CN217149895U - Cell-free steel-concrete combined section structure based on UHPC - Google Patents

Cell-free steel-concrete combined section structure based on UHPC Download PDF

Info

Publication number
CN217149895U
CN217149895U CN202220313287.3U CN202220313287U CN217149895U CN 217149895 U CN217149895 U CN 217149895U CN 202220313287 U CN202220313287 U CN 202220313287U CN 217149895 U CN217149895 U CN 217149895U
Authority
CN
China
Prior art keywords
steel
section
concrete
plate
uhpc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220313287.3U
Other languages
Chinese (zh)
Inventor
刘榕
卢立志
赵华
孙韬
卢柯宇
邵旭东
崔剑峰
周旋
贺国栋
卢江波
李文武
周洋
刘汉彪
卜式
龙绿军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Hunan Provincial Communications Planning Survey and Design Institute Co Ltd
Original Assignee
Hunan University
Hunan Provincial Communications Planning Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University, Hunan Provincial Communications Planning Survey and Design Institute Co Ltd filed Critical Hunan University
Priority to CN202220313287.3U priority Critical patent/CN217149895U/en
Application granted granted Critical
Publication of CN217149895U publication Critical patent/CN217149895U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a cell-free steel-concrete combined section structure based on UHPC, which comprises a concrete box girder transition section, a steel-concrete combined section and a steel box girder transition section which are arranged in sequence; the steel-concrete combined section comprises a steel box structure and a UHPC structure poured in the steel box structure, the steel box structure comprises a mixed section top plate, a mixed section bottom plate, a mixed section web plate, a mixed section flange plate and a steel bearing plate which is arranged between the steel-concrete combined section and the steel box girder transition section and fixedly connected with the steel box girder transition section, the mixed section web plate is a double-arm plate, and a plurality of rows of first shear nail connecting pieces are arranged on the mixed section top plate, the mixed section bottom plate, the mixed section web plate and the side wall of the steel bearing plate. The utility model provides a no check room steel-concrete combined section structure based on UHPC has simple structure, passes power characteristics such as clear and definite, the connection effect is good, the construction is simple and convenient.

Description

Cell-free steel-concrete combined section structure based on UHPC
Technical Field
The utility model relates to a bridge engineering technical field, concretely relates to no check room steel-concrete combined section structure based on UHPC.
Background
The prestressed concrete continuous beam bridge has the advantages that the dead weight of the structure is too large, the shrinkage and creep of common concrete are large, and the beam body can be excessively downwarped under the long-term action of load, so that the dead weight of the structure can be reduced by adopting the steel box girder in the bridge span, and the problems of the main span downwarping and the beam body cracking of the long-span continuous beam are solved. The steel-concrete combined section is a transition section between a steel beam and a concrete beam, and because the rigidity and the mass of the steel beam and the concrete beam on two sides are greatly different, the rigidity and the strength are mutated at the moment, the stress is complex, two materials are connected by using a shear force key usually, and measures are taken to weaken the difference of the two materials. The steel-concrete combined section is roughly divided into a steel-concrete combined section without a steel grid chamber and a steel-concrete combined section with the steel grid chamber. It is bigger to have check room steel-concrete to combine section steel-concrete area of contact to be bigger, and internal force transmission is more smooth-going between girder steel and concrete beam, and the wholeness is better, but correspondingly, the setting up of steel check room can make steel-concrete combine section inner space narrow and small, is difficult to guarantee steel construction welding quality and the inside concrete placement compactness of check room, and narrow and small inside PBL connecting piece, peg, the reinforcing bar of being covered with of structure simultaneously, the structure is too complicated. In addition, the common concrete filled in the grid chamber has large drying shrinkage due to poor volume stability, the bonding strength with the steel plate is not high, the gap is very easy to appear between the steel top plate of the combining section and the concrete, and the upper rainwater permeates the grid chamber through the cracks of the pavement layer, so that the durability of the combining section is seriously influenced, and even the structural stress is endangered.
Based on this, a new steel-concrete combined segment structure is needed to simplify the structural form and solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a no check room steel-concrete combined section structure based on UHPC, have simple structure, pass power characteristics such as clear and definite, the connection effect is good, the construction is simple and convenient.
In order to solve the above problem, the technical scheme of the utility model is as follows:
a cell-free steel-concrete combined section structure based on UHPC comprises a concrete box girder transition section, a steel-concrete combined section and a steel box girder transition section which are sequentially arranged;
the steel-concrete combined section comprises a steel box structure and a UHPC structure poured in the steel box structure, the steel box structure comprises a mixed section top plate formed by extending a top plate of a steel box girder transition section, a mixed section bottom plate formed by extending a bottom plate of the steel box girder transition section, a mixed section web plate formed by extending a web plate of the steel box girder transition section, a mixed section flange plate formed by extending a flange plate of the steel box girder transition section, and a steel bearing plate which is arranged between the steel-concrete combined section and the steel box girder transition section and fixedly connected with the steel box girder transition section, the mixed section web plate is a double-arm plate, and the mixed section top plate, the mixed section bottom plate, the mixed section web plate and the mixed section flange plate are respectively connected with the steel bearing plate;
the mixed section top plate, the mixed section flange plate, the steel bearing plate and the template used in pouring are enclosed to form an upper pouring cavity, the mixed section bottom plate, the steel bearing plate and the template used in pouring are enclosed to form a lower pouring cavity, the mixed section web plate, the mixed section top plate and the mixed section bottom plate are enclosed to form an abdomen pouring cavity, and UHPC is cast in situ in the upper pouring cavity, the lower pouring cavity and the abdomen pouring cavity to form the UHPC structure; and a plurality of rows of first shear nail connecting pieces are arranged on the corresponding mixed section top plate, mixed section bottom plate, mixed section web plate and steel bearing plate side wall in the upper layer pouring cavity, the lower layer pouring cavity and the abdomen pouring cavity;
the concrete box girder transition section and the UHPC structure are connected into a whole through a reserved steel bar.
Further, the length of the steel-concrete combined section is 1.5-3m, the distance between the double-arm plates is 0.8-1.2m, the height of the upper-layer pouring cavity is 0.8-1.5m, the height of the lower-layer pouring cavity is 0.8-1.5m, and the thickness of the steel pressure-bearing plate is 50-120 mm.
Furthermore, a concrete partition plate with a manhole is arranged in the transition section of the concrete box girder, the concrete partition plate and the UHPC structure are connected into a whole through reserved steel bars, and the reserved steel bars are distributed in parallel along the bridge direction and the transverse bridge direction.
Further, the steel box structure still include with steel bearing plate is connected and one end stretches into a plurality of longitudinal baffle in the concrete baffle, the longitudinal baffle surface is equipped with the second shear force nail connecting piece in the embedding concrete baffle.
Furthermore, the thickness of the concrete partition plate is 0.5-2m, and the depth of the longitudinal partition plate extending into the concrete partition plate is 50-100 cm.
Further, the steel pressure bearing plate is a straight steel plate.
Furthermore, a plurality of T ribs are arranged in the transition section of the steel box girder, one end of each T rib is fixedly connected with the steel bearing plate, and the other end of each T rib is fixedly connected with the steel girder stiffening rib.
Furthermore, the height of the T-shaped rib is gradually reduced from one end of the connecting steel pressure bearing plate to one end of the connecting steel beam stiffening rib, the slope ratio of the T-shaped rib is 1/8-1/10, and the height of one end of the T-shaped rib connecting steel pressure bearing plate and a row of first shear nail connecting pieces, far away from the corresponding mixing section top plate/mixing section bottom plate, in the UHPC structure are on the same horizontal line.
