CN217183607U - New forms of energy LAN power supply management system - Google Patents

New forms of energy LAN power supply management system Download PDF

Info

Publication number
CN217183607U
CN217183607U CN202220608061.6U CN202220608061U CN217183607U CN 217183607 U CN217183607 U CN 217183607U CN 202220608061 U CN202220608061 U CN 202220608061U CN 217183607 U CN217183607 U CN 217183607U
Authority
CN
China
Prior art keywords
power supply
management system
supply management
cabinet
cabinet body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220608061.6U
Other languages
Chinese (zh)
Inventor
周敏
任兰杰
申萌萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Panbang Electronic Technology Co ltd
Original Assignee
Jinan Panbang Electronic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Panbang Electronic Technology Co ltd filed Critical Jinan Panbang Electronic Technology Co ltd
Priority to CN202220608061.6U priority Critical patent/CN217183607U/en
Application granted granted Critical
Publication of CN217183607U publication Critical patent/CN217183607U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Casings For Electric Apparatus (AREA)

Abstract

The utility model relates to a LAN power supply management system technical field especially relates to a new forms of energy LAN power supply management system, and its technical scheme includes: hinge, the cabinet body, rubber circle, loading board, drier and spring, the power supply management system body is installed at the workstation top, the internal portion both sides of cabinet are sharp equidistance respectively and have seted up three group's spouts, and are three the slider has been welded respectively to the loading board both sides, the holder is installed on the internal portion top of cabinet, inside the drier inserted the holder from the jack, state cabinet body bottom four corners department and have welded fixed cover, four respectively fixed cover bottom installs the rubber circle respectively, four bottom plate, four are installed respectively to rubber circle bottom the spring is installed respectively at the bottom plate top. The utility model has the advantages of the space of depositing article is provided, conveniently adjusts and deposits the structure, keeps inside dry, improves personnel's work efficiency, alleviates the earthquake to the influence of power supply management system body, and the stability is kept.

Description

New forms of energy LAN power supply management system
Technical Field
The utility model relates to a LAN power supply management system technical field specifically is a new forms of energy LAN power supply management system.
Background
The local area network has the advantages that the local area network is wide in application range in various offices due to the characteristics of convenience and rapidness in installation, cost saving, convenience in expansion and the like, can achieve functions of file management, application software sharing, printer sharing and the like, can effectively protect data safety by maintaining the safety of the local area network in the using process, and can ensure normal and stable operation of the local area network.
The power supply management system is very important in a local area network system, so when natural disasters such as earthquakes occur, the power supply management system needs to be protected sufficiently to avoid the situation that the local area network is broken down to cause abnormal use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a new forms of energy LAN power supply management system possesses the space that provides deposit article, conveniently adjusts and deposits the structure, keeps inside dry, improves personnel's work efficiency, alleviates the earthquake to the influence of power supply management system body, and the advantage of stability has solved traditional power supply management system storage space few, can't resist the problem of vibrations.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a new forms of energy LAN power supply management system, includes hinge, the cabinet body, rubber circle, loading board, drier and spring, the workstation is installed at cabinet body top, the power supply management system body is installed at the workstation top, the internal portion both sides of cabinet are sharp equidistance respectively and have seted up three spouts of group, and are three the slider has been welded respectively to the loading board both sides, the holder is installed on the internal portion top of cabinet, the jack has been seted up to the holder rear end, inside the drier inserted the holder from the jack, the internal portion four corners department of cabinet has welded fixed cover, four respectively fixed cover bottom installs the rubber circle respectively, four the bottom plate is installed respectively, four to rubber circle bottom the spring is installed respectively at the bottom plate top.
Preferably, the cabinet body is rotatably provided with a cabinet door through a hinge, and the cabinet door is provided with a handle. Through the handle, can open the cabinet door, operate cabinet body inside.
Preferably, the three groups of sliding blocks are respectively connected with the three groups of sliding grooves in a sliding manner. Through sliding connection, be convenient for installation and dismantlement loading board.
Preferably, information boxes are respectively installed on one side of the upper surfaces of the three bearing plates. Through the information box, the article information on the corresponding bearing plate can be marked.
Preferably, the bottom of the retainer is provided with a round hole, and the round hole penetrates through the bottom of the retainer. Through the round hole, the desiccant in the retainer can absorb moisture in the air.
Preferably, the bottom of each of the four fixing sleeves is provided with an opening which is not closed, and the four springs respectively extend into the four fixing sleeves from the openings. The fixing sleeve is elastically connected with the bottom plate through a spring.
Preferably, the four fixing sleeves are respectively parallel to the four bottom plates. By being parallel, the center of gravity does not shift.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up the loading board, the slider, spout and drier, the cabinet body provides the space of storage, can be with the instrument that cooperation power supply management system body used or originally put the loading board of internal portion of cabinet on the record, information box on the loading board, can mark the article information on the loading board, avoid the staff to do thoughtlessly, the loading board passes through slider and spout and cabinet body sliding connection, the installation with dismantle easy operation, can be according to the size of depositing article, the quantity of the internal portion loading board of adjustment cabinet, the inside drier of holder is with the moisture absorption in the internal air of cabinet, avoid the article that the moisture corrosion was deposited, reached and provided the space of depositing article, conveniently adjust and deposit the structure, keep inside dry, improve personnel's work efficiency's effect.
2. The utility model discloses a set up rubber circle and spring, fixed cover and bottom plate pass through rubber circle and spring elastic connection, power supply management system body is very important in the LAN system, need remain stable use, when taking place the earthquake, vibrations are given the bottom plate by ground transmission, the bottom plate will vibrate the transmission and give spring and rubber circle, spring and rubber circle alleviate vibrations, avoid vibrations too big electric elements to power supply management system body inside to produce the influence, reached and alleviateed the influence of earthquake to power supply management system body, the effect of stability is kept.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
fig. 3 is an enlarged schematic structural view of fig. 2 of the present invention;
FIG. 4 is a schematic cross-sectional view of the retainer of the present invention;
fig. 5 is a schematic view of the sectional structure of the fixing sleeve and the rubber ring of the present invention.
In the figure: 1. a base plate; 2. fixing a sleeve; 3. a hinge; 4. a cabinet body; 5. a cabinet door; 6. a work table; 7. a power supply management system body; 8. a handle; 9. a rubber ring; 10. an information box; 11. a carrier plate; 12. a holder; 13. a slider; 14. a chute; 15. a jack; 16. a desiccant; 17. a circular hole; 18. a spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The technical solution of the present invention will be further explained with reference to the accompanying drawings and specific embodiments.
Example one
As shown in fig. 1-5, the new energy lan power supply management system provided by the present invention comprises a hinge 3, a cabinet 4, a loading board 11 and a drying agent 16, wherein a working table 6 is installed on the top of the cabinet 4, a power supply management system body 7 is installed on the top of the working table 6, a cabinet door 5 is rotatably installed on the cabinet 4 through the hinge 3, a handle 8 is installed on the cabinet door 5, three sets of sliding grooves 14 are respectively linearly and equidistantly formed on two sides inside the cabinet 4, sliders 13 are respectively welded on two sides of the loading board 11, the three sets of sliders 13 are respectively slidably connected with the three sets of sliding grooves 14, an information box 10 is respectively installed on one side of the upper surface of the loading board 11, a holder 12 is installed on the top end inside the cabinet 4, a jack 15 is formed on the rear end of the holder 12, the drying agent 16 is inserted into the holder 12 from the jack 15, a round hole 17 is formed on the bottom of the holder 12, the circular hole 17 penetrates the bottom of the holder 12, as is well known to those skilled in the art and provided by the power supply management system body 7, which belongs to conventional means or common knowledge, and will not be described herein again, and those skilled in the art can make any choice according to their needs or convenience.
The working principle based on the embodiment 1 is as follows: through the power supply management system body 7, operate the LAN power supply, use handle 8 to open the cabinet body 4, the cabinet body 4 provides the space of storing, can put the instrument that cooperation power supply management system body 7 used or record originally on the loading board 11 of the internal portion of cabinet 4, information box 10 on the loading board 11 marks article information, avoid the staff to mix, loading board 11 is through slider 13 and spout 14 and cabinet body 4 sliding connection, the installation and dismantlement easy operation, can be according to the size of depositing article, the quantity of the internal portion of cabinet 11 of adjustment cabinet 4, the moisture absorption in the internal air of cabinet 4 of drier 16 of holder 12, keep the internal portion of cabinet 4 dry, avoid the article that moisture corrodes and deposit.
Example two
As shown in fig. 1-5, the utility model provides a new forms of energy lan power supply management system compares in embodiment one, and this embodiment still includes: the cabinet comprises rubber rings 9 and springs 18, wherein fixed sleeves 2 are welded at four corners of the bottom of a cabinet body 4 respectively, the rubber rings 9 are installed at the bottoms of the four fixed sleeves 2 respectively, bottom plates 1 are installed at the bottoms of the four rubber rings 9 respectively, the four fixed sleeves 2 are parallel to the four bottom plates 1 respectively, the springs 18 are installed at the tops of the four bottom plates 1 respectively, openings are formed in the bottoms of the four fixed sleeves 2 respectively and are not closed, and the four springs 18 extend into the four fixed sleeves 2 from the openings respectively.
In this embodiment, through rubber circle 9 and spring 18, fixed cover 2 and bottom plate 1 elastic connection, when taking place the earthquake, vibrations are given bottom plate 1 by ground transmission, and spring 18 and rubber circle 9 are given with vibrations transmission to bottom plate 1, and spring 18 and rubber circle 9 alleviate vibrations, avoid vibrations too big to produce the influence to the electrical components of power supply management system body 7 inside, lead to the paralysed local area network.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a new forms of energy LAN power supply management system, includes hinge (3), the cabinet body (4), rubber circle (9), loading board (11), drier (16) and spring (18), its characterized in that: workstation (6) are installed at the cabinet body (4) top, power supply management system body (7) are installed at workstation (6) top, the cabinet body (4) inside both sides are sharp equidistance respectively and have seted up three group's spout (14), and are three slider (13) have been welded respectively to loading board (11) both sides, holder (12) are installed on the inside top of the cabinet body (4), jack (15) have been seted up to holder (12) rear end, inside jack (12) were inserted from jack (15) in drier (16), the welding respectively of cabinet body (4) bottom four corners department has fixed cover (2), four rubber circle (9), four are installed respectively to fixed cover (2) bottom rubber circle (9) bottom is installed bottom plate (1), four spring (18) are installed respectively at bottom plate (1) top.
2. The new energy local area network power supply management system according to claim 1, wherein: the cabinet body (4) is rotatably provided with a cabinet door (5) through a hinge (3), and the cabinet door (5) is provided with a handle (8).
3. The new energy local area network power supply management system according to claim 1, wherein: the three groups of sliding blocks (13) are respectively connected with the three groups of sliding grooves (14) in a sliding manner.
4. The new energy local area network power supply management system according to claim 1, wherein: and information boxes (10) are respectively arranged on one side of the upper surface of the three bearing plates (11).
5. The new energy local area network power supply management system according to claim 1, wherein: a round hole (17) is formed in the bottom of the retainer (12), and the round hole (17) penetrates through the bottom of the retainer (12).
6. The new energy local area network power supply management system according to claim 1, wherein: the bottom of each of the four fixing sleeves (2) is provided with an opening which is not closed, and the four springs (18) extend into the four fixing sleeves (2) from the openings respectively.
7. The new energy local area network power supply management system according to claim 1, wherein: the four fixing sleeves (2) are respectively parallel to the four bottom plates (1).
CN202220608061.6U 2022-03-21 2022-03-21 New forms of energy LAN power supply management system Expired - Fee Related CN217183607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220608061.6U CN217183607U (en) 2022-03-21 2022-03-21 New forms of energy LAN power supply management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220608061.6U CN217183607U (en) 2022-03-21 2022-03-21 New forms of energy LAN power supply management system

Publications (1)

Publication Number Publication Date
CN217183607U true CN217183607U (en) 2022-08-12

Family

ID=82744901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220608061.6U Expired - Fee Related CN217183607U (en) 2022-03-21 2022-03-21 New forms of energy LAN power supply management system

Country Status (1)

Country Link
CN (1) CN217183607U (en)

Similar Documents

Publication Publication Date Title
CN217183607U (en) New forms of energy LAN power supply management system
CN211092750U (en) Office table with storage function and capable of increasing use area
CN108258164B (en) High-efficient heat dissipation battery device for electric automobile
CN213534580U (en) Engineering work vehicle is protection alarm device for radar
CN209594067U (en) A kind of communication engineering prospecting record display device
CN214432814U (en) Archives management cabinet for engineering cost
CN210053042U (en) Protective peripheral device of electric power metering equipment
CN215913786U (en) BIM building design construction standard management device
CN211567427U (en) Financial and financial bill storage box
CN110927421A (en) Ammeter case for large-scale high voltage transmission electrical equipment
CN219477377U (en) Ac low-voltage distribution box
CN215271326U (en) Multifunctional office data storage device
CN211533347U (en) Tourist person's paper bill record management device that comes and goes
CN212322768U (en) Box-type transformer with data not easy to lose
CN211323792U (en) Categorised formula file placer that has fixture is used to accounting
CN219295074U (en) Spreading device for paper data arrangement
CN212591045U (en) Intelligent document circulation cabinet
CN216316286U (en) Convenient to use's manager table
CN215055568U (en) Safety device for electric power engineering operation
CN220683458U (en) Accounting report strorage device with secret effect
CN217825198U (en) Intelligent network switch
CN213546448U (en) Battery pack fixing frame
CN212257491U (en) Lithium battery box with placement stabilizing mechanism
CN214520110U (en) Electric maintenance tool case
CN214432889U (en) Manpower resource management archives stores pylon

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220812