CN217105431U - Road rainwater inspection shaft - Google Patents
Road rainwater inspection shaft Download PDFInfo
- Publication number
- CN217105431U CN217105431U CN202220991971.7U CN202220991971U CN217105431U CN 217105431 U CN217105431 U CN 217105431U CN 202220991971 U CN202220991971 U CN 202220991971U CN 217105431 U CN217105431 U CN 217105431U
- Authority
- CN
- China
- Prior art keywords
- fixed
- shaft
- well
- well lid
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to a road rainwater inspection shaft; the technical scheme of its solution includes the pit shaft, the pit shaft upper end includes well lid and well lid support, the pit shaft lower part is equipped with the water inlet and drain pipe, the below of water inlet and drain pipe is equipped with the direction fill of a big-end-up's loudspeaker shape, the direction is fought the lower extreme and is set up the sedimentation tank, be equipped with a sediment section of thick bamboo in the sedimentation tank, sediment section of thick bamboo upper end is fixed with the stay cord, the other end of stay cord is fixed on the well lid, be equipped with the vertical pit on the wall of the pit shaft, it has a plurality of branches to articulate along its length direction interval in the vertical pit, the free end of branch is fixed with a rectangle frame, the outside of a plurality of rectangle frames is equipped with a montant, a plurality of rectangle frames articulate on the montant, the montant reciprocates a plurality of branches of drive and rotates around the articulated shaft is synchronous, the articulated position that is located the branch of top is fixed with a wind spring that can make its reset, the below that is located lower extreme branch is equipped with a stopper.
Description
Technical Field
The utility model relates to an inspection shaft field, especially road rainwater inspection shaft.
Background
In recent years, every time heavy rainfall occurs, waterlogging in each big city is serious, underground water pipelines are more important in municipal construction, inspection wells are arranged on the pipelines at intervals, mud deposition positions are arranged at the bottoms of the inspection wells, rainwater flows through the inspection wells, carried silt sundries are deposited on the pipelines, the pipelines accumulate in the day and the month, and the smoothness of the pipelines can be influenced if the silt is not treated in time.
Traditional inspection shaft adopts the manual work to dig out silt, long and workman intensity of labour is big consuming time, the silt that neotype inspection shaft in addition was equipped with deposits a section of thick bamboo, the accessible is direct to be pulled out a section of thick bamboo from the well head, but the inspection still need have inspection function, consequently, must leave the ladder that makes things convenient for the business turn over on the wall of a well, and the setting of a section of thick bamboo, the inspection shaft space must carry out the position of stepping down in the space, make the ladder unable installation, perhaps the ladder size after the installation is too little can't satisfy normal use, consequently, need a new inspection shaft not only can effectively satisfy the installation of a section of thick bamboo and take out at present stage, still have sufficient space installation ladder, realize the convenient function of business turn over of inspection shaft.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned condition, for overcoming prior art's defect, the utility model provides a road rainwater inspection shaft, the effectual unreasonable problem that can not reasonable coexistence of a section of thick bamboo and ladder that makes of space utilization in having solved current inspection shaft.
The technical scheme of its solution problem includes the pit shaft, the pit shaft upper end includes well lid and well lid support, the pit shaft lower part is equipped with the water inlet and drain pipe, the below of water inlet and drain pipe is equipped with the direction fill of a big-end-up's loudspeaker shape, the direction is fought the lower extreme and is set up the sedimentation tank, be equipped with a sediment section of thick bamboo in the sedimentation tank, sediment section of thick bamboo upper end is fixed with the stay cord, the other end of stay cord is fixed on the well lid, be equipped with vertical groove on the pit shaft wall, it has a plurality of branches to articulate along its length direction interval in the vertical groove, the free end of branch is fixed with a rectangle frame, the outside of a plurality of rectangle frames is equipped with a montant, a plurality of rectangle frames articulate on the montant, the montant reciprocates a plurality of branches of drive and rotates around the articulated shaft is synchronous, the articulated position that is located the branch of top is fixed with a wind spring that can make its reset, the below that is located lower extreme branch is equipped with a stopper.
Preferably, a plurality of rings are evenly distributed on the circumference of the settling cylinder, a rope is fixed on each ring, the other ends of the ropes are fixed with the pull rope, the bottom of the well lid is provided with a fixing ring, and one end of the pull rope, which is close to the well lid, is fixed on the fixing ring.
Preferably, the diameter of the wellhead is larger than the outer diameter of the settling drum.
Preferably, the side wall of the upper end of the settling barrel is densely provided with drain holes.
Preferably, a bearing is arranged on the groove wall of the vertical groove, and a hinge shaft of the vertical rod is fixed in the bearing.
The utility model discloses think about novelty, the structure is ingenious, and the practicality is strong, folds the realization with the ladder and steps down near the wall of a well for deposiing a section of thick bamboo when not using for deposiing a section of thick bamboo can accessible pull out from the shaft bottom.
Drawings
Fig. 1 is a front sectional view of the sedimentation cylinder of the present invention.
Figure 2 is a front view section of the utility model when the personnel overhaul.
Fig. 3 is a schematic view of the structure of the right side of the ladder of the present invention.
Detailed Description
The following describes the embodiments of the present invention in further detail with reference to the accompanying drawings.
As shown in figures 1 to 3, the utility model comprises a shaft 1, the upper end of the shaft 1 comprises a well cover 2 and a well cover support, the lower part of the shaft 1 is provided with a water inlet and outlet pipe 3, a horn-shaped guide hopper 4 with a big top and a small bottom is arranged below the water inlet and outlet pipe 3, the lower end of the guide hopper 4 is provided with a sedimentation tank 5, a sedimentation tank 6 is arranged in the sedimentation tank 5, the upper end of the sedimentation tank 6 is fixed with a stay cord, the other end of the stay cord is fixed on the well cover 2, the wall of the shaft 1 is provided with a vertical groove 7, a plurality of support rods 8 are hinged in the vertical groove 7 along the length direction at intervals, the free end of each support rod 8 is fixed with a rectangular frame 9, the outer side of the plurality of rectangular frames 9 is provided with a vertical rod 10, the plurality of rectangular frames 9 are hinged on the vertical rod 10, the vertical rod 10 moves up and down to drive the plurality of support rods 8 to rotate synchronously around a hinge shaft, a coil spring 11 which can reset the support rod 8 at the uppermost end is fixed at a hinge position, a limiting block 12 is arranged below the lowest supporting rod 8.
In order to realize the installation of stay cord and deposit fixed on a section of thick bamboo 6, it has a plurality of rings to deposit the circumference equipartition on a section of thick bamboo 6, is fixed with a rope on every ring, and the other end and the stay cord of a plurality of ropes are fixed, and 2 bottoms of well lid are equipped with solid fixed ring, and the stay cord is close to the one end of well lid 2 and fixes on solid fixed ring.
In order to enable the sedimentation cylinder 6 to be pulled out of the wellhead, the diameter of the wellhead is larger than the outer diameter of the sedimentation cylinder 6.
In order to realize that the sedimentation cylinder 6 can discharge redundant water at the upper end of the sedimentation cylinder when being pulled, drain holes are densely distributed on the side wall of the upper end of the sedimentation cylinder 6.
In order to realize the hinging of the support rod 8 in the vertical groove 7, a bearing is arranged on the groove wall of the vertical groove 7, and a hinging shaft of the vertical rod 10 is fixed in the bearing.
The utility model discloses a concrete working process is: under the effect of spring 11 under the condition of no external force, make its free end keep the ascending state of slope under the effect of spring 11, this process makes under the effect of montant 10 read a branch 8 synchronous rotation, the ladder that 8 rectangular frames 9 of branch formed is in the position that is close to the section of thick bamboo wall this moment, if need directly open well lid 2 when clearing up the silt in the section of thick bamboo 6 of depositing, through hoisting equipment through the stay cord with depositing section of thick bamboo 6 upwards pulling and pull out from the well head and can realize the clearance of depositing section of thick bamboo 6, after the completion with depositing section of thick bamboo 6 place back in the sedimentation tank in the stay cord through the stay cord can, the direction is fought 4 can assist the reseing of depositing section of thick bamboo 6, the stability of depositing section of thick bamboo 6 when many ropes can assist the pulling stay cord, the position of ladder can not rather than interfering when the pulling deposits section of thick bamboo 6 and shifts up, the wash port can discharge surplus water and reduce the weight when pulling and rising depositing section of thick bamboo 6.
When the personnel that need go into the pit and inspect, open 2 workman on well lid and push down with the foot branch 8 of tilt up earlier, the spring 11 atress is tensile this moment, make the ladder to the direction of keeping away from the section of thick bamboo wall remove at the in-process that pushes down, until branch 8 and stopper 12 contact of bottommost end, 8 levels of branch this moment, make the workman be the ladder reliable and stable using under the effect of workman's own gravity and the limiting displacement of stopper 12 to the ladder is more handy when keeping away from the section of thick bamboo wall use this moment.
The significant benefits of the present device: this device designs out the telescopic ladder according to 1 inner space structure of pit shaft and replaces traditional fixed ladder for the ladder does not take place to interfere with a section of thick bamboo 6 that deposits when a section of thick bamboo 6 is deposited in the pulling, can realize the ladder facilitate use again when overhauing, makes whole inspection shaft convenient high efficiency more when using.
Claims (5)
1. A road rainwater inspection well comprises a well shaft (1), the upper end of the well shaft (1) comprises a well lid (2) and a well lid support, the lower part of the well shaft (1) is provided with a water inlet and outlet pipe (3), the road rainwater inspection well is characterized in that a trumpet-shaped guide hopper (4) with a large upper part and a small lower part is arranged below the water inlet and outlet pipe (3), the lower end of the guide hopper (4) is provided with a sedimentation tank (5), a sedimentation cylinder (6) is arranged in the sedimentation tank (5), the upper end of the sedimentation cylinder (6) is fixed with a pull rope, the other end of the pull rope is fixed on the well lid (2), the wall of the well shaft (1) is provided with a vertical groove (7), a plurality of support rods (8) are hinged in the vertical groove (7) along the length direction at intervals, a rectangular frame (9) is fixed at the free end of each support rod (8), a vertical rod (10) is arranged at the outer side of each rectangular frame (9), and a plurality of rectangular frames (9) are hinged on the vertical rods (10), the vertical rod (10) moves up and down to drive the plurality of supporting rods (8) to synchronously rotate around the hinged shaft, a coil spring (11) which can reset the supporting rod (8) at the uppermost end is fixed at the hinged position of the supporting rod (8), and a limiting block (12) is arranged below the supporting rod (8) at the lowermost end.
2. The road rainwater inspection well according to claim 1, characterized in that a plurality of hanging rings are uniformly distributed on the circumference of the settling cylinder (6), each hanging ring is fixed with a rope, the other ends of the plurality of ropes are fixed with a pulling rope, a fixing ring is arranged at the bottom of the well lid (2), and one end of the pulling rope close to the well lid (2) is fixed on the fixing ring.
3. A road stormwater inspection shaft as claimed in claim 1, wherein the diameter of the wellhead is greater than the outer diameter of the sedimentation cylinder (6).
4. A road rainwater manhole according to claim 1, wherein drainage holes are densely distributed on the side wall of the upper end of the settling drum (6).
5. A road rainwater manhole according to claim 1, wherein a bearing is provided on the wall of the vertical channel (7), and the hinge shaft of the vertical rod (10) is fixed in the bearing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220991971.7U CN217105431U (en) | 2022-04-27 | 2022-04-27 | Road rainwater inspection shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220991971.7U CN217105431U (en) | 2022-04-27 | 2022-04-27 | Road rainwater inspection shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217105431U true CN217105431U (en) | 2022-08-02 |
Family
ID=82585239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220991971.7U Active CN217105431U (en) | 2022-04-27 | 2022-04-27 | Road rainwater inspection shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217105431U (en) |
-
2022
- 2022-04-27 CN CN202220991971.7U patent/CN217105431U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218474957U (en) | Green city drainage pipe structure | |
CN112323910A (en) | Rainwater collecting and utilizing device suitable for garden landscape | |
CN217105431U (en) | Road rainwater inspection shaft | |
CN109235390B (en) | Hydraulic type surface automatic water taking device | |
CN216640744U (en) | Grass planting ditch structure for hydraulic engineering | |
CN213508586U (en) | Novel rainwater drainage well lid | |
CN212248601U (en) | Municipal works drainage pipe road junction device | |
CN218933377U (en) | Sponge city cuts dirty anti-reflux overflow well | |
CN218264203U (en) | Municipal building drainage device | |
CN114718167B (en) | Municipal drainage system | |
CN213062339U (en) | A reposition of redundant personnel sluice for town road drainage | |
CN214033995U (en) | Can be according to well lid structure of discharge rate regulation drainage speed | |
CN112281647A (en) | Road and bridge drainage system | |
CN107055840A (en) | A kind of sponge city water storage circulation Application way | |
CN213061561U (en) | Roadbed drainage structure for municipal road construction | |
CN113089726A (en) | Anti-collapse pipe fitting type inspection well for soft geology and installation method | |
CN220100147U (en) | Bottom anti-fouling scouring mechanism and integrated pump station | |
CN221219040U (en) | Urban space planning and designing construction pavement drainage structure | |
CN214194854U (en) | Municipal construction is with preventing blockking up drainage system | |
CN214363988U (en) | Environment-friendly deep basal pit rainwater regulation pond | |
CN220394807U (en) | Rainwater garden overflow arrangement | |
CN211596680U (en) | Water conservancy building steel gate | |
CN215759507U (en) | Municipal works have well head device of arranging structure soon | |
CN218508638U (en) | Wall-mounted well diverter | |
CN215926064U (en) | Urban road inspection well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |