CN217151388U - Temporary supporting device for basement roof rear support steel column - Google Patents

Temporary supporting device for basement roof rear support steel column Download PDF

Info

Publication number
CN217151388U
CN217151388U CN202220576735.9U CN202220576735U CN217151388U CN 217151388 U CN217151388 U CN 217151388U CN 202220576735 U CN202220576735 U CN 202220576735U CN 217151388 U CN217151388 U CN 217151388U
Authority
CN
China
Prior art keywords
steel column
steel
basement
plate
support device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220576735.9U
Other languages
Chinese (zh)
Inventor
郭鹏
韩继瑜
王道新
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN202220576735.9U priority Critical patent/CN217151388U/en
Application granted granted Critical
Publication of CN217151388U publication Critical patent/CN217151388U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides an interim strutting arrangement of basement roof back shore steel column adopts steel sheet and the tight basement roof in steel column top, and steel column lower part bilateral symmetry welding has two otic placodes, installs high strength bolt in the otic placode to through nut spacing fixed, adjusting nut can further exert pressure and push up tight steel column, and steel column and high strength bolt lower extreme are all buried underground in the concrete base. The utility model discloses a steel column realizes supporting the interim of basement roof, can effectively avoid setting up the problem that full hall scaffold system brought, has practiced thrift the cost and has little influence the working face, can not influence other engineering progress. Additionally, the utility model discloses utilize otic placode and high strength bolt, nut to cooperate, further push up tight steel column and steel sheet, overall structure is reliable, and the template is established comparatively easily, easy operation.

Description

Temporary supporting device for basement roof rear support steel column
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a interim strutting arrangement of basement roof back shore steel column.
Background
With the development of the building industry, under the influence of factors such as shortage of land, increase of parking space proportion, civil air defense construction requirements and the like, most of buildings adopt an integral basement design at present, the construction site is limited, and a basement top plate can be inevitably used as a material yard, a processing site, a transportation road and a construction mechanical foundation. Through the check calculation of roof plate structure, mostly all need support the reinforcement processing temporarily, can satisfy the requirement. Roof reinforcement measure commonly used is for setting up ordinary steel pipe full hall support system, but has the pole setting interval intensive, and the material consumption is big, sets up and demolishs difficult scheduling problem, and occupies the working face for a long time, seriously influences the engineering progress, consequently needs design a neotype strutting arrangement to realize the support to the basement roof.
SUMMERY OF THE UTILITY MODEL
Exist not enoughly among the prior art, the utility model provides a interim strutting arrangement of basement roof back-stay steel column adopts the steel column to realize the interim support to the basement roof, has practiced thrift the cost and has little influence to the working face, utilizes otic placode and high strength bolt, nut to cooperate simultaneously, can further push up tight steel column and steel sheet, and overall structure is reliable.
The utility model discloses a realize above-mentioned technical purpose through following technological means.
A temporary support device for a rear support steel column of a basement top plate comprises a steel column, wherein two lug plates are horizontally welded at the lower end of the steel column, a steel plate is installed at a support point position below the basement top plate, the steel column is vertically installed at the center of the lower surface of the steel plate, and the top of the steel column tightly supports the steel plate; the bottom end of the steel column is embedded in a concrete base on a basement bottom plate, two high-strength bolts are symmetrically embedded in the concrete bases on two sides of the steel column, the upper ends of the high-strength bolts penetrate through mounting holes in the lug plates and are limited and fixed through nuts, and the nuts are located below the lug plates.
Further, the depth of the steel column inserted into the concrete base is more than 10 cm.
Further, the steel column is of a hollow cylindrical structure, and round steel plates are welded at two end portions of the steel column for sealing.
Further, the lug plate is 30cm away from the bottom end of the steel column.
Further, the steel plate is rectangular, the plane size of the steel plate is 1 x 1m, and the thickness of the steel plate is 5 mm.
Further, the high-strength bolt is an M30 high-strength bolt, and the concrete base is formed by pouring concrete with the strength grade of C30.
Furthermore, four corners of the steel plate are temporarily fixed by adopting common steel pipes and jacking supports, and the steel plate is detached after the concrete base is poured and finally set.
The utility model discloses following beneficial effect has:
the utility model discloses a steel column realizes supporting the interim of basement roof, can effectively avoid setting up the problem that full hall scaffold system brought, has practiced thrift the cost and has little influence the working face, can not influence other engineering progress. Additionally, the utility model discloses utilize otic placode and high strength bolt, nut to cooperate, further push up tight steel column and steel sheet, overall structure is reliable, and the template is established comparatively easily, easy operation.
Drawings
Fig. 1 is the utility model discloses a temporary strutting arrangement of basement roof back shore steel post uses the sketch map.
In the figure: 1-steel column; 2-ear plate; 3-high strength bolts; 4-a steel plate; 5-basement roof; 6-concrete foundation.
Detailed Description
The invention will be further described with reference to the drawings and the following examples, but the scope of the invention is not limited thereto.
As shown in figure 1, interim strutting arrangement of basement roof back shore steel column, including steel column 1, otic placode 2, high strength bolt 3, steel sheet 4, nut and concrete foundation 6. Steel column 1 is prefabricated in the mill and is accomplished, and steel column 1 is hollow circular cylinder structure, and the round steel plate has all been welded at 1 both ends of steel column in order to realize sealing, and the horizontal welding of the symmetry department of 1 bottom 30cm position department of steel column has two otic placodes 2, and the diameter and the length of steel column 1 are selected according to the mechanics calculation result under the actual construction scene.
As shown in fig. 1, a steel plate 4 is arranged at a supporting point below a top plate 5 of the basement, and four corners of the steel plate are temporarily fixed by adopting common steel pipes and jacking supports; the top of the steel column 1 tightly supports the steel plate 4, the lower end of the steel column 1 is buried in a concrete base 6 on a basement bottom plate, and the depth of the steel column 1 inserted into the concrete base 6 is larger than 10 cm. In addition, two high-strength bolts 3 are symmetrically embedded in the concrete bases 6 on two sides of the steel column 1, the upper ends of the high-strength bolts 3 penetrate through mounting holes in the lug plates 2 and are limited and fixed through nuts, and the nuts are located on the high-strength bolts 3 below the lug plates 2. Before concrete foundation 6 pours, through adjusting nut, can exert pressure the top tightly with steel column 1, further guarantee the support effect. And after the concrete base 6 is poured and finally set, removing the common steel pipes and the jacking supports for temporarily fixing the periphery of the steel plate 4.
In this embodiment, preferably, the steel plate 4 is rectangular, the plane size of the steel plate is 1 × 1M, the thickness of the steel plate is 5mm, the high-strength bolt 3 is an M30 high-strength bolt 3, and the concrete foundation 6 is formed by pouring concrete with a strength grade of C30.
In actual construction, firstly, a steel column 1 with a proper size is selected according to the mechanical calculation of foundation top return, then, the two ends of the steel column 1 are sealed and processed in a factory, ear plates 2 are welded, after raw materials enter the field, the steel column 1 is inspected by a technical department and an administrative unit, and the thickness and the length of the pipe wall of the steel column 1 are rechecked to check whether cracking, warping and the like exist.
After rechecking is qualified, performing on-site measurement and paying off, mounting a steel plate 4 at the supporting position of a top plate 5 of the basement, and temporarily fixing four corners of the basement by adopting common steel pipes and jacking supports; then, a steel column 1 is arranged below the steel plate 4, a high-strength bolt 3 is arranged, and the steel column 1 is pressed and tightly pressed through an adjusting nut, so that the steel column 1 tightly presses the steel plate 4. And then, erecting templates around the lower part of the steel column 1, pouring C30 concrete, vibrating to compact, removing the templates after the concrete is finally set, maintaining on time to form a stable concrete base 6, and removing common steel pipes and jacking supports for temporarily fixing the periphery of the steel plate 4. When the basement top plate 5 does not need to be supported any more, the concrete base 6 is chiseled off, and then the steel column 1, the steel plate 4 and the high-strength bolt 3 are unloaded through adjusting the screw cap.
The embodiment is a preferred embodiment of the present invention, but the present invention is not limited to the above embodiment, and any obvious improvement, replacement or modification which can be made by those skilled in the art without departing from the essence of the present invention belongs to the protection scope of the present invention.

Claims (7)

1. A temporary support device for a rear support steel column of a basement top plate is characterized by comprising a steel column (1), wherein two lug plates (2) are horizontally welded at the lower end of the steel column (1), a steel plate (4) is installed at a support point below a basement top plate (5), and the steel plate (4) is tightly supported at the top of the steel column (1); the bottom end of a steel column (1) is embedded in a concrete base (6) on a basement bottom plate, two high-strength bolts (3) are further symmetrically embedded in the concrete bases (6) on two sides of the steel column (1), the upper ends of the high-strength bolts (3) penetrate through mounting holes in the lug plates (2) and are limited and fixed through nuts, and the nuts are located below the lug plates (2).
2. The temporary support device for the post-bracing steel column of the top plate of the basement as claimed in claim 1, wherein the steel column (1) is inserted into the concrete base (6) to a depth of more than 10 cm.
3. The temporary support device for the rear support steel column of the top plate of the basement as claimed in claim 1, wherein the steel column (1) is a hollow cylindrical structure, and round steel plates are welded to two ends of the steel column (1) to achieve sealing.
4. The temporary support device for the post-bracing steel column of the top plate of the basement as claimed in claim 1, wherein the ear plate (2) is 30cm away from the bottom end of the steel column (1).
5. The temporary support device for the post-bracing steel column of the top plate of the basement as claimed in claim 1, wherein the steel plate (4) is rectangular, the planar dimension of the steel plate (4) is 1 x 1m, and the thickness is 5 mm.
6. The temporary supporting device for the basement roof post-stay steel column according to claim 1, wherein the high-strength bolt (3) is an M30 high-strength bolt (3), and the concrete base (6) is cast by concrete with the strength grade of C30.
7. The temporary support device for the basement roof post-supporting steel column according to claim 1, wherein four corners of the steel plate (4) are temporarily fixed by common steel pipes and jacking supports, and the steel plate is removed after the concrete base (6) is poured and finally set.
CN202220576735.9U 2022-03-16 2022-03-16 Temporary supporting device for basement roof rear support steel column Active CN217151388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220576735.9U CN217151388U (en) 2022-03-16 2022-03-16 Temporary supporting device for basement roof rear support steel column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220576735.9U CN217151388U (en) 2022-03-16 2022-03-16 Temporary supporting device for basement roof rear support steel column

Publications (1)

Publication Number Publication Date
CN217151388U true CN217151388U (en) 2022-08-09

Family

ID=82695188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220576735.9U Active CN217151388U (en) 2022-03-16 2022-03-16 Temporary supporting device for basement roof rear support steel column

Country Status (1)

Country Link
CN (1) CN217151388U (en)

Similar Documents

Publication Publication Date Title
CN111441343A (en) Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application
CN217151388U (en) Temporary supporting device for basement roof rear support steel column
CN216108535U (en) Assembled foundation pit steel encloses purlin connection structure
CN105971394A (en) Assembly type photovoltaic dam and production process thereof
CN213137167U (en) Box girder steel ground child
CN114319410A (en) Wind power generation grid-connected power equipment assembly type foundation structure and installation construction process
CN209011152U (en) Tower crane based on bonded prestressed concrete
CN209924595U (en) Movable combined enclosure structure capable of being recycled
CN209760786U (en) instrumentization support system for controlling precision of two-dimensional component
CN207160052U (en) A kind of skewback for connecting arcuate bead steel construction
CN101818501B (en) Construction method of reinforced concrete foundation on top of large-scale trenched pipe culvert
CN208792366U (en) A kind of prefabrication elevator shaft foundation pit
CN218324287U (en) Assembled enclosure structure
CN203113384U (en) Detachable top plate reinforcing supporting device
CN213625607U (en) Single-side formwork support and foundation pit side wall single-side formwork supporting system
CN219824909U (en) Temporary supporting device for building construction
CN220132917U (en) Supporting structure adopting combination of L-shaped support and Lassen steel sheet pile
CN213952534U (en) Tool type template device for grouting and plugging hand hole of PC wall of prefabricated building structure
CN211735013U (en) Self-anchored steel corrugated plate and crushed stone combined arch bridge
CN220284874U (en) Underground frame structure
CN219344154U (en) Cantilever component supporting and reinforcing device
CN109235482B (en) Tower crane foundation based on bonded prestressed concrete and construction method thereof
CN214657263U (en) Adjustable post-cast strip power transmission device of prestressing force
CN220284868U (en) Prefabricated living area retaining wall
CN217897267U (en) Aluminum template system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant