CN217151301U - Regularization construction elevator connects material platform - Google Patents
Regularization construction elevator connects material platform Download PDFInfo
- Publication number
- CN217151301U CN217151301U CN202220688051.8U CN202220688051U CN217151301U CN 217151301 U CN217151301 U CN 217151301U CN 202220688051 U CN202220688051 U CN 202220688051U CN 217151301 U CN217151301 U CN 217151301U
- Authority
- CN
- China
- Prior art keywords
- footboard
- material platform
- construction elevator
- support frame
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 title claims abstract description 64
- 238000010276 construction Methods 0.000 title claims abstract description 57
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 238000003466 welding Methods 0.000 claims description 3
- 230000001681 protective effect Effects 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 11
- 238000009434 installation Methods 0.000 abstract description 5
- 239000002699 waste material Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 238000004513 sizing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a regularization construction elevator connects material platform, include supporting component, set up the footboard on supporting component and install the rail guard at the footboard both ends respectively, supporting component includes that the interval sets up and is used for setting firmly the support frame on the structure in the footboard bottom surface, the support frame is the right angle tripod. This application comprises angle steel, anti-skidding decorative pattern steel sheet, rail guard triplex, and each part equipment is simple and convenient easily to be connected, can directly connect material platform installation after accomplishing the connection according to the design, need not constructor and sets up the scaffold frame, processes such as laying the template, and this instrument can the snap-on in structure edge, and the installation is fixed directly to be used after firm. The traditional scaffold receiving platform is avoided being erected, construction safety risks are increased, and the problems of construction efficiency and complex operation are reduced.
Description
Technical Field
The utility model relates to a connect the technical field of material platform, especially relate to a regularization construction elevator connects material platform.
Background
Because of there is certain distance on elevator cage and structure limit, for guaranteeing field constructor's the safety of passing and guaranteeing the construction, set up the scaffold and connect the material platform between construction elevator and structure, the present tradition adopts the setting up of connecing the material platform, need begin to use steel pipe scaffold layer by layer to set up to the construction layer from the one deck, the elevator connects the material platform to utilize scaffold pavement upper portion to lay wooden santa album, wooden santa album upper portion full-thickness pavement template to reach the construction lift and walk to safe steady purpose to the floor. The traditional method for setting up the material receiving platform is common and easy to understand, but the work amount reduces the working efficiency; the construction method for erecting the scaffold is laggard, construction needs to be carried out by cooperation of multiple persons, the speed is low in the erecting process, and the effects of labor waste and time waste are poor.
SUMMERY OF THE UTILITY MODEL
The utility model provides a regularization construction elevator connects material platform has improved the work efficiency who connects the material platform to set up, has practiced thrift construction cost, has reduced the potential safety hazard.
The technical problem to be solved is that: the traditional material receiving platform is slow in building speed, labor-consuming and time-consuming.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model relates to a regularization construction elevator connects material platform, including supporting component, the footboard of setting on supporting component and install the rail guard at the footboard both ends respectively, supporting component includes that the interval sets up and is used for setting firmly the support frame on the structure in the footboard bottom surface, the support frame is the right angle tripod.
The utility model relates to a regularization construction elevator connects material platform, it is further, the support frame is formed by the angle steel welding.
The utility model relates to a regularization construction elevator connects material platform, it is further, the decorative pattern steel sheet is chooseed for use to the footboard.
The utility model relates to a regularization construction elevator connects material platform, it is further, footboard and support frame welded fastening.
The utility model relates to a regularization construction elevator connects material platform, it is further, the rail guard includes the montant that the twice is parallel to each other and sets firmly the multichannel horizon bar between the montant.
The utility model relates to a regularization construction elevator connects material platform, it is further, the rail guard sets firmly on the footboard, montant and footboard welded fastening.
The utility model relates to a regularization construction elevator connects material platform, it is further, the rail guard is articulated with the footboard, the twice mounting panel has set firmly on the footboard, the montant inserts to be articulated through round pin axle and footboard between the mounting panel, set up corresponding fixed orifices on montant and the mounting panel, it is fixed with the montant through the fixed pin of wearing to establish in the fixed orifices.
Compared with the prior art, the utility model, following beneficial effect has:
the traditional construction elevator material receiving platform needs to be erected by multiple persons, the speed is low in the erecting process, and the effects of labor waste and time waste are poor; the tool can be fixed on the edge of the structure by adopting the sizing material receiving platform, the device can be directly fixed on the edge of the structure by using bolts, and the device can be used after being installed, so that labor and time are saved.
Secondly, a material receiving platform is erected on the traditional steel pipe frame, and due to the fact that materials are heavy, labor is required to be divided according to the amount of manpower for transferring, and the labor amount is large; this device is simple and convenient lightweight, can rely on the lift to install, has reduced workman's amount of labour.
The traditional material receiving platform is installed, an operator needs to stand on an external frame for construction for a long time, transfer work is difficult to carry out due to limited space, and potential safety hazards in the construction process are increased due to the fact that construction is carried out on the external frame platform for a long time; the setting connects the material platform installation to utilize the lift to be under construction, has avoided carrying out the potential safety hazard that material transfer work caused because of long-time on the outrigger.
Fourthly, the traditional material receiving platform is erected, so that the efficiency of the construction process is low due to the limitation of operation, and the problems that the floor below the construction floor cannot use a construction elevator to cause work nest and the like in the construction process in order to avoid cross operation; the shaped material receiving platform greatly improves the construction efficiency, simplifies the construction method and can quickly and effectively install the material receiving platform;
the traditional material receiving platform is time-consuming, labor-consuming and labor-consuming to install and disassemble, the efficiency and the safety are low, and the construction cost is additionally increased; the regularization material receiving platform device has improved work efficiency and has practiced thrift the cost, also can have enough to meet the need the use, material saving.
The present invention will be further explained with reference to the accompanying drawings.
Drawings
Fig. 1 is a side view of the present invention;
FIG. 2 is a front view of the present invention;
fig. 3 is a schematic view illustrating a mounting structure of a guard rail and a pedal according to a second embodiment.
Reference numerals:
1. a support frame; 2. a pedal; 3. protecting the fence; 31. a vertical rod; 32. a horizontal bar; 4. mounting a plate; 5. and fixing the pin.
Detailed Description
The first embodiment is as follows:
as shown in fig. 1-2, the utility model relates to a regularization construction elevator connects material platform includes supporting component, sets up footboard 2 on supporting component and installs respectively at the rail guard 3 at 2 both ends of footboard, and supporting component includes that the interval sets up and is used for setting firmly support frame 1 on the structure in 2 bottom surfaces of footboard, and support frame 1 is the right angle tripod.
Wherein support frame 1 is formed by the angle steel welding, during the use, fixes the angle steel on structure through expansion bolts.
The pedal 2 selects the patterned steel plate, has the antiskid function, and the size of the patterned steel plate needs to meet the width of the support frame 1 and the material receiving platform, and when the patterned steel plate is selected, the integrity of the patterned steel plate needs to be ensured, and the problems of influencing use and safety, such as no defect, crack and damage on the surface, and the like are solved, so that the construction safety is ensured. The pedal 2 is welded and fixed with the support frame 1.
The guard rail 3 comprises two parallel vertical rods 31 and a plurality of horizontal rods 32 fixedly arranged between the vertical rods 31 at intervals, and the vertical rods 31 are welded and fixed with the pedal 2.
Example two:
referring to fig. 3, the difference from the first embodiment is that, in order to facilitate the transportation of the material receiving platform, the guard rail 3 is hinged to the pedal 2, two parallel mounting plates 4 are welded to the positions of the vertical rods 31 on the pedal 2, the vertical rods 31 are inserted between the mounting plates 4 and are hinged to the pedal 2 through pin shafts, corresponding fixing holes are formed in the vertical rods 31 and the mounting plates 4 above or below the pin shafts, the vertical rods 31 are fixed through fixing pins 5 penetrating through the fixing holes, when the material receiving platform is used, the guard rail 3 is turned to a vertical state, and the fixing pins 5 are inserted into the fixing holes to fix the guard rail 3; after the use is finished, the fixing pin 5 is taken out, so that the guard rail 3 is overlapped on the pedal 2, the occupied space of the guard rail 3 is reduced, and the transportation is convenient.
According to the material receiving platform, the supporting frame 1 and the pedal 2 form the material receiving platform, and during installation, the material receiving platform can be installed only by means of a side elevator without erecting a scaffold, so that the construction efficiency is greatly improved, the construction method is simplified, and the material receiving platform can be installed quickly and effectively; in addition, the protective guards 3 are arranged at the two ends of the material receiving platform, so that the two ends of the material receiving platform are prevented from being suspended, and the construction safety is ensured.
Compare with traditional connecing material platform, this application has following advantage:
the traditional construction elevator material receiving platform needs to be erected by multiple persons, the speed is low in the erecting process, and the effects of labor waste and time waste are poor; the tool can be fixed on the edge of the structure by adopting the sizing material receiving platform, the device can be directly fixed on the edge of the structure by using bolts, and the device can be used after being installed, so that labor and time are saved.
Secondly, a material receiving platform is erected on the traditional steel pipe frame, and due to the fact that materials are heavy, labor is required to be divided according to the amount of manpower for transferring, and the labor amount is large; the simple and convenient lightweight of this device can rely on the lift to install, has reduced workman's amount of labour.
The traditional material receiving platform is installed, an operator needs to stand on an external frame for construction for a long time, transfer work is difficult to carry out due to limited space, and potential safety hazards in the construction process are increased due to the fact that construction is carried out on the external frame platform for a long time; the setting connects the material platform installation to utilize the lift to be under construction, has avoided carrying out the potential safety hazard that material transfer work caused because of long-time on the outrigger.
Fourthly, the traditional material receiving platform is erected, so that the efficiency of the construction process is low due to the limitation of operation, and the problems that the floor below the construction floor cannot use a construction elevator to cause work nest and the like in the construction process in order to avoid cross operation; the shaped material receiving platform greatly improves the construction efficiency, simplifies the construction method and can quickly and effectively install the material receiving platform;
the traditional material receiving platform is time-consuming, labor-consuming and labor-consuming to install and disassemble, the efficiency and the safety are low, and the construction cost is additionally increased; the regularization material receiving platform device has improved work efficiency and has practiced thrift the cost, also can have enough to meet the need the use, material saving.
The above-mentioned embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the design spirit of the present invention should fall into the protection scope defined by the claims of the present invention.
Claims (7)
1. The utility model provides a regularization construction elevator connects material platform which characterized in that: including supporting component, footboard (2) of setting on supporting component and install rail guard (3) at footboard (2) both ends respectively, supporting component includes that the interval sets up and is used for setting firmly support frame (1) on the structure in footboard (2) bottom surface, support frame (1) are the right angle tripod.
2. The regularization construction elevator meets material platform according to claim 1 which characterized in that: the support frame (1) is formed by welding angle steel.
3. The regularization construction elevator meets material platform according to claim 2, its characterized in that: the pedal (2) is made of a patterned steel plate.
4. The regularization construction elevator meets material platform according to claim 3, its characterized in that: the pedal (2) is welded and fixed with the support frame (1).
5. The regularization construction elevator meets material platform according to claim 4, its characterized in that: the guard rail (3) comprises two vertical rods (31) which are parallel to each other and a plurality of horizontal rods (32) which are fixedly arranged between the vertical rods (31).
6. The regularization construction elevator meets material platform according to claim 5, characterized in that: the protective guard (3) is fixedly arranged on the pedal (2), and the vertical rod (31) is welded and fixed with the pedal (2).
7. The regularization construction elevator meets material platform according to claim 5, characterized in that: the guardrail (3) is articulated with footboard (2), two mounting panels (4) have set firmly on footboard (2), montant (31) are inserted between mounting panel (4) and are articulated through round pin axle and footboard (2), seted up corresponding fixed orifices on montant (31) and mounting panel (4), fixed pin (5) through wearing to establish in the fixed orifices are fixed montant (31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220688051.8U CN217151301U (en) | 2022-03-28 | 2022-03-28 | Regularization construction elevator connects material platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220688051.8U CN217151301U (en) | 2022-03-28 | 2022-03-28 | Regularization construction elevator connects material platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217151301U true CN217151301U (en) | 2022-08-09 |
Family
ID=82697338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220688051.8U Active CN217151301U (en) | 2022-03-28 | 2022-03-28 | Regularization construction elevator connects material platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217151301U (en) |
-
2022
- 2022-03-28 CN CN202220688051.8U patent/CN217151301U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284089B (en) | A kind of steel trestle rapid constructing method | |
CN104196222A (en) | Cantilever frame of tool type profile steel cantilever scaffold | |
CN204753397U (en) | Temporary mounting hanger for steel box bridge | |
CN217151301U (en) | Regularization construction elevator connects material platform | |
CN210152194U (en) | Scaffold for house building construction | |
CN209907972U (en) | Conversion frame for longitudinal and transverse conversion of precast concrete exterior wall cladding | |
CN115306137B (en) | Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof | |
CN108842933B (en) | Tower crane opening blocking method | |
CN111979925B (en) | Construction method for pouring diaphragm plate in hollow thin-wall pier by using fabricated construction platform | |
JP5670152B2 (en) | Cable rack installation method in the vertical direction and cable rack mounting brackets used in the method | |
CN205259574U (en) | Quick assembly and disassembly safety protection screen | |
CN104060838A (en) | Grouping and air-pairing installation method for corridor | |
CN210086783U (en) | Tool type operating platform for large-gradient inclined roof | |
CN218438488U (en) | Telescopic reinforcing bar processing protection canopy | |
CN109577632B (en) | Suspended scaffold and construction method thereof | |
CN217840841U (en) | High-altitude movable ladder-hanging type auxiliary construction system | |
CN211817907U (en) | Technical interlayer maintenance carriageway for sterile production workshop | |
CN218581144U (en) | Large steel pipe support parallel-connection movable construction platform | |
CN216305423U (en) | Lifting and moving device for mounting and dismounting crossbeam of single-span protective shed frame | |
CN202788016U (en) | Protective shed for construction field operation | |
CN218668606U (en) | Jacking system for transferring materials to bottom of existing floor slab | |
CN215052137U (en) | Platform is dismantled in installation of bent cap staple bolt | |
CN203640245U (en) | Scaffold structure for building exterior wall construction | |
CN215594839U (en) | Station auxiliary device applied to super high-rise steel-concrete structure | |
CN221053295U (en) | Convenient construction stair |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |