CN217079650U - Green building combination steel form - Google Patents

Green building combination steel form Download PDF

Info

Publication number
CN217079650U
CN217079650U CN202220618859.9U CN202220618859U CN217079650U CN 217079650 U CN217079650 U CN 217079650U CN 202220618859 U CN202220618859 U CN 202220618859U CN 217079650 U CN217079650 U CN 217079650U
Authority
CN
China
Prior art keywords
processing
green building
buckle
sliding
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220618859.9U
Other languages
Chinese (zh)
Inventor
郑龙
郑创雄
黄锴
叶淼
叶东鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jian'an Municipal Engineering Co ltd
Original Assignee
Guangdong Jian'an Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jian'an Municipal Engineering Co ltd filed Critical Guangdong Jian'an Municipal Engineering Co ltd
Priority to CN202220618859.9U priority Critical patent/CN217079650U/en
Application granted granted Critical
Publication of CN217079650U publication Critical patent/CN217079650U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The application discloses green building combination steel form belongs to building templates technical field, including the processing case, the last surface mounting of processing case has two cardboards, and the mounting bracket is installed jointly to the upper surface of two cardboards, and the upper bracket has been placed on the right side of mounting bracket, and the joint buckle is installed jointly to the surface of upper bracket and the surface of mounting bracket, and the promotion hydraulic stem that the equidistance was arranged is installed to the inner diapire of processing case. This green building combination steel form, through being provided with the processing case, the cardboard, the mounting bracket, the upper bracket, the joint buckle, promote the hydraulic stem, a supporting plate, the cooperation of outer baffle and removal processing board, can make the drawing of patterns concrete of processing in removing the processing board, more convenient provides power through promoting the hydraulic stem, make the concrete draw the position that needs to use through removing the processing board, play the convenience and make up the steel form card outside the wall body with processing, conveniently make the effect that the good concrete of processing removed the position that needs to use.

Description

Green building combination steel form
Technical Field
This application belongs to building templates technical field, especially relates to a green building combination steel form.
Background
The combined steel formwork, also called combined small shaped steel formwork or small steel formwork, mainly includes plane formwork, internal corner formwork, external corner formwork, connecting corner formwork, etc. it can be combined into large formwork of beam, column, wall and floor slab according to design requirements in advance, and can be integrally hoisted in place, and also can adopt bulk loose-dismantling method, so that it is convenient for construction, strong in universality, easy to assemble and has many turnover times.
In the process of implementing the application, the inventor finds that at least the following problems exist in the technology: the existing green building combined steel template can not be directly processed nearby a used template conveniently, and is very inconvenient.
Therefore, a green building combined steel template is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The purpose of this application is in order to solve prior art, can not be comparatively convenient direct near processing using the template, very inconvenient problem, and the green building combination steel form that provides.
In order to achieve the purpose, the following technical scheme is adopted in the application:
the utility model provides a green building combination steel form, includes the processing case, the last surface mounting of processing case has two cardboards, two the mounting bracket is installed jointly to the upper surface of cardboard, the upper bracket has been placed on the right side of mounting bracket, the joint buckle is installed jointly to the surface of upper bracket and the surface of mounting bracket, the promotion hydraulic stem that the equidistance was arranged is installed to the interior diapire of processing case, and is three the flexible end that promotes the hydraulic stem is connected with the backup pad jointly, the surface mounting of backup pad has the external baffle, the inside joint of external baffle has the removal processing board.
Through setting up promotion hydraulic stem, backup pad, outer baffle and removal processing board, realized utilizing the power that the promotion hydraulic stem provided, made backup pad and outer baffle remove in the processing incasement to make the removal processing board can be convenient remove in the cardboard.
Preferably, two the cardboard is kept away from each other one side all seted up the removal spout, two fixed slider is all installed to the cardboard one side that is close to each other, two the inside common sliding connection that removes the spout has the slip case, every group fixed slider difference sliding connection in the front of slip case and the back of slip case, the slip case joint is in the inside of outer baffle, the bottom surface of slip case contacts with the upper surface of backup pad.
Through setting up removal spout, fixed slider and slip case, realized utilizing removal spout and fixed slider, make slip case and outer baffle can be comparatively convenient slide in the cardboard to utilize the slip case, make the processing of solidifying in inside that the concrete can be better.
Preferably, two first fixed columns are installed on one side face, close to each other, of each clamping plate, two groups of ends, far away from each other, of the first fixed columns are fixedly connected with the bottom face of the installation frame and the upper surface of the processing box respectively, and the right side face of each group of the first fixed columns is in contact with the left side face of the outer baffle.
Through setting up first fixed column, realized making the slip case and removing the removal in the cardboard that the processing board can stabilize, utilize first fixed column to block the slip case and remove the processing board, avoid moving insecure and the problem that drops in the cardboard as far as possible.
Preferably, the two groups of first fixed columns are connected with a stabilizing plate at one end close to each other, two second fixed columns are installed on one side face of the two clamping plates close to each other, and one ends, far away from each other, of the two second fixed columns are fixedly connected with the bottom face of the mounting frame and the upper surface of the processing box respectively.
Through setting up firm board and second fixed column, realized utilizing firm board to consolidate first fixed column to utilize the second fixed column, make the slip case and remove the removal that the processing board can further stabilize and remove in the cardboard.
Preferably, two sets of ventilation holes are all seted up to the both sides face of processing case, the ventilation hole is two sets of at least.
Through setting up the ventilation hole, realized the concrete of processing in slip case and removal processing board, can obtain better ventilation effect to accelerate the solidification of concrete, improve the work efficiency of device.
Preferably, a fixed wall is installed on the right side face of one of the second fixed columns, and the right side face of each clamping plate is fixedly connected with the left side face of the fixed wall.
Through setting up the fixed wall, realized can be connected whole structure and external more firmly to can guarantee the normal clear of engineering, also can reduce the incident that takes place because the engineering is insecure.
Preferably, two handles are installed on the right side face of the movable processing plate, and a lower support is installed on the right side face of the processing box.
Through setting up handle and lower carriage, realized pulling the removal board of processing through the handle to utilize the lower carriage to fix overall structure, the person of facilitating the use can be better processing manufacturing concrete.
Preferably, every the equal activity in bottom surface of joint buckle articulates there is movable buckle, every the equal threaded connection in inside of joint buckle and the inside of every activity buckle has fixing bolt, every fixing bolt's bottom all runs through joint buckle and activity buckle in proper order and extends to the below of activity buckle.
Through setting up activity buckle and fixing bolt, realized utilizing fixing bolt to make being connected of activity buckle and joint buckle, screw up fixing bolt through the manual work, can further guarantee the fastness of whole device.
To sum up, the technical effect and the advantage of this application: according to the combined steel template for the green building, the processing box, the clamping plate, the mounting frame, the upper support, the clamping buckle, the pushing hydraulic rod, the supporting plate, the outer baffle and the movable processing plate are matched, so that the demoulded concrete processed in the movable processing plate can be more conveniently pulled to a position needing to be used by pushing the hydraulic rod;
the processing box, the clamping plate and the mounting frame are firmly clamped on the upper support by utilizing the clamping buckle, so that the demolded concrete can be conveniently taken out from the movable processing plate by manpower, the demolded concrete can be conveniently and directly processed nearby a used template, a large-scale hoisting machine is not required to integrally hoist the large-scale template in place, the concrete only needs to be conveniently and quickly moved to a position required to be used by manpower, and the probability of damage in the moving process is reduced;
and utilize the power that the promotion hydraulic stem of fixing in the processing incasement provided, make backup pad, outer baffle and removal processing plate reciprocate in the cardboard, conveniently utilize electronic external force, take out the concrete of processing at the processing incasement, play and can conveniently make the effect that processed concrete removal needs service position at the outside of wall body with whole processing combination steel form card, come the convenient concrete that makes processing well.
Drawings
FIG. 1 is a schematic three-dimensional structure of a processing box according to the present application;
FIG. 2 is a perspective structural view of a baffle plate according to the present application;
FIG. 3 is a schematic rear view perspective structural view of the mobile tooling plate of the present application;
fig. 4 is a schematic perspective structural view of the support plate of the present application.
In the figure: 1. a lower bracket; 2. fixing a wall; 3. an upper bracket; 4. clamping a buckle; 5. a mounting frame; 6. a first fixed column; 7. a stabilizing plate; 8. clamping a plate; 9. a processing box; 10. pushing the hydraulic rod; 11. a slide box; 12. an outer baffle; 13. a vent hole; 14. moving the processing plate; 15. a second fixed column; 16. a handle; 17. a moving chute; 18. a movable buckle; 19. fixing the bolt; 20. fixing the sliding block; 21. and a support plate.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments.
Referring to fig. 1-2, a green building combination steel form, including processing case 9, the last surface mounting of processing case 9 has two cardboard 8, mounting bracket 5 is installed jointly to the upper surface of two cardboard 8, two sets of ventilation holes 13 have all been seted up to the both sides face of processing case 9, ventilation hole 13 is two sets of at least, through setting up ventilation hole 13, can make the concrete of processing in the structure, obtain better ventilation effect, thereby accelerate the solidification of concrete, reach the purpose that improves device work efficiency.
Referring to fig. 2-3, upper bracket 3 has been placed on the right side of mounting bracket 5, joint buckle 4 is installed jointly to the surface of upper bracket 3 and the surface of mounting bracket 5, the promotion hydraulic stem 10 that the equidistance was arranged is installed to the inner diapire of processing case 9, the equal activity of bottom surface of every joint buckle 4 articulates there is movable buckle 18, the equal threaded connection in inside of every joint buckle 4 and the inside of every movable buckle 18 has fixing bolt 19, the bottom of every fixing bolt 19 all runs through joint buckle 4 and movable buckle 18 in proper order and extends to the below of movable buckle 18, utilize movable buckle 18 and fixing bolt 19, can utilize fixing bolt 19 to connect movable buckle 18 and joint buckle 4, and tighten fixing bolt 19 through the manual work, play guarantees the effect of whole device fastness.
Referring to fig. 2-4, the telescopic ends of the three pushing hydraulic rods 10 are connected with a support plate 21 together, outer baffles 12 are mounted on two sides of the outer surface of the support plate 21, a movable processing plate 14 is clamped inside the outer baffles 12, the cross section of the processing plate 14 is in an L shape, movable sliding grooves 17 are formed in one side surface, away from each other, of each of the two clamping plates 8, a fixed sliding block 20 is mounted on one side surface, close to each other, of each of the two clamping plates 8, and a sliding box 11 is connected inside each of the two movable sliding grooves 17 in a sliding manner together;
every group fixed sliding block 20 difference sliding connection in the front of slip case 11 and the back of slip case 11, the bottom joint of slip case 11 is in the inside of outer baffle 12, the bottom surface of slip case 11 contacts with the upper surface of backup pad 21, slip case 11 is close to a lateral wall that removes processing board 14 and offers the breach that supplies to remove processing board 14 roll-off, through setting up removal spout 17, fixed sliding block 20 and slip case 11, utilize removal spout 17 and fixed sliding block 20, can make slip case 11 and outer baffle 12 comparatively convenient slip in cardboard 8, and utilize slip case 11, make things convenient for the inside solidification processing that makes the concrete at slip case 11.
Referring to fig. 1-2, two first fixed columns 6 are all installed to the side that two cardboard 8 are close to each other, the one end that two sets of first fixed columns 6 kept away from each other respectively with the bottom surface of mounting bracket 5 and the last fixed surface of processing case 9 is connected, the right flank of every group first fixed column 6 contacts with the left surface of overhead gage 12, utilize first fixed column 6, can make the firm removal in cardboard 8 of slip case 11 and removal processing board 14, and make first fixed column 6 stop slip case 11 and remove processing board 14 and do not drop, play the effect that further increases whole framework security.
Referring to fig. 1-2, the one end that two sets of first fixed columns 6 are close to each other is connected with firm board 7 jointly, two second fixed columns 15 are installed jointly to the side that two cardboard 8 are close to each other, the one end that two second fixed columns 15 are kept away from each other is connected with the bottom surface of mounting bracket 5 and the last fixed surface of processing case 9 respectively, through setting up firm board 7 and second fixed column 15, utilize firm board 7 to consolidate first fixed column 6, and utilize second fixed column 15, make that slide box 11 and removal processing board 14 can further stabilize move in cardboard 8, reach firm overall structure, improve the purpose of structure machining efficiency.
Referring to fig. 2, the fixed wall 2 is installed to the right flank of one of the second fixed columns 15, and the right flank of each clamping plate 8 is all fixedly connected with the left flank of the fixed wall 2, so that the fixed wall 2 is utilized to more firmly connect the whole structure with the outside, thereby ensuring the personal safety of users and avoiding the safety accidents caused by the insecure structure as much as possible.
Referring to fig. 2-3, two handles 16 are installed on the right side of the movable processing plate 14, the lower bracket 1 is installed on the right side of the processing box 9, the cross section of the lower bracket 1 is i-shaped, and the handles 16 can be used for pulling the movable processing plate 14 by arranging the handles 16 and the lower bracket 1, so that a worker can take out solidified concrete conveniently, and a user can process and manufacture the concrete better.
The working principle is as follows: when the green building combined steel formwork is used, firstly, the pushing hydraulic rod 10 is communicated with a power supply, when the green building combined steel formwork is required to be used for manufacturing concrete required to be used, the mounting frame 5, the clamping plate 8 and the processing box 9 which are connected together are connected with the upper support 3 through the clamping buckle 4 by manpower, the lower support 1 and the upper support 3 are both fixed with the outer wall of a wall, the fixed wall 2 is a platform required to use the concrete, and the whole structure is firmly clamped on one side of the lower support 1, the fixed wall 2 and the upper support 3 by utilizing the movable buckle 18, so that the concrete processed in the sliding box 11 and the movable processing plate 14 can be taken out conveniently;
then, the fixing bolt 19 penetrates through the clamping buckle 4 and the movable buckle 18 manually, so that the clamping buckle 4 and the movable buckle 18 are fixed tightly by the manual work, the whole structure can be connected with the fixed wall 2 and the upper bracket 3 more firmly, then the sliding box 11 and the movable processing plate 14 are clamped in the outer baffle 12 manually, and the sliding box 11 and the movable processing plate 14 are firmly clamped in the outer baffle 12 through the supporting plate 21;
then, the sliding box 11 and the movable processing plate 14 are filled with concrete manually, the concrete is solidified after a period of time, the power supply of the hydraulic rod 10 is pushed by control, the supporting plate 21 can drive the outer baffle 12 to move up and down, the sliding box 11 and the movable processing plate 14 can move up and down, when the bottom surface of the movable processing plate 14 is flush with the surface of the fixed wall 2, the handle 16 is pulled manually, the movable processing plate 14 is pulled out of the outer baffle 12, the solidified concrete is pulled to the fixed wall 2, the concrete is moved conveniently, and the damage probability during moving is reduced.
The above description is only for the preferred embodiments of the present application, but the scope of the present application is not limited thereto, and any person skilled in the art should be considered to be within the scope of the present application, and all equivalent substitutions and changes according to the technical solutions and the inventive concepts of the present application should be covered by the scope of the present application.

Claims (8)

1. The utility model provides a green building combination steel form, is including processing case (9), its characterized in that, the last surface mounting of processing case (9) has two cardboard (8), two mounting bracket (5) are installed jointly to the upper surface of cardboard (8), upper bracket (3) have been placed on the right side of mounting bracket (5), joint buckle (4) are installed jointly to the surface of upper bracket (3) and the surface of mounting bracket (5), promotion hydraulic stem (10) that the equidistance was arranged are installed to the inner diapire of processing case (9), and are three the flexible end of promotion hydraulic stem (10) is connected with backup pad (21) jointly, the surface mounting of backup pad (21) has outer baffle (12), the inside joint of outer baffle (12) has removal processing board (14).
2. The green building combined steel formwork according to claim 1, wherein moving sliding grooves (17) are formed in one side face, away from each other, of each of the two clamping plates (8), fixed sliding blocks (20) are mounted on one side face, close to each other, of each of the two clamping plates (8), sliding boxes (11) are connected inside the two moving sliding grooves (17) in a sliding mode, each group of fixed sliding blocks (20) are connected to the front face of each sliding box (11) and the back face of each sliding box (11) in a sliding mode, each sliding box (11) is connected to the inside of the outer baffle (12) in a clamping mode, and the bottom faces of the sliding boxes (11) are in contact with the upper surfaces of the supporting plates (21).
3. The green building combined steel formwork according to claim 1, wherein two first fixing columns (6) are mounted on one side face, close to each other, of each of the two clamping plates (8), one ends, far away from each other, of the two groups of first fixing columns (6) are fixedly connected with the bottom face of the mounting frame (5) and the upper surface of the processing box (9) respectively, and the right side face of each group of first fixing columns (6) is in contact with the left side face of the outer baffle plate (12).
4. The green building combined steel formwork according to claim 3, wherein one ends of the two groups of first fixing columns (6) close to each other are connected with a stabilizing plate (7) together, one side surfaces of the two clamping plates (8) close to each other are provided with two second fixing columns (15) together, and one ends of the two second fixing columns (15) far away from each other are fixedly connected with the bottom surface of the mounting frame (5) and the upper surface of the processing box (9) respectively.
5. The green building combined steel formwork of claim 1, wherein two groups of vent holes (13) are formed in two side surfaces of the processing box (9), and at least two groups of vent holes (13) are formed in the two side surfaces.
6. A green building combined steel formwork according to claim 4, wherein the right side surface of one of the second fixing columns (15) is provided with a fixing wall (2), and the right side surface of each clamping plate (8) is fixedly connected with the left side surface of the fixing wall (2).
7. A green building composite steel form as claimed in claim 1, wherein two handles (16) are installed on the right side of the mobile processing plate (14), and the lower bracket (1) is installed on the right side of the processing box (9).
8. The green building combined steel formwork according to claim 1, wherein the bottom surface of each clamping buckle (4) is movably hinged to a movable buckle (18), the inside of each clamping buckle (4) and the inside of each movable buckle (18) are respectively in threaded connection with a fixing bolt (19), and the bottom end of each fixing bolt (19) sequentially penetrates through the clamping buckles (4) and the movable buckles (18) and extends to the lower side of the movable buckles (18).
CN202220618859.9U 2022-03-21 2022-03-21 Green building combination steel form Active CN217079650U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220618859.9U CN217079650U (en) 2022-03-21 2022-03-21 Green building combination steel form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220618859.9U CN217079650U (en) 2022-03-21 2022-03-21 Green building combination steel form

Publications (1)

Publication Number Publication Date
CN217079650U true CN217079650U (en) 2022-07-29

Family

ID=82552112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220618859.9U Active CN217079650U (en) 2022-03-21 2022-03-21 Green building combination steel form

Country Status (1)

Country Link
CN (1) CN217079650U (en)

Similar Documents

Publication Publication Date Title
CN214272905U (en) Concrete building template for civil engineering
CN208009888U (en) A kind of high slidably building template of stability
CN211341736U (en) Be applied to chain building structure of building engineering's building
CN110303577B (en) Prefabricated bay window production die and assembling or disassembling method
CN210622302U (en) Pouring template for building construction
CN217079650U (en) Green building combination steel form
CN114704080A (en) Aluminum template and PC (polycarbonate) component combined mold hanging system and construction method
CN204781946U (en) Novel post die clamper
CN210850741U (en) Prefabricated window production mould that wafts
CN204571289U (en) A kind of construction formwork of overhang layer exterior wall preformed hole
CN216109672U (en) Modularization assembled building is pour and is used mould
CN212984323U (en) Reinforced concrete prefabricated composite slab component
CN210791405U (en) Prefabricated window frame mould subassembly that wafts
CN211104612U (en) Forming die for pressing refractory material
CN213440234U (en) Vertical mold production equipment for light partition board
CN205088944U (en) A building templates for concrete placement
CN211646646U (en) Adjustable ditch beam template
CN112123516A (en) Vertical mold production equipment for light partition board
CN217537843U (en) Mould system that hangs that aluminium template and PC component combine
CN201261217Y (en) T type light partition board mould machine
CN212826016U (en) Prefabricated plate mould
CN211850816U (en) Split type dismantled and assembled cold drawing side forms is used in shaping of PC superimposed sheet
CN217812555U (en) Early steel column of tearing open of basement formwork
CN217175711U (en) Constructional column aluminum formwork that can open door
CN212201253U (en) Building construction formwork support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant