CN217169368U - Cooling device is used in production of three-layer wall composite reinforcement pipe - Google Patents

Cooling device is used in production of three-layer wall composite reinforcement pipe Download PDF

Info

Publication number
CN217169368U
CN217169368U CN202220050034.1U CN202220050034U CN217169368U CN 217169368 U CN217169368 U CN 217169368U CN 202220050034 U CN202220050034 U CN 202220050034U CN 217169368 U CN217169368 U CN 217169368U
Authority
CN
China
Prior art keywords
fixed mounting
water
cooling device
pipe
fixedly mounted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220050034.1U
Other languages
Chinese (zh)
Inventor
黄开军
邹伟
赵信红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Guobiao Pipeline Co ltd
Original Assignee
Guizhou Guobiao Pipeline Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Guobiao Pipeline Co ltd filed Critical Guizhou Guobiao Pipeline Co ltd
Priority to CN202220050034.1U priority Critical patent/CN217169368U/en
Application granted granted Critical
Publication of CN217169368U publication Critical patent/CN217169368U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of the cooling arrangement, especially, be a cooling device is used in production of compound reinforcing pipe of three-layer wall, it is single to cooling area among the cooling device is used in production of the compound reinforcing pipe of three-layer wall commonly used, and relatively poor to the location effect of reinforcing pipe, lead to the lower problem of production efficiency of reinforcing pipe, present following scheme is proposed, and it includes the base, the equal fixed mounting in top both sides of base has the backup pad, and the top fixed mounting of backup pad has the arc, the rectangular channel has all been seted up to the top both sides of base, rotates on the lateral wall of rectangular channel and installs two-way threaded rod, and the outside threaded connection of two-way threaded rod has two movable plates, and the equal fixed mounting in one side that two movable plates are close to each other has the grip block. The utility model has the advantages of reasonable design, through the transmission cooperation of worm and worm wheel and the cooperation of circle axle and well hollow frame, can realize promoting the cooling range to the reciprocal swing work of shower nozzle, the reliability is high.

Description

Cooling device is used in production of compound reinforcing pipe of three-layer wall
Technical Field
The utility model relates to a cooling arrangement technical field especially relates to a three-layer wall composite reinforcement pipe production is with cooling device.
Background
The reinforced pipe is not a specific pipe, and the reinforced performance is achieved by adding other medium materials into the pipe wall of the pipe made of rubber, PVC and the like. Common additive media materials are spiral steel wires, mesh fibers, and the like.
The cooling device for producing the common three-layer-wall composite reinforced pipe has a single cooling area, and has poor positioning effect on the reinforced pipe, so that the production efficiency of the reinforced pipe is low, and therefore, the cooling device for producing the three-layer-wall composite reinforced pipe is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving cooling area singleness among the cooling device is used in the production of the compound reinforcing pipe of three-layer wall commonly used, and relatively poor to the location effect of reinforcing pipe, lead to the lower shortcoming of production efficiency of reinforcing pipe, and the compound reinforcing pipe of three-layer wall cooling device is used in production who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a three-layer wall is cooling device for compound reinforcing pipe production, includes the base, the equal fixed mounting in top both sides of base has the backup pad, and the top fixed mounting of backup pad has the arc, the rectangular channel has all been seted up to the top both sides of base, rotates on the lateral wall of rectangular channel and installs two-way threaded rod, and the outside threaded connection of two-way threaded rod has two movable plates, and the equal fixed mounting in one side that two movable plates are close to each other has the grip block, the top rear side fixed mounting of base has the water tank, and the top fixed mounting of water tank has the L template, and the last fixed mounting of L template has two limiting plates, and spacing through-hole has been seted up to one side of limiting plate, and same rotation water pipe is installed to two spacing through-hole internal rotations, and the delivery port intercommunication of rotation water pipe has a plurality of shower nozzles.
Preferably, vertical groove has been seted up at the top of L template, rotates on the lateral wall in vertical groove and installs the connecting axle, and the outside fixed mounting of connecting axle has the worm wheel, rotate on the bottom inner wall in vertical groove and install the worm, worm and worm wheel intermeshing, the outside fixed mounting of connecting axle has the disc, and one side fixed mounting of disc has the circle axle, and the outside slip cap of circle axle is equipped with well cavity frame, and the bottom fixed mounting of well cavity frame has the connecting plate, and one side fixed mounting of connecting plate is on rotating the water pipe.
Preferably, the top fixed mounting of L template has the water pump, and the delivery port intercommunication of water pump has the water delivery hose, and the one end of water delivery hose and the one end of rotating the water pipe communicate each other, and the water inlet intercommunication of water pump has the inlet tube, and the one end of inlet tube extends to the inside of water tank.
Preferably, the top of the L-shaped plate is fixedly provided with a motor, and an output shaft of the motor is fixedly arranged at the top end of the worm.
Preferably, one end of the bidirectional threaded rod extends to the outer side of the base, and a rotary disc is fixedly mounted on the outer side of the bidirectional threaded rod.
Preferably, the guide plate is fixedly installed on the inner wall of the rectangular groove, and the two moving plates are respectively sleeved on the guide plate in a sliding mode.
In the utility model, the cooling device for producing the three-layer wall composite reinforced pipe is characterized in that a water pump and a motor are started, the working of the water pump enables cooling liquid in a water tank to be input into a water delivery hose through a water inlet pipe so as to be sprayed out by a spray head, the working of the motor drives a worm to rotate so as to drive a worm wheel to rotate, a connecting shaft is rotated to drive a round shaft to rotate, the rotating water pipe is driven to alternately carry out two different rotating directions under the connection of a hollow frame, the reciprocating swing work of the spray head is realized, the spraying range can be enlarged, and the cooling efficiency is improved;
the utility model has the advantages of reasonable design, through the transmission cooperation of worm and worm wheel and the cooperation of circle axle and well hollow frame, can realize promoting the cooling range to the reciprocal swing work of shower nozzle, the reliability is high.
Drawings
FIG. 1 is a schematic structural view of a cooling apparatus for producing a three-wall composite reinforced pipe according to the present invention;
FIG. 2 is a schematic cross-sectional view of a cooling apparatus for producing a three-wall composite reinforced pipe according to the present invention;
FIG. 3 is a schematic structural view of part A of a cooling apparatus for producing a three-wall composite reinforced pipe according to the present invention;
fig. 4 is a schematic structural diagram of a part B of a cooling device for producing a three-wall composite reinforced pipe according to the present invention.
In the figure: 1. a base; 2. a support plate; 3. an arc-shaped plate; 4. a bidirectional threaded rod; 5. moving the plate; 6. a clamping plate; 7. a guide plate; 8. a turntable; 9. a water tank; 10. an L-shaped plate; 11. a water pump; 12. a water delivery hose; 13. a water inlet pipe; 14. a limiting plate; 15. rotating the water pipe; 16. a spray head; 17. a connecting shaft; 18. a worm gear; 19. a worm; 20. a motor; 21. a disc; 22. a circular shaft; 23. a hollow frame; 24. a connecting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a cooling device is used in production of three-layer wall composite reinforced pipe, including base 1, the equal fixed mounting in top both sides of base 1 has backup pad 2, the top fixed mounting of backup pad 2 has arc 3, the rectangular channel has all been seted up to the top both sides of base 1, rotate on the lateral wall of rectangular channel and install two-way threaded rod 4, the outside threaded connection of two-way threaded rod 4 has two movable plates 5, the equal fixed mounting in one side that two movable plates 5 are close to each other has grip block 6, the top rear side fixed mounting of base 1 has water tank 9, the top fixed mounting of water tank 9 has L template 10, the last fixed mounting of L template 10 has two limiting plates 14, spacing through-hole has been seted up to one side of limiting plate 14, same rotation water pipe 15 is installed to two spacing through-hole internal rotations, the delivery port intercommunication that rotates water pipe 15 has a plurality of shower nozzles 16.
The utility model discloses in, vertical groove has been seted up at the top of L template 10, it installs connecting axle 17 to rotate on the lateral wall of vertical groove, the outside fixed mounting of connecting axle 17 has worm wheel 18, it installs worm 19 to rotate on the bottom inner wall of vertical groove, worm 19 and worm wheel 18 intermeshing, the outside fixed mounting of connecting axle 17 has disc 21, one side fixed mounting of disc 21 has round axle 22, the outside sliding sleeve of round axle 22 is equipped with well hollow frame 23, the bottom fixed mounting of well hollow frame 23 has connecting plate 24, one side fixed mounting of connecting plate 24 is on rotating water pipe 15, the rotation of disc 21 can drive shower nozzle 16 and obtain reciprocal swing work, increase cooling range.
The utility model discloses in, the top fixed mounting of L template 10 has water pump 11, and water pump 11's delivery port intercommunication has water delivery hose 12, and water delivery hose 12's one end and the one end of rotating water pipe 15 communicate each other, and water pump 11's water inlet intercommunication has inlet tube 13, and inlet tube 13's one end extends to the inside of water tank 9, and water pump 11's setting can spray the coolant liquid in the water tank 9 to the reinforcing pipe on, realizes cooling treatment.
The utility model discloses in, the top fixed mounting of L template 10 has motor 20, and motor 20's output shaft fixed mounting is on the top of worm 19, and motor 20's work drives 16 reciprocating oscillations of shower nozzle, improves cooling efficiency.
The utility model discloses in, the one end of two-way threaded rod 4 extends to the outside of base 1, and the outside fixed mounting of two-way threaded rod 4 has carousel 8, and the centre gripping work to the reinforcing pipe can be realized to the setting of two-way threaded rod 4.
The utility model discloses in, fixed mounting has deflector 7 on the inner wall of rectangular channel, and two movable plates 5 slide the cover respectively and establish on deflector 7, and setting up of deflector 7 provides the guide effect for movable plate 5.
The utility model discloses in, when using, place compound reinforcing pipe on two arcs 3, the manual work rotates carousel 8 and drives two-way threaded rod 4 and rotates, make two movable plates 5 be close to each other under the direction of deflector 7, make the centre gripping that two grip blocks 6 can be stable both sides about compound reinforcing pipe, start water pump 11 and motor 20, water pump 11's work makes the coolant liquid in the water tank 9 can input the water hose 12 in through inlet tube 13, thereby spray away by shower nozzle 16, motor 20's work drives worm 19 and rotates, thereby drive worm wheel 18 rotates, make connecting axle 17 rotate, it rotates to drive round axle 22, under the connection of well hollow frame 23, drive and rotate the rotation direction that carries out two kinds of differences of water pipe 15 alternatedly, realize the reciprocal swing work to shower nozzle 16, can increase the spray range, and improve the cooling efficiency.

Claims (6)

1. The cooling device for producing the three-layer-wall composite reinforced pipe comprises a base (1) and is characterized in that supporting plates (2) are fixedly mounted on two sides of the top of the base (1), arc-shaped plates (3) are fixedly mounted on the top of the supporting plates (2), rectangular grooves are formed in two sides of the top of the base (1), two-way threaded rods (4) are rotatably mounted on the side walls of the rectangular grooves, two moving plates (5) are in threaded connection with the outer sides of the two-way threaded rods (4), clamping plates (6) are fixedly mounted on one sides, close to each other, of the two moving plates (5), a water tank (9) is fixedly mounted on the rear side of the top of the base (1), an L-shaped plate (10) is fixedly mounted on the top of the water tank (9), two limiting plates (14) are fixedly mounted on the L-shaped plate (10), limiting through holes are formed in one sides of the limiting plates (14), and the same rotating water pipe (15) is rotatably mounted in the two limiting through holes, the water outlet of the rotary water pipe (15) is communicated with a plurality of spray heads (16).
2. The cooling device for the production of three-layer wall composite reinforced pipe according to claim 1, characterized in that, vertical groove has been seted up at the top of L template (10), rotates on the lateral wall of vertical groove and installs connecting axle (17), and the outside fixed mounting of connecting axle (17) has worm wheel (18), rotate on the bottom inner wall of vertical groove and install worm (19), worm (19) and worm wheel (18) intermeshing, the outside fixed mounting of connecting axle (17) has disc (21), and one side fixed mounting of disc (21) has round axle (22), and the outside slip cap of round axle (22) is equipped with well hollow frame (23), and the bottom fixed mounting of well hollow frame (23) has connecting plate (24), and one side fixed mounting of connecting plate (24) is on rotating water pipe (15).
3. The cooling device for the production of the three-layer-wall composite reinforced pipe as claimed in claim 1, wherein a water pump (11) is fixedly mounted at the top of the L-shaped plate (10), a water outlet of the water pump (11) is communicated with a water delivery hose (12), one end of the water delivery hose (12) is communicated with one end of a rotating water pipe (15), a water inlet of the water pump (11) is communicated with a water inlet pipe (13), and one end of the water inlet pipe (13) extends to the inside of the water tank (9).
4. The cooling device for producing the three-layer-wall composite reinforced pipe as claimed in claim 1, wherein a motor (20) is fixedly mounted at the top of the L-shaped plate (10), and an output shaft of the motor (20) is fixedly mounted at the top end of the worm (19).
5. The cooling device for producing the three-layer-wall composite reinforced pipe as claimed in claim 1, wherein one end of the bidirectional threaded rod (4) extends to the outer side of the base (1), and a turntable (8) is fixedly mounted on the outer side of the bidirectional threaded rod (4).
6. The cooling device for producing the three-layer wall composite reinforced pipe as claimed in claim 1, wherein the inner wall of the rectangular groove is fixedly provided with a guide plate (7), and the two moving plates (5) are respectively sleeved on the guide plate (7) in a sliding manner.
CN202220050034.1U 2022-01-10 2022-01-10 Cooling device is used in production of three-layer wall composite reinforcement pipe Active CN217169368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220050034.1U CN217169368U (en) 2022-01-10 2022-01-10 Cooling device is used in production of three-layer wall composite reinforcement pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220050034.1U CN217169368U (en) 2022-01-10 2022-01-10 Cooling device is used in production of three-layer wall composite reinforcement pipe

Publications (1)

Publication Number Publication Date
CN217169368U true CN217169368U (en) 2022-08-12

Family

ID=82734262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220050034.1U Active CN217169368U (en) 2022-01-10 2022-01-10 Cooling device is used in production of three-layer wall composite reinforcement pipe

Country Status (1)

Country Link
CN (1) CN217169368U (en)

Similar Documents

Publication Publication Date Title
CN107930893A (en) A kind of auto spray painting device of section bar
CN112962781A (en) Municipal pipeline dredging device and using method thereof
CN112962469A (en) Concrete curing means is used in bridge construction
CN217169368U (en) Cooling device is used in production of three-layer wall composite reinforcement pipe
CN112157567A (en) Polishing equipment is paintd to 3D printing piece polishing solution
CN218196426U (en) Plastic pipe cooling and shaping device
CN216937320U (en) Ternary dynamic cleaning equipment for automobile
CN215107905U (en) From construction of taking spray set encloses fender
CN217128016U (en) Box girder multi-angle spraying and curing device for bridge construction
CN215352695U (en) House building construction dust collector
CN215786689U (en) Auxiliary casting device of casting mold
CN212857035U (en) Special bottle washing machine for plant tissue culture
CN212561091U (en) Municipal works road is with drawing traditional thread binding putting
CN113019747A (en) Paint spraying device with multi-angle rotation for machining of automobile internal thread parts
CN215051900U (en) Irrigation device for civil engineering
CN221074341U (en) Spraying dust settling device for hydraulic support of fully-mechanized mining face
CN112065126A (en) Novel three-dimensional parking equipment
CN217399363U (en) Joint cutting device is used in town road bridge construction
CN216322786U (en) Hardware die casting surface protection layer spraying device
CN220520658U (en) Anodic oxidation line hole sealing groove spray set
CN110578395A (en) Building wall whitewashes device
CN215505824U (en) Impurity removal and filtration device for waterproof coating production
CN220242357U (en) Double-wall corrugated pipe cooling forming equipment
CN221218655U (en) Energy-saving environment-friendly watering cart
CN211967901U (en) Cement wall surface spraying device used in house building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant