CN217092703U - Building construction place is with high-efficient dust device - Google Patents

Building construction place is with high-efficient dust device Download PDF

Info

Publication number
CN217092703U
CN217092703U CN202220774960.3U CN202220774960U CN217092703U CN 217092703 U CN217092703 U CN 217092703U CN 202220774960 U CN202220774960 U CN 202220774960U CN 217092703 U CN217092703 U CN 217092703U
Authority
CN
China
Prior art keywords
pipe
valve
mounting platform
building construction
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220774960.3U
Other languages
Chinese (zh)
Inventor
张仁旭
凌星
黄永平
杨文华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Huashun Water Conservancy And Hydropower Engineering Co ltd
Original Assignee
Fujian Huashun Water Conservancy And Hydropower Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Huashun Water Conservancy And Hydropower Engineering Co ltd filed Critical Fujian Huashun Water Conservancy And Hydropower Engineering Co ltd
Priority to CN202220774960.3U priority Critical patent/CN217092703U/en
Application granted granted Critical
Publication of CN217092703U publication Critical patent/CN217092703U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a dust device field, in particular to a high-efficiency dust device for a building construction site, which comprises a water inlet pipe, an inclined bracket, a supporting bracket, a mounting platform, a flow limiting valve, a water outlet pipe, a flow dividing valve, a flow dividing pipe, a spherical connecting piece, a rotating bracket, a flexible bent pipe and a spray head; the water inlet pipe is connected with the side surface of the flow limiting valve; the bottom of the flow limiting valve is connected with the mounting platform; the bottom of the mounting platform is connected with the support bracket in a sliding manner; the side surface of the mounting platform is rotatably connected with the inclined bracket; the top of the flow limiting valve is connected with the flow dividing valve; a control rod is arranged on the side surface of the shunt valve, and the top of the shunt valve is connected with the multi-component flow pipe; one end of the shunt pipe, which is far away from the shunt valve, is connected with the spherical connecting piece; the spherical connecting piece is rotatably connected with the connecting pipe. The utility model discloses a structure that rotates the connecting pipe can effectual improvement this device's working range, and the water resource raw materials cleanliness factor of being convenient for the real-time inspection water smoke use when the structure through inlet tube and outlet pipe can effectual improvement this device's circulation performance.

Description

Building construction place is with high-efficient dust device
Technical Field
The utility model relates to a dust device technical field especially relates to a building construction is high-efficient dust device for place.
Background
Present job site can produce more raise dust and adopt artifical watering or watering lorry to carry out the dust fall usually, wastes time and energy and the lower problem of efficiency, simultaneously because job site ground is rugged and rugged, and article stack irregularly, causes the inconvenient condition of large-scale watering lorry entering, and current building site can't cool down when removing dust, can't effectively reach energy-concerving and environment-protective and the good problem of cooling effect.
Chinese patent that the grant bulletin number is CN209464783U discloses a high-efficient dust device is used in construction site, including bracing piece and fixed plate, there is the fixed plate bracing piece top through bolt fixed mounting, there is the dead lever on the fixed plate left side through bolt fixed mounting, there is the locating plate on the dead lever top through bolt fixed mounting, there is the change machine locating plate bottom through bolt fixed mounting, there is signal receiver on the change machine top through bolt fixed mounting, there is annular slide bottom through bolt fixed mounting, annular slide bottom is rotated and is connected with water smoke sprinkler, the water smoke sprinkler outside all around all trompils be provided with the hole of spraying, and it has and compares in the watering lorry, and application scope is bigger, has avoided because construction site ground is rugged, and article stack advantages such as irregularity.
However, the above-mentioned known solutions have the following disadvantages: the dust fall function is realized through the water smoke sprayer in the above-mentioned scheme for the water smoke scope has the limitation, thereby makes liquid laminating reduce liquid flow velocity at above-mentioned device shell inner wall side through the centrifugal structure of change of engine.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the technical problem who exists among the background art, the utility model provides a building construction is high-efficient dust device for place, the utility model discloses a structure of rotating the connecting pipe can effectual improvement this device's working range, the water resource raw materials cleanliness factor of being convenient for the real-time check water smoke use when the structure through inlet tube and outlet pipe can effectual improvement this device's circulation performance.
The utility model provides a high-efficient dust device for building construction site, which comprises a water inlet pipe, an inclined bracket, a supporting bracket, an installation platform, a flow limiting valve, a water outlet pipe, a flow dividing valve, a flow dividing pipe, a spherical connecting piece, a rotating bracket, a connecting pipe, a flexible bent pipe and a spray head;
the water inlet pipe is connected with the side surface of the flow limiting valve; the bottom of the flow limiting valve is connected with the mounting platform; the bottom of the mounting platform is connected with the support bracket in a sliding manner; the side surface of the mounting platform is rotatably connected with the inclined bracket; the side surface of the mounting platform is connected with a water outlet pipe; one end of the flow limiting valve, which is far away from the water inlet pipe, is connected with the water outlet pipe; the top of the flow limiting valve is connected with the flow dividing valve; a control rod is arranged on the side surface of the shunt valve, and the top of the shunt valve is connected with the multi-component flow pipe; one end of the shunt pipe, which is far away from the shunt valve, is connected with the spherical connecting piece; the spherical connecting piece is rotationally connected with the connecting pipe; the side surface of the connecting pipe is connected with the rotating bracket; the rotating bracket is rotationally connected with the spherical connecting piece; one end of the connecting pipe, which is far away from the spherical connecting piece, is connected with the flexible bent pipe; the bottom of the flexible elbow is connected with the spray head.
Preferably, the bottom of the support bracket is provided with a ground nail, the support bracket is provided with a telescopic column, and the side surface of the telescopic column is provided with a sliding damping device.
Preferably, a valve is arranged on the water outlet pipe and connected with the top of the mounting platform.
Preferably, the top of the flow dividing valve is provided with a plurality of groups of through holes, and the through holes are connected with the multi-component flow pipe.
Preferably, the side surface of the mounting platform is provided with a locking device, and the locking device is in damping connection with the joint of the inclined bracket and the mounting platform.
Preferably, the spherical connecting piece is provided with a rubber sealing ring, and the rubber sealing ring is connected with the side seam of the connecting pipe.
Preferably, the spray head is provided with an atomizing head, and the spray head and the flexible bent pipe are symmetrically arranged on two sides of the flow divider.
Preferably, the water inlet pipe is provided with a connecting flange, and the connecting flange is provided with a fixed connecting hole.
The above technical scheme of the utility model has following profitable technological effect:
the utility model discloses a structure that rotates the connecting pipe can effectually improve the working range of this device, the water resource raw materials cleanliness factor of being convenient for when the structure through inlet tube and outlet pipe can the effectual circulation performance of this device of improvement use of real-time check water smoke, can control different shunt tubes through the flow divider and use, thereby water economy resource's utilization effectively, can improve the rotation flexibility of this device when guaranteeing this device leakproofness through spherical connecting piece, thereby the dust fall dead angle has been avoided.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the high-efficiency dust-settling device for a building construction site of the present invention;
fig. 2 is a side view of the high-efficiency dust settling device for a building construction site provided by the utility model;
fig. 3 is a front view of the high-efficiency dust settling device for a building construction site provided by the utility model;
reference numerals: 1. a water inlet pipe; 2. a tilting bracket; 3. a support bracket; 4. mounting a platform; 5. a flow-limiting valve; 6. a water outlet pipe; 7. a flow divider valve; 8. a shunt tube; 9. a spherical connecting member; 10. rotating the bracket; 11. a connecting pipe; 12. a flexible bend; 13. and (4) a spray head.
Detailed Description
Example one
As shown in fig. 1-3, the utility model provides a high-efficient dust device for building construction site, including inlet tube 1, inclined support 2, support bracket 3, mounting platform 4, restriction valve 5, outlet pipe 6, flow divider valve 7, shunt tubes 8, spherical connecting piece 9, rotating support 10, connecting pipe 11, flexible return bend 12 and shower nozzle 13;
the water inlet pipe 1 is connected with the side surface of the flow limiting valve 5; the bottom of the flow limiting valve 5 is connected with the mounting platform 4; the bottom of the mounting platform 4 is connected with the support bracket 3 in a sliding way; the side surface of the mounting platform 4 is rotationally connected with the inclined bracket 2; the side surface of the mounting platform 4 is connected with a water outlet pipe 6; one end of the flow limiting valve 5, which is far away from the water inlet pipe 1, is connected with the water outlet pipe 6; the top of the flow limiting valve 5 is connected with a flow dividing valve 7; a control rod is arranged on the side surface of the shunt valve 7, and the top of the shunt valve 7 is connected with a plurality of groups of shunt tubes 8; one end of the shunt pipe 8 far away from the shunt valve 7 is connected with a spherical connecting piece 9; the spherical connecting piece 9 is rotationally connected with the connecting pipe 11; the side surface of the connecting pipe 11 is connected with the rotating bracket 10; the rotating bracket 10 is rotationally connected with the spherical connecting piece 9; one end of the connecting pipe 11 far away from the spherical connecting piece 9 is connected with the flexible elbow 12; the bottom of the flexible elbow 12 is connected with a spray head 13; a valve is arranged on the water outlet pipe 6 and connected with the top of the mounting platform 4; the top of the shunt valve 7 is provided with a plurality of groups of through holes which are connected with a plurality of groups of shunt tubes 8; the spherical connecting piece 9 is provided with a rubber sealing ring, and the rubber sealing ring is connected with the side seam of the connecting pipe 11; the spray head 13 is provided with an atomizing head, and the spray head 13 and the flexible bent pipe 12 are symmetrically arranged at two sides of the flow dividing valve 7; the water inlet pipe 1 is provided with a connecting flange which is provided with a fixed connecting hole.
In this embodiment, can effectual improvement this device's installation fixed stability through the combination of slope support 2 and support holder 3, when this device is in operating condition, can be convenient for this device installation butt joint through inlet tube 1, can avoid rivers fluid to produce the biasing impact to the valve body inner wall through vertically current-limiting valve 5, thereby the life of this device has been prolonged, can be convenient for this device control through flow divider 7 and control lever, the structure of rotating support 10 can prevent that connecting pipe 11 from excessively rotating, thereby avoided the junction to take place to leak when having improved the stability of this device, the waste proportion of side that can effectual reduction this device through the combination of shower nozzle 13 and flexible return bend 12, thereby make this device dust fall direction more clear and definite.
Example two
As shown in fig. 2-3, compared with the first embodiment, the high-efficiency dust settling device for a building construction site provided by the present invention has the advantages that in the first embodiment, ground nails are arranged on the bottom of the support frame 3, the telescopic columns are arranged on the support frame 3, and sliding damping devices are arranged on the side surfaces of the telescopic columns; the side of the mounting platform 4 is provided with a locking device, and the locking device is connected with the joint of the inclined bracket 2 and the mounting platform 3 in a damping manner.
The utility model discloses an in the embodiment, the combination of ground nail and flexible post can make this device can adapt to different service environment, improves compatibility, can prevent through the locking device that slope support 2 from taking place to slide.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited thereto, and various changes can be made without departing from the gist of the present invention within the scope of knowledge possessed by those skilled in the art.

Claims (8)

1. A high-efficiency dust-settling device for a building construction site is characterized by comprising a water inlet pipe (1), an inclined support (2), a support (3), a mounting platform (4), a flow limiting valve (5), a water outlet pipe (6), a flow dividing valve (7), a flow dividing pipe (8), a spherical connecting piece (9), a rotating support (10), a connecting pipe (11), a flexible bent pipe (12) and a spray head (13);
the water inlet pipe (1) is connected with the side surface of the flow limiting valve (5); the bottom of the flow limiting valve (5) is connected with the mounting platform (4); the bottom of the mounting platform (4) is connected with the support bracket (3) in a sliding way; the side surface of the mounting platform (4) is rotationally connected with the inclined bracket (2); the side surface of the mounting platform (4) is connected with a water outlet pipe (6); one end of the flow limiting valve (5) far away from the water inlet pipe (1) is connected with the water outlet pipe (6); the top of the flow limiting valve (5) is connected with the flow dividing valve (7); a control rod is arranged on the side surface of the shunt valve (7), and the top of the shunt valve (7) is connected with a plurality of groups of shunt tubes (8); one end of the shunt pipe (8) far away from the shunt valve (7) is connected with the spherical connecting piece (9); the spherical connecting piece (9) is rotationally connected with the connecting pipe (11); the side surface of the connecting pipe (11) is connected with the rotating bracket (10); the rotating bracket (10) is rotationally connected with the spherical connecting piece (9); one end of the connecting pipe (11) far away from the spherical connecting piece (9) is connected with the flexible elbow (12); the bottom of the flexible elbow (12) is connected with the spray head (13).
2. The efficient dust falling device for the building construction site as claimed in claim 1, wherein ground nails are arranged at the bottom of the support bracket (3), the telescopic column is arranged on the support bracket (3), and a sliding damping device is arranged on the side surface of the telescopic column.
3. The efficient dust settling device for the building construction site as claimed in claim 1, wherein a valve is arranged on the water outlet pipe (6) and connected with the top of the mounting platform (4).
4. The efficient dust settling device for the building construction site as claimed in claim 1, wherein a plurality of groups of through holes are formed in the top of the flow dividing valve (7), and the through holes are connected with the plurality of groups of flow dividing pipes (8).
5. The efficient dust falling device for the building construction site as claimed in claim 1, wherein a locking device is arranged on the side surface of the mounting platform (4), and the locking device is in damping connection with the joint of the inclined bracket (2) and the mounting platform (4).
6. The efficient dust falling device for the building construction site as claimed in claim 1, wherein a rubber sealing ring is arranged on the spherical connecting piece (9), and the rubber sealing ring is connected with a side seam of the connecting pipe (11).
7. The efficient dust falling device for the building construction site as claimed in claim 1, wherein an atomizing head is arranged on the spray head (13), and the spray head (13) and the flexible elbow (12) are symmetrically arranged on two sides of the flow divider (7).
8. The efficient dust settling device for the building construction site as claimed in claim 1, wherein the water inlet pipe (1) is provided with a connecting flange, and the connecting flange is provided with a fixed connecting hole.
CN202220774960.3U 2022-04-06 2022-04-06 Building construction place is with high-efficient dust device Active CN217092703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220774960.3U CN217092703U (en) 2022-04-06 2022-04-06 Building construction place is with high-efficient dust device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220774960.3U CN217092703U (en) 2022-04-06 2022-04-06 Building construction place is with high-efficient dust device

Publications (1)

Publication Number Publication Date
CN217092703U true CN217092703U (en) 2022-08-02

Family

ID=82578255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220774960.3U Active CN217092703U (en) 2022-04-06 2022-04-06 Building construction place is with high-efficient dust device

Country Status (1)

Country Link
CN (1) CN217092703U (en)

Similar Documents

Publication Publication Date Title
CN217092703U (en) Building construction place is with high-efficient dust device
CN105544981A (en) Dust collection device for building site
CN107034830A (en) It is a kind of can convenient cleaning roads traffic indication board spray truck
CN209643504U (en) A kind of Chinese garden planting hand propelled watering appliance
CN206868471U (en) A kind of environmental project sprayer unit
CN216219279U (en) Municipal garden is with automatic water spraying device
CN215161394U (en) Anti-blocking anaerobic rotational flow water distribution device
CN210987863U (en) Pesticide spraying device for agricultural machinery
CN210229489U (en) Atomizer for municipal administration dust fall
CN207970641U (en) Spraying system for oil fume purifier
CN112482291A (en) Dust device for construction
CN208095523U (en) A kind of hidden afforestation humidifier
CN206473951U (en) A kind of construction site tower crane spray system
CN215311075U (en) Environment-friendly equipment for humidifying and dedusting
CN209791153U (en) Automatic spraying device for building
CN216554655U (en) Injector, injector control system, and storage tank
CN216713308U (en) Intelligent integrated pump station
CN216714074U (en) Novel environmental protection engineering construction is with giving sound insulation device
CN213132572U (en) Acid mist exhaust treatment device with spray tower
CN215138171U (en) Dust device is used in house construction
CN215736193U (en) Green water saving fixtures that waters
CN108295589B (en) Construction site combination formula dust fall fog gun moving platform
CN213214659U (en) Ecological garden sponge city drainage device
CN212612217U (en) Urban road watering lorry
CN215610232U (en) Outer frame spraying dust-settling system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant