CN217078729U - Prestressed square pile hoop - Google Patents

Prestressed square pile hoop Download PDF

Info

Publication number
CN217078729U
CN217078729U CN202122287207.XU CN202122287207U CN217078729U CN 217078729 U CN217078729 U CN 217078729U CN 202122287207 U CN202122287207 U CN 202122287207U CN 217078729 U CN217078729 U CN 217078729U
Authority
CN
China
Prior art keywords
square pile
steel plate
hoop
pile hoop
steel sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122287207.XU
Other languages
Chinese (zh)
Inventor
陈孝虎
彭成雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Liyin Building Material Science And Technology LLC
Original Assignee
Jiangsu Liyin Building Material Science And Technology LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Liyin Building Material Science And Technology LLC filed Critical Jiangsu Liyin Building Material Science And Technology LLC
Priority to CN202122287207.XU priority Critical patent/CN217078729U/en
Application granted granted Critical
Publication of CN217078729U publication Critical patent/CN217078729U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a prestressed square pile hoop in the technical field of square pile hoops, which comprises a square pile hoop, wherein the square pile hoop comprises a horizontal steel plate and a vertical steel plate, a groove is arranged at the central position of the outer wall at one side of the vertical steel plate, fixing components are arranged at two sides of the surface of the horizontal steel plate and the vertical steel plate, and a baffle is arranged at the front end surface of the horizontal steel plate and the vertical steel plate, the structure is reasonable, the utility model discloses a fixing component and a baffle are arranged, the square pile hoop is formed by combining the horizontal steel plate and the vertical steel plate and is reinforced by the fixing component, the front end of the square pile hoop is blocked by the baffle, an insert block is clamped in the groove, the welding operation is conveniently carried out after each accessory is fixed, the condition that the welding of the square pile hoop is not firm is prevented, the sealing effect of the square pile hoop is ensured, the structure is simple, the operation is convenient, and a large number of complicated steps are saved, the hoop stability of the prestressed square pile is effectively improved.

Description

Prestressed square pile hoop
Technical Field
The utility model relates to a square pile hoop technical field specifically is a prestressed square pile hoop.
Background
The square pile is divided into prestressed concrete according to the concrete strength grade and wall thickness, the prestressed high-strength concrete square pile is PC, the prestressed high-strength concrete square pile is PHS, the concrete strength of the PS pile is not lower than that of C60 concrete, the concrete strength grade of the PHC pile is not lower than that of C80, the PCS pile and the PTC pile are generally maintained by normal pressure steam, and generally can be driven after 28 days, while the PHS pile is subjected to autoclave steam curing after being demoulded, and is maintained by steam pressure of about 10 atmospheric pressure and 180 degrees, and the concrete strength grade reaches the shortest time of C80 from molding to use and only needs three or four days.
The existing prestressed square pile hoop has the following defects: most prestressing force square pile hoop simple structure and singleness, and then lead to appearing the insecure condition in the welding process, simultaneously, at the in-process of prestressing force square pile hoop transportation, the condition that also appears warping comparatively easily takes place.
Therefore, it is necessary to develop a prestressed square pile hoop.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prestressed square pile hoop, through being equipped with fixed subassembly and baffle, form square pile hoop by horizontal steel sheet and perpendicular steel sheet combination, and consolidate by fixed subassembly, separate the square pile hoop front end through the baffle and block, make the inserted block card go into in the recess, make things convenient for welding operation after each accessory is fixed, prevent the insecure condition of square pile hoop welding, guarantee the sealed effect of square pile hoop, with the insecure problem of prestressed square pile hoop welding of proposing among the solution above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prestressed square pile hoop, includes square pile hoop, square pile hoop includes horizontal steel sheet and perpendicular steel sheet, erect one side outer wall central point of steel sheet and put and set up flutedly, fixed subassembly is all installed with the surperficial both sides of erecting the steel sheet to horizontal steel sheet, the baffle is installed with the preceding terminal surface of erecting the steel sheet to horizontal steel sheet.
Preferably, mount pad A is all installed to the surperficial both sides of horizontal steel sheet, mount pad A's surface is equipped with clamp A, clamp A's internally mounted has prestressing tendons A.
Preferably, the central position of the surface of the groove is provided with a mounting hole A.
Preferably, mount pad B is all installed to one side outer wall top and the below of erecting the steel sheet, be equipped with clamp B on one side outer wall of mount pad B, clamp B's internally mounted has prestressing tendons B.
Preferably, the fixing component comprises outer angle steel and inner angle steel, and the outer angle steel is located on two sides of the outer surfaces of the transverse steel plate and the vertical steel plate.
Preferably, the inner angle steel is positioned on two sides of the inner wall of the transverse steel plate and the inner wall of the vertical steel plate.
Preferably, mounting holes B are formed in two sides of the surfaces of the outer angle steel and the inner angle steel, fastening bolts are arranged inside the mounting holes B, and the outer angle steel and the inner angle steel are connected through the fastening bolts.
Preferably, the inserted block is installed on both sides of the rear end face of the baffle, the outer wall of the inserted block is connected with the hole wall of the groove in a sliding mode, and a mounting hole C is formed in the center of the surface of the inserted block.
Compared with the prior art, the beneficial effects of the utility model are that:
the square pile hoop is formed by combining the transverse steel plate and the vertical steel plate, the outer angle steel on the fixing assembly is arranged on the outer sides of corners of the transverse steel plate and the vertical steel plate, the inner angle steel is arranged on the inner sides of the corners of the transverse steel plate and the vertical steel plate, and the transverse steel plate and the vertical steel plate are fixed by penetrating the mounting holes B through the fastening bolts, so that the transverse steel plate and the vertical steel plate can be connected and mounted, meanwhile, the stability of the square pile hoop is improved, and the deformation of the square pile hoop is reduced;
set up the baffle through the front end with horizontal steel sheet and perpendicular steel sheet, and one side that will erect the steel sheet sets up the recess, make the plug-in block outer wall on the baffle and the pore wall sliding connection of recess, can install and dismantle the baffle, through seting up mounting hole A in the groove, and set up mounting hole C on the plug-in block, correspond mounting hole C and mounting hole A, by fixing bolt fixed connection, fix at horizontal steel sheet and perpendicular steel sheet front end back when the baffle, weld again, operating personnel welding operation has been made things convenient for, prevent the insecure condition of square pile cover hoop welding, guarantee the sealed effect of square pile cover hoop, while simple structure, high durability and convenient operation, save a large amount of loaded down with trivial details steps, the effectual square pile hoop steadiness of prestressing force has been improved.
Drawings
FIG. 1 is a front sectional view of the present invention;
fig. 2 is a front view provided by the present invention;
fig. 3 is a front sectional view of the fixing member according to the present invention;
fig. 4 is a perspective view of a part of the square pile hoop structure provided by the present invention;
fig. 5 is a perspective view of the baffle structure provided by the present invention.
In the figure: 1. a square pile hoop; 2. a transverse steel plate; 201. a mounting seat A; 202. a clamp A; 203. a prestressed tendon A; 3. erecting a steel plate; 301. a groove; 302. a mounting hole A; 303. a mounting seat B; 304. a clamp B; 305. a prestressed tendon B; 4. a fixing assembly; 401. outer angle steel; 402. inner angle steel; 403. a mounting hole B; 404. fastening a bolt; 5. a baffle plate; 501. inserting a block; 502. and (7) installing holes C.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a following technical scheme: a prestressed square pile hoop can effectively enhance the stability of the prestressed square pile hoop in the using process, and a fixing component 4 and a baffle 5 are added, please refer to fig. 1-5, the prestressed square pile hoop comprises a square pile hoop 1, the square pile hoop 1 comprises a transverse steel plate 2 and a vertical steel plate 3, a groove 301 is formed in the center of the outer wall of one side of the vertical steel plate 3, the fixing component 4 is arranged on each of two sides of the surface of the transverse steel plate 2 and the surface of the vertical steel plate 3, and the baffle 5 is arranged on the front end face of each of the transverse steel plate 2 and the vertical steel plate 3;
furthermore, the installation bases A201 are installed on two sides of the surface of the transverse steel plate 2, the hoop A202 is arranged on the surface of the installation base A201, the prestressed tendon A203 is installed inside the hoop A202, specifically, the installation base A201 on the transverse steel plate 2 is provided with the hoop A202, the prestressed tendon A203 is inserted into the hoop A202, the prestressed tendon A203 can be installed, the problem that operators manufacture the hoop firstly and then penetrate the prestressed main tendon is effectively solved, and the working efficiency is improved;
furthermore, a mounting hole A302 is formed in the center of the surface of the groove 301, mounting seats B303 are mounted above and below the outer wall of one side of the vertical steel plate 3, a hoop B304 is arranged on the outer wall of one side of the mounting seat B303, a prestressed rib B305 is mounted inside the hoop B304, specifically, the mounting seat B303 on the vertical steel plate 3 is provided with the hoop B304, and the prestressed rib B305 is inserted into the hoop B304 to mount the prestressed rib B305, so that the problem that operators manufacture the hoops firstly and then penetrate the prestressed main reinforcements is solved effectively, and the working efficiency is improved;
further, the fixing component 4 comprises outer angle steels 401 and inner angle steels 402, the outer angle steels 401 are located on two sides of the outer surfaces of the transverse steel plates 2 and the vertical steel plates 3, the inner angle steels 402 are located on two sides of the inner walls of the transverse steel plates 2 and the vertical steel plates 3, mounting holes B403 are formed in two sides of the surfaces of the outer angle steels 401 and the inner angle steels 402, fastening bolts 404 are arranged inside the mounting holes B403, the outer angle steels 401 and the inner angle steels 402 are connected through the fastening bolts 404, specifically, the square pile hoop 1 is formed by combining the transverse steel plates 2 and the vertical steel plates 3, the outer angle steels 401 on the fixing component 4 are mounted on the outer sides of corners of the transverse steel plates 2 and the vertical steel plates 3, the inner angle steels 402 are mounted on the inner sides of the corners of the transverse steel plates 2 and the vertical steel plates 3, the transverse steel plates 2 and the vertical steel plates 3 can be connected and mounted through the fastening bolts 403 penetrating through the mounting holes B404, and meanwhile, the stability of the square pile hoop 1 is improved, the deformation of the square pile hoop 1 is reduced;
further, inserted block 501 is all installed to baffle 5's rear end face both sides, the outer wall of inserted block 501 and the pore wall sliding connection of recess 301, the mounting hole C502 has been seted up to inserted block 501's surperficial central point, it is specific, set up baffle 5 with horizontal steel sheet 2 and the front end of erecting steel sheet 3, and will erect one side of steel sheet 3 and set up recess 301, make inserted block 501 outer wall on the baffle 5 and the pore wall sliding connection of recess 301, can install and dismantle baffle 5, through set up mounting hole A302 in recess 301 department, and set up mounting hole C502 on inserted block 501, correspond mounting hole C502 with mounting hole A302, by fixing bolt fixed connection, after baffle 5 is fixed at horizontal steel sheet 2 and the front end of erecting steel sheet 3, the welding operation is made things convenient for operating personnel, prevent the insecure condition of square pile cuff 1 welding, guarantee the sealed cuff effect of square pile 1.
The working principle is as follows: when the utility model is used, the mounting seat A201 on the transverse steel plate 2 is provided with the clamp A202, the prestressed tendon A203 is inserted into the clamp A202, the prestressed tendon A203 can be mounted, the mounting seat B303 on the vertical steel plate 3 is provided with the clamp B304, the prestressed tendon B305 is inserted into the clamp B304, the prestressed tendon B305 can be mounted, the problem that operators firstly manufacture the clamp tendons and then penetrate the prestressed main tendons is effectively solved, the working efficiency is improved, the square pile hoop 1 is formed by combining the transverse steel plate 2 and the vertical steel plate 3, the outer angle steel 401 on the fixing component 4 is mounted at the outer sides of the corners of the transverse steel plate 2 and the vertical steel plate 3, the inner angle steel 402 is mounted at the inner sides of the corners of the transverse steel plate 2 and the vertical steel plate 3, the transverse steel plate 2 and the vertical steel plate 3 can be connected and mounted through the fastening bolt 403 penetrating through the mounting hole B404 to fix the transverse steel plate 2 and the vertical steel plate 3, and the stability of the square pile 1 is improved, reduce the condition that the deformation appears in square pile cuff 1, the front end with horizontal steel sheet 2 and perpendicular steel sheet 3 sets up baffle 5, and one side that will erect steel sheet 3 sets up recess 301, make the plug 501 outer wall on baffle 5 and the pore wall sliding connection of recess 301, can install and dismantle baffle 5, through seting up mounting hole A302 in recess 301 department, and set up mounting hole C502 on plug 501, correspond mounting hole C502 and mounting hole A302, by fixing bolt fixed connection, fix behind horizontal steel sheet 2 and perpendicular steel sheet 3 front end when baffle 5, weld again, operating personnel welding operation has been made things convenient for, prevent the condition that square pile cuff 1 welds insecurely, guarantee square pile cuff 1 sealed effect, and is simple structure, high durability and convenient operation, a large amount of loaded down with trivial details steps are saved, the effectual square pile cuff prestress steadiness that has improved.
While the invention has been described above with reference to an embodiment, various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In particular, as long as there is no structural conflict, the various features of the disclosed embodiments of the present invention can be used in any combination with each other, and the description of such combinations is not exhaustive in the present specification only for the sake of brevity and resource conservation. Therefore, it is intended that the invention not be limited to the particular embodiments disclosed, but that the invention will include all embodiments falling within the scope of the appended claims.

Claims (8)

1. The utility model provides a prestressed square pile hoop, includes square pile hoop (1), its characterized in that: square pile hoop (1) is including horizontal steel sheet (2) and perpendicular steel sheet (3), erect one side outer wall central point of steel sheet (3) and put and set up fluted (301), fixed subassembly (4) are all installed to the surface both sides of horizontal steel sheet (2) and perpendicular steel sheet (3), baffle (5) are installed to the preceding terminal surface of horizontal steel sheet (2) and perpendicular steel sheet (3).
2. The pre-stressed square pile hoop of claim 1, wherein: the surface both sides of horizontal steel sheet (2) all install mount pad A (201), the surface of mount pad A (201) is equipped with clamp A (202), the internally mounted of clamp A (202) has prestressing tendons A (203).
3. The pre-stressed square pile hoop of claim 1, wherein: the central position of the surface of the groove (301) is provided with a mounting hole A (302).
4. The pre-stressed square pile hoop of claim 1, wherein: erect one side outer wall top and the below of steel sheet (3) and all install mount pad B (303), be equipped with clamp B (304) on one side outer wall of mount pad B (303), the internally mounted of clamp B (304) has prestressing tendons B (305).
5. The pre-stressed square pile hoop of claim 1, wherein: the fixed component (4) comprises outer angle steel (401) and inner angle steel (402), and the outer angle steel (401) is located on two sides of the outer surfaces of the transverse steel plate (2) and the vertical steel plate (3).
6. The pre-stressed square pile hoop of claim 5, wherein: the inner angle steel (402) is positioned on two sides of the inner wall of the transverse steel plate (2) and the inner wall of the vertical steel plate (3).
7. The pre-stressed square pile hoop of claim 5, wherein: mounting holes B (403) are formed in two sides of the surfaces of the outer angle steel (401) and the inner angle steel (402), fastening bolts (404) are arranged inside the mounting holes B (403), and the outer angle steel (401) and the inner angle steel (402) are connected through the fastening bolts (404).
8. The pre-stressed square pile hoop of claim 1, wherein: inserted block (501) are all installed to the rear end face both sides of baffle (5), the outer wall of inserted block (501) and the pore wall sliding connection of recess (301), mounting hole C (502) have been seted up to the surperficial central point of inserted block (501).
CN202122287207.XU 2021-09-22 2021-09-22 Prestressed square pile hoop Active CN217078729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122287207.XU CN217078729U (en) 2021-09-22 2021-09-22 Prestressed square pile hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122287207.XU CN217078729U (en) 2021-09-22 2021-09-22 Prestressed square pile hoop

Publications (1)

Publication Number Publication Date
CN217078729U true CN217078729U (en) 2022-07-29

Family

ID=82498135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122287207.XU Active CN217078729U (en) 2021-09-22 2021-09-22 Prestressed square pile hoop

Country Status (1)

Country Link
CN (1) CN217078729U (en)

Similar Documents

Publication Publication Date Title
CN217078729U (en) Prestressed square pile hoop
CN212000639U (en) Template splicing structure
CN216865982U (en) Adjustable fastener of circle limit fossil fragments
CN214575323U (en) Prefabricated exterior wall cladding connected node
CN213233925U (en) Assembled building curtain
CN210032246U (en) Plate-type embedded part of glass curtain wall
CN210858012U (en) Building templates link for civil engineering
CN210780634U (en) Component for connecting photovoltaic module and cable structure
CN216446496U (en) Assembly type construction formwork of assembly type building
CN217557640U (en) Building templates of environmental protection
CN210603807U (en) Vibrating table convenient to assemble
CN219118494U (en) Building decoration curtain wall assembly
CN220978402U (en) Building wall
CN214364062U (en) Steel construction factory building
CN219470949U (en) Combined steel supporting structure
CN218758283U (en) Lattice type support column for heavy steel workshop
CN216810428U (en) Prefabricated building prepositioning mounting structure
CN209817128U (en) Steel connection structure for steel right-angle connection
CN219060361U (en) Assembled connected node
CN214560259U (en) Steel form positioning tool
CN216713485U (en) Pre-assembly type steel structure building wall body plate installation framework installation assembly
CN217974807U (en) Connection structure for optimizing steel structure column
CN214575630U (en) Reinforced structure for aluminum template support
CN218466778U (en) Side direction buckle formula decorates wall structure fast
CN217630487U (en) Steel construction simple and easy room that can install fast

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant