CN217151380U - Joist pulls out post construction equipment - Google Patents

Joist pulls out post construction equipment Download PDF

Info

Publication number
CN217151380U
CN217151380U CN202220750397.6U CN202220750397U CN217151380U CN 217151380 U CN217151380 U CN 217151380U CN 202220750397 U CN202220750397 U CN 202220750397U CN 217151380 U CN217151380 U CN 217151380U
Authority
CN
China
Prior art keywords
frame beam
joist
underpinning
unloading
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220750397.6U
Other languages
Chinese (zh)
Inventor
陈伟
黄旭辉
邓万青
江嘉伦
朱福祥
楼驰
江超瑜
冯展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Gubang Construction Special Technology Co ltd
Original Assignee
Zhejiang Gubang Construction Special Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Gubang Construction Special Technology Co ltd filed Critical Zhejiang Gubang Construction Special Technology Co ltd
Priority to CN202220750397.6U priority Critical patent/CN217151380U/en
Application granted granted Critical
Publication of CN217151380U publication Critical patent/CN217151380U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a joist post-pulling construction device, which comprises an unloading component for supporting a frame beam and a bearing component for supporting a to-be-pulled post, wherein a circle of underpinning area is chiseled between the to-be-pulled post and the lower part of the frame beam, the bearing component is provided with a plurality of bearing components which are arranged in the underpinning area and are sequentially arranged around the circumference of the to-be-pulled post; the unloading assemblies are positioned between the lower part of the frame beam and the ground, the number of the unloading assemblies is equal to that of the frame beam, and the unloading assemblies and the frame beam are distributed in a one-to-one correspondence manner; the beneficial effects of the utility model are that: the combination of the unloading assembly and the bearing assembly is adopted, so that the vertical load is effectively transferred downwards under the condition that the force transfer path of an original structure system is not changed during the construction of pulling the joist from the column, the construction device can shorten the construction period and reduce the manufacturing cost, and the normal use of the original structure is not influenced during the construction.

Description

Joist pulls out post construction equipment
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a post construction equipment is pulled out to joist.
Background
In recent years, the development of the building industry has shifted from a large-scale new construction period to a new construction and maintenance modification period, and existing buildings are increasingly subjected to modification and reinforcement problems, such as changing the use function of the building or increasing the indoor space. Joist column pulling is a technical method and is widely applied to engineering practice because the problem of column distance expansion can be effectively solved. The joist pull column is a general name of a joist pull column, a joist wall-dismantling column and a joist pull column, and is a special technology for dismantling part (or all) of bearing columns or walls under the condition of not dismantling or only slightly dismantling an upper structure. The traditional joist column pulling method adopts the method of erecting a full space support floor system, and removing the full space support after removing the reinforced concrete column and reinforcing the original frame beam, so as to complete joist column pulling; therefore, a new joist column-pulling construction device is urgently needed to be developed to solve the problem of the device adopted by the traditional joist column-pulling method.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the not enough of prior art existence, and provide one kind and pull out the joist that the post need not to set up full support and pull out post construction equipment during the transformation at whole joist.
The utility model aims to solve the problems that the construction device for pulling out the column from the joist comprises an unloading component for supporting a frame beam and a bearing component for supporting a column to be pulled out, wherein a circle of underpinning area is arranged between the column to be pulled out and the lower part of the frame beam, and the bearing components are provided with a plurality of bearing components which are circumferentially distributed and arranged in the underpinning area; the unloading assemblies are located between the lower portion of the frame beam and the ground, the number of the unloading assemblies is equal to the number of the frame beam, and the unloading assemblies and the frame beam are distributed in a one-to-one correspondence mode.
The utility model has the advantages that: compared with the prior art, the combination of the unloading assembly and the bearing assembly is adopted, and the vertical load is effectively transmitted downwards under the condition of not changing a force transmission path of an original structure system during the construction of pulling the joist from the column, so that the construction device can shorten the construction period, reduce the manufacturing cost and does not influence the normal use of the original structure during the construction.
Preferably, the unloading assembly comprises a jack, a steel pipe and a first supporting piece, the lower end of the steel pipe is fixed on the jack, the jack is installed on the ground, the first supporting piece is fixed at the upper end of the steel pipe, and the first supporting piece is abutted to the frame beam through jacking of the jack; through the arrangement of the structure, the bearing capacity of the frame beam can be met, and meanwhile, the mounting and dismounting are convenient.
Preferably, the bearing assembly comprises a second supporting piece, a leveling block and a supporting block, the leveling block is integrally cast and molded at the bottom of the underpinning area, the supporting block is integrally molded at the top of the underpinning area, and the second supporting piece is positioned between the leveling block and the supporting block and is abutted against the leveling block; through the arrangement of the structure, the vertical load bearing of the underpinning area in the column to be pulled out is ensured, and the vertical load force can be effectively transmitted.
Preferably, the first supporting piece and the second supporting piece are both I-shaped steel, and the lengths of the first supporting piece and the second supporting piece are equal; when guaranteeing support piece intensity, can also make the interchangeability between two support pieces better, convenient construction and saving cost.
Preferably, the distance a between the unloading assembly and the column to be pulled out is 1.2 to 1.8 meters; therefore, the unloading assembly can effectively support the frame beam and is convenient for on-site construction.
Preferably, the height h of the underpinning area is greater than or equal to the thickness m of the reinforcing beam poured below the frame beam; therefore, the supporting and replacing area can be integrally cast and molded in the pouring process of the reinforcing beam, and the strength of the reinforcing beam and the frame beam is better.
Preferably, the top plane of the underpinning area is flush with the bottom plane of the frame beam; during the construction of pulling out the column from the joist, the damage to the existing frame-girder structure is reduced as much as possible, and the strength of the existing frame-girder structure is maintained.
Preferably, the bearing components are sequentially arranged around the circumference of the column to be pulled out at equal intervals; therefore, the uniform support between the frame beam and the column to be pulled out can be realized through the underpinning area, and the uneven bearing capacity is prevented.
Drawings
Fig. 1 is the utility model discloses a joist pulls out post construction equipment in the main view structure sketch map of operating condition.
Fig. 2 is an enlarged schematic view of a portion a of fig. 1.
Fig. 3 is a schematic view of the sectional structure a-a of fig. 2.
Fig. 4 is a schematic view of a cross-sectional structure B-B of fig. 2.
Fig. 5 is a schematic perspective view of the bearing assembly of the present invention in a construction state.
The reference numbers in the figures are respectively: 1. a frame beam; 2. removing the column; 3. an unloading assembly; 4. a load bearing assembly; 5. a underpinning area; 6. reinforcing the beam; 31. a jack; 32. a steel pipe; 33. a first support; 41. a second support member; 42. leveling blocks; 43. and (7) a supporting block.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings: as shown in the attached drawings 1 to 5, the utility model comprises an unloading component 3 for supporting the frame beam 1 and a bearing component 4 for supporting the column 2 to be pulled out, wherein the column 2 to be pulled out and the frame beam 1 are vertically distributed between the vertical direction and the horizontal direction; a circle of underpinning area 5 is chiseled between the column 2 to be pulled out and the lower part of the frame beam 1, the underpinning area 5 is an intersection area of the bottom surface of the frame beam 1 and the top of the column 2 to be pulled out, and a circle of area for placing a bearing assembly is chiseled out along the circumferential direction of the column 2 to be pulled out in sequence; the bearing components 4 are arranged in the underpinning area 5 and are sequentially arranged around the circumference of the column 2 to be pulled out at equal intervals; the unloading assemblies 3 are positioned between the lower part of the frame beam 1 and the ground, the number of the unloading assemblies 3 is equal to that of the frame beam 1, and the unloading assemblies 3 and the frame beam 1 are distributed in a one-to-one correspondence manner, so that each frame beam 1 connected with a post to be pulled can be supported by the unloading assemblies 3 during the construction of pulling the post from the joist, and the construction is convenient and the safety performance is improved.
The unloading assembly 3 comprises a jack 31, a steel pipe 32 and a first supporting piece 33, the lower end of the steel pipe 32 is fixed on the jack 31, the jack 31 is installed on the ground, the first supporting piece 33 is fixed at the upper end of the steel pipe 32, and the first supporting piece 33 is abutted against the frame beam 1 through the jacking of the jack 31; the jack 31 is a hydraulic jack with a dial, so that the unloading value applied to the frame beam 1 by the jack can be directly read through the dial, and the frame beam 1 can be prevented from deforming due to the excessive application of the unloading value by the jack.
The bearing component 4 comprises a second supporting piece 41, a leveling block 42 and a supporting block 43, wherein the leveling block 42 is integrally cast and molded at the bottom of the underpinning area 5, the supporting block 43 is integrally molded at the top of the underpinning area 5, and the second supporting piece 41 is positioned between the leveling block 42 and the supporting block 43 and is abutted against the same; the thickness of the leveling block 42 is generally 20mm, and the thickness of the supporting block 43 is generally 25 mm.
The first supporting piece 33 and the second supporting piece 41 are both made of I-steel and have the same length; in the construction process, the construction of the I-shaped steel of the same type is convenient, and certain cost can be saved.
The distance a between the unloading assembly 3 and the column 2 to be pulled out is 1.2-1.8 m, the value is generally 1.5 m, and the trafficability of a construction device and constructors can be improved during construction.
The height h of the underpinning area 5 is more than or equal to the thickness m of the reinforcing beam 6 poured below the frame beam 1; the top plane of the underpinning area 5 is flush with the bottom plane of the frame beam 1; the construction of the later stage reinforcing beam 6 of being convenient for, reinforcing beam 6 needs to explain be: a underpinning area 5 is chiseled in advance and is placed in the bearing component 4, the height h of the underpinning area 5 is calculated according to actual requirements, and then a reinforcing beam 6 is poured on the bottom surface of the frame beam 1.
The present invention is not limited to the above embodiments, and any change is made on the shape or material composition, and all the structural designs provided by the present invention are all the deformation of the present invention, which should be considered within the protection scope of the present invention.

Claims (8)

1. The utility model provides a post construction equipment is pulled out to joist, is including being used for unloading subassembly (3) that support frame roof beam (1) and being used for removing bearing component (4) that post (2) supported to the plan, its characterized in that: a circle of underpinning area (5) is arranged between the column (2) to be pulled out and the lower part of the frame beam (1), and a plurality of bearing components (4) are circumferentially distributed and installed in the underpinning area (5); the unloading assemblies (3) are located between the lower portion of the frame beam (1) and the ground, the number of the unloading assemblies (3) is equal to that of the frame beam (1), and the unloading assemblies (3) and the frame beam (1) are distributed in a one-to-one correspondence mode.
2. The joist column pulling construction device according to claim 1, wherein: the unloading assembly (3) comprises a jack (31), a steel pipe (32) and a first supporting piece (33), the lower end of the steel pipe (32) is fixed on the jack (31), the jack (31) is installed on the ground, the first supporting piece (33) is fixed at the upper end of the steel pipe (32), and the first supporting piece (33) is abutted to the frame beam (1) through jacking of the jack (31).
3. The joist column pulling construction device according to claim 2, wherein: the bearing assembly (4) comprises a second supporting piece (41), a leveling block (42) and a supporting block (43), the leveling block (42) is integrally cast and molded at the bottom of the underpinning area (5), the supporting block (43) is integrally molded at the top of the underpinning area (5), and the second supporting piece (41) is located between the leveling block (42) and the supporting block (43) and is abutted against the supporting block.
4. The joist column pulling construction device according to claim 3, wherein: the first supporting piece (33) and the second supporting piece (41) are both I-shaped steel, and the lengths of the first supporting piece and the second supporting piece are equal.
5. The joist column pulling construction device according to claim 1, wherein: the distance a between the unloading assembly (3) and the column (2) to be pulled out is 1.2-1.8 m.
6. The joist column pulling construction device according to claim 1, wherein: the height h of the underpinning area (5) is more than or equal to the thickness m of the reinforcing beam (6) poured below the frame beam (1).
7. The joist column pulling construction device according to claim 1, wherein: the top plane of the underpinning area (5) is flush with the bottom plane of the frame beam (1).
8. The joist column pulling construction device according to claim 1, wherein: the bearing components (4) are sequentially arranged around the periphery of the column (2) to be pulled out at equal intervals.
CN202220750397.6U 2022-03-31 2022-03-31 Joist pulls out post construction equipment Active CN217151380U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220750397.6U CN217151380U (en) 2022-03-31 2022-03-31 Joist pulls out post construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220750397.6U CN217151380U (en) 2022-03-31 2022-03-31 Joist pulls out post construction equipment

Publications (1)

Publication Number Publication Date
CN217151380U true CN217151380U (en) 2022-08-09

Family

ID=82698111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220750397.6U Active CN217151380U (en) 2022-03-31 2022-03-31 Joist pulls out post construction equipment

Country Status (1)

Country Link
CN (1) CN217151380U (en)

Similar Documents

Publication Publication Date Title
CN108867885B (en) Damping energy consumption assembly node of prefabricated column and integrated prefabricated beam slab and construction method thereof
CN217151380U (en) Joist pulls out post construction equipment
CN113482330A (en) Basement back-jacking detachable steel pipe construction method
CN114592714A (en) Joist column pulling construction device and construction method
CN210105373U (en) Replacement, reinforcement and support device for concrete building shear wall
CN114575451B (en) Construction method of assembled reinforced concrete frame
CN215291438U (en) Independent bearing structure of post-cast strip
CN213296364U (en) Connecting piece and supporting beam steel bar assembly for cast-in-place reinforced concrete foundation pit inner support sectional construction
CN111172998A (en) Standardized and extensible fabricated foundation pit inner support system
CN218713253U (en) Construction elevator standard module steel platform basis
CN220057602U (en) Prefabricated case roof beam of assembled
CN211873027U (en) Standardized and extensible fabricated foundation pit inner support system
CN217480416U (en) Assembled steel concrete integrated configuration frame
CN220866968U (en) Can turnover formula tower crane support system
CN218541249U (en) Prefabricated motor vehicle ramp plate structure
CN216553008U (en) Assembled floor scaffold frame anchor that encorbelments
CN219196714U (en) Integral lifting template and template system thereof
CN218815281U (en) Dragging and beam falling construction structure for installing single steel structure main truss
CN218148399U (en) Steel structure assembled supporting device for foundation pit emergency
CN216840768U (en) Assembled steel structure underpinning device for frame column concrete replacement
CN217840891U (en) High-altitude large-span steel frame supporting platform
CN216739664U (en) Supporting structure for subway station foundation pit
CN216950398U (en) Small-aperture tunnel lining construction system
CN115217121B (en) Cooperative stress system and method for assembled steel-concrete enclosure support and main body structure