Furthermore, an STC layer with the thickness of 30-60mm is arranged on the top surfaces of the steel-concrete combined section and the steel box girder transition section, and comprises a third shear nail welded on the top surfaces of the steel-concrete combined section and the steel box girder transition section, a steel bar mesh laid on the top surfaces of the steel-concrete combined section and the steel box girder transition section, and an UHPC layer poured on the steel bar mesh.
The utility model also provides a construction method of no check room steel-concrete combined section structure based on UHPC, including following step:
step S1, manufacturing a steel-concrete combined section steel box structure, and welding a first shear pin connecting piece inside the steel-concrete combined section steel box structure;
step S2, hoisting a steel box structure of the steel-concrete combined section and a transition section of the concrete box girder, butting and fixing, and installing a prestressed duct of the steel-concrete combined section;
step S3, installing templates of an upper layer pouring cavity and a lower layer pouring cavity of the steel-concrete combined section, and pouring UHPC (ultra high performance concrete) on the upper layer pouring cavity, the lower layer pouring cavity and the abdomen pouring cavity to form a steel-concrete combined section UHPC structure;
and step S4, curing the UHPC of the steel-concrete combined section.
Compared with the prior art, the utility model provides a no check room steel-concrete joint section structure and construction method based on UHPC, beneficial effect lies in:
the structure of the cell-free steel-concrete combined section based on the UHPC provided by the utility model cancels the structure of the steel cell, reduces the number of shear connectors, greatly simplifies the structure and is simple and convenient to manufacture; the concrete beam is easy to be reinforced and poured.
Secondly, the utility model provides a no check room steel-concrete joint section structure based on UHPC adopts UHPC material and concrete girder to be connected, and the UHPC mechanical properties is between concrete and steel, is favorable to the rigidity transition, makes the structure atress good; meanwhile, the UHPC has good fluidity and small aggregate particle size, and is easy to pour and construct; the contraction is small, and the combination between the steel grating chamber and the concrete can be effectively ensured; high rigidity, toughness and fatigue strength.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a schematic structural diagram of a UHPC-based cellular-free steel-concrete combined segment structure of the present invention;
FIG. 2 is a schematic structural diagram of a steel box of a steel-concrete composite section in the structure of the UHPC-based cell-free steel-concrete composite section shown in FIG. 1;
FIG. 3 is a schematic cross-sectional view of 1/2 at A-A in FIG. 1;
FIG. 4 is a schematic cross-sectional view of 1/2 at B-B of FIG. 1;
fig. 5 is a schematic top plan view 1/2 of a steel-concrete joint in a UHPC-based cellular-free steel-concrete joint structure according to the present invention;
fig. 6 is a schematic view of 1/2 bottom plan of the steel-concrete joint in the structure of the UHPC-based cellular-free steel-concrete joint according to the present invention.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the embodiments of the present invention and make the above objects, features and advantages of the present invention more obvious and understandable, the following description will make further description of the embodiments of the present invention.
The endpoints of the ranges and any values disclosed herein are not limited to the precise range or value, and such ranges or values should be understood to encompass values close to those ranges or values. For ranges of values, between the endpoints of each of the ranges and the individual values, and between the individual values may be combined with each other to yield one or more new ranges of values, which ranges of values should be considered as specifically disclosed herein.
Please refer to fig. 1 to fig. 6, wherein fig. 1 is a schematic structural diagram of a UHPC-based cellular steel-concrete combined segment structure according to the present invention; FIG. 2 is a schematic structural diagram of a steel box of a steel-concrete composite section in the structure of the UHPC-based cell-free steel-concrete composite section shown in FIG. 1; FIG. 3 is a schematic cross-sectional view of 1/2 at A-A of FIG. 1; FIG. 4 is a schematic cross-sectional view of 1/2 at B-B of FIG. 1; fig. 5 is a schematic top plan view 1/2 of a steel-concrete joint in a UHPC-based cellular-free steel-concrete joint structure according to the present invention; fig. 6 is a schematic view of 1/2 bottom plan of the steel-concrete joint in the structure of the UHPC-based cellular-free steel-concrete joint according to the present invention. The utility model discloses a no check room steel-concrete joint section structure based on UHPC is including the concrete box girder changeover portion 1, steel-concrete joint section 2 and the steel box girder changeover portion 3 that set gradually, and steel-concrete joint section 2 realizes being connected concrete box girder changeover portion 1 and steel box girder changeover portion 3.
The steel-concrete joint section 2 comprises a steel box structure 21 and a UHPC structure 22 poured in the steel box structure 21. The steel box structure 21 includes a mixed section top plate 211 formed by extending a top plate of the steel box girder transition section, a mixed section bottom plate 212 formed by extending a bottom plate of the steel box girder transition section, a mixed section web 213 formed by extending a web of the steel box girder transition section, a mixed section flange plate 214 formed by extending a flange plate of the steel box girder transition section, and a steel bearing plate 215 disposed between the steel-concrete combining section 2 and the steel box girder transition section 3 and fixedly connected with the steel box girder transition section, the mixed section web 213 is a double-arm plate, and the mixed section top plate 211, the mixed section bottom plate 212, the mixed section web 213, and the mixed section flange plate 214 are respectively connected with the steel bearing plate 215.
The mixed section top plate 211, the mixed section flange plate 214, the steel bearing plate 215 and the template 4 used in pouring are enclosed to form an upper pouring cavity 216, the mixed section bottom plate 212, the steel bearing plate 215 and the template 4 used in pouring are enclosed to form a lower pouring cavity 217, the mixed section web plate 213, the mixed section top plate 211 and the mixed section bottom plate 212 are enclosed to form an abdomen pouring cavity 218, and UHPC is cast in place in the upper pouring cavity 216, the lower pouring cavity 217 and the abdomen pouring cavity 218 to form the UHPC structure 22; and the mixed section top plate, the mixed section bottom plate, the mixed section web plate and the steel bearing plate side wall which are positioned in the upper layer pouring cavity 216, the lower layer pouring cavity 217 and the abdomen pouring cavity 218 and correspond to each other are respectively provided with a plurality of rows of first shear nail connecting pieces 219, and the first shear nail connecting pieces 219 are used for increasing the bonding force between the UHPC structure and the steel box structure.
In this embodiment, the length of the steel-concrete combined section 2 is 1.5-3m, the distance between the double-arm plates is 0.8-1.2m, the height of the upper-layer pouring cavity 216 is 0.8-1.5m, the height of the lower-layer pouring cavity 217 is 0.8-1.5m, and the steel pressure plate 218 is a flat steel plate with a thickness of 50-120 mm.
The transition section 1 of the concrete box girder and the UHPC structure in the steel-concrete combined section 2 are connected into a whole through reserved steel bars. Specifically, a concrete partition plate 11 with a manhole is arranged in the concrete box girder transition section 1, and the concrete partition plate 11 and the UHPC structure are connected into a whole through reserved steel bars. Preferably, the reserved steel bars are distributed in parallel along the bridge direction and the transverse bridge direction, so that the UHPC and the transition section of the concrete box girder are stressed together. In this embodiment, the thickness of the concrete spacer 11 is 0.5 to 2 m.
In order to ensure the good combination of the steel-concrete combination section 2 and the concrete box girder transition section 1, longitudinal internal prestressed tendons 12 and external prestressed tendons 13 are distributed in the concrete box girder transition section 1, the longitudinal internal prestressed tendons 12 penetrate through a UHPC structure 22 of the steel-concrete combination section and are anchored on a steel bearing plate 215, and the external prestressed tendons 13 penetrate through a main span from a main pier diaphragm and are anchored on a main pier diaphragm on the other side.
In order to further improve the good combination of the steel-concrete combination section 2 and the concrete box girder transition section 1, preferably, the steel-concrete combination section 2 further comprises a plurality of longitudinal partition plates 210 which are connected with the steel pressure bearing plates 215 and one ends of which extend into the concrete partition plates 11, and the surfaces of the longitudinal partition plates 210 are provided with second shear nail connecting pieces 2101 embedded in the concrete partition plates. In this embodiment, the depth of the longitudinal partition 210 extending into the concrete partition 11 is 50-100 cm.
Be equipped with girder steel stiffening rib 31 and a plurality of piece T rib 32 in the steel case roof beam changeover portion 3, wherein the one end and the steel bearing plate 215 fixed connection of T rib 32, the other end and girder steel stiffening rib 31 fixed connection. In this embodiment, the height of the T-rib 32 is gradually reduced from the end connected with the steel pressure bearing plate 215 to the end connected with the steel beam stiffener 31 to realize rigidity transition, the slope ratio is 1/8-1/10, and the height of the end connected with the steel pressure bearing plate 215 of the T-rib 32 is in the same horizontal line with the row of first shear pin connectors 219 of the UHPC structure far away from the corresponding top plate/bottom plate of the mixing section.
The utility model discloses in, the 3 top surfaces of steel and concrete joint section 2 and steel box girder changeover portion set up the STC layer 5 that one deck thickness is 30-60mm, and the STC layer represents steel-super high tenacity concrete, and specific STC layer 5 is including welding in the third shear force nail 51 of steel and concrete joint section and steel box girder changeover portion top surface, laying in the reinforcing bar net (not numbered) of steel and concrete joint section and steel box girder changeover portion top surface, pour in the UHPC layer (not numbered) of reinforcing bar net. The STC layer covers the top surfaces of the concrete box girder transition sections in which the longitudinal prestress of the bonding sections exists, besides the top surfaces of the steel-concrete bonding sections 2 and the steel box girder transition sections 3.
The utility model discloses a no check room steel-concrete joint section structure based on UHPC, construction method includes following step:
step S1, manufacturing a steel-concrete combined section steel box structure, and welding a first shear pin connecting piece inside the steel-concrete combined section steel box structure;
step S2, the steel box structure of the hoisting steel-concrete combined section is butted and fixed with the transition section of the concrete box girder, and a prestressed duct of the steel-concrete combined section is installed;
step S3, installing templates of an upper layer pouring cavity and a lower layer pouring cavity of the steel-concrete combined section, and pouring UHPC (ultra high performance concrete) on the upper layer pouring cavity, the lower layer pouring cavity and the abdomen pouring cavity to form a steel-concrete combined section UHPC structure;
the UHPC structure of the upper-layer pouring cavity and the UHPC structure of the abdomen pouring cavity are poured through pouring holes 2110 formed in the top plate 211 of the combining section, and the UHPC structure of the lower-layer pouring cavity is poured through pouring holes formed in the template 4.
And step S4, curing the UHPC of the steel-concrete combined section.
Compared with the prior art, the utility model provides a no check room steel-concrete joint section structure and construction method based on UHPC, beneficial effect lies in:
the structure of the cell-free steel-concrete combined section based on the UHPC provided by the utility model cancels the structure of the steel cell, reduces the number of shear connectors, greatly simplifies the structure and is simple and convenient to manufacture; the concrete beam is easy to be reinforced and poured.
Secondly, the utility model provides a no check room steel-concrete joint section structure based on UHPC adopts UHPC material and concrete girder to be connected, and the UHPC mechanical properties is between concrete and steel, is favorable to the rigidity transition, makes the structure atress good; meanwhile, the UHPC has good fluidity and small aggregate particle size, and is easy to pour and construct; the contraction is small, and the combination between the steel grating chamber and the concrete can be effectively ensured; high rigidity, toughness and fatigue strength.
The embodiments of the present invention have been described in detail, but the present invention is not limited to the described embodiments. Various changes, modifications, substitutions and alterations to these embodiments will occur to those skilled in the art without departing from the spirit and scope of the present invention.

Claims (9)

1. A cell-free steel-concrete combined section structure based on UHPC is characterized by comprising a concrete box girder transition section, a steel-concrete combined section and a steel box girder transition section which are sequentially arranged;
the steel-concrete combined section comprises a steel box structure and a UHPC structure poured in the steel box structure, the steel box structure comprises a mixed section top plate formed by extending a top plate of a steel box girder transition section, a mixed section bottom plate formed by extending a bottom plate of the steel box girder transition section, a mixed section web plate formed by extending a web plate of the steel box girder transition section, a mixed section flange plate formed by extending a flange plate of the steel box girder transition section, and a steel bearing plate which is arranged between the steel-concrete combined section and the steel box girder transition section and fixedly connected with the steel box girder transition section, the mixed section web plate is a double-arm plate, and the mixed section top plate, the mixed section bottom plate, the mixed section web plate and the mixed section flange plate are respectively connected with the steel bearing plate;
the mixed section top plate, the mixed section flange plate, the steel bearing plate and the template used in pouring are enclosed to form an upper pouring cavity, the mixed section bottom plate, the steel bearing plate and the template used in pouring are enclosed to form a lower pouring cavity, the mixed section web plate, the mixed section top plate and the mixed section bottom plate are enclosed to form an abdomen pouring cavity, and UHPC is cast in situ in the upper pouring cavity, the lower pouring cavity and the abdomen pouring cavity to form the UHPC structure; and a plurality of rows of first shear nail connecting pieces are arranged on the corresponding mixed section top plate, mixed section bottom plate, mixed section web plate and steel bearing plate side wall in the upper layer pouring cavity, the lower layer pouring cavity and the abdomen pouring cavity;
the concrete box girder transition section and the UHPC structure are connected into a whole through a reserved steel bar.
2. The structure of the UHPC-based cell-free steel-concrete combined section as recited in claim 1, wherein the length of the steel-concrete combined section is 1.5-3m, the distance between the double-arm plates is 0.8-1.2m, the height of the upper-layer casting cavity is 0.8-1.5m, the height of the lower-layer casting cavity is 0.8-1.5m, and the thickness of the steel bearing plate is 50-120 mm.
3. The UHPC-based cellular-free steel-concrete combined section structure is characterized in that a concrete partition plate with a manhole is arranged in the concrete box girder transition section, the concrete partition plate and the UHPC structure are connected into a whole through reserved steel bars, and the reserved steel bars are distributed in parallel along the forward bridge direction and the transverse bridge direction.
4. The UHPC-based cellular-free steel-concrete composite section structure according to claim 3, wherein the steel box structure further comprises a plurality of longitudinal partition plates connected with the steel bearing plates and having one ends extending into the concrete partition plates, and the surfaces of the longitudinal partition plates are provided with second shear nail connectors embedded in the concrete partition plates.
5. A UHPC-based cellular-free steel-concrete bonded section structure according to claim 4 wherein the concrete partition has a thickness of 0.5-2m and the depth of the longitudinal partition extending into the concrete partition is 50-100 cm.
6. The UHPC-based cellular-free steel-concrete joint section structure according to claim 1, wherein the steel pressure-bearing plate is a flat steel plate.
7. The UHPC-based cellular-free steel-concrete combined section structure as claimed in claim 1, wherein a plurality of T-shaped ribs are arranged in the steel box girder transition section, one ends of the T-shaped ribs are fixedly connected with the steel bearing plate, and the other ends of the T-shaped ribs are fixedly connected with the steel girder stiffening ribs.
8. A UHPC-based cellular-steel-concrete bonded section structure as claimed in claim 7 wherein the T-rib height gradually decreases from the end of the connecting steel pressure-bearing plate to the end of the connecting steel beam stiffener, with a ramp ratio of 1/8-1/10, and the height of the end of the T-rib connecting steel pressure-bearing plate is at the same level as the row of first shear pin connections in the UHPC structure away from the corresponding top/bottom plate of the hybrid section.
9. A UHPC-based cellular-free reinforced concrete composite block structure according to claim 1 wherein the top surfaces of the reinforced concrete composite block and the steel box girder transition block are provided with an STC layer having a thickness of 30-60mm, the STC layer comprises a third shear pin welded to the top surfaces of the reinforced concrete composite block and the steel box girder transition block, a steel bar net laid on the top surfaces of the reinforced concrete composite block and the steel box girder transition block, and a UHPC layer poured on the steel bar net.
CN202220313287.3U 2022-02-16 2022-02-16 Cell-free steel-concrete combined section structure based on UHPC Active CN217149895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220313287.3U CN217149895U (en) 2022-02-16 2022-02-16 Cell-free steel-concrete combined section structure based on UHPC

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220313287.3U CN217149895U (en) 2022-02-16 2022-02-16 Cell-free steel-concrete combined section structure based on UHPC

Publications (1)

Publication Number Publication Date
CN217149895U true CN217149895U (en) 2022-08-09

Family

ID=82690726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220313287.3U Active CN217149895U (en) 2022-02-16 2022-02-16 Cell-free steel-concrete combined section structure based on UHPC

Country Status (1)

Country Link
CN (1) CN217149895U (en)

Similar Documents

Publication Publication Date Title
CN110331664B (en) Steel-concrete mixed continuous box girder bridge deck joint structure and construction method thereof
CN109440625B (en) Steel-concrete combined continuous rigid frame steel truss bridge
CN109024219B (en) Prefabricated ultrahigh-performance concrete-common concrete combined beam bridge structure and construction method
CN104762871A (en) Prestressed concrete-steel tank beam bond beam continuous beam bridge
CN216040604U (en) Prefabricated combined T-beam structure
CN103556565A (en) Connection construction for girders made of concrete with different performance
CN114059440A (en) Fully-assembled SBSG shear connection steel-concrete composite beam
CN218813128U (en) Steel-concrete combined structure for cable-stayed bridge with double-side I-steel mixed beams
CN111778835A (en) Combined beam of steel, common concrete and ultrahigh-performance concrete and construction method
CN110331648B (en) Ultra-high-performance concrete-part section steel composite beam unit, ultra-high-performance concrete-section steel composite beam unit and composite beam
CN112746554A (en) Combined capping beam and bridge with same
CN217149895U (en) Cell-free steel-concrete combined section structure based on UHPC
CN114197321B (en) Prestressed UHPC-NC combined continuous box girder bridge and construction method thereof
CN201381470Y (en) Assembled variable cross-section composite continuous bridge
CN206503063U (en) Prefabricated assembled Wavelike steel webplate T beam bridges
CN216338993U (en) Longitudinal joint for steel-UHPC (ultra high performance concrete) assembled pi-shaped combination beam
CN217869977U (en) Novel UHPC orthotropic bridge panel
CN216551524U (en) Continuous case girder bridge of prestressing force UHPC-NC combination
CN115961539A (en) Steel-concrete combined section
CN110055874A (en) A kind of box girder with corrugated steel webs bridge novel lining concrete structure
CN212582397U (en) Combined beam of steel, common concrete and ultrahigh-performance concrete
CN215210455U (en) Steel-free lattice connecting system of steel-concrete mixed beam
CN114635345A (en) Cell-free steel-concrete combined section structure based on UHPC and construction method thereof
CN215482231U (en) Assembled waffle bridge panel combination case roof beam structure
CN210621439U (en) Combined beam unit and combined beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant