CN217106106U - Plate buckle frame walkway hanging rod - Google Patents

Plate buckle frame walkway hanging rod Download PDF

Info

Publication number
CN217106106U
CN217106106U CN202123455259.XU CN202123455259U CN217106106U CN 217106106 U CN217106106 U CN 217106106U CN 202123455259 U CN202123455259 U CN 202123455259U CN 217106106 U CN217106106 U CN 217106106U
Authority
CN
China
Prior art keywords
steel pipe
couple
hook portion
arc
buckle frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123455259.XU
Other languages
Chinese (zh)
Inventor
王九明
李小松
夏前兵
范传侠
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Tengyue Construction Engineering Co Ltd
Original Assignee
Guangdong Tengyue Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Tengyue Construction Engineering Co Ltd filed Critical Guangdong Tengyue Construction Engineering Co Ltd
Priority to CN202123455259.XU priority Critical patent/CN217106106U/en
Application granted granted Critical
Publication of CN217106106U publication Critical patent/CN217106106U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a dish is detained frame pavement peg, including the steel pipe, the couple that a set of tip outwards extended is all installed to the both ends lateral wall of steel pipe, and the quantity of every group couple is two, and two couple symmetries are installed in the both sides of steel pipe tip, installs the adjusting device who is used for adjusting couple opening space on the couple, the couple is including installing connecting portion on the steel pipe lateral wall and connecting the hook portion that extends outside the steel pipe in connecting portion one end, adjusting device is no less than one and outside outstanding locating pin including connecting the one end quantity that hook portion is close to connecting portion, and swing joint has the arc that promotes downwards and reduce the uncovered space of hook portion on the locating pin. This dish is detained frame pavement peg through directly hanging hook portion on the horizon bar, promotes the arc and reduces hook portion's opening, reaches spacing purpose, easy operation, low in labor strength, and the dismouting is convenient, promotes work efficiency, and reduce cost expense has very strong practicality.

Description

Plate buckle frame walkway hanging rod
Technical Field
The utility model relates to a scaffold technical field especially relates to a dish is detained a walking peg.
Background
In the process of erecting the plate buckle frame, a walkway can be erected along the horizontal length direction of the plate buckle frame at intervals of a certain height, and the conventional common steel pipe scaffold and the spigot-and-socket plate buckle frame are generally adopted by an outer frame system in the current building market.
The existing building method of the steel pipe scaffold is to install steel pipes in an encrypted mode along the length direction, and then steel fence pieces, steel fence nets, wood walkway plates and the like are paved on the surfaces of the steel pipe scaffold.
The plate buckle frame walkway plate is generally made of steel or the method of the plate buckle frame walkway plate is the same as that of a traditional frame. The weight of the steel walkway plate of the plate buckling frame is about 7-8kg per square meter (building area), the weight of the steel walkway plate of the plate buckling frame is about 2/5 of the whole weight of the external frame, the material cost is large, and meanwhile, the void leakage area is too small, so that garbage is easily accumulated and is not easy to clean. The ice easily freezes in winter, and the potential safety hazard is big. Therefore, the plate buckle frame walkway hanging rod is provided.
SUMMERY OF THE UTILITY MODEL
In view of the above-mentioned shortcomings of the prior art, the present patent application aims to provide a hanging rod for a walkway of a coil buckle rack, which solves the above-mentioned problems of the prior art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a dish is detained frame pavement peg, includes the steel pipe, the couple that a set of tip outwards extended is all installed to the both ends lateral wall of steel pipe, and the quantity of every group couple is two, and two couples symmetry install in the both sides of steel pipe tip, install the adjusting device who is used for adjusting couple opening space on the couple.
Furthermore, the hook comprises a connecting part arranged on the side wall of the steel pipe and a hook part connected to one end of the connecting part and extending out of the steel pipe.
Furthermore, adjusting device is including connecting that hook portion is close to the one end quantity of connecting portion and is no less than one and outside outstanding locating pin, and swing joint has the arc that promotes downwards and reduce the uncovered space of hook portion on the locating pin, prevents that the couple from droing.
Furthermore, an arc-shaped groove for the positioning pin to move under the driving of external force is formed in the arc-shaped plate.
Further, the end side wall of the steel pipe is fixedly connected with the connecting part through a screw rod.
Further, the section of the steel pipe is of a rectangular structure.
Compared with the prior art, the beneficial effects of the utility model are that: this dish is detained frame pavement peg through directly hanging hook portion on the horizon bar, promotes the arc and reduces hook portion's opening, reaches spacing purpose, easy operation, low in labor strength, and the dismouting is convenient, promotes work efficiency, and reduce cost expense has very strong practicality.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is the schematic view of the structure of the hook and the arc plate of the present invention.
The reference numbers illustrate: the steel pipe comprises a steel pipe 1, a hook 2, a connecting part 21, a hook part 22, a screw rod 3, a positioning pin 4, an arc-shaped plate 5 and an arc-shaped groove 51.
Detailed Description
The following description of the embodiments of the present application is provided by way of specific examples, and other advantages and effects of the present application will be readily apparent to those skilled in the art from the disclosure herein. The present application is capable of other and different embodiments and its several details are capable of modifications and variations in various respects, all without departing from the spirit of the present application. It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict.
Referring to fig. 1-2, the present invention provides a technical solution:
the utility model provides a dish is detained frame pavement peg, as shown in figure 1, including the cross-section for the steel pipe 1 of rectangle structure, it is concrete, can be for galvanized square pipe, the contact surface of steel pipe 1 is platelike structure, increase and couple 2 area of contact of being connected the terminal surface, couple 2 that a set of tip outwards extended are all installed to the both ends lateral wall of steel pipe 1, the quantity of every group couple 2 is two, and two couples 2 symmetries are installed in the both sides of steel pipe 1 tip, install the adjusting device who is used for adjusting 2 opening spaces of couple on couple 2.
As shown in fig. 2, the hook 2 includes a connecting portion 21 installed on the side wall of the steel pipe 1 and a hook portion 22 connected to one end of the connecting portion 21 and extending outward from the steel pipe 1, the adjusting device includes a positioning pin 4 which is connected to one end of the hook portion 22 close to the connecting portion 21 and is not less than one and protrudes outward, concretely, the number of the positioning pin 4 is two, the positioning pin 4 is movably connected with an arc plate 5 which pushes downward to reduce the open space of the hook portion 22, an arc groove 51 which allows the positioning pin 4 to move under the external force driving is formed on the arc plate 5, the circle center of the arc groove 51 overlaps with the circle center of the arc plate 5, the positioning pin 4 and the inner wall of the arc groove 51 form friction, the opening size of the hook portion 22 is adjusted by manually pushing the arc plate 5 by an operator, when the opening space of the hook portion 22 is minimum, the minimum opening space of the arc groove is smaller than the pipe diameter of the horizontal rod, and the hook 2 is prevented from falling off.
As shown in fig. 2, the end side wall of the steel pipe 1 is fixedly connected to the connecting portion 21 by the screws 3, specifically, the number of the screws 3 is two, and through holes corresponding to the screws 3 are formed in the side wall of the steel pipe 1 and the connecting portion 21.
During the use, a workman operate can, at first the manual arc 5 that promotes, open hook portion 22, hang into on the horizontal pole of scaffold, then promote arc 5 and hook portion 22 and form the closure, whenever stride place two, on it ligature steel basketry net can, easy operation, low in labor strength, the dismouting is convenient, promotes work efficiency, reduce cost expense.
The above-described embodiments are merely illustrative of the principles and utilities of the present patent application and are not intended to limit the present patent application. Modifications and variations can be made to the above-described embodiments by those skilled in the art without departing from the spirit and scope of this patent application. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical concepts disclosed in the present application shall be covered by the claims of the present application.

Claims (6)

1. The utility model provides a dish detains frame pavement peg, includes steel pipe (1), its characterized in that: couple (2) that a set of tip outwards extended are all installed to the both ends lateral wall of steel pipe (1), and the quantity of every group couple (2) is two, and just two couples (2) symmetry are installed in the both sides of steel pipe (1) tip, install the adjusting device who is used for adjusting couple (2) opening space on couple (2).
2. The disc buckle frame walkway hanging pole of claim 1, wherein: the hook (2) comprises a connecting part (21) arranged on the side wall of the steel pipe (1) and a hook part (22) connected to one end of the connecting part (21) and extending out of the steel pipe (1).
3. The disc buckle frame walkway hanging pole of claim 2, wherein: adjusting device is including connecting hook portion (22) and being close to one end quantity of connecting portion (21) and being no less than one and outside outstanding locating pin (4), and swing joint has arc (5) that promote downwards and reduce hook portion (22) uncovered space on locating pin (4).
4. The disc buckle frame walkway hanging pole of claim 3, wherein: the arc-shaped plate (5) is provided with an arc-shaped groove (51) for the positioning pin (4) to move under the driving of external force.
5. The disc buckle frame walkway hanging pole of claim 2, wherein: the side wall of the end part of the steel pipe (1) is fixedly connected with the connecting part (21) through the screw (3).
6. The plate buckle frame walkway hanging rod of claim 1, wherein: the section of the steel pipe (1) is of a rectangular structure.
CN202123455259.XU 2021-12-31 2021-12-31 Plate buckle frame walkway hanging rod Active CN217106106U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123455259.XU CN217106106U (en) 2021-12-31 2021-12-31 Plate buckle frame walkway hanging rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123455259.XU CN217106106U (en) 2021-12-31 2021-12-31 Plate buckle frame walkway hanging rod

Publications (1)

Publication Number Publication Date
CN217106106U true CN217106106U (en) 2022-08-02

Family

ID=82593262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123455259.XU Active CN217106106U (en) 2021-12-31 2021-12-31 Plate buckle frame walkway hanging rod

Country Status (1)

Country Link
CN (1) CN217106106U (en)

Similar Documents

Publication Publication Date Title
CN217106106U (en) Plate buckle frame walkway hanging rod
CN215212255U (en) Suspension type frame combined high-altitude operation platform
CN213898162U (en) Movable chute for concrete pouring of hidden culvert
CN207063479U (en) Cantilever frame draws system to one side
CN110593556A (en) Grid combined formwork system
CN109779238A (en) A kind of multi-storey residential buildings outer scaffold wall connector
CN209924121U (en) Independent supporting structure for assembly type building construction
CN210150645U (en) Wet seam construction formwork lifting device of bridge
CN209277304U (en) The box shape steel structure formula load transfer device of bottom plate rear pouring tape
CN207754308U (en) A kind of novel piglet fence
CN217735069U (en) Municipal afforestation central authorities rail guard
CN220058983U (en) Quick-dismantling horizontal safety protection device
CN214006774U (en) Movable fence device
CN111502038A (en) Assembly type PC building structure and construction method thereof
CN215122862U (en) Agricultural irrigation buried pipe low tube auxiliary device
CN215212272U (en) Combined self-stabilizing support system
CN213928379U (en) Ditch template for fast pouring of mine underground roadway
CN218292788U (en) Lifting support
CN216197144U (en) Novel anti-tilting device for supporting building template
CN217652496U (en) Rail for construction convenient to dismantle
CN220099696U (en) Protection device for bridge construction on reconstruction and expansion engineering
CN220133513U (en) Integrated operation platform device of creeping formwork
CN218201737U (en) Vertical installation special lifting device of cavity type ECP cement board
CN210458946U (en) Bolt formula support device of cast-in-place construction of bridge
CN214530313U (en) Foldable road signboard for highway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant