secondary cable of transformer substation
CN208078587U (en) A kind of wind driven generator cable clamp easy to assembly
CN116454781A (en) Cable laying device for power engineering construction and use method
CN210838708U (en) Indoor threading device of vapour-pressure type
CN2592324Y (en) Electric welding machine
CN205765882U (en) A kind of electric power apparatus examination combination screw driver illuminator
CN212626990U (en) Street lamp junction box
CN201084866Y (en) Combined pipe and wire fixing clip
CN202712081U (en) Spring assembling tool
CN213027241U (en) Cable fixing device for weak current engineering
CN210519186U (en) Air conditioner electric control box convenient to maintain
CN205102291U (en) Modular air conditioner connecting pipe
CN208199734U (en) A kind of automotive engineering and the part delivery apparatus being combined as a whole of marketing
CN216872752U (en) Threading pipe fixing device
CN206042692U (en) Lamps and lanterns flow centre gripping leads to electric test device
CN220749989U (en) Line lamp
CN218621923U (en) Multifunctional base for active spike in tunnel
CN210900017U (en) Water pump control cabinet device
CN219801729U (en) Wire harness fixing clamp
CN204760910U (en) Dark piping device of wearing to go between
CN219106977U (en) Electrical wire installation fixing device
CN218671713U (en) Accurate positioning and mounting structure of flexible line lamp
CN216902175U (en) Hidden wall surface guide lamp box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220816