CN217154954U - Aluminum alloy circular ingot manufacturing is with aluminium scrap bits melting equipment - Google Patents
Aluminum alloy circular ingot manufacturing is with aluminium scrap bits melting equipment Download PDFInfo
- Publication number
- CN217154954U CN217154954U CN202220550710.1U CN202220550710U CN217154954U CN 217154954 U CN217154954 U CN 217154954U CN 202220550710 U CN202220550710 U CN 202220550710U CN 217154954 U CN217154954 U CN 217154954U
- Authority
- CN
- China
- Prior art keywords
- ring
- ring plate
- wall
- scrap
- melting equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
The utility model relates to a technical field is smelted to the aluminium scrap bits, specifically is an aluminium alloy circle is aluminium scrap bits smelting equipment for ingot manufacturing, include: the top of the smelting furnace is provided with a bottom ring plate; the top of the top ring plate is provided with a rotating ring, the bottom of the rotating ring is provided with a telescopic sleeve, the outer wall of the top ring plate is provided with a ring groove, the inner wall of the bottom ring plate is provided with a fixed ring, and the bottom of the telescopic sleeve is provided with a limiting rod; the handle is arranged on the outer wall of the limiting rod; the beneficial effects are that: the utility model provides a bottom ring board is installed at the top of smelting furnace, and the outer wall of bottom ring board is seted up jaggedly, and it has top ring board to peg graft at the top of bottom ring board, when aiming at the breach of bottom ring board with top ring board breach, emptys the material of smelting furnace inside with regard to the accessible discharge gate, rotates top ring board, and top ring board blocks the breach of bottom ring board, just can realize keeping warm, and the breach of bottom ring board can be used to fill and put the material, when the material is too long, can take off top ring board from the inside of bottom ring board.
Description
Technical Field
The utility model relates to a technical field is smelted to the aluminium scrap bits, specifically is an aluminium alloy circle is aluminium scrap bits smelting equipment for ingot manufacturing.
Background
In the smelting production process of the waste aluminum products, the aluminum products are often required to be quickly smelted, insulated and poured, and the existing aluminum smelting furnace often adopts an electric heating mode;
in the prior art, scrap aluminum is smelted by a smelter, and a traditional smelter heats an aluminum product by using an electric resistance;
but traditional smelting device need empty the smelting furnace and empty out with the useless aluminium that melts, so lack the heat preservation device, can cause the very big waste of electric energy.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an aluminium alloy circle is aluminium scrap bits smelting equipment for ingot manufacturing to solve the problem that provides among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an aluminium alloy circle is aluminium scrap bits smelting equipment for ingot manufacturing, includes:
the top of the smelting furnace is provided with a bottom ring plate;
the top of the top ring plate is provided with a rotating ring, the bottom of the rotating ring is provided with a telescopic sleeve, the outer wall of the top ring plate is provided with a ring groove, the inner wall of the bottom ring plate is provided with a fixed ring, and the bottom of the telescopic sleeve is provided with a limiting rod; and
the handle is arranged on the outer wall of the limiting rod.
Preferably, the top of smelting furnace is installed the bottom ring board, and the outer wall of bottom ring board is provided with the breach, and the discharge gate is installed at the top of smelting furnace, and the inserting groove has been seted up at the top of bottom ring board.
Preferably, a top ring plate is inserted in the insertion groove at the top of the bottom ring plate, a notch is formed in the outer wall of the top ring plate, and a ring groove is formed in the outer wall of the top ring plate.
Preferably, the inner wall of the inserting groove of the bottom ring plate is provided with a fixing ring, the fixing ring is flexible, and when the top ring plate is inserted into the inserting groove at the top of the bottom ring plate, the fixing ring can be clamped in the ring groove.
Preferably, the rotating ring is installed at the bottom of the top ring plate, the telescopic sleeve is installed at the bottom of the rotating ring, the lifting groove is formed in the surface of the telescopic sleeve, and the limiting rod is installed at the bottom of the telescopic sleeve.
Preferably, the spring is arranged inside the telescopic sleeve, the bottom of the spring is connected with the limiting rod, the handle is arranged on the outer wall of the limiting rod, the limiting hole is formed in the top of the smelting furnace, and the limiting rod can be inserted into the limiting hole.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a bottom ring plate is installed at the top of smelting furnace, the breach is seted up to the outer wall of bottom ring plate, top ring plate has been pegged graft at the top of bottom ring plate, when aim at the breach of bottom ring plate with top ring plate breach, empty the material of smelting furnace inside with regard to the accessible discharge gate, rotate the top ring plate, the top ring plate blocks the breach of bottom ring plate, just can realize keeping warm, and the breach of bottom ring plate can be used to fill and put the material, when the material is too long, can take off the inside of bottom ring plate from the top ring plate, solid fixed ring card keeps the stability of top ring plate in the annular.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the sectional three-dimensional structure of the present invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 1;
FIG. 4 is an enlarged view of the structure at B in FIG. 1;
fig. 5 is an enlarged view of the structure at C in fig. 2.
In the figure: smelting furnace 1, discharge gate 2, bottom ring board 3, top ring board 4, gag lever post 5, swivel 6, telescope tube 7, lifting groove 8, handle 9, solid fixed ring 10, annular 11, spring 12.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clear and fully described, embodiments of the present invention will be further described in detail below with reference to the accompanying drawings. It is to be understood that the specific embodiments described herein are merely illustrative of some embodiments of the invention and are not limiting of the invention, and that all other embodiments obtained by those of ordinary skill in the art without the exercise of inventive faculty are within the scope of the invention.
In the description of the present invention, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "a," "an," "first," "second," "third," "fourth," "fifth," and "sixth" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
For the purposes of simplicity and explanation, the principles of the embodiments are described by referring mainly to examples. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the embodiments. It will be apparent, however, to one skilled in the art that the embodiments may be practiced without these specific details. In some instances, well-known methods and structures have not been described in detail so as not to unnecessarily obscure the embodiments. In addition, all embodiments may be used in combination with each other.
Referring to fig. 1 to 5, the present invention provides a technical solution: the utility model provides an aluminium alloy circle is aluminium scrap bits smelting equipment for ingot manufacturing, includes: the smelting furnace 1 is provided with a bottom ring plate 3 at the top of the smelting furnace 1, the bottom ring plate 3 is arranged at the top of the smelting furnace 1, a notch is arranged on the outer wall of the bottom ring plate 3, a discharge port 2 is arranged at the top of the smelting furnace 1, an inserting groove is arranged at the top of the bottom ring plate 3, a top ring plate 4 is inserted in the inserting groove at the top of the bottom ring plate 3, the notch is arranged on the outer wall of the top ring plate 4, a ring groove 11 is arranged on the outer wall of the top ring plate 4, a fixing ring 10 is arranged on the inner wall of the inserting groove of the bottom ring plate 3, the fixing ring 10 has flexibility, when the top ring plate 4 is inserted in the inserting groove at the top of the bottom ring plate 3, the fixing ring 10 can be clamped in the ring groove 11 to rotate a rotating ring 6, so that the top ring plate 4 shields the gap of the bottom ring plate 3 to play a role of heat preservation, and the fixing ring 10 is positioned in the ring groove 11 to ensure that the top ring plate 4 keeps stable, when the material placed in the smelting furnace 1 is too long, the top ring plate 4 can be taken out from the bottom ring plate 3;
a top ring plate 4, a rotating ring 6 is arranged at the top of the top ring plate 4, a telescopic sleeve 7 is arranged at the bottom of the rotating ring 6, an annular groove 11 is arranged on the outer wall of the top ring plate 4, a fixing ring 10 is arranged on the inner wall of a bottom ring plate 3, a limiting rod 5 is arranged at the bottom of the telescopic sleeve 7, the rotating ring 6 is arranged at the bottom of the top ring plate 4, the telescopic sleeve 7 is arranged at the bottom of the rotating ring 6, a lifting groove 8 is arranged on the surface of the telescopic sleeve 7, the limiting rod 5 is arranged at the bottom of the telescopic sleeve 7, a spring 12 is arranged inside the telescopic sleeve 7, the limiting rod 5 is connected at the bottom of the spring 12, a handle 9 is arranged on the outer wall of the limiting rod 5, a limiting hole is arranged at the top of the smelting furnace 1, the limiting rod 5 can be inserted into the limiting hole, the notch of the top ring plate 4 is aligned with the notch of the bottom ring plate 3, the melted materials in the smelting furnace 1 can be poured out through a discharge port 2, the handle 9 and the spring 12 are pulled upwards, the limiting rod 5 is taken out from the limiting hole at the top of the smelting furnace 1, and the rotating ring 6 is rotated, so that the top ring plate 4 shields the notch of the bottom ring plate 3, and the heat preservation effect can be achieved.
Aim at the breach of bottom ring board 3 with the breach of top ring board 4, just the material of melting of smelting furnace 1 inside is poured out to accessible discharge gate 2, upwards pulling handle 9, compression spring 12, take out gag lever post 5 from the spacing hole in smelting furnace 1 top, rotate swivel 6, make top ring board 4 shield the breach of bottom ring board 3, just can play the heat preservation effect, and solid fixed ring 10 is located annular 11, make top ring board 4 remain stable, when placing into the material overlength of smelting furnace 1, can take out top ring board 4 from bottom ring board 3.
Although the illustrative embodiments of the present application have been described above to enable those skilled in the art to understand the present application, the present application is not limited to the scope of the embodiments, and various modifications within the spirit and scope of the present application defined and determined by the appended claims will be apparent to those skilled in the art from this disclosure.
Claims (6)
1. The utility model provides an aluminium alloy circle is aluminium scrap bits melting equipment for ingot manufacturing which characterized in that: the method comprises the following steps:
the top of the smelting furnace (1) is provided with a bottom ring plate (3);
the top ring plate (4), the top of the top ring plate (4) is provided with a rotating ring (6), the bottom of the rotating ring (6) is provided with a telescopic sleeve (7), the outer wall of the top ring plate (4) is provided with a ring groove (11), the inner wall of the bottom ring plate (3) is provided with a fixing ring (10), and the bottom of the telescopic sleeve (7) is provided with a limiting rod (5); and
the handle (9) is arranged on the outer wall of the limiting rod (5).
2. The scrap aluminum scrap melting equipment for manufacturing the aluminum alloy round ingot according to claim 1, which is characterized in that: bottom ring board (3) are installed at the top of smelting furnace (1), and the outer wall of bottom ring board (3) is provided with the breach, and discharge gate (2) are installed at the top of smelting furnace (1), and the inserting groove has been seted up at the top of bottom ring board (3).
3. The scrap aluminum scrap melting equipment for manufacturing the aluminum alloy round ingot according to claim 2, wherein the scrap aluminum scrap melting equipment comprises: the top ring plate (4) is inserted in the top inserting groove of the bottom ring plate (3), a notch is formed in the outer wall of the top ring plate (4), and a ring groove (11) is formed in the outer wall of the top ring plate (4).
4. The scrap aluminum scrap melting equipment for manufacturing the aluminum alloy round ingot according to claim 3, wherein the scrap aluminum scrap melting equipment comprises: the inner wall of the inserting groove of the bottom ring plate (3) is provided with a fixing ring (10), the fixing ring (10) is flexible, and when the top ring plate (4) is inserted into the inserting groove at the top of the bottom ring plate (3), the fixing ring (10) can be clamped in the ring groove (11).
5. The scrap aluminum scrap melting equipment for manufacturing the aluminum alloy round ingot according to claim 4, wherein the scrap aluminum scrap melting equipment comprises: the bottom of top crown plate (4) is installed swivel (6), and flexible cover (7) are installed to the bottom of swivel (6), and lifting groove (8) have been seted up on the surface of flexible cover (7), and gag lever post (5) are installed to the bottom of flexible cover (7).
6. The scrap aluminum scrap melting equipment for manufacturing the aluminum alloy round ingot according to claim 5, wherein the scrap aluminum scrap melting equipment comprises: the internal mounting of flexible cover (7) has spring (12), and gag lever post (5) are being connected to the bottom of spring (12), and handle (9) are installed to the outer wall of gag lever post (5), and the spacing hole has been seted up at the top of smelting furnace (1), and gag lever post (5) can peg graft in spacing hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220550710.1U CN217154954U (en) | 2022-03-14 | 2022-03-14 | Aluminum alloy circular ingot manufacturing is with aluminium scrap bits melting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220550710.1U CN217154954U (en) | 2022-03-14 | 2022-03-14 | Aluminum alloy circular ingot manufacturing is with aluminium scrap bits melting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217154954U true CN217154954U (en) | 2022-08-09 |
Family
ID=82693025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220550710.1U Active CN217154954U (en) | 2022-03-14 | 2022-03-14 | Aluminum alloy circular ingot manufacturing is with aluminium scrap bits melting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217154954U (en) |
-
2022
- 2022-03-14 CN CN202220550710.1U patent/CN217154954U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106521560B (en) | A kind of liquid rare earth metal discharging device | |
CN217154954U (en) | Aluminum alloy circular ingot manufacturing is with aluminium scrap bits melting equipment | |
CN101639326B (en) | Smelting furnace | |
CN208976814U (en) | Aluminium alloy smelting, heat preservation, casting all-in-one oven | |
CN211250632U (en) | Full-automatic maintenance bucket of cement test block | |
CN213175053U (en) | Steel pipe pole anti-tilting device | |
CN210533007U (en) | Bell-type split furnace | |
CN209978626U (en) | Positive electrode material sintering sagger | |
CN216282197U (en) | Cooling device for glass processing | |
CN220497746U (en) | Pouring device for investment casting | |
CN208430207U (en) | High-efficiency cleaning structure for metal smelt | |
CN219701957U (en) | Composite corrosion-resistant fast-melting crucible | |
CN217529160U (en) | Adjust structure and use flat square ingot mould of this structure | |
CN215440642U (en) | High smelting device of security is used in preparation of alloy resistance wire | |
CN215413132U (en) | Graphite crucible pot support convenient to adjust | |
CN210242382U (en) | Quick ejecting device of induction furnace graphite crucible | |
CN213877290U (en) | Building model for display | |
CN105862076B (en) | Electrolytic zinc cathode conducting beam and preparation method thereof | |
CN218097181U (en) | Molten iron smelting intermediate frequency furnace for cast iron pan production | |
CN215725031U (en) | Novel energy-saving heat preservation furnace | |
CN210892680U (en) | Crucible for metal casting | |
CN214663004U (en) | Adjustable anti-seismic support | |
CN215725136U (en) | Cooling device for smelting furnace production contact net parts | |
CN213896869U (en) | Effectual signpost of anti-wind | |
CN215328405U (en) | Three-layer aluminum electrolysis cathode structure for producing high-purity aluminum |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |