CN217106330U - Fixed support equipment is used in construction of full prefabricated assembled transformer substation - Google Patents

Fixed support equipment is used in construction of full prefabricated assembled transformer substation Download PDF

Info

Publication number
CN217106330U
CN217106330U CN202123416159.6U CN202123416159U CN217106330U CN 217106330 U CN217106330 U CN 217106330U CN 202123416159 U CN202123416159 U CN 202123416159U CN 217106330 U CN217106330 U CN 217106330U
Authority
CN
China
Prior art keywords
base
fixed
construction
screw
transformer substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123416159.6U
Other languages
Chinese (zh)
Inventor
兰军锋
崔俊岭
卫涛
黄新田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Fu Electric Power Co ltd
Original Assignee
Henan Fu Electric Power Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Fu Electric Power Co ltd filed Critical Henan Fu Electric Power Co ltd
Priority to CN202123416159.6U priority Critical patent/CN217106330U/en
Application granted granted Critical
Publication of CN217106330U publication Critical patent/CN217106330U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model relates to a prepackage type transformer substation technical field just discloses a fixed stay equipment is used in construction of full prefabricated assembled transformer substation, including main part mechanism, supporting mechanism, go up clamping mechanism and lower clamping mechanism, supporting mechanism is located main part mechanism's lower extreme, it is located main part mechanism's upper end to go up clamping mechanism, lower clamping mechanism is located main part mechanism's inner, main part mechanism includes the base, the lower extreme fixed mounting of base has the loose wheel. This fixed stay equipment is used in construction of prefabricated assembled transformer substation entirely can support the whole through installation supporting mechanism, makes its in-process stability more using, and during the staple inserted earth, can avoid the base to appear the displacement at the in-process that uses, causes the influence to whole support, the effectual stability that improves the use.

Description

Fixed support equipment is used in construction of full prefabricated assembled transformer substation
Technical Field
The utility model relates to a prepackage type transformer substation technical field specifically is a fixed stay equipment is used in construction of full prefabricated assembly type transformer substation.
Background
The prefabricated substation realizes electrical connection through a cable or a bus, all high-low voltage distribution devices and transformers are conventional shaped products, and the prefabricated substation has the advantages of small volume, small occupied area, light weight, low manufacturing cost and reliability, and is called a box-type substation or a prefabricated substation.
When installing prepackage type transformer substation, often use support equipment to support it through the manual work, then installing the operation, but current support equipment supporting effect is relatively poor, and can't highly carry out altitude mixture control according to the transformer substation, and the practicality is lower.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
An object of the utility model is to provide a fixed stay equipment is used in construction of prefabricated assembled transformer substation entirely to it is relatively poor to propose current support equipment supported effects among the above-mentioned background art to solve, and can't highly carry out altitude mixture control, the lower problem of practicality according to the transformer substation.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a fixed stay equipment is used in construction of full prefabricated assembled transformer substation, includes main part mechanism, supporting mechanism, goes up clamping mechanism and lower clamping mechanism, the supporting mechanism is located the lower extreme of main part mechanism, it is located the upper end of main part mechanism to go up clamping mechanism, clamping mechanism is located the inner of main part mechanism down, the main part mechanism includes the base, the lower extreme fixed mounting of base has the movable wheel.
Preferably, the supporting mechanism includes the nut, nut fixed mounting is in the upper end of base, the upper end evenly distributed of nut, the lifting screw is installed to the upper end screw thread of nut, the lower extreme of lifting screw passes nut and base and extends to the below of base, the lower extreme fixed mounting of lifting screw has the fixed disk, the lower extreme fixed mounting of fixed disk has the staple, can support the whole through installation supporting mechanism, makes its in-process stability more in the use, and during the staple inserted earth, can avoid the base displacement to appear in the in-process of using, causes the influence to whole support, the effectual stability that improves the use.
Preferably, go up clamping mechanism and include the bracing piece, bracing piece fixed mounting is in the outer end of base upper end, the bracing piece is in the outer end symmetric distribution of base upper end, the upper end movable mounting of bracing piece has the lifter, can press from both sides tight fixedly the upper end of transformer substation through installing clamping mechanism for when assembling the transformer substation, the upper end of transformer substation can be more stable.
Preferably, the fixed screw that is provided with in front end of lifter, fixed screw is at the front end evenly distributed of lifter, clamping screw is installed to the upper end screw thread of bracing piece front end, clamping screw's rear end extend to the inside of bracing piece and with fixed screw threaded connection, can adjust last clamping mechanism's height through the installation lifter, make it adjust along with the change of mounting height for it is more convenient to use, and applicable in the transformer substation erection bracing of co-altitude, further improvement the suitability of this equipment.
Preferably, the upper end fixed mounting of lifter has the backup pad, electric putter is gone up to the outer end fixed mounting of backup pad, the transmission end of going up electric putter extends to the inner of backup pad, the transmission end fixed mounting who goes up electric putter has catch bar one, the other end fixed mounting of catch bar one has the clamping disk, can promote the clamping disk to press from both sides tight fixedly the upper end of transformer substation through installing electric putter.
Preferably, clamping mechanism includes down electric putter down, electric putter fixed mounting is both ends around the base down, electric putter's transmission end extends to the inner of base down, and clamping mechanism can press from both sides tight the support to the lower extreme of transformer substation under the installation for the lower extreme can not appear inclining when the transformer substation is installed, makes its whole more stable, the installation operation of being convenient for more.
Preferably, the transmission end of the lower electric push rod is fixedly provided with a second push rod, the other end of the second push rod is fixedly provided with a clamping plate, and the lower end of the transformer substation can be clamped and fixed by installing the clamping plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the fixing and supporting equipment for the construction of the fully prefabricated assembly type transformer substation can support the whole body through the mounting of the supporting mechanism, so that the whole body is more stable in the using process, and the fixing nails are inserted into soil, so that the phenomenon that the base is displaced in the using process and the whole body is supported is avoided, and the using stability is effectively improved;
2. according to the fixing and supporting equipment for construction of the fully prefabricated assembly type transformer substation, the lower end of the transformer substation can be clamped and supported by installing the lower clamping mechanism, so that the lower end of the transformer substation cannot incline when being installed, the whole body of the transformer substation is more stable, and the installation and operation are more convenient;
3. this fixed stay equipment is used in construction of prefabricated assembled transformer substation entirely can adjust last clamping mechanism's height through the installation lifter, makes it adjust along with the change of mounting height for it is more convenient to use, and applicable in the transformer substation erection bracing of co-altitude, further improvement the suitability of this equipment.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the upper electric push rod of the present invention showing a partially detailed enlarged three-dimensional structure;
FIG. 3 is a schematic view of the supporting mechanism of the present invention showing a partially detailed enlarged three-dimensional structure;
fig. 4 is the enlarged three-dimensional structure diagram of the local detail of the fixing screw of the present invention.
In the figure: 1. a main body mechanism; 101. a base; 102. a movable wheel; 2. a support mechanism; 201. a nut; 202. a lifting screw; 203. fixing the disc; 204. fixing nails; 3. an upper clamping mechanism; 301. a support bar; 302. a lifting rod; 303. fixing screw holes; 304. fixing the screw rod; 305. a support plate; 306. an electric push rod is arranged; 307. a first push rod; 308. clamping the disc; 4. a lower clamping mechanism; 401. a lower electric push rod; 402. a second push rod; 403. and (5) clamping the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a fixed stay equipment is used in construction of full prefabricated assembled transformer substation, includes main part mechanism 1, supporting mechanism 2, goes up clamping mechanism 3 and lower clamping mechanism 4, and supporting mechanism 2 is located the lower extreme of main part mechanism 1, goes up clamping mechanism 3 and is located the upper end of main part mechanism 1, and lower clamping mechanism 4 is located the inner of main part mechanism 1, and main part mechanism 1 includes base 101, and the lower extreme fixed mounting of base 101 has loose wheel 102.
The supporting mechanism 2 comprises a nut 201, the nut 201 is fixedly installed at the upper end of the base 101, the upper end of the nut 201 is uniformly distributed, the upper end of the nut 201 is provided with a lifting screw 202 in a threaded mode, the lower end of the lifting screw 202 penetrates through the nut 201 and the base 101 and extends to the position below the base 101, the lower end of the lifting screw 202 is fixedly provided with a fixed disc 203, and the lower end of the fixed disc 203 is fixedly provided with a fixed nail 204.
The upper clamping mechanism 3 comprises a supporting rod 301, the supporting rod 301 is fixedly arranged at the outer end of the upper end of the base 101, the supporting rods 301 are symmetrically distributed at the outer end of the upper end of the base 101, a lifting rod 302 is movably arranged at the upper end of the supporting rod 301, a fixing screw hole 303 is fixedly arranged at the front end of the lifting rod 302, the fixing screw hole 303 is uniformly distributed at the front end of the lifting rod 302, a fixing screw 304 is arranged at the upper end of the front end of the supporting rod 301 in a threaded manner, the rear end of the fixing screw 304 extends into the supporting rod 301 and is in threaded connection with the fixing screw hole 303, a supporting plate 305 is fixedly arranged at the upper end of the lifting rod 302, an upper electric push rod 306 is fixedly arranged at the outer end of the supporting plate 305, the transmission end of the upper electric push rod 306 extends to the inner end of the supporting plate 305, a first push rod 307 is fixedly arranged at the transmission end of the upper electric push rod 306, a clamping disc 308 is fixedly arranged at the other end of the first push rod 307, the lower clamping mechanism 4 comprises a lower electric push rod 401, the lower electric push rod 401 is fixedly arranged at the front end and the rear end of the base 101, the transmission end of the lower electric push rod 401 extends to the inner end of the base 101, the transmission end of the lower electric push rod 401 is fixedly provided with a second push rod 402, the other end of the second push rod 402 is fixedly provided with a clamping plate 403, after the base 101 is fixed, the fixing screw 304 is screwed to loosen the supporting rod 301 and the lifting rod 302, then the lifting rod 302 is pulled upwards to adjust the height of the lifting rod, after the lifting rod is adjusted, the fixing screw 304 is screwed again to fix the lifting rod, then the upper electric push rod 306 is started, the upper electric push rod 306 pushes the first push rod 307, the first push rod 307 pushes the clamping disc 308 to clamp and fix the transformer substation, meanwhile, the lower electric push rod 401 starts to push a second push rod 402, the second push rod 402 pushes the clamping plate 403 to fixedly support the lower end of the transformer substation, and after the installation is finished, the steps are operated in the reverse direction.
The working principle is as follows: when the device is used, firstly, the base 101 is pushed to an installation area through the movable wheel 102 at the lower end, then the transformer substation is enclosed in the transformer substation, then the lifting screw 202 is screwed, the lifting screw 202 rotates to drive the fixed disc 203 to descend, the fixed disc 203 descends to drive the fixed nail 204 to descend, the fixed nail 204 descends to be inserted into soil, meanwhile, the fixed disc 203 is contacted with the soil to jack up the base 101, after the base 101 is fixed, the fixed screw 304 is screwed to loosen the supporting rod 301 and the lifting rod 302, then the lifting rod 302 is pulled upwards to adjust the height of the lifting rod 302, after the adjustment is completed, the fixed screw 304 is screwed again to fix the lifting rod, then the upper electric push rod 306 is started, the upper electric push rod 306 pushes the first push rod 307, the first push rod 307 pushes the clamping disc 308 to clamp and fix the transformer substation, meanwhile, the lower electric push rod 401 starts to push the second push rod 402, the second push the clamping plate 403 to fix and support the lower end of the transformer substation, and after the installation is finished, reversely operating the steps.
It should be finally noted that the above only serves to illustrate the technical solution of the present invention, and not to limit the scope of the present invention, and that simple modifications or equivalent replacements performed by those skilled in the art to the technical solution of the present invention do not depart from the spirit and scope of the technical solution of the present invention.

Claims (7)

1. The utility model provides a fixed stay equipment is used in construction of full prefabricated assembled transformer substation, includes main part mechanism (1), supporting mechanism (2), goes up clamping mechanism (3) and lower clamping mechanism (4), its characterized in that: the supporting mechanism (2) is located at the lower end of the main body mechanism (1), the upper clamping mechanism (3) is located at the upper end of the main body mechanism (1), the lower clamping mechanism (4) is located at the inner end of the main body mechanism (1), the main body mechanism (1) comprises a base (101), and the lower end of the base (101) is fixedly provided with a movable wheel (102).
2. The fixed support equipment for construction of the fully prefabricated substation according to claim 1, characterized in that: supporting mechanism (2) include nut (201), nut (201) fixed mounting is in the upper end of base (101), the upper end evenly distributed of nut (201), lifting screw (202) are installed to the upper end screw thread of nut (201), the lower extreme of lifting screw (202) passes nut (201) and base (101) and extends to the below of base (101), the lower extreme fixed mounting of lifting screw (202) has fixed disk (203), the lower extreme fixed mounting of fixed disk (203) has staple (204).
3. The fixed support equipment for construction of the fully prefabricated substation according to claim 2, characterized in that: go up clamping mechanism (3) including bracing piece (301), bracing piece (301) fixed mounting is in the outer end of base (101) upper end, bracing piece (301) are in the outer end symmetric distribution of base (101) upper end, the upper end movable mounting of bracing piece (301) has lifter (302).
4. The fixed support equipment for construction of the fully prefabricated substation according to claim 3, characterized in that: the utility model discloses a supporting rod, including lifter (302), fixed screw (303) that is provided with in the front end of lifter (302), fixed screw (303) are at the front end evenly distributed of lifter (302), set screw (304) are installed to the upper end screw thread of bracing piece (301) front end, the rear end of set screw (304) extend to the inside of bracing piece (301) and with fixed screw (303) threaded connection.
5. The fixed support equipment for construction of the fully prefabricated substation according to claim 4, wherein: the utility model discloses a clamping device, including lifter (302), backup pad (305), electric putter (306) on the outer end fixed mounting of backup pad (305), the transmission end of going up electric putter (306) extends to the inner of backup pad (305), the transmission end fixed mounting of going up electric putter (306) has catch bar (307), the other end fixed mounting of catch bar (307) has clamping disc (308).
6. The fixed support equipment for construction of the fully prefabricated substation according to claim 5, wherein: lower clamping mechanism (4) are including lower electric putter (401), electric putter (401) fixed mounting is both ends around base (101) down, electric putter (401)'s transmission end extends to the inner of base (101) down.
7. The fixed support equipment for construction of the fully prefabricated substation according to claim 6, wherein: and a second push rod (402) is fixedly installed at the transmission end of the lower electric push rod (401), and a clamping plate (403) is fixedly installed at the other end of the second push rod (402).
CN202123416159.6U 2021-12-31 2021-12-31 Fixed support equipment is used in construction of full prefabricated assembled transformer substation Active CN217106330U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123416159.6U CN217106330U (en) 2021-12-31 2021-12-31 Fixed support equipment is used in construction of full prefabricated assembled transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123416159.6U CN217106330U (en) 2021-12-31 2021-12-31 Fixed support equipment is used in construction of full prefabricated assembled transformer substation

Publications (1)

Publication Number Publication Date
CN217106330U true CN217106330U (en) 2022-08-02

Family

ID=82593533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123416159.6U Active CN217106330U (en) 2021-12-31 2021-12-31 Fixed support equipment is used in construction of full prefabricated assembled transformer substation

Country Status (1)

Country Link
CN (1) CN217106330U (en)

Similar Documents

Publication Publication Date Title
CN202004372U (en) Tool for live-line replacing large disc diameter and deadweight dead end insulator string
CN217106330U (en) Fixed support equipment is used in construction of full prefabricated assembled transformer substation
CN211450733U (en) Solar illuminating lamp convenient to adjust
CN115411652B (en) Umbrella-shaped grounding device of extra-high voltage transformer substation, auxiliary unfolding device and using method
CN214044717U (en) Prefabricated substation
CN213122066U (en) Novel lift ammeter case
CN218241496U (en) Electronic voltage transformer with two core columns
CN216699898U (en) Photovoltaic power generation is with installation base
CN205191160U (en) Push -down lift power supply unit
CN218677593U (en) Distribution network line overhauls uses ground connection discharge device
CN213184627U (en) Grounding device for electrical test below 10Kv
CN216416623U (en) Mosquito net rod for high-low bed of system type camp
CN219224884U (en) Three-phase ammeter
CN218213267U (en) Cable withstand voltage test device
CN213806928U (en) Outdoor tent convenient to installation
CN204441506U (en) Earth connection automatic clamping device
CN219994850U (en) Geological survey equipment support
CN211790269U (en) Totally closed looped netowrk cabinet of gas insulation
CN214673232U (en) Automatic protection control device for fault analysis
CN217789074U (en) Outdoor power distribution cabinet capable of adjusting size of internal space
CN220400917U (en) Combined grounding electrode
CN211507931U (en) Anti-drop formula earthing device of electric substation
CN214043813U (en) Shell battery convenient to maintain and used for automobile
CN220421186U (en) Low-voltage cabinet
CN218548829U (en) Be used for insulating ground rod clamp of electric power 35kV transformer substation construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant