CN217098259U - Concrete standard curing room anti-corrosion rust-proof test piece maintenance frame - Google Patents

Concrete standard curing room anti-corrosion rust-proof test piece maintenance frame Download PDF

Info

Publication number
CN217098259U
CN217098259U CN202220885473.4U CN202220885473U CN217098259U CN 217098259 U CN217098259 U CN 217098259U CN 202220885473 U CN202220885473 U CN 202220885473U CN 217098259 U CN217098259 U CN 217098259U
Authority
CN
China
Prior art keywords
placing
concrete
fixedly connected
plate
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220885473.4U
Other languages
Chinese (zh)
Inventor
马永胜
殷继伟
李虎成
李斌
郝源
张益豪
张�浩
臧术勇
任林燕
尤启铭
王宇涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Jingtai New Building Materials Co ltd
Original Assignee
Weifang Jingtai New Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Jingtai New Building Materials Co ltd filed Critical Weifang Jingtai New Building Materials Co ltd
Priority to CN202220885473.4U priority Critical patent/CN217098259U/en
Application granted granted Critical
Publication of CN217098259U publication Critical patent/CN217098259U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model relates to a maintenance frame technical field specifically is a concrete standard curing room anticorrosion rust-resistant test piece maintenance frame, including the support column, the board is placed to one side fixedly connected with of support column. Has the advantages that: through setting up the bracing piece, the backup pad is located one side of bracing piece, when using, put the concrete at the top of delivery board, starter motor, make the lead screw rotate in the inside of locating plate, make the locating plate move in the inside of bracing piece, drive the backup pad at one side rebound of bracing piece, when moving the backup pad to one side of placing the board, can promote the delivery board to placing on the board, and then move the concrete to placing on the board, and both ends on one side of bracing piece all are provided with the slider, through promoting the bracing piece, make the slider move in the inside of spout, make the bracing piece move in one side of placing the board, and then can remove the concrete piece to placing the different positions on the board, need not carry the concrete piece, and is easy and simple to handle, and is more labor-saving.

Description

Concrete standard curing room anti-corrosion rust-proof test piece maintenance frame
Technical Field
The utility model relates to a maintenance frame technical field, especially a concrete standard curing room anti-corrosion rust-proof test piece maintenance frame.
Background
The concrete test block is also called a cubic test block and used for reflecting the construction quality of a concrete structure, and the concrete curing room is a room with specific temperature and humidity and used for storing the concrete test block, so that the concrete test block is placed on the curing frame when the concrete test block is maintained in the standard humidity range in the concrete curing room.
The existing concrete standard curing room corrosion-resistant rust-resistant test piece curing frame has the following defects:
1. when the existing standard concrete curing room corrosion-resistant and rust-resistant test piece curing frame is used, the curing frame has a certain height, so that a mixed soil test piece is inconvenient to carry;
2. when the existing concrete standard curing room corrosion-resistant and rust-resistant test piece curing frame is used, a test block is not convenient to move on the curing frame.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a concrete standard curing room anti-corrosion rust-resistant test piece maintenance frame.
The purpose of the utility model is realized through the following technical scheme: a concrete standard curing room corrosion-resistant rust-resistant test piece curing frame comprises a supporting column, wherein a placing plate is fixedly connected to one side of the supporting column, a sliding groove is formed in one side of the placing plate, a sliding block is movably connected to the inside of the sliding groove, and a supporting rod is fixedly connected to one side of the sliding block;
one side swing joint of bracing piece has the backup pad, the equal fixedly connected with baffle in both ends at backup pad top, one side swing joint of baffle has the delivery board, the equal fixedly connected with supporting wheel in four corners department of delivery board bottom, supporting wheel swing joint is in the top of backup pad.
Optionally, the locating slot has been seted up to the inside of bracing piece, one side fixedly connected with locating plate of backup pad, locating plate swing joint is in the inside of locating slot, fixes a position the backup pad in one side of bracing piece through the locating plate, is convenient for make the backup pad remove in one side of bracing piece, carries the concrete piece.
Optionally, the top of the supporting rod is fixedly connected with a motor, the output end of the motor is fixedly connected with a lead screw, and the lead screw is movably connected inside the supporting rod and the positioning plate.
Optionally, the four corners of the placing plate are provided with supporting columns, the placing plate is provided with a plurality of placing plates, the distance between every two adjacent placing plates is equal, and the placing plates at the top and the bottom are provided with sliding grooves.
Optionally, the top and the bottom of the supporting rod are both provided with a sliding block, and the supporting rod is movably connected to one side of the placing plate.
Optionally, the equal fixedly connected with connecting plate in both sides of delivery board, the inside swing joint of connecting plate has the threaded rod, the bottom fixedly connected with fixed plate of threaded rod, fixed plate swing joint is in the top of placing the board, is provided with the slipmat in the bottom of fixed plate, increases stability.
The utility model has the advantages of it is following:
1. this concrete standard curing room anticorrosive rust-resistant test piece maintenance frame, through setting up the bracing piece, the backup pad is located one side of bracing piece, when using, put the concrete at the top of delivery board, starter motor, make the lead screw rotate in the inside of locating plate, make the locating plate move in the inside of bracing piece, drive the backup pad at one side rebound of bracing piece, when moving the backup pad to one side of placing the board, can promote the delivery board to placing on the board, and then move the concrete to placing on the board, and both ends on one side of the bracing piece all are provided with the slider, through promoting the bracing piece, make the slider move in the inside of spout, make the bracing piece move in one side of placing the board, and then can move the concrete piece to the different positions on placing the board, need not carry the concrete piece, and is simple and convenient to operate, and is more laborsaving.
2. This concrete standard curing room anticorrosive rust-resistant test piece maintenance frame, through setting up the delivery board, all be provided with the supporting wheel in the four corners department of delivery board bottom, when using, put the concrete piece at the top of delivery board, carry the concrete piece through the backup pad, after removing to the one side of placing the board, promote the delivery board, can make the delivery board remove through the supporting wheel, after removing to placing the suitable position in board top, the rotation threaded rod, make the threaded rod promote the fixed plate downwards, make the fixed plate be located the top of placing the board, fix a position the board of placing this moment, increase stability, make reduce colliding with to the concrete piece in handling, excellent in use effect.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic structural view of the support rod of the present invention;
fig. 3 is a schematic structural diagram of the support plate of the present invention.
In the figure: 1-supporting column, 2-placing plate, 3-sliding chute, 4-sliding block, 5-supporting rod, 6-supporting plate, 7-baffle, 8-conveying plate, 9-supporting wheel, 10-positioning plate, 11-motor, 12-screw rod, 13-threaded rod and 14-fixing plate.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-3, a concrete standard curing room corrosion and rust prevention test piece curing frame comprises a support pillar 1, a placing plate 2 is fixedly connected to one side of the support pillar 1, a sliding chute 3 is formed in one side of the placing plate 2, a sliding block 4 is movably connected inside the sliding chute 3, and a support rod 5 is fixedly connected to one side of the sliding block 4;
one side swing joint of bracing piece 5 has backup pad 6, the equal fixedly connected with baffle 7 in both ends at 6 tops of backup pad, and one side swing joint of baffle 7 has delivery board 8, and the equal fixedly connected with supporting wheel 9 of four corners department of delivery board 8 bottom is convenient for make delivery board 8 remove, and then removes the concrete piece, reduces colliding with of concrete piece in the handling, and supporting wheel 9 swing joint is in the top of backup pad 6.
As an optional technical solution of the utility model:
the constant head tank has been seted up to the inside of bracing piece 5, one side fixedly connected with locating plate 10 of backup pad 6, and locating plate 10 swing joint is in the inside of constant head tank.
As an optional technical solution of the utility model:
the top fixedly connected with motor 11 of bracing piece 5, the output fixedly connected with lead screw 12 of motor 11, lead screw 12 swing joint is in the inside of bracing piece 5 and locating plate 10, and starter motor 11 makes lead screw 12 rotate in the inside of locating plate 10, makes locating plate 10 remove in the inside of constant head tank, drives backup pad 6 and removes in one side of bracing piece 5, carries the concrete piece.
As an optional technical solution of the utility model:
the four corners department of placing board 2 all is provided with support column 1, places board 2 and is provided with a plurality of, and adjacent two are placed the distance between board 2 and are equal.
As an optional technical solution of the utility model:
the top and the bottom of bracing piece 5 all are provided with slider 4, and bracing piece 5 swing joint is in the one side of placing board 2, is convenient for remove bracing piece 5, moves backup pad 6 to the different positions on placing board 2.
As an optional technical solution of the utility model:
the equal fixedly connected with connecting plate in both sides of delivery board 8, the inside swing joint of connecting plate has threaded rod 13, the bottom fixedly connected with fixed plate 14 of threaded rod 13, fixed plate 14 swing joint is in the top of placing board 2, rotates threaded rod 13, makes the inside of threaded rod 13 connecting plate rotate, is convenient for promote fixed plate 14 to the top of placing board 2, with the location of delivery board 8 at the top of placing board 2.
The working process of the utility model is as follows: when the concrete conveying device is used, concrete blocks are placed at the top of the conveying plate 8, the motor 11 is started, the screw rod 12 is rotated in the positioning plate 10, the positioning plate 10 is moved in the supporting rod 5, the supporting plate 6 is driven to move upwards on one side of the supporting rod 5, when the supporting plate 6 is moved to one side of the placing plate 2, because the supporting wheels 9 are arranged at the four corners of the bottom of the conveying plate 8, the conveying plate 8 can be moved through the supporting wheels 9, after the supporting plate is moved to a proper position at the top of the placing plate 2, the threaded rod 13 is rotated, the threaded rod 13 pushes the fixed plate 14 downwards, the fixed plate 14 is positioned at the top of the placing plate 2, the placing plate 8 is positioned at the moment, the stability is improved, the collision of the concrete blocks in the conveying process is reduced, the using effect is good, the sliding blocks 4 are arranged at the two ends of one side of the supporting rod 5, and the supporting rod 5 is pushed, make slider 4 remove in the inside of spout 3, make bracing piece 5 remove in the one side of placing board 2, and then can remove the concrete piece to placing the different positions on board 2, need not carry the concrete piece, and is easy and simple to handle, more laborsaving.
To sum up, when the concrete standard curing room corrosion-proof and rust-proof test piece curing frame is used, the support rod 5 is arranged, the support plate 6 is positioned on one side of the support rod 5, when the concrete standard curing room corrosion-proof and rust-proof test piece curing frame is used, the concrete is placed on the top of the conveying plate 8, the motor 11 is started, the screw rod 12 is rotated in the positioning plate 10, the positioning plate 10 is moved in the support rod 5, the support plate 6 is driven to move upwards on one side of the support rod 5, when the support plate 6 is moved to one side of the placing plate 2, the conveying plate 8 can be pushed to the placing plate 2, the concrete is further moved to the placing plate 2, the slide blocks 4 are arranged at both ends of one side of the support rod 5, the slide blocks 4 are moved in the chute 3 by pushing the support rod 5, the support rod 5 is moved on one side of the placing plate 2, the concrete blocks can be further moved to different positions on the placing plate 2, and the concrete blocks do not need to be carried, the operation is simple and convenient, and the labor is saved; through setting up delivery board 8, all be provided with supporting wheel 9 in the four corners department of delivery board 8 bottom, when using, put the concrete piece at delivery board 8's top, carry the concrete piece through backup pad 6, after removing to the one side of placing board 2, promote delivery board 8, can make delivery board 8 remove through supporting wheel 9, after removing to the suitable position in placing board 2 top, rotation threaded rod 13, make threaded rod 13 promote fixed plate 14 downwards, make fixed plate 14 be located the top of placing board 2, fix a position board 8 to placing this moment, increase stability, make reduce colliding with to the concrete piece in handling, excellent in use effect.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a concrete standard curing room anti-corrosion rust-resistant test piece maintenance frame which characterized in that: the device comprises a supporting column (1), wherein a placing plate (2) is fixedly connected to one side of the supporting column (1), a sliding groove (3) is formed in one side of the placing plate (2), a sliding block (4) is movably connected to the inside of the sliding groove (3), and a supporting rod (5) is fixedly connected to one side of the sliding block (4);
one side swing joint of bracing piece (5) has backup pad (6), the equal fixedly connected with baffle (7) in both ends at backup pad (6) top, one side swing joint of baffle (7) has delivery board (8), the equal fixedly connected with supporting wheel (9) of four corners department of delivery board (8) bottom, supporting wheel (9) swing joint is in the top of backup pad (6).
2. The standard concrete curing room corrosion and rust prevention test piece curing rack of claim 1, wherein: the locating slot has been seted up to the inside of bracing piece (5), one side fixedly connected with locating plate (10) of backup pad (6), locating plate (10) swing joint is in the inside of locating slot.
3. The concrete standard curing room corrosion and rust prevention test piece curing frame of claim 1, which is characterized in that: the top fixedly connected with motor (11) of bracing piece (5), the output fixedly connected with lead screw (12) of motor (11), lead screw (12) swing joint is in the inside of bracing piece (5) and locating plate (10).
4. The standard concrete curing room corrosion and rust prevention test piece curing rack of claim 1, wherein: the supporting columns (1) are arranged at the four corners of the placing plates (2), the placing plates (2) are provided with a plurality of supporting columns, and the distance between every two adjacent placing plates (2) is equal.
5. The standard concrete curing room corrosion and rust prevention test piece curing rack of claim 1, wherein: the top and the bottom of the supporting rod (5) are both provided with a sliding block (4), and the supporting rod (5) is movably connected to one side of the placing plate (2).
6. The standard concrete curing room corrosion and rust prevention test piece curing rack of claim 1, wherein: the conveying device is characterized in that connecting plates are fixedly connected to two sides of the conveying plate (8), a threaded rod (13) is movably connected to the inside of each connecting plate, a fixing plate (14) is fixedly connected to the bottom of each threaded rod (13), and the fixing plates (14) are movably connected to the tops of the placing plates (2).
CN202220885473.4U 2022-04-15 2022-04-15 Concrete standard curing room anti-corrosion rust-proof test piece maintenance frame Active CN217098259U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220885473.4U CN217098259U (en) 2022-04-15 2022-04-15 Concrete standard curing room anti-corrosion rust-proof test piece maintenance frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220885473.4U CN217098259U (en) 2022-04-15 2022-04-15 Concrete standard curing room anti-corrosion rust-proof test piece maintenance frame

Publications (1)

Publication Number Publication Date
CN217098259U true CN217098259U (en) 2022-08-02

Family

ID=82581412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220885473.4U Active CN217098259U (en) 2022-04-15 2022-04-15 Concrete standard curing room anti-corrosion rust-proof test piece maintenance frame

Country Status (1)

Country Link
CN (1) CN217098259U (en)

Similar Documents

Publication Publication Date Title
CN213135682U (en) Automatic welding device for iron accessories
CN110001228B (en) Binding means for financial accounting
CN217098259U (en) Concrete standard curing room anti-corrosion rust-proof test piece maintenance frame
CN210253705U (en) Automobile exhaust pipe machining equipment
CN115229390B (en) Cold rolled steel bar butt welding equipment convenient to adjust
CN111287483B (en) Wall surface renovating device and wall surface renovating method
CN212681517U (en) Quick mopping device of pipeline for mine
CN220327204U (en) Combined stamping die display rack
CN220133452U (en) Scaffold convenient to use
CN216468740U (en) Aluminum substrate temporary storage conveyor
CN221123066U (en) Multistage tubular condenser
CN211491478U (en) Forging die placing rack
CN221311218U (en) Aluminum profile surface anti-corrosion treatment device
CN220949372U (en) Oak barrel rack
CN221209685U (en) Reinforcing bar bending device
CN219212146U (en) Reinforcing steel bar connection fixing assembly
CN217776615U (en) Cultural product processing is with polishing equipment
CN220683154U (en) Finished product storage equipment for exhaust pipe production
CN217862101U (en) Single horizontal shaft forced concrete mixer for experiments
CN219172447U (en) Carrying supporting device for sofa mattress production
CN213837028U (en) Movable board house with heat-insulating layer
CN219619153U (en) Multilayer storage transfer trolley
CN217457801U (en) Automatic feeding device of stainless steel flange machining production line
CN111250573A (en) Bending device for metal product processing
CN211391786U (en) Novel portable sealant filling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant