CN217191582U - Waste treatment device for building engineering - Google Patents

Waste treatment device for building engineering Download PDF

Info

Publication number
CN217191582U
CN217191582U CN202220505060.9U CN202220505060U CN217191582U CN 217191582 U CN217191582 U CN 217191582U CN 202220505060 U CN202220505060 U CN 202220505060U CN 217191582 U CN217191582 U CN 217191582U
Authority
CN
China
Prior art keywords
crushing
wall
water
collecting box
dust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220505060.9U
Other languages
Chinese (zh)
Inventor
李喜财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220505060.9U priority Critical patent/CN217191582U/en
Application granted granted Critical
Publication of CN217191582U publication Critical patent/CN217191582U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The application relates to the technical field of constructional engineering, and discloses a waste treatment device for constructional engineering, including smashing the case, it is provided with the collecting box to smash bottom of the case portion, the inside collection box that is provided with of collecting box, it is provided with dust fall structure to smash incasement portion. This waste material processing apparatus for building engineering, the staff is through throwing into building waste and smashing incasement portion, smash the case to the kibbling in-process of building waste, dust in the building waste can float and smash incasement portion, then it gets into in the draft tube through the outlet pipe to drive the inside water of water tank through the suction pump, then it is inside to get into the water storage canal who smashes the incasement roof through the draft tube, at last shower nozzle through water storage canal bottom with the water injection smash incasement portion, make water and dust mix together, carry out the humidifying through water to the dust and handle, make the dust fall on the waste material surface, prevent effectively that the dust from appearing showy condition, reach the effect of carrying out the dust fall processing to building waste.

Description

Waste treatment device for building engineering
Technical Field
The application relates to the technical field of constructional engineering, in particular to a waste treatment device for constructional engineering.
Background
The building engineering is an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings and the auxiliary facilities, and can meet the requirements of production, living, learning and public activities of people.
Can produce certain construction waste in the building engineering production activity, at present the processing to construction waste, generally carry out shredding to the great construction waste of granule with the help of crushing apparatus, crushing apparatus smashes the in-process to construction waste, dust in the construction waste can float aloft, cause certain pollution to the environment, current crushing apparatus does not nevertheless possess the function of dust fall, make crushing apparatus's practicality lower, application scope is extensive inadequately, consequently, a waste material processing apparatus for the building engineering is needed urgently.
SUMMERY OF THE UTILITY MODEL
To prior art's not enough, this application provides a waste material processing apparatus for building engineering, and crushing apparatus possesses the advantage of dust fall, has solved the problem that the crushing apparatus who mentions in the above-mentioned background art does not possess the dust fall.
In order to achieve the above purpose, the present application provides the following technical solutions: the utility model provides a waste treatment device for building engineering, is including smashing the case, it is provided with the collecting box to smash bottom of the case portion, the inside collection box that is provided with of collecting box, it is provided with the dust fall structure to smash incasement portion.
The dust fall structure includes water tank, outlet pipe, suction pump, honeycomb duct, water storage canal and shower nozzle, the water tank sets up in crushing roof portion, the outlet pipe sets up in water tank one side, outlet pipe one end is connected on the water tank, outlet pipe other end port seals and sets up in the suction pump, honeycomb duct one end is connected on the suction pump, honeycomb duct one end is run through crushing roof portion and is extended to crushing incasement portion, the water storage canal sets up roof in crushing incasement, the honeycomb duct extends to crushing case one end port and seals and set up in the water storage canal, the shower nozzle sets up in water storage canal bottom, the shower nozzle top is connected on the water storage canal.
Preferably, a feed inlet is formed in one side of the crushing box, a sealing cover is arranged inside the feed inlet, the size of the sealing cover is matched with that of the feed inlet, the outer wall of the sealing cover is in lap joint with the inner wall of the feed inlet, and the sealing cover extends out of the outer wall of the crushing box and is fixedly connected with a first pull block.
Can carry out the shutoff to the feed inlet through the closing cap, prevent effectively that the dust from getting into crushing case outside through the feed inlet, the pull force is exerted to the closing cap to the staff to first drawing the piece.
Preferably, a crushing motor is arranged on one side of the crushing box, a crushing shaft is fixedly connected to the output end of the crushing motor, the crushing shaft is arranged inside the crushing box, crushing teeth are fixedly connected to the outer surface of the crushing shaft inside the crushing box, a stabilizing disc is fixed to the end part of the inner side wall of the crushing box at the end of the crushing shaft, and the crushing shaft is rotatably connected inside the stabilizing disc.
Make construction waste smash more thoroughly through two sets of crushing teeth, make crushing axle more stable when smashing incasement portion and rotating through stable dish.
Preferably, the bottom of the crushing box is provided with a discharge port, a baffle is arranged inside the discharge port, the crushing box is provided with a first chute on the side wall of the discharge port, a slide block is arranged inside the first chute, one end of the slide block extending out of the first chute is fixedly connected with the outer wall of one side of the baffle, and a second pull block is fixedly connected with the outer wall of the crushing box extending out of the baffle.
Sliding connection through first spout and slider makes the baffle slide to crushing case outside, makes building waste get into the collecting box through the discharge gate inside, and the second draws the piece to make things convenient for the staff to apply the pulling force to the baffle.
Preferably, a threaded hole is formed in one side of the collecting box, a threaded cover is arranged in the threaded hole, the inner wall of the threaded hole is in threaded connection with the outer wall of the threaded cover, an activated carbon adsorption net is fixedly connected to the outer wall of one side of the threaded cover, and the threaded cover extends out of a rotating rod fixedly connected to the outer wall of the collecting box.
Preferably, a second chute is formed in the collecting box, a pulley is arranged in the second chute, a transmission rod is arranged on one side of the pulley in the second chute, one end of the transmission rod extending out of the second chute is fixedly connected with the outer wall of one side of the collecting box, and the collecting box extends out of the outer wall of the collecting box and is fixedly connected with a pull ring.
In summary, the present application includes at least one of the following benefits:
1. this waste material processing apparatus for building engineering, through being provided with the dust fall structure, specifically be when needs carry out the dust fall to construction waste and handle, the staff is through throwing into construction waste smashes incasement portion, smash the case to the kibbling in-process of construction waste, dust in the construction waste can float crushing incasement portion, then drive the inside water of water tank through the suction pump and get into in the draft tube through the outlet pipe, then it is inside to get into the water storage canal who smashes the incasement roof through the draft tube, at last the shower nozzle through water storage canal bottom is gone into crushing incasement portion with the water injection, make water and dust mix together, carry out the humidifying through water to the dust and handle, make the dust fall on the waste material surface, prevent effectively that the dust from appearing showy condition, reach the effect of carrying out the dust fall and handle to construction waste.
2. This waste material processing apparatus for building engineering, through being provided with the active carbon adsorption net, it is inside specifically to get into the collecting box through the discharge gate after the construction waste smashes, the in-process that the construction waste descends, the part dust on construction waste surface can float inside the collecting box, adsorb the dust through the inside active carbon adsorption net of collecting box, get rid of the inside dust of collecting box to a certain extent, and the cooperation through screw cap and screw hole, make things convenient for the staff to pull down the active carbon adsorption net, then clear up the dust on active carbon adsorption net surface, make the active carbon adsorption net carry out normal adsorption work, reach the effect of further getting rid of construction waste surface dust.
Drawings
FIG. 1 is a schematic structural diagram of the present application;
FIG. 2 is a schematic structural diagram of the present application;
FIG. 3 is a schematic structural diagram of the present application;
FIG. 4 is a schematic structural diagram of the present application;
fig. 5 is a schematic structural diagram of the present application.
Wherein: 1. a crushing box; 101. a water tank; 102. a water outlet pipe; 103. a water pump; 104. a flow guide pipe; 105. a water storage channel; 106. a spray head; 107. a feed inlet; 108. sealing the cover; 109. a first pull block; 110. a grinding motor; 111. a crushing shaft; 112. crushing teeth; 113. a stabilizing disc; 114. a discharge port; 115. a baffle plate; 116. a first chute; 117. a slider; 118. a second pull block; 2. a collection box; 201. a threaded hole; 202. a threaded cap; 203. an activated carbon adsorption net; 204. rotating the rod; 205. a second chute; 206. a pulley; 207. a transmission rod; 3. a collection box; 301. and (4) a pull ring.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses a waste treatment device for building engineering. Referring to fig. 1 and 4, a waste treatment device for construction engineering comprises a crushing box 1, wherein a dust falling structure is arranged inside the crushing box 1, the dust falling structure comprises a water tank 101, a water outlet pipe 102, a water suction pump 103, a flow guide pipe 104, a water storage channel 105 and a spray head 106, and when workers throw construction waste into the crushing box 1, during the process that the crushing box 1 crushes the construction waste, dust in the construction waste floats inside the crushing box 1, then the water in the water tank 101 is driven by the water pump 103 to enter the draft tube 104 through the water outlet pipe 102, then enters the inside of a water storage channel 105 on the inner top wall of the crushing box 1 through a guide pipe 104, finally sprays water into the inside of the crushing box 1 through a spray head 106 at the bottom of the water storage channel 105, mixes the water with dust, the dust is humidified by water, so that the dust falls on the surface of the waste, and the floating condition of the dust is effectively prevented.
Referring to fig. 1, crushing case 1 one side has been seted up feed inlet 107, the inside closing cap 108 that is provided with of feed inlet 107, closing cap 108 size and feed inlet 107 size looks adaptation, closing cap 108 outer wall and the overlap joint of feed inlet 107 inner wall, closing cap 108 extends and smashes 1 outer wall fixed connection first pull block 109 of case, the staff passes through feed inlet 107 and drops into crushing case 1 inside with construction waste, and can carry out the shutoff to feed inlet 107 through closing cap 108, prevent effectively that the dust from getting into crushing case 1 outside through feed inlet 107, first pull block 109 makes things convenient for the staff to exert pulling force to closing cap 108.
Referring to fig. 1, crushing case 1 one side is provided with crushing motor 110, crushing motor 110 output end fixedly connected with crushing axle 111, crushing axle 111 sets up inside crushing case 1, crushing case 1 is inside crushing axle 111 outer fixed surface is connected with crushing tooth 112, crushing case 1 inside wall is fixed with stabilizer disc 113 at crushing axle 111 end, crushing axle 111 rotates and connects in stabilizer disc 113, crushing motor 110 through crushing case 1 one side drives crushing axle 111 and crushing tooth 112 and rotates inside crushing case 1, make crushing tooth 112 pivoted in-process carry out shredding to construction waste, and crushing tooth 112 is provided with two sets ofly, make construction waste smash more thoroughly through two sets of crushing teeth 112, make crushing axle 111 more stable when crushing case 1 is inside to rotate through stabilizer disc 113.
Referring to fig. 1, fig. 2 and fig. 4, discharge gate 114 has been seted up to crushing case 1 bottom, discharge gate 114 is inside to be provided with baffle 115, crushing case 1 has seted up first spout 116 at discharge gate 114 lateral wall, the inside slider 117 that is provided with of first spout 116, slider 117 extends first spout 116 one end and baffle 115 one side outer wall fixed connection, baffle 115 extends crushing case 1 outer wall fixed connection and draws piece 118, baffle 115 mainly blocks discharge gate 114, prevent to smash in-process construction waste material to get into inside collecting box 2, and make baffle 115 slide to crushing case 1 outside through the sliding connection of first spout 116 and slider 117, make construction waste material get into inside collecting box 2 through discharge gate 114, the second draws piece 118 and makes things convenient for the staff to exert the pulling force to baffle 115.
Referring to fig. 1, fig. 4 and fig. 5, smash 1 bottom of case and be provided with collecting box 2, threaded hole 201 has been seted up to collecting box 2 one side, threaded hole 201 inside is provided with screw lid 202, threaded hole 201 inner wall and screw lid 202 outer wall threaded connection, screw lid 202 one side outer wall fixedly connected with active carbon adsorption net 203, screw lid 202 extends collecting box 2 outer wall fixedly connected with dwang 204, adsorb the inside dust of collecting box 2 through active carbon adsorption net 203, cooperation through threaded hole 201 and screw lid 202, conveniently take off active carbon adsorption net 203 from collecting box 2, the staff of being convenient for clears up the dust on active carbon adsorption net 203 surface, make things convenient for the staff to exert the turning force to screw lid 202 through dwang 204, so that take off screw lid 202.
Referring to fig. 1, fig. 3 and fig. 4, collection box 3 is provided inside collection box 2, second spout 205 has been seted up inside collection box 2, inside pulley 206 that is provided with of second spout 205, be provided with transfer line 207 on one side of pulley 206 in second spout 205, transfer line 207 extends second spout 205 one end and collects box 3 one side outer wall fixed connection, collection box 3 extends collection box 2 outer wall fixedly connected with pull ring 301, construction waste falls into inside collection box 3, concentrate the collection through collection box 3 to construction waste, make collection box 3 slide to collection box 2 outside through the sliding connection of second spout 205 and pulley 206, make the staff clear up the construction waste inside collection box 3, pull ring 301 makes things convenient for the staff to exert the pulling force to collection box 3.
The application principle of the waste treatment device for the construction engineering of the embodiment of the application is as follows: when needs carry out the dust fall to construction waste and handle, the staff is through throwing into construction waste smashes incasement 1 inside, smash case 1 to the kibbling in-process of construction waste, dust in the construction waste can float and smash incasement 1 inside, then drive the inside water of water tank 101 through suction pump 103 and pass through outlet pipe 102 and get into in the honeycomb duct 104, then get into through honeycomb duct 104 and smash the water storage canal 105 inside of incasement 1 roof, it is inside to inject the water into crushing incasement 1 through the shower nozzle 106 of water storage canal 105 bottom at last, make water and dust mix together, carry out the humidifying through water to the dust and handle, make the dust fall on the waste surface, prevent effectively that the dust from appearing showy condition, and then handle the dust fall to construction waste.
Although embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the application, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a waste material processing apparatus for building engineering, includes crushing case (1), its characterized in that: a collecting box (2) is arranged at the bottom of the crushing box (1), a collecting box (3) is arranged in the collecting box (2), and a dust falling structure is arranged in the crushing box (1);
the dust fall structure comprises a water tank (101), a water outlet pipe (102), a water suction pump (103), a flow guiding pipe (104), a water storage channel (105) and a spray head (106), wherein the water tank (101) is arranged at the top of the crushing box (1), the water outlet pipe (102) is arranged on one side of the water tank (101), one end of the water outlet pipe (102) is connected to the water tank (101), the port of the other end of the water outlet pipe (102) is sealed and arranged in the water suction pump (103), one end of the flow guiding pipe (104) is connected to the water suction pump (103), one end of the flow guiding pipe (104) runs through the top of the crushing box (1) and extends to the inside of the crushing box (1), the water storage channel (105) is arranged on the inner top wall of the crushing box (1), the flow guiding pipe (104) extends to the port of one end of the crushing box (1) and is sealed and arranged in the water storage channel (105), the spray head (106) is arranged at the bottom of the water storage channel (105), the top end of the spray head (106) is connected to the water storage channel (105).
2. The construction work waste disposal apparatus according to claim 1, wherein: smash case (1) one side and seted up feed inlet (107), feed inlet (107) inside be provided with closing cap (108), closing cap (108) size and feed inlet (107) size looks adaptation, closing cap (108) outer wall and feed inlet (107) inner wall overlap joint, closing cap (108) extend smash case (1) outer wall fixed connection first draw piece (109).
3. The construction work waste disposal apparatus according to claim 1, wherein: smash case (1) one side and be provided with crushing motor (110), crushing motor (110) output end fixedly connected with crushing roller (111), crushing roller (111) set up inside smashing case (1), crushing roller (111) internal surface fixedly connected with crushing tooth (112) of crushing case (1), it is fixed with at crushing roller (111) end portion to smash case (1) inside wall stable dish (113), crushing roller (111) rotate to be connected in stable dish (113).
4. The construction work waste disposal apparatus according to claim 1, wherein: smash case (1) bottom and seted up discharge gate (114), discharge gate (114) inside is provided with baffle (115), smash case (1) and seted up first spout (116) at discharge gate (114) lateral wall, first spout (116) inside is provided with slider (117), slider (117) extend first spout (116) one end and baffle (115) one side outer wall fixed connection, baffle (115) extend and smash case (1) outer wall fixedly connected with second and draw piece (118).
5. The construction work waste disposal apparatus according to claim 1, wherein: threaded hole (201) is seted up to collecting box (2) one side, threaded hole (201) inside is provided with screw thread lid (202), screw hole (201) inner wall and screw thread lid (202) outer wall threaded connection, screw thread lid (202) one side outer wall fixedly connected with active carbon adsorption net (203), screw thread lid (202) extend collecting box (2) outer wall fixedly connected with dwang (204).
6. The construction work waste disposal apparatus according to claim 1, wherein: the collecting box is characterized in that a second sliding groove (205) is formed in the collecting box (2), a pulley (206) is arranged in the second sliding groove (205), a transmission rod (207) is arranged on one side of the pulley (206) in the second sliding groove (205), one end, extending out of the second sliding groove (205), of the transmission rod (207) is fixedly connected with the outer wall of one side of the collecting box (3), and the collecting box (3) extends out of the outer wall of the collecting box (2) and is fixedly connected with a pull ring (301).
CN202220505060.9U 2022-03-08 2022-03-08 Waste treatment device for building engineering Expired - Fee Related CN217191582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220505060.9U CN217191582U (en) 2022-03-08 2022-03-08 Waste treatment device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220505060.9U CN217191582U (en) 2022-03-08 2022-03-08 Waste treatment device for building engineering

Publications (1)

Publication Number Publication Date
CN217191582U true CN217191582U (en) 2022-08-16

Family

ID=82755636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220505060.9U Expired - Fee Related CN217191582U (en) 2022-03-08 2022-03-08 Waste treatment device for building engineering

Country Status (1)

Country Link
CN (1) CN217191582U (en)

Similar Documents

Publication Publication Date Title
CN211413131U (en) Dust collector for building refuse treatment
CN214087983U (en) Sewage treatment pond for water pollution prevention and control
CN206328812U (en) A kind of building roof rainwater-collecting reuse means
CN206308223U (en) A kind of sewage purifying and treating device of municipal wastewater pipe network
CN216149875U (en) Breaker that dust removal effect is good
CN217191582U (en) Waste treatment device for building engineering
CN214437107U (en) Anti-blocking building water supply and drainage pipeline device
CN210495853U (en) Useless denitrification catalyst is with preprocessing device
CN210021581U (en) Waste gas treatment air inlet unit
CN214439733U (en) Kitchen garbage crushing treatment device
CN213591358U (en) Dust removal device for processing of waterproof coiled material
CN210357454U (en) Crushing device for coal mining of coal mine
CN211051646U (en) Environment-friendly reducing mechanism that urban construction rubbish was recycled
CN211078705U (en) Circulating sewage treatment device
CN206188792U (en) Kitchen garbage fermentation cabin
CN219785064U (en) House building engineering construction garbage disposal device
CN206276451U (en) A kind of garbage recovery device for afforestation
CN206395843U (en) A kind of mechanical grille cleaning machine
CN218339361U (en) Dustproof device for calcium oxide production process
CN219688791U (en) Sealed automatic feeding device
CN214019415U (en) Titanium dioxide production is with having waste liquid collecting equipment that filter screen dismantled structure
CN218794832U (en) Improved efficient rotational flow plate tower
CN215946863U (en) Novel bury integration sewage treatment device
CN219280593U (en) Road surface cleaning device
CN212669398U (en) River sewage treatment device capable of intercepting garbage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220816