CN217106328U - Novel building engineering supports device - Google Patents

Novel building engineering supports device Download PDF

Info

Publication number
CN217106328U
CN217106328U CN202220904819.0U CN202220904819U CN217106328U CN 217106328 U CN217106328 U CN 217106328U CN 202220904819 U CN202220904819 U CN 202220904819U CN 217106328 U CN217106328 U CN 217106328U
Authority
CN
China
Prior art keywords
back plate
base
plate
front bezel
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220904819.0U
Other languages
Chinese (zh)
Inventor
杨华明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220904819.0U priority Critical patent/CN217106328U/en
Application granted granted Critical
Publication of CN217106328U publication Critical patent/CN217106328U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Hinges (AREA)

Abstract

The utility model relates to a building engineering technical field especially relates to a novel building engineering supports device. The technical scheme comprises the following steps: the back plate, front bezel and base, the fixed station is installed to the top and the bottom of back plate, and the inserted bar is installed to the one end of fixed station, install the front bezel through solid fixed ring between the inserted bar, the limiting plate is installed to the both sides of back plate and front bezel, the internally mounted of limiting plate has the gim peg, and the other end of gim peg installs the regulating plate, the hinge pin is all installed to the one end of back plate and front bezel, the bottom movable mounting of hinge pin has the telescopic link, the sleeve pipe is installed to the periphery of telescopic link, and sheathed tube surface mounting has spacing bolt, the base is installed through the revolving stage in sheathed tube bottom. The utility model discloses a combination of various structures makes this device can drip when using and carry out joint support with two buildings, increases the holistic stability of device, and the strong convenient to use of flexibility of device optimizes the use process.

Description

Novel building engineering supports device
Technical Field
The utility model relates to a building engineering technical field specifically is a novel building engineering supports device.
Background
The building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation of lines, pipes and equipment matched with them, in which the building buildings refer to the engineering with top cover, beam column, wall, foundation and capable of forming internal space, meeting the requirements of people for production, living, study and public activities, in the building engineering, various supporting devices are required.
Through retrieval, patent publication No. CN212836868U discloses novel building engineering strutting arrangement, belongs to building engineering technical field. Novel building engineering supports device, the on-line screen storage device comprises a base, one side fixedly connected with installation piece of base, the mounting hole has been seted up to the surface of installation piece, it has the telescopic link to peg graft in the inside of mounting hole.
The existing constructional engineering supporting device has the following defects:
1. the existing support device for the building engineering has a single support mode, and can only support the building structure at the top of the device when in use, but cannot connect and support two adjacent building structures, so that the stability of the device is reduced;
2. the flexibility of current building engineering strutting arrangement is general, can't support effectively according to the different molding of building structure and installation condition when using, for this we provide a novel building engineering strutting arrangement and solve current problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel building engineering supports device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a novel building engineering strutting arrangement, includes back plate, front bezel and base, the fixed station is installed to the top and the bottom of back plate, and the one end of fixed station installs the inserted bar, install the front bezel through solid fixed ring between the inserted bar, the limiting plate is installed with the both sides of front bezel to the back plate, the internally mounted of limiting plate has the gim peg, and the other end of gim peg installs the regulating plate, the hinge pin is all installed with the one end of front bezel to the back plate, the bottom movable mounting of hinge pin has the telescopic link, the sleeve pipe is installed to the periphery of telescopic link, and sheathed tube surface mounting has spacing bolt, the base is installed through the revolving stage in sheathed tube bottom.
When in use, the front plate and the rear plate are respectively arranged at the front end and the rear end of a building structure to be supported, the inserted rods are inserted into the fixing rings for connection after installation, the length of the telescopic rod extending out of the inner part of the sleeve is adjusted by the limit bolts according to actual conditions after connection, the sleeve is rotatably adjusted by the hinge shaft and the rotating table after adjustment, the base is connected with an external structure after adjustment, and the connection and support between two adjacent building structures are realized by the stability of a triangle after connection, thereby improving the stability of the building structure, when the front plate and the rear plate clamp the building structure, the length that the adjusting plate extends can be adjusted through manual rotation adjusting bolt, and the area of contact between building structure and the device is increased, so that the building structure with a peculiar shape can be clamped and limited.
Preferably, the surface of the telescopic rod is provided with a limiting hole, and the limiting bolt penetrates through the sleeve and is embedded with the limiting hole. Can realize prescribing a limit to the length that the telescopic link extends inside the sleeve pipe through inserting spacing bolt in the inside different spacing hole of telescopic link.
Preferably, the base of revolving stage both sides internally mounted has the pilot pin, and the pilot pin runs through the base. Utilize the pilot pin to pass and to be connected between base and the exterior structure after the base, stability when connecting the back and increasing the base use effectively avoids the base gliding condition to appear when using.
Preferably, a connecting ring is mounted at the top of the telescopic rod, and the connecting ring is connected with the hinge shaft through a central shaft. Utilize the go-between can be connected telescopic link and hinge pin when using, the flexibility when increasing the telescopic link and using.
Preferably, the fixing ring is provided with a fixing hole inside, and the inserted bar is embedded in the fixing hole. The fixing hole is utilized to facilitate the connection and the disassembly between the inserted link and the fixing ring of a user when the device is used, and the practicability of the device is improved.
Preferably, a spindle is mounted inside the rotating table, and the spindle penetrates through the sleeve. The sleeve can be rotated and adjusted to be used by the spindle inside the rotating table when in use, so that the flexibility of the device is improved when in use, and convenience is brought to users to install and use the device.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the front plate is installed between the inserted rods through the fixing rings, the front plate and the rear plate are installed at the front end and the rear end of a building structure needing to be supported respectively when the building structure is used, the base and an external structure are connected, and after connection, triangular stability is utilized to realize connection and support between two adjacent building structures.
2. Through the internally mounted at the limiting plate have the adjusting bolt, and the adjusting plate is installed to the other end of adjusting bolt, and board and back plate are carrying out the in-process of centre gripping to building structure, can realize adjusting the length that the adjusting plate extends through manual rotation adjusting bolt, increase the area of contact between building structure and the device to can realize carrying out the centre gripping to the building structure of molding strange and special and prescribe a limit to.
Drawings
Fig. 1 is a perspective view of the present invention;
FIG. 2 is a schematic view of the structure of the rear plate and the sleeve of the present invention;
FIG. 3 is a schematic view of a partial structure of the front plate and the sleeve of the present invention;
fig. 4 is a rear view of the present invention.
In the figure: 1. a back plate; 101. a fixed table; 102. inserting a rod; 2. a front plate; 201. a fixing ring; 202. a fixing hole; 3. a limiting plate; 301. adjusting the bolt; 302. an adjusting plate; 4. a sleeve; 401. a limit bolt; 5. a base; 501. a rotating table; 502. a main shaft; 503. positioning bolts; 6. a telescopic rod; 601. a limiting hole; 602. a connecting ring; 7. and a hinge axis.
Detailed Description
The technical solution of the present invention will be further explained with reference to the accompanying drawings and specific embodiments.
Example one
As shown in fig. 2-4, the novel supporting device for construction engineering provided by the utility model comprises a back plate 1, a front plate 2 and a base 5, wherein the top and the bottom of the back plate 1 are provided with a fixed platform 101, and one end of the fixed platform 101 is provided with an inserted bar 102, a front plate 2 is arranged between the inserted bars 102 through a fixed ring 201, two sides of the back plate 1 and the front plate 2 are provided with a limit plate 3, an adjusting bolt 301 is arranged inside the limit plate 3, and the other end of the adjusting bolt 301 is provided with an adjusting plate 302, one end of the back plate 1 and one end of the front plate 2 are both provided with a hinge shaft 7, the bottom of the hinge shaft 7 is movably provided with a telescopic rod 6, the periphery of the telescopic rod 6 is provided with a sleeve 4, and the surface of the sleeve 4 is provided with a limiting bolt 401, the bottom of the sleeve 4 is provided with a base 5 through a rotating platform 501, the surface of the telescopic rod 6 is provided with a limiting hole 601, and the limiting bolt 401 penetrates through the sleeve 4 to be embedded with the limiting hole 601.
The working principle of the novel building engineering supporting device based on the embodiment 1 is as follows: when in use, the front plate 2 and the rear plate 1 are respectively arranged at the front end and the rear end of a building structure to be supported, the inserted rod 102 is inserted into the fixing ring 201 for connection after installation, the length of the telescopic rod 6 extending out of the interior of the sleeve 4 is adjusted by the limit bolt 401 according to actual conditions after connection, the sleeve 4 is rotatably adjusted by the hinge shaft 7 and the rotating platform 501 after adjustment, the base 5 is connected with an external structure after adjustment, and the connection and support between two adjacent building structures are realized by the stability of a triangle after connection, thereby improving the stability of the building structure, when the front plate 2 and the back plate 1 clamp the building structure, the length of the extending part of the adjusting plate 302 can be adjusted by manually rotating the adjusting bolt 301, so that the contact area between the building structure and the device is increased, and the building structure with a peculiar shape can be clamped and limited.
Example two
As shown in fig. 1-4, the utility model provides a novel building engineering supports device compares in embodiment one, and this embodiment still includes: the base 5 internally mounted of revolving stage 501 both sides has locating bolt 503, and locating bolt 503 runs through base 5, and the go-between 602 is installed at the top of telescopic link 6, and passes through the center pin connection between go-between 602 and the hinge pin 7, and the inside of solid fixed ring 201 is provided with fixed orifices 202, and inserted bar 102 and fixed orifices 202 gomphosis mutually, and the internally mounted of revolving stage 501 has main shaft 502, and main shaft 502 runs through sleeve pipe 4.
In this embodiment, after the positioning bolt 503 passes through the base 5, the base 5 and the external structure can be connected, after connection, the stability of the base 5 in use is effectively improved, the sliding condition of the base 5 in use is avoided, the connecting ring 602 can be used for connecting the telescopic rod 6 and the hinge shaft 7 in use, the flexibility of the telescopic rod 6 in use is improved, the fixing hole 202 can be used for more conveniently connecting and detaching the inserting rod 102 and the fixing ring 201 by a user in use, the practicability of the device is improved, the main shaft 502 inside the rotating table 501 can be used for rotating and adjusting the sleeve 4 in use, the flexibility of the device in use is improved, and the device is convenient for the user to install and use.
The above embodiments are merely some preferred embodiments of the present invention, and those skilled in the art can make various alternative modifications and combinations to the above embodiments based on the technical solution of the present invention and the related teachings of the above embodiments.

Claims (6)

1. The utility model provides a novel building engineering supports device, includes back plate (1), front bezel (2) and base (5), its characterized in that: fixed station (101) are installed to the top and the bottom of back plate (1), and the one end of fixed station (101) installs inserted bar (102), install front bezel (2) through solid fixed ring (201) between inserted bar (102), limiting plate (3) are installed with the both sides of front bezel (2) in back plate (1), the internally mounted of limiting plate (3) has adjusting bolt (301), and adjusting bolt (301) installs adjusting plate (302) at the other end, hinge pin (7) are all installed to the one end of back plate (1) and front bezel (2), the bottom movable mounting of hinge pin (7) has telescopic link (6), sleeve pipe (4) are installed to the periphery of telescopic link (6), and the surface mounting of sleeve pipe (4) has spacing bolt (401), base (5) are installed through revolving stage (501) in the bottom of sleeve pipe (4).
2. The novel constructional engineering support device of claim 1, wherein: the surface of the telescopic rod (6) is provided with a limiting hole (601), and the limiting bolt (401) penetrates through the sleeve (4) to be embedded with the limiting hole (601).
3. The novel constructional engineering support device of claim 1, wherein: the base (5) of revolving stage (501) both sides internally mounted has a pilot pin (503), and pilot pin (503) run through base (5).
4. The novel constructional engineering support device of claim 1, wherein: the top of the telescopic rod (6) is provided with a connecting ring (602), and the connecting ring (602) is connected with the hinge shaft (7) through a central shaft.
5. The novel constructional engineering support device of claim 1, wherein: a fixing hole (202) is formed in the fixing ring (201), and the inserted rod (102) is embedded in the fixing hole (202).
6. The novel building engineering support device of claim 1, characterized in that: a main shaft (502) is installed inside the rotating table (501), and the main shaft (502) penetrates through the sleeve (4).
CN202220904819.0U 2022-04-19 2022-04-19 Novel building engineering supports device Expired - Fee Related CN217106328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220904819.0U CN217106328U (en) 2022-04-19 2022-04-19 Novel building engineering supports device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220904819.0U CN217106328U (en) 2022-04-19 2022-04-19 Novel building engineering supports device

Publications (1)

Publication Number Publication Date
CN217106328U true CN217106328U (en) 2022-08-02

Family

ID=82581512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220904819.0U Expired - Fee Related CN217106328U (en) 2022-04-19 2022-04-19 Novel building engineering supports device

Country Status (1)

Country Link
CN (1) CN217106328U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115387606A (en) * 2022-08-16 2022-11-25 武莉 But core pulling formula building templates

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115387606A (en) * 2022-08-16 2022-11-25 武莉 But core pulling formula building templates
CN115387606B (en) * 2022-08-16 2024-01-09 山东公用设计集团有限公司 Building template capable of pulling core

Similar Documents

Publication Publication Date Title
CN217106328U (en) Novel building engineering supports device
CN111609218A (en) Detachable valve supporting device
CN216195505U (en) A novel fossil fragments for building engineering
CN214737407U (en) Bridge construction is with dismantling strutting arrangement
CN212271693U (en) Strutting arrangement is used in building engineering construction
CN210662131U (en) Building design on-site measurement room auxiliary stand
CN210297596U (en) Photovoltaic support of flat single-shaft double-row system
CN221823097U (en) Building steel structure capable of being installed rapidly
CN211713739U (en) Construction warning baffle with adjustable municipal works are used
CN219548493U (en) Roof beam slab of building engineering support
CN212105032U (en) Equipment maintenance sliding platform in limited space
CN218264905U (en) Scaffold frame auto-lock hinge convenient to it is fixed
CN210225312U (en) Photovoltaic power supply erecting device of signal tower
CN219843389U (en) Connection supporting mechanism of bridge
CN219261617U (en) Assembled stand
CN214833287U (en) Drainage is with electric melting connection polymer inspection shaft
CN212507556U (en) Be applicable to assembled building construction wall body strutting arrangement
CN221862738U (en) Adjustable photovoltaic support of solar energy
CN219611314U (en) Railway tunnel cable mounting rack
CN220014772U (en) Concealed door handle
CN219327299U (en) H-shaped steel member
CN219937912U (en) Current remote supply transmission cable rack
CN219954837U (en) Building design measuring device
CN215528191U (en) Lightning protection grounding device for building engineering
CN219081318U (en) Detachable blind hinge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220802

CF01 Termination of patent right due to non-payment of annual fee