CN217115440U - Pipeline clamping device for construction and installation - Google Patents
Pipeline clamping device for construction and installation Download PDFInfo
- Publication number
- CN217115440U CN217115440U CN202220885652.8U CN202220885652U CN217115440U CN 217115440 U CN217115440 U CN 217115440U CN 202220885652 U CN202220885652 U CN 202220885652U CN 217115440 U CN217115440 U CN 217115440U
- Authority
- CN
- China
- Prior art keywords
- bolt
- clamping plate
- block
- fixedly connected
- grip block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 238000009434 installation Methods 0.000 title claims abstract description 15
- 238000000034 method Methods 0.000 abstract description 10
- 230000007423 decrease Effects 0.000 abstract 1
- 230000000149 penetrating effect Effects 0.000 description 4
- 230000002093 peripheral effect Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Abstract
The utility model relates to an electric power engineering technical field, and disclose a pipeline clamping device is used in construction installation, including lower grip block, go up grip block and hinge, it is articulated that the hinge is passed through to one side of lower grip block and one side of going up the grip block, goes up the first connecting block of opposite side fixedly connected with of grip block, and the opposite side fixedly connected with second connecting block of lower grip block, the middle part screw thread on first connecting block top run through there is first bolt, the one end and the second connecting block threaded connection of first bolt. This scheme is through rotatory a plurality of second bolt, and a jacking force is exerted to a plurality of pressure boost piece at the in-process of rotatory decline to a plurality of second bolt for a plurality of pressure boost piece descends, and carries out the pressure boost to the pipeline that runs through from the first spacing groove of a plurality of fixed, and the phenomenon that many pipelines were complicatedly complicated then can not appear like this, improves the arrangement regularity of pipeline simultaneously.
Description
Technical Field
The application relates to the technical field of electric power engineering, in particular to a pipeline clamping device for construction and installation.
Background
When carrying out electric power construction, need not draw, winding displacement to many cable lines, in this in-process, many pipeline complicacies's phenomenon appears easily, can influence the arrangement regularity of pipeline, is unfavorable for the later stage moreover to the pipeline inspection.
SUMMERY OF THE UTILITY MODEL
In order to solve the above-mentioned problem, the present application provides a pipeline clamping device for construction installation.
The application provides a pipeline clamping device for construction installation adopts following technical scheme:
the utility model provides a pipeline clamping device is used in construction installation, includes grip block, last grip block and hinge down, it is articulated through the hinge that one side of lower grip block and one side of last grip block are passed through, the first spacing groove of a plurality of has been seted up to equidistant side by side on the top of grip block down, the bottom of going up the grip block has seted up a plurality of second spacing groove, a plurality of equidistant side by side first spacing groove cooperatees with a plurality of second spacing groove one by one respectively and forms the spacing hole of a plurality of, go up the first connecting block of opposite side fixedly connected with of grip block, the opposite side fixedly connected with second connecting block of grip block down, the middle part screw thread on first connecting block top runs through there is first bolt, the one end and the second connecting block threaded connection of first bolt.
Through adopting above-mentioned technical scheme, through merging last grip block and lower grip block, then through rotatory first bolt for the one end and the second connecting block threaded connection of first bolt, and then to going up the grip block and fixing down between the grip block, like this alright with a plurality of pipelines centre gripping respectively one by one spacing in a plurality of spacing hole that a plurality of first spacing groove of a plurality of cooperateed one by one with a plurality of second spacing groove respectively.
Preferably, a plurality of the inside of second spacing groove is all movable and is provided with the pressure increasing piece, a plurality of the spout has all been seted up to two inner walls of second spacing groove, a plurality of the equal fixedly connected with slider in both sides of pressure increasing piece, a plurality of slider sliding connection is respectively in the inside of a plurality of spout.
Through adopting above-mentioned technical scheme, through with a plurality of slider difference sliding connection in the inside of a plurality of spout, can carry on spacingly to a plurality of pressure boost piece, a plurality of pressure boost piece just can vertically go up and down in the inside of a plurality of second spacing groove like this.
Preferably, a plurality of the equal fixedly connected with spring in bottom of slider, a plurality of the bottom of spring respectively with the interior diapire fixed connection of a plurality of spout, the top of going up the grip block is equidistant screw thread side by side and is run through and has a plurality of second bolt, a plurality of the bottom of second bolt is contradicted with the top of a plurality of briquetting respectively.
Through adopting above-mentioned technical scheme, through two liang of mutually supporting of a plurality of spring, can play the effect of support to a plurality of pressure boost piece, through rotatory a plurality of second bolt in proper order, a jacking force is applyed to a plurality of pressure boost piece at the in-process that rotatory descends to a plurality of second bolt for a plurality of pressure boost piece can be fixed to the pipeline that runs through from the first spacing groove of a plurality of, carries out the pressure boost.
Preferably, the inner walls of the first limiting grooves and the bottom ends of the pressurizing blocks are fixedly bonded with rubber sheets.
Through adopting above-mentioned technical scheme, the rubber piece through all fixedly bonding in the inner wall of the first spacing groove of a plurality of and the bottom of a plurality of briquetting is mutually supported one by one respectively, can protect the surface that runs through the pipeline centre gripping part in the spacing hole of a plurality of.
Preferably, the two ends of the two sides of the upper clamping plate are fixedly connected with fixing blocks, and the top ends of the fixing blocks are provided with through holes.
By adopting the technical scheme, the lower clamping plate can be fixed on the wall body by penetrating the four peripheral screws through the four through holes respectively and connecting the four through holes with the peripheral wall body threads respectively.
To sum up, this application includes following beneficial technological effect:
through rotating first bolt, make the one end and the second connecting block threaded connection of first bolt, and then fix last grip block and lower grip block, thereby it is spacing in the spacing hole of a plurality of with a plurality of pipeline centre gripping one by one respectively, simultaneously through rotating a plurality of second bolt, a jacking force is exerted to a plurality of pressure boost piece at the rotatory in-process that descends to a plurality of second bolt, make a plurality of pressure boost piece descend, and carry out the pressure boost to the pipeline that runs through from the first spacing groove of a plurality of and fix, the phenomenon that many pipelines are complicated and complicated then can not appear like this, improve the arrangement regularity of pipeline simultaneously.
Drawings
Fig. 1 is a schematic overall structure diagram of the application embodiment.
FIG. 2 is a schematic cross-sectional view of an embodiment of the present invention.
FIG. 3 is a schematic view of a combined structure of a pressurizing block and a sliding block according to an embodiment of the present application.
Description of reference numerals: 1. a lower clamping plate; 2. an upper clamping plate; 3. a hinge; 401. a first limit groove; 402. a second limit groove; 501. a first connection block; 502. a second connecting block; 503. a first bolt; 601. a pressure increasing block; 602. a chute; 603. a slider; 604. a spring; 605. a second bolt; 606. a rubber sheet; 701. a fixed block; 702. and a through hole.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses pipeline clamping device is used in construction installation. Referring to fig. 1-3, a pipeline clamping device for construction and installation comprises a lower clamping plate 1, an upper clamping plate 2 and a hinge 3, wherein one side of the lower clamping plate 1 is hinged to one side of the upper clamping plate 2 through the hinge 3, a plurality of first limiting grooves 401 are arranged at the top end of the lower clamping plate 1 side by side at equal intervals, a plurality of second limiting grooves 402 are arranged at the bottom end of the upper clamping plate 2 side by side at equal intervals, a plurality of first limiting grooves 401 are respectively matched with the plurality of second limiting grooves 402 one by one to form a plurality of limiting holes, a first connecting block 501 is fixedly connected to the other side of the upper clamping plate 2, a second connecting block 502 is fixedly connected to the other side of the lower clamping plate 1, a first bolt 503 penetrates through the middle thread at the top end of the first connecting block 501, one end of the first bolt 503 is in threaded connection with the second connecting block 502, the upper clamping plate 2 and the lower clamping plate 1 are combined, and then the first bolt 503 is rotated, one end of the first bolt 503 is in threaded connection with the second connecting block 502, and then the upper clamping plate 2 and the lower clamping plate 1 are fixed, so that the plurality of pipelines can be clamped and limited in a plurality of limiting holes formed by the first limiting grooves 401 of the plurality of pipelines and the second limiting grooves 402 of the plurality of pipelines in a one-to-one matching mode.
Referring to fig. 2 and 3, the inside of a plurality of second spacing groove 402 is all movably provided with pressure increasing block 601, two inner walls of a plurality of second spacing groove 402 have all been seted up with spout 602, the equal fixedly connected with slider 603 in both sides of a plurality of pressure increasing block 601, a plurality of slider 603 is sliding connection respectively in the inside of a plurality of spout 602, with the inside of a plurality of slider 603 sliding connection respectively at a plurality of spout 602, can carry on spacingly to a plurality of pressure increasing block 601, a plurality of pressure increasing block 601 only can vertically go up and down in the inside of a plurality of second spacing groove 402 like this.
Referring to fig. 2, the bottom of a plurality of sliding blocks 603 is fixedly connected with springs 604, the bottom of a plurality of springs 604 is fixedly connected with the inner bottom wall of a plurality of sliding grooves 602, the top of an upper clamping plate 2 is penetrated with a plurality of second bolts 605 at equal intervals side by side, the bottom of the plurality of second bolts 605 is abutted with the top of a plurality of pressurizing blocks 601, the plurality of springs 604 are matched with each other two by two, the plurality of pressurizing blocks 601 can be supported, through rotating the plurality of second bolts 605 in sequence, a jacking force is applied to the plurality of pressurizing blocks 601 by the plurality of second bolts 605 in the rotating and descending process, so that the plurality of pressurizing blocks 601 can pressurize and fix the pipeline penetrating through the plurality of first limiting grooves 401.
Referring to fig. 1, 2 and 3, rubber sheets 606 are fixedly bonded to the inner walls of the first limiting grooves 401 and the bottom ends of the pressurizing blocks 601, the rubber sheets 606 fixedly bonded to the inner walls of the first limiting grooves 401 and the bottom ends of the pressurizing blocks 601 are respectively matched with each other one by one, and the outer surface of a pipeline clamping portion penetrating through the limiting holes can be protected.
Referring to fig. 1, the two ends of the two sides of the upper clamping plate 2 are fixedly connected with fixing blocks 701, the top ends of the four fixing blocks 701 are provided with through holes 702, four external screws penetrate through the four through holes 702 respectively and are in threaded connection with an external wall respectively, and the lower clamping plate 1 can be fixed on the wall.
The implementation principle of the pipeline clamping device for construction and installation in the embodiment of the application is as follows: firstly, arranging a plurality of pipelines in a plurality of first limiting grooves 401 one by one respectively, then combining an upper clamping plate 2 and a lower clamping plate 1, rotating a first bolt 503 to enable one end of the first bolt 503 to be in threaded connection with a second connecting block 502, fixing the upper clamping plate 2 and the lower clamping plate 1, and clamping and limiting the plurality of pipelines in a plurality of limiting holes one by one respectively;
secondly, the second bolts 605 are rotated, a jacking force is applied to the pressurizing blocks 601 by the second bolts 605 in the rotating and descending process, so that the pressurizing blocks 601 can pressurize and fix pipelines penetrating through the first limiting grooves 401, and finally, four peripheral screws penetrate through the four through holes 702 respectively and are in threaded connection with a peripheral wall body respectively, and the lower clamping plate 1 is fixed on the wall body.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A pipeline clamping device for construction and installation comprises a lower clamping plate (1), an upper clamping plate (2) and a hinge (3), and is characterized in that one side of the lower clamping plate (1) is hinged with one side of the upper clamping plate (2) through the hinge (3), a plurality of first limiting grooves (401) are arranged at the top end of the lower clamping plate (1) side by side at equal intervals, a plurality of second limiting grooves (402) are arranged at the bottom end of the upper clamping plate (2) side by side at equal intervals, a plurality of first limiting grooves (401) are respectively matched with the second limiting grooves (402) one by one to form a plurality of limiting holes, a first connecting block (501) is fixedly connected to the other side of the upper clamping plate (2), a second connecting block (502) is fixedly connected to the other side of the lower clamping plate (1), and a first bolt (503) penetrates through the middle thread at the top end of the first connecting block (501), one end of the first bolt (503) is in threaded connection with the second connecting block (502).
2. The pipe clamping device for construction and installation according to claim 1, wherein: the inside of a plurality of second spacing groove (402) is all movably provided with pressure increasing block (601), a plurality of spout (602) have all been seted up to two inner walls of second spacing groove (402), a plurality of the equal fixedly connected with slider (603) in both sides of pressure increasing block (601), a plurality of slider (603) are sliding connection respectively in the inside of a plurality of spout (602).
3. The pipe clamping device for construction and installation according to claim 2, wherein: the bottom of a plurality of slider (603) is all fixedly connected with spring (604), and a plurality of the bottom of spring (604) respectively with the interior diapire fixed connection of a plurality of spout (602), the top of going up grip block (2) is equidistant screw thread side by side runs through has a plurality of second bolt (605), a plurality of the bottom of second bolt (605) is contradicted with the top of a plurality of pressure boost piece (601) respectively.
4. The pipe clamping device for construction and installation according to claim 2, wherein: rubber sheets (606) are fixedly bonded to the inner walls of the first limiting grooves (401) and the bottom ends of the pressurizing blocks (601).
5. The pipe clamping device for construction and installation according to claim 1, wherein: go up the equal fixedly connected with fixed block (701) in both ends of grip block (2) both sides, four through-hole (702) have all been seted up on the top of fixed block (701).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220885652.8U CN217115440U (en) | 2022-04-18 | 2022-04-18 | Pipeline clamping device for construction and installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220885652.8U CN217115440U (en) | 2022-04-18 | 2022-04-18 | Pipeline clamping device for construction and installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217115440U true CN217115440U (en) | 2022-08-02 |
Family
ID=82582347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220885652.8U Expired - Fee Related CN217115440U (en) | 2022-04-18 | 2022-04-18 | Pipeline clamping device for construction and installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217115440U (en) |
-
2022
- 2022-04-18 CN CN202220885652.8U patent/CN217115440U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203929504U (en) | A kind of dismantled and assembled small sample cupping machine jig | |
CN101521090B (en) | Compaction technology and compaction device for iron core of electric reactor | |
CN217115440U (en) | Pipeline clamping device for construction and installation | |
CN206018179U (en) | The assembling equipment of flat panel TV frock and flat panel TV | |
CN201998082U (en) | Pressurized curing clamp | |
CN103674700B (en) | The pre-pulling test machine of the long wire rope of km | |
CN111238969A (en) | A fatigue test fixing device for combined material pipe | |
CN208060290U (en) | A kind of multifunctional material mechanics testing machine | |
CN215677888U (en) | Tensile testing device for steel cable production | |
CN2665254Y (en) | Plywood type coupling device | |
CN205157215U (en) | Test device is drawn to anchor structure | |
CN109424790A (en) | Novel assembled pipe clamp cross arm | |
CN209658418U (en) | A kind of T-type wire clamp of fast and easy connection | |
CN207377147U (en) | Architectural engineering glass clamping device | |
CN103364268B (en) | Tension machine clamp | |
CN220043667U (en) | Fixing device for loudspeaker test | |
CN215448730U (en) | Small-size self-assembly tensile testing machine | |
CN214224755U (en) | Clamping device suitable for tensile test is carried out to non-metallic product | |
CN205352856U (en) | Realize direct tensile test device of rock sample | |
CN215115580U (en) | Electronic tension testing machine based on flexible printing electronic ink printed matter | |
CN211318004U (en) | Tensile strength testing device for audio and video cable production and processing | |
CN219833643U (en) | Auxiliary fixing mechanism for weak current engineering building installation | |
CN205446943U (en) | Rubber pipeline clip | |
CN204375990U (en) | A kind of multichannel binding post of tape insulation cover | |
CN218733137U (en) | Electric power pipe of resistance to compression |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220802 |