CN217081683U - Pipe shed conduit guiding inserting device - Google Patents

Pipe shed conduit guiding inserting device Download PDF

Info

Publication number
CN217081683U
CN217081683U CN202122836292.0U CN202122836292U CN217081683U CN 217081683 U CN217081683 U CN 217081683U CN 202122836292 U CN202122836292 U CN 202122836292U CN 217081683 U CN217081683 U CN 217081683U
Authority
CN
China
Prior art keywords
plate
support
sliding
pipe
position control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122836292.0U
Other languages
Chinese (zh)
Inventor
潘嘉诚
马嘉良
方维龙
杨健
韩宏刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communication South Road and Bridge Co Ltd
Original Assignee
China Communication South Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communication South Road and Bridge Co Ltd filed Critical China Communication South Road and Bridge Co Ltd
Priority to CN202122836292.0U priority Critical patent/CN217081683U/en
Application granted granted Critical
Publication of CN217081683U publication Critical patent/CN217081683U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model is suitable for a pipeline engineering technical field especially relates to a pipe shed pipe direction is inserted and is established device, including hole week soil body, hole week soil body surface is equipped with support bottom plate and support and props the mound in proper order, the top of support props the mound and is connected with two support vaulting poles that distribute relatively through propping the rod end hinge, two be equipped with vaulting pole positioning bolt between the support vaulting pole, vaulting pole positioning bolt both ends are connected with two support vaulting poles respectively through positioning bolt end hinge, the other end of support vaulting pole all is connected with the connection extension board through propping the rod end hinge, the connection extension board is connected with support landing slab through extension board fastening bolt, wherein the surface of support landing slab is equipped with the pilot hole rig, the output of pilot hole rig is connected with the pipe actuating lever, the pipe actuating lever is connected with the insert pipe, the bottom of pipe actuating lever is equipped with fixed hoop board; the utility model discloses an inclination of vaulting pole regulating bolt adjustment support vaulting pole, and then change the height of support platform board, reduced the degree of difficulty of setting up of construction support platform.

Description

Pipe shed conduit guiding inserting device
Technical Field
The utility model relates to a pipeline engineering technical field specifically is pipe shed pipe direction is inserted and is established the device.
Background
The pipe shed conduit is used as an important structure of the advance support of the tunnel, is widely applied to tunnel engineering, and the key and difficult point of engineering technology research is how to reduce the construction efficiency of support erection, improve the construction quality of conduit drilling and reduce the difficulty of casing replacement construction.
In the prior art, there is a tube inserting mechanism for automatically inserting a tube body, including a tube feeding unit for feeding a tube belt, a cutting unit for cutting the tube belt into tubes of a required length is arranged on a conveying path of the tube feeding unit, a guide pillar arranged along the outlet end of the tube feeding unit for supporting the cut tubes of a fixed length is arranged at the outlet end of the tube feeding unit, and the tubes are sleeved on the guide pillar; this technique can be effectual carries appointed position with the intubate, but is difficult to solve the accurate direction of pipe and convenient change scheduling problem.
In view of this, in order to improve the construction quality of pipe shed pipe guide insertion, the present invention is urgently needed to provide a pipe shed pipe guide insertion device which can improve the supporting efficiency of the support platform plate and reduce the insertion construction difficulty of the inserted pipe.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipe shed pipe direction is inserted and is established the device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
pipe canopy pipe direction is inserted and is established device, including hole week soil body, hole week soil body surface is equipped with support bottom plate and support in proper order props the mound, the support props the top of mound and is connected with two relative distribution's support vaulting pole, two through propping the end hinge of pole be equipped with vaulting pole positioning bolt between the support vaulting pole, and vaulting pole positioning bolt both ends are connected with two support vaulting poles respectively through positioning bolt end hinge, and the other end of support vaulting pole all is connected with the connection extension board through the end hinge of pole, and the connection extension board is connected with support landing slab through extension board fastening bolt, and wherein the surface of support landing slab is equipped with the pilot hole rig, and the output of pilot hole rig is connected with the pipe actuating lever, the pipe actuating lever is connected with the insert pipe, the bottom of pipe actuating lever is equipped with fixed hoop board, fixed hoop board is connected with accuse position mechanism.
Further: the stay bar positioning bolt comprises a screw rod and a bolt, and the fastening directions of the screw rods on the two sides of the bolt are opposite.
Further: the outer side of the inserted conduit is provided with a hole cover arch, and the hole cover arch is firmly connected with the support platform plate through a cover arch connecting rib.
Further: the fixed hoop plate is arc in cross section, the top end of the fixed hoop plate is rotatably connected with two rotating hoop plates which are distributed oppositely through the hoop plate rotating hinge, the other end of each rotating hoop plate is provided with a hoop plate ear plate, and each hoop plate ear plate is connected with an ear plate fastening bolt.
Further: the position control mechanism comprises a first sliding plate, the first sliding plate is connected with the fixed hoop plate through a hoop plate connecting rib, the hoop plate connecting rib is connected with a first position control connecting plate, the first position control connecting plate is connected with a second position control connecting plate through a first position control body, and the second position control connecting plate is connected with a third position control connecting plate through a second position control body.
Further: and the first control body and the second control body both adopt hydraulic jacks.
Further: the surface of the support platform plate is paved with a second sliding groove, the second sliding groove is connected with a second sliding plate in a sliding mode, and the second position control connecting plate is fixed on the surface of the second sliding plate.
Further: the surface of second slide is equipped with first spout, and first spout sliding connection has first slide, first slide and hoop board splice bar fixed connection.
Further: the two ends of the hoop plate connecting rib are respectively welded with the first sliding plate and the fixed hoop plate, and the outer side wall of the hoop plate connecting rib is perpendicularly welded with the first position control connecting plate.
Further: the second sliding groove and the first sliding groove are respectively provided with sliding grooves with inverted T-shaped cross sections, and the first sliding plate and the second sliding plate can slide along the directions of the two sliding grooves respectively.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses an inclination of vaulting pole regulating bolt adjustment support vaulting pole, and then change the height of support platform board, reduced the degree of difficulty of setting up of construction support platform.
(2) The utility model discloses a plane position of first accuse position body and second accuse position body adjustment pipe actuating lever has reduced the artifical work load that moves the pipe when taking over the construction, has improved the degree of accuracy of connection location.
Drawings
Fig. 1 is a schematic view of the pipe shed pipe guiding and inserting device of the present invention;
fig. 2 is a schematic sectional view of the catheter drive rod of fig. 1 in a plane-shifted configuration.
In the figure: 1-soil body around the hole; 2-arch sheathing of the opening; 3-a support base plate; 4-support pier supporting; 5-hinging the end of the stay bar; 6-a stent strut; 7-connecting the support plate; 8-a support platform plate; 9-a support plate fastening bolt; 10-a second chute; 11-a second sled; 12-a first runner; 13-a glide channel; 14-a first sled; 15-hoop plate connecting ribs; 16-fixed hoop plate; 17-a second position control connecting plate; 18-a first position control connecting plate; 19-a first control body; 20-a third control tie plate; 21-a second control body; 22-a catheter drive shaft; 23-a pilot hole drill; 24-inserting a catheter; 25-ear plate fastening bolt; 26-a hoop plate ear plate; 27-a strut positioning bolt; 28-positioning bolt end hinge; 29-rotating the hoop plate; 30-the hoop plate is hinged in a rotating way; 31-set arch connecting ribs.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The following detailed description is provided for the specific embodiments of the present invention.
In this embodiment, referring to fig. 1-2, a pipe shed guide pipe insertion device includes a soil body 1 around a hole, a support bottom plate 3 and a support supporting pier 4 are sequentially disposed on the surface of the soil body 1 around the hole, the top end of the support supporting pier 4 is connected with two support supporting rods 6 which are distributed oppositely through a supporting rod end hinge 5, a supporting rod positioning bolt 27 is disposed between the two support supporting rods 6, both ends of the supporting rod positioning bolt 27 are respectively connected with the two support supporting rods 6 through positioning bolt end hinges 28, the supporting rod positioning bolt 27 includes a screw rod and a bolt, fastening directions of the screw rods on both sides of the bolt are opposite, the other end of each support supporting rod 6 is connected with a connecting supporting plate 7 through a supporting rod end hinge 5, the connecting supporting plate 7 is connected with a support platform plate 9 through a supporting plate fastening bolt 9, wherein a guiding hole drilling machine 23 is disposed on the surface of the support platform plate 9, an output end of the guiding hole drilling machine 23 is connected with a guide pipe driving rod 22, the utility model discloses a catheter drive pole, including catheter drive pole 22, insert pipe 24, fixed hoop plate 16, hoop plate rotating hinge 30, catheter drive pole 22 is connected with insert pipe 24, the outside of insert pipe 24 is equipped with the entrance to a cave cover and encircles 2, entrance to a cave cover encircles 2 and encircles 31 and 8 firm connections of support platform boards through the cover, catheter drive pole 22's bottom is equipped with fixed hoop plate 16, fixed hoop plate 16 cross-section is arc, and fixed hoop plate 16's top is rotated through the hoop plate and is connected with two relative distribution's rotation hoop plate 29, and rotation hoop plate 29 other end is equipped with hoop plate otic placode 26, and hoop plate otic placode 26 is connected with otic placode gim 25, fixed hoop plate 16 is connected with accuse position mechanism.
In the embodiment, when the device is used, the guide pipe driving rod 22 is arranged on the fixed hoop plate 16, one end of the guide pipe driving rod 22 is connected with the hole guiding drilling machine 23, the other end of the guide pipe driving rod is connected with the inserting guide pipe 24, and the inserting construction of the inserting guide pipe 24 is carried out; during the construction of the connecting pipe, the connection between the conduit driving rod 22 and the inserted conduit 24 is firstly released, then the hoop plate ear plates 26 with opposite mirror images are firmly connected through the ear plate fastening bolts 25, then the plane position of the conduit driving rod 22 is adjusted through the position control mechanism, in addition, the inclination angle of the support brace rod 6 can be adjusted through the brace rod adjusting bolt, further the height of the support platform plate 8 is changed, the erection difficulty of the construction support platform is reduced,
wherein the soil body 1 around the hole is strongly weathered sandstone, the cover arch 2 of the hole is made of reinforced concrete material with the strength grade of C35, the bracket bottom plate 3 is made of steel plate with the thickness of 10mm, the cross section of the steel plate is rectangular, the width of the steel plate is 2m, the length of the steel plate is 3m, the bracket support pier 4 is rolled by a steel pipe with the diameter of 300mm, two groups of bracket support piers 4 are arranged on the bracket bottom plate 3, the support rod end hinge 5 is a spherical hinge with the diameter of 300mm, the bracket support rod 6 is rolled by a steel pipe with the diameter of 100mm, the support rod position adjusting bolt 27 comprises a screw rod and a bolt with the diameter of 60mm, the position adjusting bolt end hinge 28 is a spherical hinge with the diameter of 60mm, the connecting support plate 7 is rolled by a steel plate with the thickness of 10mm, the bracket platform plate 8 is rolled by a steel plate with the thickness of 10mm, the support plate fastening bolt 9 is formed by combining a screw rod and a bolt with the diameter of 30mm, the hoop plate connecting rib 15 is rolled into a square steel pipe with the thickness of 10mm, fixed hoop plate 16 adopts the steel sheet rolling of thickness 10mm to form, the cross section is arc, the central angle is 45, it forms to rotate hoop plate 29 and adopts the steel sheet rolling of thickness 10mm, the cross section is arc, pipe actuating lever 22 adopts the diameter to be 100 mm's circular steel tube, the threading rig 23 is the rig that operating voltage is 220V, insert pipe 24 and adopt the diameter to be 100 mm's circular steel tube, otic placode gim peg 25 adopts the diameter to be 20 mm's bolt, hoop placode otic placode 26 highly is 10cm, predetermine the hole that supplies otic placode gim peg 25 to pass on hoop placode otic placode 26, hoop plate rotation hinge 30 adopts the diameter to be 10 mm's hinge, cover encircles splice bar 31 and adopts the diameter to form for 30 mm's screw rod and nut combination.
In another embodiment, referring to fig. 1-2, the position control mechanism includes a first sliding plate 14, the first sliding plate 14 is connected to a fixed hoop plate 16 through a hoop plate connecting rib 15, the hoop plate connecting rib 15 is connected to a first position control connecting plate 18, the first position control connecting plate 18 is connected to a second position control connecting plate 17 through a first position control body 19, the second position control connecting plate 17 is connected to a third position control connecting plate 20 through a second position control body 21, the first position control body 19 and the second position control body 21 both use hydraulic jacks, a second sliding slot 10 is laid on the surface of the support platform plate 8, the second sliding slot 10 is slidably connected to a second sliding plate 11, the second position control connecting plate 17 is fixed on the surface of the second sliding plate 11, a first sliding slot 12 is arranged on the surface of the second sliding plate 11, the first sliding slot 12 is slidably connected to the first sliding plate 14, the first sliding plate 14 is fixedly connected to the hoop plate connecting rib 15, the two ends of the hoop plate connecting rib 15 are respectively welded with the first sliding plate 14 and the fixed hoop plate 16, the outer side wall of the hoop plate connecting rib 15 is perpendicularly welded with the first position control connecting plate 18, the sliding channel 13 with the cross section being in an inverted T shape is respectively arranged on the second sliding groove 10 and the first sliding groove 12, and the first sliding plate 14 and the second sliding plate 11 can respectively slide along two directions of the sliding channel 13.
In the embodiment, during the pipe connecting construction, the plane position of the catheter driving rod 22 is adjusted through the first control body 19 and the second control body 21, so that the workload of manual pipe moving during the pipe connecting construction is reduced, and the accuracy of connection positioning is improved.
The second sliding groove 10 and the first sliding groove 12 are formed by rolling steel plates with the thickness of 10mm, the first sliding plate 14 and the second sliding plate 11 are formed by rolling steel plates with the thickness of 10mm, the width of the sliding channel 13 is 280mm, the height of the sliding channel is 10mm, and the second position control connecting plate 17, the first position control connecting plate 18 and the third position control connecting plate 20 are formed by rolling steel plates with the thickness of 10 mm.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (10)

1. The pipe shed conduit guiding and inserting device comprises a soil body around a hole; the hole-surrounding soil body surface is sequentially provided with a support bottom plate and a support supporting pier, the top end of the support supporting pier is connected with two support rods which are distributed oppositely through support rod end hinges, two support rod positioning bolts are arranged between the support rods, two ends of each support rod positioning bolt are respectively connected with the two support rods through positioning bolt end hinges, the other ends of the support rods are connected with connecting support plates through support rod end hinges, the connecting support plates are connected with support platform plates through support plate fastening bolts, a hole-leading drilling machine is arranged on the surface of each support platform plate, the output end of the hole-leading drilling machine is connected with a guide pipe driving rod, the guide pipe driving rod is connected with an inserted guide pipe, the bottom end of the guide pipe driving rod is provided with a fixed hoop plate, and the fixed hoop plate is connected with a position control mechanism.
2. The pipe shed duct guiding and inserting device as claimed in claim 1, wherein the stay rod positioning bolt comprises a screw rod and a bolt, and the fastening directions of the screw rods on the two sides of the bolt are opposite.
3. The pipe shed conduit guiding insertion device as claimed in claim 1, wherein the outside of the insertion conduit is provided with a hole cover arch, and the hole cover arch is firmly connected with the support platform plate through a cover arch connecting rib.
4. The pipe shed conduit guiding inserting device as claimed in claim 1, wherein the cross section of the fixed hoop plate is circular arc-shaped, the top end of the fixed hoop plate is rotatably connected with two oppositely distributed rotating hoop plates through a hoop plate rotating hinge, the other end of the rotating hoop plate is provided with a hoop plate ear plate, and the hoop plate ear plate is connected with an ear plate fastening bolt.
5. The pipe shed conduit guiding insertion device as claimed in claim 1, wherein the position control mechanism comprises a first slide plate, the first slide plate is connected with the fixed hoop plate through a hoop plate connecting rib, the hoop plate connecting rib is connected with a first position control connecting plate, the first position control connecting plate is connected with a second position control connecting plate through a first position control body, and the second position control connecting plate is connected with a third position control connecting plate through a second position control body.
6. The pipe shed conduit guiding insertion device as claimed in claim 5, wherein the first control body and the second control body each employ a hydraulic jack.
7. The pipe shed conduit guiding and inserting device as claimed in claim 5, wherein a second sliding groove is laid on the surface of the support platform plate, a second sliding plate is connected to the second sliding groove in a sliding manner, and the second position control connecting plate is fixed on the surface of the second sliding plate.
8. The pipe shed conduit guiding and inserting device as claimed in claim 7, wherein the surface of the second sliding plate is provided with a first sliding groove, the first sliding groove is slidably connected with a first sliding plate, and the first sliding plate is fixedly connected with the hoop plate connecting rib.
9. The pipe shed conduit guiding and inserting device as claimed in claim 8, wherein both ends of the hoop plate connecting bar are respectively welded with the first sliding plate and the fixed hoop plate, and the outer side wall of the hoop plate connecting bar is vertically welded with the first position control connecting plate.
10. The pipe shed conduit guiding and inserting device as claimed in claim 8, wherein the second sliding chute and the first sliding chute are respectively provided with sliding channels with inverted T-shaped cross sections, and the first sliding plate and the second sliding plate can respectively slide along the directions of the two sliding channels.
CN202122836292.0U 2021-11-19 2021-11-19 Pipe shed conduit guiding inserting device Active CN217081683U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122836292.0U CN217081683U (en) 2021-11-19 2021-11-19 Pipe shed conduit guiding inserting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122836292.0U CN217081683U (en) 2021-11-19 2021-11-19 Pipe shed conduit guiding inserting device

Publications (1)

Publication Number Publication Date
CN217081683U true CN217081683U (en) 2022-07-29

Family

ID=82537628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122836292.0U Active CN217081683U (en) 2021-11-19 2021-11-19 Pipe shed conduit guiding inserting device

Country Status (1)

Country Link
CN (1) CN217081683U (en)

Similar Documents

Publication Publication Date Title
US4115976A (en) Method for screeding cement
CN212272249U (en) Supporting device for tunnel section
CN201025038Y (en) Adjustable pre-stress steel arch frame
CN113969795B (en) Excavation supporting structure and construction method of tunnel
CN217081683U (en) Pipe shed conduit guiding inserting device
CN114922661B (en) Miniature reinforcing pile for concrete pipe sheet of shield tunnel
CN210461936U (en) Municipal water supply pipeline strutting arrangement
CN2360518Y (en) Single wall climbing form
CN112575791B (en) Foundation pit supporting structure and construction method thereof
CN212427124U (en) Municipal pipeline foundation pit protective structure
CN111236988A (en) Tunnel arch top steel bow member auxiliary installation device
CN210917382U (en) Foundation pit supporting structure
CN211547749U (en) Inner supporting structure for foundation pit
CN213269065U (en) A building bearing diagonal structure for construction
CN212477760U (en) Pipeline groove supporting construction
CN211623339U (en) Advanced small catheter support
CN113775156A (en) Concrete crash barrier top surface folding device
CN214364954U (en) Side form bracing piece for building
CN211817975U (en) Constructional column bracket construction template mounting structure
CN206346201U (en) A kind of sand control alignment system for being used to lay lattice column
CN217174784U (en) Concrete grouting device for building construction
CN219972880U (en) A template reinforcing apparatus that is used for steady bilayer of water to link to spread
CN220468564U (en) Formwork support device for highway engineering
KR102191937B1 (en) Plastering equipment for on-site laying of auxiliary pipes for sewage pipes
CN218479169U (en) Pile foundation steel reinforcement cage top centering location frock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant