CN217106431U - Guardrail for water conservancy construction - Google Patents

Guardrail for water conservancy construction Download PDF

Info

Publication number
CN217106431U
CN217106431U CN202123000927.XU CN202123000927U CN217106431U CN 217106431 U CN217106431 U CN 217106431U CN 202123000927 U CN202123000927 U CN 202123000927U CN 217106431 U CN217106431 U CN 217106431U
Authority
CN
China
Prior art keywords
extension rod
guardrail
buckle
water conservancy
conservancy construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123000927.XU
Other languages
Chinese (zh)
Inventor
陈银海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Juncheng Engineering Project Management Co ltd
Original Assignee
Jiangxi Ganheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Ganheng Construction Engineering Co ltd filed Critical Jiangxi Ganheng Construction Engineering Co ltd
Priority to CN202123000927.XU priority Critical patent/CN217106431U/en
Application granted granted Critical
Publication of CN217106431U publication Critical patent/CN217106431U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a guardrail for water conservancy construction, which comprises an installation base, wherein the top of the installation base is fixedly provided with two stand columns through bolts, two separation nets are arranged between the two stand columns, and two sides of the two separation nets are respectively connected with the two stand columns; the stand includes the stay tube, the inboard sliding connection of stay tube has the extension rod, two equal fixedly connected with two first buckles in the relative one side of stay tube, install two second buckles on the extension rod, two the both sides of separating the net are connected with adjacent first buckle and second buckle respectively. The utility model discloses a, can adjust the protection height of guardrail, satisfy user's user demand to also can set up the stand of different sections and increase the extension range, application scope is wider, satisfies user's user demand, and the practicality is stronger, conveniently carries out the split with the rail guard, and the turnover transportation of being convenient for is simple to use reliable.

Description

Guardrail for water conservancy construction
Technical Field
The utility model relates to a guardrail field, more specifically say, relate to a guardrail for water conservancy construction.
Background
The guardrail can be seen everywhere in our life, and the price of the guardrail can be different according to the height and the length per meter. The concatenation is made wholly to the current guardrail that water conservancy construction used, and its height or take up an area of itself can't adjust according to environment or user demand, and the practicality is relatively poor, and is whole heavy, is unfavorable for having enough to meet the need the use, so has proposed a guardrail for water conservancy construction and has solved this type of problem.
SUMMERY OF THE UTILITY MODEL
To the problem that exists among the prior art, the utility model aims to provide a guardrail for water conservancy construction.
In order to solve the above problems, the utility model adopts the following technical proposal.
A guardrail for water conservancy construction comprises an installation base, wherein two stand columns are fixedly installed at the top of the installation base through bolts, two separation nets are arranged between the two stand columns, and two sides of the two separation nets are respectively connected with the two stand columns;
the stand includes the stay tube, the inboard sliding connection of stay tube has the extension rod, two equal two first buckles of fixedly connected with in the relative one side of stay tube, install two second buckles on the extension rod, two the both sides that separate the net are connected with adjacent first buckle and second buckle respectively, it has the fixed pole to alternate on the stay tube, the fixed pole is located the bottom of extension rod and contacts with the extension rod.
As a further description of the above technical solution:
the second buckle includes the backup pad, the backup pad be located the inboard of extension rod and with the inner wall sliding connection of extension rod, one side fixedly connected with spring of backup pad, the other end of spring and the inner wall fixed connection of extension rod, the opposite side fixedly connected with arc ring of backup pad, one side that the backup pad was kept away from to the arc ring is run through and is extended to the outside of extension rod.
As a further description of the above technical solution:
the mounting base comprises a main board, a stabilizing board is connected to the front side of the main board in a sliding mode, mounting holes are formed in the stabilizing board and the main board and are arranged equidistantly, positioning pins are inserted into the stabilizing board in a penetrating mode, and the bottom end of each positioning pin is connected with the main board in an inserting mode.
As a further description of the above technical solution:
the wire winding machine is characterized in that a wire winding machine is fixedly mounted at the top of the extension rod, a reinforcing steel wire rope is connected to the wire winding machine, and the other end of the reinforcing steel wire rope is connected with the stabilizing plate in a hanging mode.
As a further description of the above technical solution:
the partition net comprises an installation frame, the inner side of the installation frame is fixedly connected with steel wires which are uniformly distributed, and the two sides of the installation frame are fixedly connected with third retaining rings.
As a further description of the above technical solution:
the third buckle is connected with the adjacent second buckle and the first buckle through a padlock.
Compared with the prior art, the utility model has the advantages of:
this scheme, according to the user demand, the accessible is with the net that separates at top from dismantling between two extension rods, then decide the pole through demolising, the bottom of extension rod loses the restriction back, can retrieve to the inside of stay tube, simultaneously can be with the inside of second buckle income extension rod in recovery process, thereby change the whole height of stand, the protection height of adjustment guardrail, satisfy user's user demand, and also can set up the stand increase extension range of different sections, application scope is wider, satisfy user's user demand, the practicality is stronger, conveniently carry out the split with the rail guard, the turnover transportation of being convenient for, and is simple to use reliable.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of a front cross-sectional structure of the column of the present invention;
FIG. 3 is a side view, cross-sectional structural schematic view of the mounting base of the present invention;
fig. 4 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
The numbering in the figures illustrates:
1. installing a base; 11. a main board; 12. mounting holes; 13. a stabilizing plate; 14. positioning pins; 2. a column; 21. supporting a tube; 22. an extension rod; 23. a first retaining ring; 24. a second retaining ring; 241. a support plate; 242. a spring; 243. an arc-shaped ring; 25. fixing a rod; 3. separating the net; 31. installing a frame; 32. a steel wire; 33. A third retaining ring; 4. a wire rewinding device; 5. and reinforcing the steel wire rope.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention;
referring to fig. 1-4, in the utility model, a guardrail for water conservancy construction comprises an installation base 1, two upright posts 2 are fixedly installed at the top of the installation base 1 through bolts, two separation nets 3 are arranged between the two upright posts 2, and two sides of the two separation nets 3 are respectively connected with the two upright posts 2;
the upright column 2 comprises a supporting tube 21, an extending rod 22 is slidably connected to the inner side of the supporting tube 21, two first buckles 23 are fixedly connected to one opposite sides of the two supporting tubes 21, two second buckles 24 are installed on the extending rod 22, two sides of the two partition nets 3 are respectively connected with the adjacent first buckles 23 and the adjacent second buckles 24, a fixed rod 25 is inserted into the supporting tube 21 in a penetrating mode, and the fixed rod 25 is located at the bottom of the extending rod 22 and is in contact with the extending rod 22.
The utility model discloses in, according to the user demand, the accessible is dismantled the net 3 at the top from between two extension rods 22, then through demolising deciding pole 25, the bottom of extension rod 22 loses the restriction back, can retrieve to the inside of stay tube 21, simultaneously can be with the inside of second buckle 24 income extension rod 22 in the recovery process, thereby change stand 2's overall height, the protection height of adjustment guardrail, satisfy user's user demand, and also can set up the stand 2 increase extension range of different sections, application scope is wider, satisfy user's user demand, the practicality is stronger, the convenience is carried out the split with the rail guard, be convenient for have enough to meet the need the transportation, and is simple and reliable in use.
Please refer to fig. 1, 2 and 4, wherein: the second retaining ring 24 includes a supporting plate 241, the supporting plate 241 is located the inside of the extension rod 22 and is connected with the inner wall of the extension rod 22 in a sliding manner, one side of the supporting plate 241 is fixedly connected with a spring 242, the other end of the spring 242 is fixedly connected with the inner wall of the extension rod 22, the other side of the supporting plate 241 is fixedly connected with an arc-shaped ring 243, and one side of the arc-shaped ring 243, which is far away from the supporting plate 241, penetrates through and extends to the outside of the extension rod 22.
The utility model discloses in, extension rod 22 descends the in-process of income stay tube 21, the top of stay tube 21 inner wall can extrude arc ring 243, arc ring 243 in time drives backup pad 241 and removes and compression spring 242 to extension rod 22's inside, thereby let arc ring 243 income extension rod 22's inside, during the use, take extension rod 22 out from stay tube 21, the elasticity that utilizes spring 242 promotes backup pad 241, pop out arc ring 243, make things convenient for arc ring 243 and the connection that separates net 3, moreover, the steam generator is simple in structure reliable, high durability and convenient use, and the convenience of its use is improved.
Please refer to fig. 3, in which: the mounting base 1 includes a main board 11, a stabilizing board 13 is slidably connected to the front surface of the main board 11, mounting holes 12 arranged at equal intervals are formed in the stabilizing board 13 and the main board 11, positioning pins 14 are inserted into the stabilizing board 13, and the bottom ends of the positioning pins 14 are inserted into the main board 11.
The utility model discloses in, can increase stabilizer plate 13 at mainboard 11 according to the demand, can improve mainboard 11's area, can improve the stability of installing mainboard 11 simultaneously, can carry out the reinforcement work of instrument such as bolt through mounting hole 12, further improve the stability in use of rail guard, and locating pin 14 can restrict and slide between mainboard 11 and the stabilizer plate 13, avoids droing of stabilizer plate 13.
Please refer to fig. 1, in which: the top of the extension rod 22 is fixedly provided with a wire winding device 4, the wire winding device 4 is connected with a reinforcing steel wire rope 5, and the other end of the reinforcing steel wire rope 5 is hung with the stabilizing plate 13.
The utility model discloses in, can receive and release the reinforcement wire rope 5 of certain length through spooler 4, when extension rod 22 stretches out the use, for guaranteeing its stability, can pull out reinforcement wire rope 5's one end and articulate with steadying plate 13 and be connected the formation and draw to one side to further improve stand 2's stability.
Please refer to fig. 1, in which: the partition net 3 comprises a mounting frame 31, steel wires 32 which are uniformly distributed are fixedly connected to the inner side of the mounting frame 31, and third retaining rings 33 are fixedly connected to the two sides of the mounting frame 31.
The utility model discloses in, keep apart the protection through the inboard steel wire 32 of installing frame 31 to the both sides of installing frame 31, weave the netted that forms through steel wire 32, can improve the shock resistance and the protecting effect of rail guard, reduce the use and the weight of material simultaneously.
Please refer to fig. 1, in which: the third clasp 33 is connected to the adjacent second clasp 24 and first clasp 23 by a padlock.
The utility model discloses in, conveniently be connected third buckle 33 and adjacent second buckle 24 or first buckle 23 through the padlock, convenient to use, simple structure is common, conveniently maintains the change, satisfies user's user demand.
The working principle is as follows: according to the user demand, the accessible separates net 3 with the top and dismantles from between two extension rods 22, then through demolising decides pole 25, the bottom of extension rod 22 loses the restriction back, can retrieve to the inside of stay tube 21, can take in the inside of extension rod 22 with second buckle 24 simultaneously in the recovery process, thereby change stand 2's overall height, the protection height of adjustment guardrail, satisfy user's user demand, and also can set up the stand 2 increase extension range of different sections, application scope is wider, satisfy user's user demand, the practicality is stronger, the convenience is split the rail guard, the turnover transportation of being convenient for, and is simple to use reliable.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (6)

1. The utility model provides a guardrail for water conservancy construction, includes installation base (1), its characterized in that: the top of the mounting base (1) is fixedly provided with two upright posts (2) through bolts, two separation nets (3) are arranged between the two upright posts (2), and two sides of the two separation nets (3) are respectively connected with the two upright posts (2);
stand (2) include stay tube (21), the inboard sliding connection of stay tube (21) has extension rod (22), two equal fixedly connected with two first buckles (23) in one side that stay tube (21) is relative, install two second buckles (24) on extension rod (22), two the both sides that separate net (3) are connected with adjacent first buckle (23) and second buckle (24) respectively, it has fixed pole (25) to alternate on stay tube (21), fixed pole (25) are located the bottom of extension rod (22) and contact with extension rod (22).
2. The guardrail for water conservancy construction according to claim 1, characterized in that: second buckle (24) include backup pad (241), backup pad (241) be located the inboard of extension rod (22) and with the inner wall sliding connection of extension rod (22), one side fixedly connected with spring (242) of backup pad (241), the other end of spring (242) and the inner wall fixed connection of extension rod (22), the opposite side fixedly connected with arc ring (243) of backup pad (241), one side that backup pad (241) was kept away from in arc ring (243) is run through and is extended to the outside of extension rod (22).
3. The guardrail for water conservancy construction according to claim 1, characterized in that: installation base (1) includes mainboard (11), the front sliding connection of mainboard (11) has stabilizer plate (13), all set up mounting hole (12) of arranging with the equidistance on stabilizer plate (13) and mainboard (11), alternate on stabilizer plate (13) and have locating pin (14), the bottom and mainboard (11) of locating pin (14) are pegged graft.
4. The guardrail for water conservancy construction according to claim 1, characterized in that: the top fixed mounting of extension rod (22) has spooler (4), be connected with on spooler (4) and consolidate wire rope (5), the other end and the stabilising plate (13) of consolidating wire rope (5) articulate.
5. The guardrail for water conservancy construction according to claim 1, characterized in that: the partition net (3) comprises an installation frame (31), steel wires (32) which are uniformly distributed are fixedly connected to the inner side of the installation frame (31), and third retaining rings (33) are fixedly connected to the two sides of the installation frame (31).
6. The guardrail for water conservancy construction according to claim 5, characterized in that: the third buckle (33) is connected with the adjacent second buckle (24) and the first buckle (23) through a padlock.
CN202123000927.XU 2021-12-02 2021-12-02 Guardrail for water conservancy construction Active CN217106431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123000927.XU CN217106431U (en) 2021-12-02 2021-12-02 Guardrail for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123000927.XU CN217106431U (en) 2021-12-02 2021-12-02 Guardrail for water conservancy construction

Publications (1)

Publication Number Publication Date
CN217106431U true CN217106431U (en) 2022-08-02

Family

ID=82589564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123000927.XU Active CN217106431U (en) 2021-12-02 2021-12-02 Guardrail for water conservancy construction

Country Status (1)

Country Link
CN (1) CN217106431U (en)

Similar Documents

Publication Publication Date Title
CN217106431U (en) Guardrail for water conservancy construction
CN202619075U (en) Multi-functional showing stand
CN208440991U (en) A kind of support construction of suspension bridge fashioned iron anchor system
CN211046296U (en) Cable temporary fixing device with good stability
CN210933574U (en) Compound trampoline protection network
CN209398938U (en) A kind of multi-functional antidetonation suspension and support
CN210152148U (en) Detachable inner and outer wall decorative plate
CN209497163U (en) A kind of electrically install uses safety device
CN212837878U (en) Mining anchor net with supporting function
CN214861086U (en) Detachable body-building sandbag
CN206078314U (en) Portable rack of canopy and built -up connection device of rack of encircleing
CN206889848U (en) A kind of footstock structure of derrick type suspension and support
CN111852348B (en) Safety device for geological mineral exploration and drilling
CN220714602U (en) Safety belt suspension device
CN217129144U (en) Mounting structure of ground surface protection network
CN217602297U (en) Protective net rack for simply installed protective sports ground
CN210068172U (en) Wood bracket for building field
CN214740371U (en) Flagpole capable of hanging multi-face national flag
CN218143090U (en) Hanging rack
CN210347048U (en) Civil engineering antidetonation composite set
CN216998627U (en) Automobile parts electrophoresis frock hanger
CN217270270U (en) Protective net device for hydraulic support
CN215099788U (en) Goods shelf capable of preventing material bag from inclining
CN213743505U (en) Mine mining safety device
CN216056048U (en) Convenient-to-guide support frame for cable laying

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240328

Address after: Room 145, building 2, No. 360, Huangtian street, Jiulongshan Township, xiannvhu District, Xinyu City, Jiangxi Province

Patentee after: Jiangxi Juncheng Engineering Project Management Co.,Ltd.

Country or region after: China

Address before: 330000 No. 24, group 6, Xiaqi natural village, Fuxia village, Bayi Township, Nanchang County, Nanchang City, Jiangxi Province

Patentee before: Jiangxi ganheng Construction Engineering Co.,Ltd.

Country or region before: China