CN217203637U - High-altitude installation and welding operation platform for steel box arch bridge segments - Google Patents
High-altitude installation and welding operation platform for steel box arch bridge segments Download PDFInfo
- Publication number
- CN217203637U CN217203637U CN202220490220.7U CN202220490220U CN217203637U CN 217203637 U CN217203637 U CN 217203637U CN 202220490220 U CN202220490220 U CN 202220490220U CN 217203637 U CN217203637 U CN 217203637U
- Authority
- CN
- China
- Prior art keywords
- steel box
- arch bridge
- platform body
- brackets
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 26
- 239000010959 steel Substances 0.000 title claims abstract description 26
- 238000003466 welding Methods 0.000 title claims abstract description 25
- 238000009434 installation Methods 0.000 title claims abstract description 15
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 241000282326 Felis catus Species 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 11
- 230000009194 climbing Effects 0.000 abstract description 3
- 230000001681 protective effect Effects 0.000 description 8
- 238000000034 method Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008094 contradictory effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型提供了一种钢箱拱桥节段高空安装焊接作业平台,包括平台本体、设置在所述平台本体两侧的支架,所述平台本体设置在两侧的所述支架上,所述支架包括分布在四角的立柱,两个所述支架于相互靠近的一侧设置有进入口,所述支架的其他三侧间隔分布设置有横杆,所述横杆配合所述支架构成爬梯。本实用新型解决钢箱拱桥节段安装焊接存在的高空作业风险和高空抛物问题,平台给操作工人提供了较大的作业空间,工人进行焊接操过程中可安全自由的活动,提高了焊接质量,线性控制精度得到了有效保障,两侧梯笼构造,加快了施工效率。
The utility model provides a steel box arch bridge segment high-altitude installation and welding operation platform, comprising a platform body and brackets arranged on both sides of the platform body, the platform body is arranged on the brackets on both sides, and the brackets It includes uprights distributed at four corners, two of the brackets are provided with inlets on one side close to each other, and the other three sides of the brackets are provided with horizontal bars at intervals, and the horizontal bars cooperate with the brackets to form a climbing ladder. The utility model solves the high-altitude operation risks and high-altitude parabolic problems existing in the installation and welding of steel box arch bridge segments, the platform provides operators with a larger working space, the workers can move safely and freely during the welding operation, and the welding quality is improved. The linear control accuracy is effectively guaranteed, and the ladder cage structure on both sides speeds up the construction efficiency.
Description
技术领域technical field
本实用新型涉及钢箱拱桥安装设备技术领域,具体涉及一种钢箱拱桥节段高空安装焊接作业平台。The utility model relates to the technical field of steel box arch bridge installation equipment, in particular to a steel box arch bridge segment high-altitude installation and welding operation platform.
背景技术Background technique
随着我国经济的飞速发展,对交通的要求日益提高,钢结构桥梁作为重要的基础设施发挥着不可替代的作用。尤其是大跨度钢结构拱桥以其独特的结构、优美的造型受到了人们的青睐,广泛应用于公路交通基础设施建设中。钢箱梁节段安装焊接过程中存在高空作业安全风险高、焊接质量、控制线形精度控制难、焊接效率慢等诸多问题。With the rapid development of my country's economy, the requirements for transportation are increasing day by day, and steel structure bridges play an irreplaceable role as an important infrastructure. Especially the long-span steel structure arch bridge is favored by people for its unique structure and beautiful shape, and is widely used in the construction of highway transportation infrastructure. During the installation and welding of steel box girder segments, there are many problems such as high safety risk of high-altitude operation, difficult welding quality, difficult control of linear precision control, and slow welding efficiency.
实用新型内容Utility model content
本实用新型的目的是解决上述的不足,提供一种钢箱拱桥节段高空安装焊接作业平台。The purpose of the utility model is to solve the above deficiencies and provide a steel box arch bridge segment high-altitude installation and welding operation platform.
为了解决上述技术问题,本实用新型采用如下技术方案:一种钢箱拱桥节段高空安装焊接作业平台,包括平台本体、设置在所述平台本体两侧的支架,所述平台本体设置在两侧的所述支架上,所述支架包括分布在四角的立柱,两个所述支架于相互靠近的一侧设置有进入口,所述支架的其他三侧间隔分布设置有横杆,所述横杆配合所述支架构成爬梯。In order to solve the above technical problems, the present utility model adopts the following technical solutions: a steel box arch bridge segment high-altitude installation welding operation platform, comprising a platform body and brackets arranged on both sides of the platform body, and the platform body is arranged on both sides On the said bracket, the bracket includes uprights distributed at four corners, two of the brackets are provided with inlets on the side close to each other, and the other three sides of the bracket are provided with cross bars at intervals, and the cross bars are arranged at intervals. A climbing ladder is formed in cooperation with the brackets.
进一步的,所述支架与所述平台本体上分别设置有防护架,所述防护架包括设置在所述支架和所述平台本体上的立杆以及设置在所述立杆顶端的连接杆。Further, a protective frame is provided on the bracket and the platform body, respectively, and the protective frame includes a vertical rod disposed on the bracket and the platform body and a connecting rod disposed on the top end of the vertical rod.
进一步的,所述支架的底部设置有加强底板,所述立柱分别设置在所述加强底板的四角处。Further, the bottom of the bracket is provided with a reinforced bottom plate, and the uprights are respectively arranged at four corners of the reinforced bottom plate.
进一步的,所述平台本体的上表面四周分别设置有挡边。Further, ribs are respectively provided around the upper surface of the platform body.
进一步的,所述平台本体的上表面设置为防滑表面。Further, the upper surface of the platform body is set as a non-slip surface.
进一步的,所述支架之间的距离大于待焊接钢箱拱桥节段的横向距离。Further, the distance between the brackets is greater than the lateral distance of the steel box arch bridge segments to be welded.
对比现有技术,本实用新型具有如下的有益效果:Compared with the prior art, the utility model has the following beneficial effects:
1、本实用新型解决钢箱拱桥节段安装焊接存在的高空作业风险和高空抛物问题,平台给操作工人提供了较大的作业空间,工人进行焊接操过程中可安全自由的活动,提高了焊接质量,线性控制精度得到了有效保障,两侧梯笼构造,加快了施工效率;1. The utility model solves the high-altitude operation risks and high-altitude parabolic problems existing in the installation and welding of steel box arch bridge segments. The platform provides the operators with a larger working space, and the workers can move safely and freely during the welding operation, which improves the welding performance. The quality and linear control accuracy are effectively guaranteed, and the ladder cage structure on both sides speeds up the construction efficiency;
2、本实用新型通过在平台本体的两侧设置支架,从而能够保证平台本体的结构稳定性,在使用过程中两侧支架分布在待焊接钢箱拱桥节段的两侧,从而方便工人进行施工;2. The utility model can ensure the structural stability of the platform body by arranging brackets on both sides of the platform body. During use, the brackets on both sides are distributed on both sides of the steel box arch bridge segment to be welded, so as to facilitate the construction of workers. ;
3、本实用新型通过在平台本体和支架的上方设置防护架,能够保证工人施工的安全,提高平台使用过程中的安全性能。3. The utility model can ensure the safety of workers during construction and improve the safety performance during the use of the platform by arranging a protective frame above the platform body and the bracket.
附图说明Description of drawings
构成本申请的一部分的说明书附图用来提供对本实用新型的进一步理解,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The accompanying drawings forming a part of the present application are used to provide further understanding of the present invention, and the schematic embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation of the present invention. In the attached image:
图1为本实用新型一实施例的立体图。FIG. 1 is a perspective view of an embodiment of the present invention.
图2为本实用新型一实施例的使用时的立体图。FIG. 2 is a perspective view of an embodiment of the present invention during use.
图3为本实用新型一实施例的平台本体的俯视结构示意图。FIG. 3 is a schematic top-view structural diagram of a platform body according to an embodiment of the present invention.
图中:1、平台本体;2、支架;21、立柱;22、进入口;23、横杆;3、爬梯;4、防护架;41、立杆;42、连接杆;24、加强底板;11、挡边。In the figure: 1, platform body; 2, bracket; 21, column; 22, entrance; 23, cross bar; 3, ladder; 4, protective frame; 41, vertical pole; 42, connecting rod; 24, reinforced bottom plate; 11. Sidewall.
具体实施方式Detailed ways
下面将结合本实用新型实施例,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型的一部分实施例,而不是全部的实施例。在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. The embodiments in this application and the features in the embodiments may be combined with each other without conflict. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
需要说明,若本实用新型实施例中有涉及方向性指示(诸如上、下、左、右、前、后……),则该方向性指示仅用于解释在某一特定姿态下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。It should be noted that if there are directional indications (such as up, down, left, right, front, back...) in the embodiments of the present invention, the directional indications are only used to explain the relationship between the various components under a certain posture. If the specific posture changes, the directional indication also changes accordingly.
另外,若本实用新型实施例中有涉及“第一”、“第二”等的描述,则该“第一”、“第二”等的描述仅用于描述目的,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。另外,全文中出现的“和/或”的含义,包括三个并列的方案,以“A和/或B”为例,包括A方案、或B方案、或A和B同时满足的方案。另外,“多个”指两个以上。另外,各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本实用新型要求的保护范围之内。In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only for the purpose of description, and should not be construed as instructions or Implicit their relative importance or implicitly indicate the number of technical features indicated. Thus, a feature delimited with "first", "second" may expressly or implicitly include at least one of that feature. In addition, the meaning of "and/or" appearing in the whole text includes three parallel schemes. Taking "A and/or B" as an example, it includes scheme A, scheme B, or scheme satisfying both of A and B. In addition, "a plurality" means two or more. In addition, the technical solutions between the various embodiments can be combined with each other, but must be based on the realization by those of ordinary skill in the art. When the combination of technical solutions is contradictory or cannot be realized, it should be considered that the combination of such technical solutions does not exist. , is not within the scope of protection required by the present utility model.
如图1-3所示,本实用新型钢箱拱桥节段高空安装焊接作业平台,包括平台本体1、设置在所述平台本体1两侧的支架2,所述平台本体1设置在两侧的所述支架2上,所述支架2包括分布在四角的立柱21,两个所述支架2于相互靠近的一侧设置有进入口22,所述支架2的其他三侧间隔分布设置有横杆23,所述横杆23配合所述支架2构成爬梯3。As shown in Figures 1-3, the steel box arch bridge segment high-altitude installation and welding operation platform of the present invention includes a platform body 1 and
在一实施例中,所述支架2与所述平台本体1上分别设置有防护架4,所述防护架4包括设置在所述支架2和所述平台本体1上的立杆41以及设置在所述立杆41顶端的连接杆42。这样设计,通过设置防护架4,能够为平台本体1提供防护性能,方便工人的施工,解决了施工过程中的安全隐患。In one embodiment, the
在一实施例中,所述支架2的底部设置有加强底板24,所述立柱21分别设置在所述加强底板24的四角处。这样设计,通过设置加强底板24,使得立柱21之间的连接更加稳固,并且方便支架2的使用,通过加强底板24增大支架2与地面的接触面积,从而提高支架2的结构稳定性。In one embodiment, the bottom of the
在一实施例中,所述平台本体1的上表面四周分别设置有挡边11。这样设计,通过设置挡边11,能够为工人提供防护,避免工人意外踩落,并且能够对施工过程中的工具进行阻挡,避免工具掉落。In one embodiment, the upper surface of the platform body 1 is respectively provided with
在一实施例中,所述平台本体1的上表面设置为防滑表面。这样设计,通过将平台本体1的上表面设置为防滑表面,能够有效避免工人在施工过程中滑倒的情况发生。In one embodiment, the upper surface of the platform body 1 is provided as a non-slip surface. In this way, by setting the upper surface of the platform body 1 as a non-slip surface, it can effectively avoid the occurrence of slipping of workers during the construction process.
在一实施例中,所述支架2之间的距离大于待焊接钢箱拱桥节段的横向距离。这样设计,方便焊接作业平台的使用,在施工时能够使得支架2位于待焊接钢箱拱桥节段的两侧,方便施工的进行。In one embodiment, the distance between the
当钢箱拱桥节段吊装至指定位置后,将焊接作业平台吊装至该节段处,两侧的支架2分别位于钢箱拱桥节段的两侧,工作人员通过进入口22进入支架2之间,通过横杆23与支架2构成的爬梯3到达支架2的顶部,之后进入平台本体1上对节段进行焊接,当指定高度焊接完成后,通过移动支架2调整支架2的位置,直至钢箱拱桥节段焊接全部完成。After the steel box arch bridge segment is hoisted to the designated position, the welding operation platform is hoisted to the segment, the
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, and that the present invention may be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments are to be considered in all respects as exemplary and not restrictive, and the scope of the present invention is defined by the appended claims rather than the foregoing description, and it is therefore intended that the All changes within the meaning and range of the required equivalents are embraced within the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220490220.7U CN217203637U (en) | 2022-03-08 | 2022-03-08 | High-altitude installation and welding operation platform for steel box arch bridge segments |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220490220.7U CN217203637U (en) | 2022-03-08 | 2022-03-08 | High-altitude installation and welding operation platform for steel box arch bridge segments |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217203637U true CN217203637U (en) | 2022-08-16 |
Family
ID=82755312
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202220490220.7U Expired - Fee Related CN217203637U (en) | 2022-03-08 | 2022-03-08 | High-altitude installation and welding operation platform for steel box arch bridge segments |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217203637U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116971293A (en) * | 2023-06-01 | 2023-10-31 | 广东省建筑工程集团有限公司 | A self-propelled hanger platform for steel box arch construction |
-
2022
- 2022-03-08 CN CN202220490220.7U patent/CN217203637U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116971293A (en) * | 2023-06-01 | 2023-10-31 | 广东省建筑工程集团有限公司 | A self-propelled hanger platform for steel box arch construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204876586U (en) | T roof beam reinforcement fixes a position rack | |
| CN204455829U (en) | Bridge-collision-avoidance wall construction equipment | |
| CN103603496A (en) | Deviation integral elevation steel corridor carrying method and lateral limiting device thereof | |
| CN208668300U (en) | A bridge and culvert support structure for highway bridge engineering | |
| CN201574360U (en) | Truss type hanging basket | |
| CN208650506U (en) | A kind of slip-framed reverse mould constructing device | |
| CN204385629U (en) | A kind of support for the construction of suspension bridge king-tower top rail | |
| CN207933894U (en) | A kind of bridge double-limb Thin-Wall Piers pier stud reinforcing bar binding device | |
| CN203213019U (en) | Long cantilever bent cap cast-in-place construction support system | |
| CN201865053U (en) | Continuous steel beam template | |
| CN204850469U (en) | Commercial building construction system | |
| CN110670873B (en) | A kind of support system and construction method of steel formwork for ultra-high-section concrete column | |
| CN209255714U (en) | An integral prefabricated tooling for pier column reinforcement | |
| CN107620270A (en) | Portable positioning die carrier and its application method for guardrail reinforcing bar colligation | |
| CN203668857U (en) | Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates | |
| CN207392768U (en) | A kind of Multi-section slippage device in irregular large-span space structure of constructing | |
| CN217992913U (en) | Be applied to well word bracket of hollow slab beam steel mandrel form removal | |
| CN206015700U (en) | A kind of raft foundation steelframe support | |
| CN210658028U (en) | Continuous rigid frame bridge 0# block support with decorative plate | |
| CN213573090U (en) | Accurate positioning structure of railway general contact net basis embedded bolt | |
| CN210217757U (en) | Overlength lining cutting platform truck | |
| CN217149853U (en) | Large-span steel box connecting arch bridge support system | |
| CN219212046U (en) | A mobile vehicle used for welding steel box girder decorative panels | |
| CN217579789U (en) | An adjustable stiffness skeleton group tire frame | |
| CN105003074A (en) | Commercial building construction system and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220816 |
