CN217174805U - Gardens construction foundation ditch compaction fill structure - Google Patents
Gardens construction foundation ditch compaction fill structure Download PDFInfo
- Publication number
- CN217174805U CN217174805U CN202123146510.4U CN202123146510U CN217174805U CN 217174805 U CN217174805 U CN 217174805U CN 202123146510 U CN202123146510 U CN 202123146510U CN 217174805 U CN217174805 U CN 217174805U
- Authority
- CN
- China
- Prior art keywords
- tensioning
- plate
- blocking plate
- barrier plate
- connecting rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a gardens construction foundation ditch compaction fill structure, including the barrier plate, the lower extreme of barrier plate is provided with the bottom plate, be provided with the tensioning frame on the barrier plate, and the tensioning frame includes tensioning cover and tensioning bolt, the tensioning cover is installed on the barrier plate, tensioning bolt sets up and sheathes in barrier plate and tensioning, the tensile structure is installed to the upper end of barrier plate. A gardens construction foundation ditch compaction fill structure, belong to the construction technology field, tensioning frame through setting up, can guarantee the steadiness of barrier plate, improve the supporting effect, adopt the pulling force structure, the pulling force structure can play the effect of dragging the barrier plate effectively, steadiness when guaranteeing the barrier plate use can be dismantled simultaneously, be convenient for recycle, use cost has been reduced to a certain extent, through the alignment jig that sets up, can carry out the regulation of rate of tension, use flexibility has been improved, and go on of still convenient to detach work.
Description
Technical Field
The utility model relates to a construction technical field, in particular to gardens construction foundation ditch compaction fill structure.
Background
The garden construction refers to the process of carrying out construction and later maintenance in the gardens, garden engineering generally can excavate some interim foundation pits in advance in the work progress, some foundation pits are located near comparatively complicated topography in garden engineering, for example at the view lakeside, the foundation pit near artifical river bank is higher because of soil water content, when carrying out compaction fill to the foundation pit, constructor need lay the backfill material of different materials in the foundation pit, constructor can be in the operation in the foundation pit, and the lateral wall of the higher foundation pit of water content takes place to collapse easily, there is great threat to constructor's personal safety. In order to improve the safety of constructors, a corresponding filling structure is required to support and protect. The Chinese patent numbers are: CN213682121U discloses "a garden engineering construction foundation ditch compaction fill structure", in this patent, guarantees the supporting effect through backup pad, drill rod, draw anchor isotructure that set up, but in the above-mentioned patent, adopts structures such as bracing piece, sleeve, bracing piece to realize the supporting role, and during the fill, these structures are all buried, and non-detachable recycles, and the cost of using is higher, uses and has certain limitation.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a gardens construction foundation ditch compaction fill structure can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a gardens construction foundation ditch compaction fill structure, includes the barrier plate, the lower extreme of barrier plate is provided with the bottom plate, be provided with the tensioning frame on the barrier plate, and the tensioning frame includes tensioning cover and tensioning bolt, the tensioning cover is installed on the barrier plate, the tensioning bolt sets up and sheathes in barrier plate and tensioning, the tension structure is installed to the upper end of barrier plate, and the tension structure includes that first connecting rope, second are connected rope, installation piece, fixed block and alignment jig, be connected between first connecting rope and the installation piece, and the installation piece connects on the barrier plate, fixed connection between rope and the fixed block is connected to the second, the alignment jig is connected between second connecting rope and first connecting rope.
Preferably, the blocking plate and the bottom plate are arranged at ninety degrees, the blocking plate and the bottom plate are connected in a welding mode, and a reinforcing plate is fixedly connected between the blocking plate and the bottom plate.
Preferably, the blocking plate is provided with a through hole, the through hole is positioned between the two bottom plates, and the tensioning frame is aligned with the through hole.
Preferably, the tensioning frame still includes the screw hole, the tip in the tensioning cover is seted up to the screw hole, the tensioning bolt runs through in the through-hole, and threaded connection between the terminal of tensioning bolt and the screw hole on the tensioning cover.
Preferably, the tension structure further comprises a mounting bolt, an insertion rod and a round hole, the mounting bolt is arranged on the mounting block and is in threaded connection with the blocking plate, the mounting block is connected to the blocking plate through the mounting bolt, the insertion rod penetrates through the fixing block, and the round hole is formed in the upper end position of the insertion rod.
Preferably, the alignment jig includes connector, turning block, regulation pole and threaded rod, the connector is connected in the end of first connecting rope, the turning block rotates and connects on the connector, adjust the pole and connect the end of rope in the second, fixed connection between threaded rod and the turning block, and threaded connection between threaded rod and the regulation pole.
Compared with the prior art, the utility model discloses following beneficial effect has: this gardens construction foundation ditch compaction fill structure, through the tensioning frame that sets up, can guarantee the steadiness of barrier plate, improve the supporting effect, adopt the pulling force structure, the pulling force structure can play the effect of dragging the barrier plate effectively, steadiness when guaranteeing the barrier plate and using, can dismantle simultaneously, be convenient for recycle, use cost has been reduced to a certain extent, through the alignment jig that sets up, can carry out the regulation of rate of tension, use flexibility has been improved, and still going on of convenient to detach work.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the tension frame of the present invention;
fig. 3 is a schematic structural view of the tension structure of the present invention;
fig. 4 is a schematic structural diagram of the adjusting bracket of the present invention.
In the figure: 1. a blocking plate; 2. a base plate; 3. a tension frame; 301. a tensioning sleeve; 302. a threaded hole; 303. tensioning the bolt; 4. a tension structure; 401. a first connecting rope; 402. a second connecting rope; 403. mounting blocks; 404. installing a bolt; 405. a fixed block; 406. inserting a rod; 407. an adjusting bracket; 4071. a connector; 4072. rotating the block; 4073. adjusting a rod; 4074. a threaded rod; 408. a circular hole; 5. a reinforcing plate.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, a compaction filling structure for a garden construction foundation pit comprises a blocking plate 1, a bottom plate 2 is arranged at the lower end of the blocking plate 1, a tensioning frame 3 is arranged on the blocking plate 1, the tensioning frame 3 comprises a tensioning sleeve 301 and a tensioning bolt 303, the tensioning sleeve 301 is installed on the blocking plate 1, the tensioning bolt 303 is arranged on the blocking plate 1 and the tensioning sleeve 301, a tension structure 4 is installed at the upper end of the blocking plate 1, the tension structure 4 comprises a first connecting rope 401, a second connecting rope 402, an installation block 403, a fixing block 405 and an adjusting frame 407, the first connecting rope 401 is connected with the installation block 403, the installation block 403 is connected with the blocking plate 1, the second connecting rope 402 is fixedly connected with the fixing block 405, and the adjusting frame 407 is connected between the second connecting rope 402 and the first connecting rope 401.
Through above-mentioned embodiment, be ninety degrees settings between barrier plate 1 and the bottom plate 2, and the connected mode between barrier plate 1 and the bottom plate 2 is the welding, fixedly connected with reinforcing plate 5 between barrier plate 1 and the bottom plate 2, has seted up the through-hole on the barrier plate 1, and the through-hole is located between two bottom plates 2, and tensioning frame 3 aligns with the through-hole.
Through above-mentioned embodiment, tensioning frame 3 still includes screw hole 302, and screw hole 302 is seted up in the tip of tensioning sleeve 301, and tensioning bolt 303 runs through in the through-hole, and threaded connection between the terminal of tensioning bolt 303 and the screw hole 302 on the tensioning sleeve 301, through the tensioning frame 3 that sets up, can guarantee the steadiness of barrier plate 1, improves the support effect.
Through the above embodiment, the tension structure 4 further includes a mounting bolt 404, an insertion rod 406 and a circular hole 408, the mounting bolt 404 is disposed on the mounting block 403, and the mounting bolt 404 is in threaded connection with the blocking plate 1, the mounting block 403 is connected to the blocking plate 1 through the mounting bolt 404, the insertion rod 406 penetrates through the fixing block 405, the circular hole 408 is opened at the upper end position of the insertion rod 406, the adjusting bracket 407 includes a connector 4071, a rotating block 4072, an adjusting rod 4073 and a threaded rod 4074, the connector 4071 is connected to the end of the first connecting rope 401, the rotating block 4072 is rotatably connected to the connector 4071, the adjusting rod 4073 is connected to the end of the second connecting rope 402, the threaded rod 4074 is fixedly connected to the rotating block 4072, and the threaded rod 4074 is in threaded connection with the adjusting rod 4073, by using the tension structure 4, the tension structure 4 can effectively play a role of pulling the blocking plate 1, and ensure the stability of the blocking plate 1 when in use, can dismantle simultaneously, be convenient for recycle has reduced use cost to a certain extent, through the alignment jig 407 that sets up, can carry out the regulation of rate of tension, has improved the use flexibility to go on of still convenient to detach work.
It should be noted that, the utility model relates to a garden construction foundation pit compaction fill structure, when in use, the stop plate 1 and other structures are placed in the foundation pit, the stop plate 1 is supported by the bottom plate 2, a circular groove is arranged at the corresponding position on the side wall of the foundation pit, the stop plate 1 and the bottom plate 2 are moved, the tensioning sleeve 301 in the tensioning frame 3 is inserted into the circular groove, then the end of the tensioning bolt 303 is inserted into the hole on the stop plate 1, the end is screwed into the threaded hole 302, the tensioning bolt 303 is rotated by a tool until the tensioning bolt 303 clings to the stop plate 1, in the process, due to the threaded connection of the threaded hole 302 and the tensioning bolt 303, the tensioning sleeve 301 shrinks and deforms, meanwhile, the middle part of the tensioning sleeve 301 expands outwards, thereby playing the role of tensioning and fixing, the stability of the stop plate 1 after being adhered to the side wall of the foundation pit is ensured, then a worker screws the end of the mounting bolt 404 on the mounting block into the screw hole 403, at this time, the first connecting rope 401, the second connecting rope 402 and other structures are connected to the blocking plate 1 through the mounting block 403, the whole tension structure 4 is rotated, the mounting block 403 rotates around the mounting bolt 404 until the fixing block 405 is located at a proper position, then the mounting bolt 404 is screwed, the mounting block 403 is fixed at the upper end of the blocking plate 1, the top end of the inserting rod 406 is hammered downwards, the lower end of the inserting rod 406 is inserted into the soil, and further the fixing block 405 is ensured to be fixed relative to the soil, after the fixing block 405 is also fixed, the first connecting rope 401 and the second connecting rope 402 are in a normal straight state at this time, and cannot provide a pulling effect, a worker clamps the rotating block 4072 and the adjusting rod 4073 respectively by using a pipe clamp or a related tool, the rotating block 4072 is rotated by using the tool, the rotating block 4072 rotates on the connecting head 4071, so that the threaded rod 4074 is rotated relative to the adjusting rod 4073, threaded rod 4074 and adjust relative rotation between the pole 4073, whole length shortens, thereby make first connecting rope 401, the tensioning of second connecting rope 402, just so provide a pulling force to barrier plate 1 through tension structure 4, further guarantee the supporting role that barrier plate 1 played to the lateral wall soil, can prevent the emergence of the condition of collapsing effectively, carry out the installation work of opposite side barrier plate 1 isotructure according to the above-mentioned process, after barrier plate 1 isotructure installation finishes, lay corresponding filler and soil between the structure of filling, finish until the work of foundation ditch filling, turn off mounting bolt 404 on the installation piece 403 afterwards, take away whole tension structure 4 and accomodate, can take out reuse during next time of use.
The foregoing has described the principles of use, features and advantages of the present invention. The above embodiments and the description describe the basic principles and features of the present invention, and the present invention can be modified in various ways, which are within the scope of the present invention as claimed.
Claims (6)
1. The utility model provides a gardens construction foundation ditch compaction fill structure, includes barrier plate (1), the lower extreme of barrier plate (1) is provided with bottom plate (2), its characterized in that: the blocking plate (1) is provided with a tensioning frame (3), the tensioning frame (3) comprises a tensioning sleeve (301) and a tensioning bolt (303), the tensioning sleeve (301) is installed on the blocking plate (1), the tensioning bolt (303) is arranged on the blocking plate (1) and the tensioning sleeve (301), the upper end of the blocking plate (1) is provided with a tension structure (4), the tension structure (4) comprises a first connecting rope (401), a second connecting rope (402), a mounting block (403), a fixing block (405) and an adjusting frame (407), the first connecting rope (401) is connected with the mounting block (403), the mounting block (403) is connected to the blocking plate (1), the second connecting rope (402) is fixedly connected with the fixing block (405), the adjusting frame (407) is connected between the second connecting rope (402) and the first connecting rope (401).
2. The garden construction foundation pit compaction fill structure of claim 1, characterized in that: the blocking plate is characterized in that the blocking plate (1) and the bottom plate (2) are arranged at ninety degrees, the blocking plate (1) and the bottom plate (2) are connected in a welding mode, and a reinforcing plate (5) is fixedly connected between the blocking plate (1) and the bottom plate (2).
3. The garden construction foundation pit compaction fill structure of claim 2, characterized in that: the stop plate (1) is provided with a through hole which is positioned between the two bottom plates (2), and the tensioning frame (3) is aligned with the through hole.
4. The garden construction foundation pit compaction fill structure of claim 3, characterized in that: the tensioning frame (3) further comprises a threaded hole (302), the threaded hole (302) is formed in the end portion of the tensioning sleeve (301), the tensioning bolt (303) penetrates through the through hole, and the tail end of the tensioning bolt (303) is in threaded connection with the threaded hole (302) in the tensioning sleeve (301).
5. The garden construction foundation pit compaction fill structure of claim 4, characterized in that: the tension structure (4) further comprises a mounting bolt (404), an inserted bar (406) and a round hole (408), the mounting bolt (404) is arranged on the mounting block (403), the mounting bolt (404) is in threaded connection with the blocking plate (1), the mounting block (403) is connected to the blocking plate (1) through the mounting bolt (404), the inserted bar (406) penetrates through the fixing block (405), and the round hole (408) is formed in the upper end position of the inserted bar (406).
6. The garden construction foundation pit compaction fill structure of claim 5, characterized in that: adjusting bracket (407) includes connector (4071), turning block (4072), adjusts pole (4073) and threaded rod (4074), connector (4071) is connected in the end of first connecting rope (401), turning block (4072) rotates and connects on connector (4071), it connects in the end of second connecting rope (402) to adjust pole (4073), fixed connection between threaded rod (4074) and turning block (4072), and threaded connection between threaded rod (4074) and the regulation pole (4073).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123146510.4U CN217174805U (en) | 2021-12-14 | 2021-12-14 | Gardens construction foundation ditch compaction fill structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123146510.4U CN217174805U (en) | 2021-12-14 | 2021-12-14 | Gardens construction foundation ditch compaction fill structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217174805U true CN217174805U (en) | 2022-08-12 |
Family
ID=82713999
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123146510.4U Active CN217174805U (en) | 2021-12-14 | 2021-12-14 | Gardens construction foundation ditch compaction fill structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217174805U (en) |
-
2021
- 2021-12-14 CN CN202123146510.4U patent/CN217174805U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211713979U (en) | Foundation pit excavation slope supporting device | |
CN107653884B (en) | Steel casing setting device for drilling of sand foundation cast-in-place pile and construction method thereof | |
CN212983877U (en) | Ultra-deep foundation pit supporting structure | |
CN106638655A (en) | Conical-head tendon body post-tensioning pile foundation and construction process thereof | |
CN210368986U (en) | Foundation pit supporting pile supporting structure | |
CN109183857A (en) | A kind of anti-float anchor rod construction method | |
CN107558470A (en) | A kind of new grouted anchor bar and construction method with the adjustable wing | |
CN217174805U (en) | Gardens construction foundation ditch compaction fill structure | |
CN110777775A (en) | Foundation pit structure and construction method thereof | |
CN211257011U (en) | Triaxial stirring stake stagnant water curtain structure | |
CN206554106U (en) | Conehead muscle body posttension pile foundation | |
CN215594147U (en) | Anti-floating anchor rod device of basement of adjustable elevation | |
CN116221496A (en) | Ground source heat pump vertical buried pipe laying device and ground source heat pump vertical buried pipe construction method | |
CN206581314U (en) | Screw head muscle body posttension pile foundation | |
CN215053066U (en) | Geotechnical engineering side slope reinforcing apparatus | |
CN214695656U (en) | Combined type inclined pile anchor rod foundation pit supporting structure | |
CN210712857U (en) | Easy dismouting formula underground structure | |
CN209538034U (en) | The efficient constructing structure of plank road waterborne | |
JP3169911B2 (en) | Heavy weight type steel pipe digging and driving method using the same | |
CN113175237A (en) | Building outer wall reinforcing structure and reinforcing method | |
CN219604371U (en) | Supporting structure in foundation pit | |
CN217517592U (en) | Connecting structure of supporting beam and upright post pile in building engineering | |
CN218813689U (en) | Anchor cable steel waist rail connection structure | |
CN215669547U (en) | Foundation pit supporting structure for building construction | |
KR200344979Y1 (en) | Earth anchor bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |