CN217198276U - Handling device of building construction tubbiness thing - Google Patents

Handling device of building construction tubbiness thing Download PDF

Info

Publication number
CN217198276U
CN217198276U CN202221067454.7U CN202221067454U CN217198276U CN 217198276 U CN217198276 U CN 217198276U CN 202221067454 U CN202221067454 U CN 202221067454U CN 217198276 U CN217198276 U CN 217198276U
Authority
CN
China
Prior art keywords
lifter
plate
slide
square
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221067454.7U
Other languages
Chinese (zh)
Inventor
陈健
张为塘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Haoxing Construction Engineering Co Ltd
Original Assignee
Anhui Haoxing Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Haoxing Construction Engineering Co Ltd filed Critical Anhui Haoxing Construction Engineering Co Ltd
Priority to CN202221067454.7U priority Critical patent/CN217198276U/en
Application granted granted Critical
Publication of CN217198276U publication Critical patent/CN217198276U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a handling device of construction tubbiness relates to construction technical field. The utility model discloses a place the platform, place the platform downside and installed drive assembly, two dead levers have all been installed to the drive assembly both sides, two pendulum rods, the slide has been seted up to dead lever one side, the spout has all been seted up to the relative both sides of slide inner wall, sliding fit has the lifter in the slide, two square strips have been installed to the lifter lower extreme, square strip sliding fit is in the spout, the steel shaft has been installed between two square strips, the square groove has been seted up to pendulum rod one end, steel shaft clearance fit is in the square groove, the lifter plate has been installed to two lifter upsides, the removal subassembly has been installed to the lifter plate upside, the removal subassembly upside has been installed to the removal subassembly and has been pressed from both sides and get the subassembly. The utility model discloses a drive assembly pendulum rod of being convenient for rotates, through square strip and spout sliding fit, and the lifter of being convenient for slides in the slide, promotes the stability of lifter motion.

Description

Handling device of building construction tubbiness thing
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a handling device of construction tubbiness thing.
Background
In the building construction process, a lot of building materials can be used, various building materials need to be carried, and in the material carrying process of workers, some materials can be carried manually, and other materials can be lifted to a cart for carrying.
When the existing cart is used for carrying building materials, the building materials need to be lifted to the cart and then lifted from the cart, so that the carrying is difficult, especially for some barrel-shaped building materials, the barrel-shaped building materials are smooth, a proper hand-lifting position is difficult to find for carrying, the carrying difficulty is increased, the labor intensity is increased, and the working efficiency is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a handling device of construction tubbiness, when having solved current use shallow and carrying out the building material transport, need lift building material to establish on the shallow and lift from the shallow, comparatively troublesome, especially some tubbiness building material, tubbiness building material is comparatively mellow and full, is difficult to find suitable hand and lifts the position and carry it, increases the transport degree of difficulty, increases intensity of labour, reduces work efficiency's technical problem.
In order to achieve the purpose, the utility model is realized by the following technical proposal:
the utility model provides a handling device of building construction tubbiness thing, including placing the platform, place the platform downside and installed drive assembly, two dead levers have all been installed to the drive assembly both sides, two pendulum rods, the slide has been seted up to dead lever one side, the spout has all been seted up to the relative both sides of slide inner wall, sliding fit has the lifter in the slide, two square strips have been installed to the lifter lower extreme, square strip sliding fit is in the spout, the steel shaft has been installed between two square strips, the square groove has been seted up to pendulum rod one end, steel shaft clearance fit is in the square groove, the lifter is located the upside of pendulum rod, a lifter plate has been installed to two lifter upslopes, the removal subassembly has been installed to the lifter plate upside, the removal subassembly upside has been installed to the removal subassembly upside, the base plate is located between two removal subassemblies.
Optionally, the transmission assembly comprises a substrate, a support frame, two support plates and four support rods are arranged on the upper side of the substrate, the two support plates are located between the two support rods, the support frame is located between the two support plates, two worm gears are arranged in the support frame in a matched mode, a first motor is arranged on the lower side of the substrate, a worm is arranged at the output end of the first motor and located between the two worm gears, the worm penetrates through the substrate and is meshed with the two worm gears, rotating rods are arranged at two opposite ends of each worm gear, and the rotating rods are in matched mode in the support frame and the support plates in a rotating mode.
Optionally, two first connecting rods are arranged on one side of the substrate, the first connecting rods are located on one side of the fixing rods, the baffle is arranged on the upper side of the first connecting rods, two handles are arranged on one side of the baffle, and the baffle is located between the lifting plate and the handles.
Optionally, the moving assembly comprises a sliding rail arranged on the upper side of the lifting plate, a second motor is arranged on one side of the sliding rail, a screw rod is arranged at the output end of the second motor, the screw rod is positioned in the sliding rail, a sliding plate is in sliding fit in the sliding rail, and the sliding plate is in threaded fit with the periphery of the screw rod.
Optionally, press from both sides the subassembly and install the movable plate at the slide upside, place the piece upside and installed the cylinder, the output of cylinder runs through the movable plate, the fixed block has been installed to the output of cylinder, the movable plate is located the fixed block and places between the piece, the arc splint have been installed to fixed block one side, the fixed block is located between arc splint and the movable plate.
Optionally, the lower sides of the fixing rods are provided with universal wheels, one side of each of two adjacent fixing rods is provided with a second connecting rod, and the fixing rods are located between the second connecting rods and the substrate.
The embodiment of the utility model has the following beneficial effect:
the utility model discloses an embodiment is convenient for the pendulum rod through the transmission subassembly and is rotated, through square strip and spout sliding fit, the lifter of being convenient for slides in the slide, promote the stability of lifter motion, through steel axle and square groove cooperation, the pendulum rod of being convenient for promotes the lifter motion, through pendulum rod and lifter cooperation, the lifter of being convenient for removes and drives the tubbiness thing and goes up and down, press from both sides the subassembly cooperation through removing the subassembly with pressing from both sides, be convenient for remove and press from both sides the tubbiness thing, reduce the transport degree of difficulty, reduce intensity of labour, and the work efficiency is improved.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
The accompanying drawings, which form a part of the present application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic perspective view of an apparatus according to an embodiment of the present invention;
fig. 2 is a schematic perspective view of a transmission assembly according to an embodiment of the present invention;
fig. 3 is a schematic cross-sectional view of a lifting assembly according to an embodiment of the present invention;
FIG. 4 is a schematic view of the structure at A in FIG. 3;
fig. 5 is a schematic cross-sectional view of a worm wheel according to an embodiment of the present invention;
wherein the figures include the following reference numerals:
the base plate 1, the handle 101, the baffle 104, the support frame 2, the first motor 3, the bull stick 4, the worm 5, the worm wheel 6, the backup pad 7, the bracing piece 8, place the platform 9, the pendulum rod 10, the second motor 11, the screw rod 12, the slide 13, the slide rail 14, the head rod 15, the movable plate 16, the fixed block 17, the arc splint 18, the lifter plate 19, the lifter 20, the steel shaft 21, place the piece 22, the cylinder 23, the dead lever 24, the universal wheel 25, the second connecting rod 26.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
To maintain the following description of the embodiments of the present invention clear and concise, detailed descriptions of well-known functions and components may be omitted.
Referring to fig. 1 to 5, in the present embodiment, there is provided a device for transporting a construction barrel, including: place platform 9, place the downside of platform 9 and installed transmission assembly, two dead levers 24 have all been installed to the transmission assembly both sides, two pendulum rods 10, the slide has been seted up in the dead lever 24, the spout has all been seted up to the relative both sides of slide inner wall, sliding fit has lifter 20 in the slide, square strip has been installed to lifter 20 one end, square strip sliding fit is in the spout, steel axle 21 has been installed between two square strips, the square groove has been seted up to pendulum rod 10 one end, steel axle 21 clearance fit is in the square groove, lifter 20 is located the upside of pendulum rod 10, a lifter plate 19 has been installed to two adjacent lifter 20 upsides, the removal subassembly has been installed to lifter 19 upside, the removal subassembly upside has been installed to the removal subassembly upside, base plate 1 is located between two removal subassemblies.
The application of one aspect of the embodiment is as follows: the device is firstly close to a barrel-shaped object, the barrel-shaped object is located between two movable assemblies, the clamping assemblies move to two sides of the barrel-shaped object, the clamping assemblies are clamped, then the transmission assemblies rotate to drive the swing rods 10 to rotate, the swing rods 10 rotate to drive the lifting rods 20 to move upwards, the lifting rods 20 move to drive the lifting plates 19 to move until the lower ends of the barrel-shaped object are lifted to the upper side of the placing table 9, the transmission assemblies stop transmission, then the movable assemblies move the barrel-shaped object to the upper side of the placing table 9, the transmission assemblies drive the swing rods 10 to rotate, the swing rods 10 drive the lifting rods 20 to move downwards until the lower ends of the barrel-shaped object are in contact with the placing table 9, the transmission assemblies stop transmission, the clamping assemblies shrink finally, and the barrel-shaped object is placed on the upper side of the placing table 9. It should be noted that the electric devices involved in the present application may be powered by a storage battery or an external power source.
Through the transmission assembly pendulum rod 10 of being convenient for rotate, through square strip and spout sliding fit, the lifter 20 of being convenient for slides in the slide, promote the stability of lifter 20 motion, through steel axle 21 and square groove cooperation, the pendulum rod 10 of being convenient for promotes the lifter 20 motion, through pendulum rod 10 and lifter plate 19 cooperation, the lifter plate 19 of being convenient for removes and drives the tubbiness thing and goes up and down, press from both sides the subassembly cooperation through removing the subassembly, be convenient for remove and press from both sides the tubbiness thing, reduce the transport degree of difficulty, reduce intensity of labour, and the work efficiency is improved.
As shown in fig. 1-2, the transmission assembly of this embodiment includes a substrate 1, a support frame 2, two support plates 7, and four support rods 8 are mounted on an upper side of the substrate 1, the two support plates 7 are located between two adjacent support rods 8, the support frame 2 is located between the two support plates 7, two worm wheels 6 are rotatably fitted in the support frame 2, a first motor 3 is mounted on a lower side of the substrate 1, a worm 5 is mounted at an output end of the first motor 3, the worm 5 penetrates through the substrate 1 and is engaged with the two worm wheels 6, rotating rods 4 are mounted on two opposite sides of the worm wheels 6, the rotating rods 4 are rotatably fitted in the support frame 2 and the support plates 7, the rotating rods 4 penetrate through the support plates 7, and a swinging rod 10 is mounted at one end of the rotating rods 4 and is engaged with the two worm wheels 6 through the worm 5, so that the rotating rods 4 can rotate to drive the swinging rod 10 to swing.
As shown in fig. 1-5, two first connecting rods 15 are installed on one side of the substrate 1, the first connecting rods 15 are located on one side of the fixing rods 24, a baffle plate 104 is installed on the upper side of the first connecting rods 15, two handles 101 are installed on one side of the baffle plate 104, the baffle plate 104 is located between the lifting plate 19 and the handles 101, the first connecting rods 15 serve to connect the substrate 1 and the baffle plate 104, so that the stability of the whole device is increased, the deformation caused by external force impact is reduced, and the device is conveniently pushed to move by the handles 101.
As shown in fig. 1-2, the moving assembly of this embodiment includes a sliding rail 14 installed on the upper side of the lifting plate 19, a second motor 11 is installed on one side of the sliding rail 14, a screw 12 is installed at the output end of the second motor 11, the screw 12 is located in the sliding rail 14, a sliding plate 13 is slidably fitted in the sliding rail 14, the sliding plate 13 is in threaded fit with the periphery of the screw 12, and the sliding plate 13 is fitted with the sliding rail 14, so that the clamping assembly can move stably, the probability of deviation of the sliding plate 13 is reduced, and the flexibility of the clamping assembly is increased.
As shown in fig. 3-4, the clamping assembly of this embodiment includes a moving plate 16 mounted on the upper side of the sliding plate 13, a placing block 22, a cylinder 23 mounted on the upper side of the placing block 22, an output end of the cylinder 23 penetrates through the moving plate 16, a fixing block 17 is mounted at an output end of the cylinder 23, the moving plate 16 is located between the fixing block 17 and the placing block 22, an arc-shaped clamp plate 18 is mounted on one side of the fixing block 17, the fixing block 17 is located between the arc-shaped clamp plate 18 and the moving plate 16, one side of the fixing block 17 is an arc-shaped surface, which is convenient for placing the arc-shaped clamp plate 18, a through groove is formed on one side of the moving plate 16, an output end of the cylinder 23 penetrates through the through groove to be connected with the fixing block 17, an air pump is connected to one side of the cylinder 23, when a barrel-shaped object needs to be clamped, the cylinder 23 is started, the output end of the cylinder 23 pushes the fixing block 17 and the arc-shaped clamping plates 18 to move, and the two arc-shaped clamping plates 18 approach each other to clamp the barrel-shaped object.
As shown in fig. 1-5, the universal wheel 25 is installed at the lower side of the fixing rod 24, the second connecting rod 26 is installed at one side of two adjacent fixing rods 24, the fixing rod 24 is located between the second connecting rod 26 and the base plate 1, the moving direction of the device is convenient to change through the universal wheel 25, the flexibility of the device is increased, the second connecting rod 26 plays a role in fixing two adjacent fixing rods 24, the stability of the lifting rod 20 during movement is increased, and the swing probability of the fixing rods 24 is reduced.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the accompanying drawings are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the application described herein are capable of operation in sequences other than those illustrated or described herein.
In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the orientation words such as "front, back, up, down, left, right", "horizontal, vertical, horizontal" and "top, bottom" etc. are usually based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, and in the case of not making a contrary explanation, these orientation words do not indicate and imply that the device or element referred to must have a specific orientation or be constructed and operated in a specific orientation, and therefore, should not be interpreted as limiting the scope of the present invention; the terms "inner and outer" refer to the inner and outer relative to the profile of the respective component itself.

Claims (6)

1. A handling device of construction tubbiness characterized by comprising: place platform (9), place platform (9) downside and installed drive assembly, two dead levers (24) have all been installed to the drive assembly both sides, two pendulum rods (10), the slide has been seted up to dead lever (24) one side, the spout has all been seted up to the relative both sides of slide inner wall, sliding fit has lifter (20) in the slide, two square strips have been installed to lifter (20) lower extreme, square strip sliding fit is in the spout, steel axle (21) have been installed between two square strips, the square groove has been seted up to pendulum rod (10) one end, steel axle (21) clearance fit is in the square groove, lifter (20) upside has been installed lifter (19), the removal subassembly has been installed to lifter (19) upside, the removal subassembly upside has been installed and has been got the clamp.
2. The device for conveying the building construction tubs as claimed in claim 1, wherein the transmission assembly comprises a base plate (1), a support frame (2), two support plates (7) and four support rods (8) are arranged on the upper side of the base plate (1), two worm gears (6) are rotatably fitted in the support frame (2), a first motor (3) is arranged on the lower side of the base plate (1), a worm (5) is arranged at the output end of the first motor (3), the worm (5) penetrates through the base plate (1) to be meshed with the two worm gears (6), two opposite ends of the worm gears (6) are respectively provided with a rotating rod (4), and the rotating rods (4) are rotatably fitted in the support frame (2) and the support plates (7).
3. The apparatus for transporting a construction bucket according to claim 2, wherein the base plate (1) is provided with two first connecting rods (15) at one side thereof, the first connecting rods (15) are provided with the baffle (104) at an upper side thereof, and the baffle (104) is provided with two handles (101) at one side thereof.
4. The device for transporting the building construction barrel-shaped object as claimed in claim 1, wherein the moving assembly comprises a slide rail (14) installed on the upper side of the lifting plate (19), a second motor (11) is installed on one side of the slide rail (14), a screw (12) is installed at the output end of the second motor (11), a sliding plate (13) is slidably fitted in the slide rail (14), and the sliding plate (13) is threadedly fitted on the peripheral side of the screw (12).
5. The device for transporting the building construction tubs as claimed in claim 4, wherein the gripping assembly comprises a moving plate (16) mounted on the upper side of the sliding plate (13), a placing block (22), an air cylinder (23) mounted on the upper side of the placing block (22), an output end of the air cylinder (23) penetrates through the moving plate (16), a fixed block (17) mounted on an output end of the air cylinder (23), and an arc-shaped clamping plate (18) mounted on one side of the fixed block (17).
6. The apparatus for transporting a construction bucket according to claim 1, wherein universal wheels (25) are provided on the lower sides of the fixing bars (24), and a second connecting bar (26) is provided on one side of both fixing bars (24).
CN202221067454.7U 2022-05-06 2022-05-06 Handling device of building construction tubbiness thing Active CN217198276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221067454.7U CN217198276U (en) 2022-05-06 2022-05-06 Handling device of building construction tubbiness thing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221067454.7U CN217198276U (en) 2022-05-06 2022-05-06 Handling device of building construction tubbiness thing

Publications (1)

Publication Number Publication Date
CN217198276U true CN217198276U (en) 2022-08-16

Family

ID=82777396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221067454.7U Active CN217198276U (en) 2022-05-06 2022-05-06 Handling device of building construction tubbiness thing

Country Status (1)

Country Link
CN (1) CN217198276U (en)

Similar Documents

Publication Publication Date Title
CN210754641U (en) Novel adjustable punching device for upper side plate
CN217198276U (en) Handling device of building construction tubbiness thing
CN211004384U (en) Dedicated jacking equipment of electromechanical installation
CN210065044U (en) Scraped car stores and oil pumping platform
CN218520917U (en) Clamp crane
CN217552360U (en) Multi-shaft turntable for machining end cover for hydraulic pump
CN210398217U (en) Positioning instrument for mounting electromechanical equipment
CN113459080B (en) Manipulator grabbing device is used in production and processing of liquid crystal flat back of body lid
CN212831548U (en) Loading attachment of polymer board cutting edge machine
CN212861579U (en) Oil tank carrying and pouring vehicle
CN212190684U (en) Die steel deformation correcting device
CN113619961A (en) Portable garbage can auxiliary pouring device
CN219113270U (en) Welding positioning equipment for die supporting vehicle
CN218109144U (en) Clamping unit for stamping manipulator
CN219189247U (en) Stirring type equipment bottom bearing dismounting device
CN220113705U (en) Brick cutting machine for electric melting bricks
CN217126126U (en) Material piling and transferring equipment for building engineering construction
CN220719596U (en) Quick punching equipment
CN216949586U (en) Discharging platform for building construction
CN213975951U (en) Artificial intelligence robot transfer device
CN219791183U (en) Building material stores frame
CN214263487U (en) Angle bar punching equipment
CN212687370U (en) Steel construction engineering component rotating device
CN212474959U (en) Openable belt conveyor line body
CN213458682U (en) Real standard machine convenient to remove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant