CN217062941U - New energy centralized monitoring equipment based on one graph of power grid - Google Patents

New energy centralized monitoring equipment based on one graph of power grid Download PDF

Info

Publication number
CN217062941U
CN217062941U CN202122928520.7U CN202122928520U CN217062941U CN 217062941 U CN217062941 U CN 217062941U CN 202122928520 U CN202122928520 U CN 202122928520U CN 217062941 U CN217062941 U CN 217062941U
Authority
CN
China
Prior art keywords
inboard
centralized monitoring
install bin
new energy
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122928520.7U
Other languages
Chinese (zh)
Inventor
陈磊
谈明
叶淑君
杨洋
徐涛
董元球
杨鑫宇
王旭波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd Xiangshan County Power Supply Co
Original Assignee
State Grid Zhejiang Electric Power Co Ltd Xiangshan County Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Zhejiang Electric Power Co Ltd Xiangshan County Power Supply Co filed Critical State Grid Zhejiang Electric Power Co Ltd Xiangshan County Power Supply Co
Priority to CN202122928520.7U priority Critical patent/CN217062941U/en
Application granted granted Critical
Publication of CN217062941U publication Critical patent/CN217062941U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses a new forms of energy centralized monitoring equipment based on a picture of electric wire netting, including the device install bin, the inboard fixed mounting of device install bin has the position sleeve board, the inboard of position sleeve board is installed the elasticity cardboard, the press post is installed to the up end of elasticity cardboard, the device mounting bracket is installed to the below of position sleeve board in the inboard of device install bin, the equal sliding connection in both ends of device mounting bracket has the gib block, one side of device mounting bracket is provided with the bleeder vent, the connection terminal is installed to the one end of device install bin, one side fixed mounting of connection terminal has the insulating frame of protection, the inboard of connection terminal is provided with the wiring jack, the inboard that the one end of position sleeve board is located the device install bin installs pilot lamp installation shrouding. The utility model discloses a concentrate each wiring end to the electric wire netting and connect and the state demonstration, be convenient for carry out the centralized monitoring operation to the circuit in real time.

Description

New energy centralized monitoring equipment based on one graph of power grid
Technical Field
The utility model relates to a power grid technology field specifically is new forms of energy centralized monitoring equipment based on a picture of electric wire netting.
Background
With the rapid development of social economy, the living standard of people is continuously improved, so that the demand of social electricity consumption is higher and higher, the power dispatching is a crucial link, and the centralized control and monitoring of a power grid are more and more important with the higher coverage rate and the higher scale of the power grid by monitoring the operation condition of power grid equipment in the whole area.
The power dispatching is more and more intelligent, and a power grid diagram is proposed and realized. The power grid map refers to a maintenance scene, a fault scene, a new energy scene and a power supply protection scene; scanning in a maintenance scene in a real-time whole-network operation mode, actively analyzing the power grid risks existing in a fault and maintenance mode, and timely reminding a regulation and control person; in a new energy scene, installation and output are displayed layer by layer from a 500kV supply area to a distribution transformer, on the basis, new energy access margin analysis is performed, and analysis on new energy backward delivery during a load valley period is performed; the power protection scheme is flexibly customized and managed in the power protection and supply scene, the power protection diagram is automatically generated, and the functions of user classification, risk warning, main and standby power supply path display, checking of power protection scheme arrangement and the like are realized. When a real-time fault occurs, a 'power grid map' accurately positions and displays fault details by using a dispatching SCADA (supervisory control and data acquisition), distribution automation, service and distribution network fault command and other systems through a fault scene, and simultaneously calls main distribution cooperation transfer analysis to provide a fault handling scheme for a regulator. The implementation of a graph of the grid requires the use of centralized monitoring equipment.
However, the existing power grid is wide in distribution, incomplete in centralized monitoring and unstable in equipment during use and monitoring; therefore, the existing requirements are not met, and a new energy centralized monitoring device based on a power grid graph is proposed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a new forms of energy centralized monitoring equipment based on a picture of electric wire netting to solve the current electric wire netting wide distribution that proposes in the above-mentioned background art, centralized monitoring is imperfect, and uses when monitoring equipment unstability scheduling problem.
In order to achieve the above object, the utility model provides a following technical scheme: new energy centralized monitoring equipment based on one power grid map comprises a device installation box, wherein a positioning sleeve plate is fixedly arranged on the inner side of the device installation box, an elastic clamping plate is arranged on the inner side of the positioning sleeve plate, a pressing column is arranged on the upper end face of the elastic clamping plate, a device installation frame is arranged on the lower portion of the positioning sleeve plate and positioned on the inner side of the device installation box, guide strips are connected to the two ends of the device installation frame in a sliding mode, air holes are formed in one side of the device installation frame, a wiring seat is arranged at one end of the device installation box, a protective insulating frame is fixedly arranged on one side of the wiring seat, a wiring jack is arranged on the inner side of the wiring seat, an indicator lamp installation sealing plate is arranged on the inner side of the positioning sleeve plate, a connecting strip is fixedly arranged at one end of the indicator lamp installation sealing plate, and a connecting strip is connected to the inner side of the connecting strip in a sliding mode, one side of pilot lamp installation shrouding is provided with the pilot lamp body.
Preferably, a display screen is installed on one side of the device installation box, and a key operation area is arranged on one side, located on the device installation box, of one end of the display screen.
Preferably, pilot lamp installation shrouding passes through hinge connection with the device install bin, the material of pilot lamp installation shrouding is rigid plastic, pilot lamp installation shrouding passes through the screw connection with the pilot lamp body and fixes.
Preferably, the connecting strip is fixed with the indicator lamp mounting sealing plate through screw connection, the middle part of the connecting strip is connected with the connecting plug board through a positioning pin, and a clamping groove is formed in the lower end face of the connecting plug board.
Preferably, one end of the elastic clamping plate and the positioning sleeve plate are integrally formed in an injection molding mode, and the connecting plug board and the positioning sleeve plate are fixedly clamped through the elastic clamping plate.
Preferably, the bottom end of the pressing column penetrates through the upper end of the device installation box and the positioning sleeve plate and extends to the upper end face of the elastic clamping plate, and an insulating layer is arranged on the outer side of the pressing column.
Preferably, the one end of gib block passes through bolted connection with the device install bin and fixes, the inboard of gib block is provided with the spout, the both ends of device mounting bracket all extend to the inboard of spout.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a be provided with the spout in the inboard of gib block for the upper and lower both ends of device mounting bracket all extend to the inboard of spout, be convenient for through two gib blocks to the device mounting bracket installation of leading, and then realize the dismouting operation of being convenient for to the device mounting bracket, be provided with the wiring jack in the inboard of connection terminal, make through pegging graft the wiring end in the inboard of wiring jack, and then be convenient for connect connection terminal and device mounting bracket;
2. the utility model discloses an indicate the lamp body and can show each line state, the elasticity cardboard is fixed with the connection picture peg joint, drives the elasticity cardboard through pressing the post and moves down, and the separation of elasticity cardboard and connection picture peg, and then be convenient for open and shut indicator installation shrouding and device install bin.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a side view of the utility model as a whole;
FIG. 3 is a schematic view of a partial cross-sectional structure of the positioning sleeve plate of the present invention;
fig. 4 is a schematic structural diagram of the device mounting frame of the present invention.
In the figure: 1. a device installation box; 2. a key operation area; 3. a display screen; 4. an indicator lamp is provided with a sealing plate; 5. a wire holder; 6. a protective insulating frame; 7. a wiring jack; 8. an indicating lamp body; 9. a connecting strip; 10. connecting the plug boards; 11. positioning a sleeve plate; 12. an elastic clamping plate; 13. pressing the column; 14. a device mounting frame; 15. a guide bar; 16. and (4) air holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides an embodiment: new energy centralized monitoring equipment based on one diagram of a power grid comprises a device installation box 1, wherein a positioning sleeve plate 11 is fixedly installed on the inner side of the device installation box 1, an elastic clamping plate 12 is installed on the inner side of the positioning sleeve plate 11, a pressing column 13 is installed on the upper end face of the elastic clamping plate 12, a device installation frame 14 is installed below the positioning sleeve plate 11 and located on the inner side of the device installation box 1, two ends of the device installation frame 14 are both connected with guide strips 15 in a sliding mode, air holes 16 are formed in one side of the device installation frame 14, a wiring seat 5 is installed at one end of the device installation box 1, a protective insulating frame 6 is fixedly installed on one side of the wiring seat 5, a wiring jack 7 is arranged on the inner side of the wiring seat 5, an indicator lamp installation sealing plate 4 is installed at one end of the positioning sleeve plate 11 and located on the inner side of the device installation box 1, a connecting strip 9 is fixedly installed at one end of the indicator lamp installation sealing plate 4, and a connecting plugboard 10 is connected with the inner side of the connecting strip 9 in a sliding mode, through connecting picture peg 10 be convenient for connect pilot lamp installation shrouding 4 and device install bin 1, one side of pilot lamp installation shrouding 4 is provided with pilot lamp body 8, wholly through concentrating each wiring end to the electric wire netting and connecting and state display, be convenient for carry out the centralized monitoring operation to the circuit in real time.
Further, a display screen 3 is installed on one side of the device installation box 1, and a key operation area 2 is arranged on one side, located on the device installation box 1, of one end of the display screen 3.
Through adopting above-mentioned technical scheme, can carry out state control to the electric wire netting through button operation area 2 and display screen 3.
Further, pilot lamp installation shrouding 4 passes through hinge connection with device install bin 1, and the material of pilot lamp installation shrouding 4 is rigid plastic, and pilot lamp installation shrouding 4 passes through the screw connection with instruction lamp body 8 fixedly.
Through adopting above-mentioned technical scheme, can show each line state through instructing lamp body 8.
Further, the connecting strip 9 and the indicator lamp mounting sealing plate 4 are fixedly connected through screws, the middle portion of the connecting strip 9 is connected with the connecting plug board 10 through a positioning pin, and a clamping groove is formed in the lower end face of the connecting plug board 10.
Through adopting above-mentioned technical scheme, be convenient for connect pilot lamp installation shrouding 4 and device install bin 1 through connection picture peg 10.
Furthermore, one end of the elastic clamping plate 12 and the positioning sleeve plate 11 are integrally formed by injection molding, and the connecting plug board 10 and the positioning sleeve plate 11 are fixedly clamped through the elastic clamping plate 12.
By adopting the technical scheme, the pressing column 13 drives the elastic clamping plate 12 to move downwards, and the elastic clamping plate 12 is separated from the connecting plugboard 10.
Further, the bottom end of the pressing column 13 penetrates through the upper end of the device installation box 1 and the positioning sleeve plate 11 to extend to the upper end face of the elastic clamping plate 12, and an insulating layer is arranged on the outer side of the pressing column 13.
By adopting the technical scheme, the operation safety can be ensured when the pressing column 13 is operated conveniently through the insulating layer.
Further, the one end of gib block 15 passes through the bolted connection with device mounting box 1 fixedly, and the inboard of gib block 15 is provided with the spout, and the both ends of device mounting bracket 14 all extend to the inboard of spout.
By adopting the technical scheme, the device mounting frame 14 can be conveniently guided and mounted through the two guide strips 15.
The working principle is as follows: when the device mounting frame is used, whether the functions of all parts are intact or not is checked, the wire holder 5 is connected with the device mounting box 1 through the positioning pin, one end of each guide strip 15 is fixedly connected with the device mounting box 1 through the screw, the inner sides of the guide strips 15 are provided with sliding grooves, the upper end and the lower end of the device mounting frame 14 extend to the inner sides of the sliding grooves, the device mounting frame 14 is conveniently guided and mounted through the two guide strips 15, the device mounting frame 14 is further convenient to disassemble and assemble, the wiring jacks 7 are arranged on the inner sides of the wire holder 5, wiring terminals are inserted into the inner sides of the wiring jacks 7, the wire holder 5 is further conveniently connected with the device mounting frame 14, the power supply is switched on, the indicator lamp mounting sealing plate 4 is connected with the device mounting box 1 through hinges, the indicator lamp mounting sealing plate 4 is used for mounting the indicator lamp body 8, and the states of all lines can be displayed through the indicator lamp body 8, be provided with button operation district 2 and display screen 3 respectively in one side of device install bin 1, make and to carry out state control to the electric wire netting through button operation district 2 and display screen 3, install elastic clamping plate 12 in the inboard of location sleeve board 11, make elastic clamping plate 12 fixed with connection picture peg 10 joint, it moves down to drive elastic clamping plate 12 through pressing post 13, elastic clamping plate 12 separates with connection picture peg 10, and then be convenient for open and shut indicator installation shrouding 4 and device install bin 1.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. New energy centralized monitoring equipment based on one power grid diagram comprises a device installation box (1), and is characterized in that: the inside fixed mounting of device install bin (1) has location sleeve board (11), the inboard of location sleeve board (11) is installed elasticity cardboard (12), the up end of elasticity cardboard (12) is installed and is pressed post (13), device mounting bracket (14) is installed to the inboard that the below position of location sleeve board (11) lies in device install bin (1), the equal sliding connection in both ends of device mounting bracket (14) has guide bar (15), one side of device mounting bracket (14) is provided with bleeder vent (16), connection terminal (5) are installed to one end of device install bin (1), one side fixed mounting of connection terminal (5) has protection insulating frame (6), the inboard of connection terminal (5) is provided with wiring jack (7), pilot lamp installation shrouding (4) are installed to one end of location sleeve board (11) lies in the inboard of device install bin (1), the one end fixed mounting of pilot lamp installation shrouding (4) has connecting strip (9), the inboard sliding connection of connecting strip (9) has connection picture peg (10), one side of pilot lamp installation shrouding (4) is provided with pilot lamp body (8).
2. A grid-based centralized monitoring apparatus for new energy according to claim 1, wherein: the device comprises a device installation box (1) and is characterized in that a display screen (3) is installed on one side of the device installation box (1), and a key operation area (2) is arranged on one side, located on the device installation box (1), of one end of the display screen (3).
3. A centralized monitoring apparatus of new energy based on one graph of power grid as claimed in claim 1, characterized in that: the indicating lamp mounting sealing plate (4) is connected with the device mounting box (1) through a hinge, and the indicating lamp mounting sealing plate (4) is connected and fixed with the indicating lamp body (8) through a screw.
4. A centralized monitoring apparatus of new energy based on one graph of power grid as claimed in claim 1, characterized in that: the connecting strip (9) is fixedly connected with the indicating lamp mounting sealing plate (4) through screws, the middle of the connecting strip (9) is connected with the connecting insertion plate (10) through a positioning pin, and a clamping groove is formed in the lower end face of the connecting insertion plate (10).
5. A grid-based centralized monitoring apparatus for new energy according to claim 1, wherein: one end of the elastic clamping plate (12) and the positioning sleeve plate (11) are integrally formed by injection molding, and the connecting insertion plate (10) and the positioning sleeve plate (11) are fixedly connected through the elastic clamping plate (12) in a clamping mode.
6. A grid-based centralized monitoring apparatus for new energy according to claim 1, wherein: the bottom of the pressing column (13) penetrates through the upper end of the device installation box (1) and the positioning sleeve plate (11) and extends to the upper end face of the elastic clamping plate (12), and an insulating layer is arranged on the outer side of the pressing column (13).
7. A grid-based centralized monitoring apparatus for new energy according to claim 1, wherein: the one end of gib block (15) passes through bolted connection with device install bin (1) fixedly, the inboard of gib block (15) is provided with the spout, the both ends of device mounting bracket (14) all extend to the inboard of spout.
CN202122928520.7U 2021-11-26 2021-11-26 New energy centralized monitoring equipment based on one graph of power grid Active CN217062941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122928520.7U CN217062941U (en) 2021-11-26 2021-11-26 New energy centralized monitoring equipment based on one graph of power grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122928520.7U CN217062941U (en) 2021-11-26 2021-11-26 New energy centralized monitoring equipment based on one graph of power grid

Publications (1)

Publication Number Publication Date
CN217062941U true CN217062941U (en) 2022-07-26

Family

ID=82475092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122928520.7U Active CN217062941U (en) 2021-11-26 2021-11-26 New energy centralized monitoring equipment based on one graph of power grid

Country Status (1)

Country Link
CN (1) CN217062941U (en)

Similar Documents

Publication Publication Date Title
CN207215917U (en) A kind of distribution automation terminal comprehensive debugging device
CN217062941U (en) New energy centralized monitoring equipment based on one graph of power grid
CN203289196U (en) Pluggable distribution network automation terminal
CN205068137U (en) Transformer substation uses environmental monitoring device
CN215009755U (en) Commercial power supply and oil engine power supply safety switching system of communication base station machine room equipment
CN216251717U (en) Intelligent charging power supply power distribution cabinet with circuit protection function
CN205581694U (en) Intelligent temperature and humidity controller
CN209311647U (en) A kind of monitoring battery disengaging bus alarm device
CN107293951B (en) Hot plug type precise power distribution cabinet
CN112467589A (en) In put cabinet intelligent security warning device
CN209860525U (en) Plug-in movable ring line concentrator
CN205943970U (en) Intelligent control protection and management device
CN205377095U (en) Intelligent protection system control box of power transmission and transformation net
CN214707308U (en) Pluggable distribution automation terminal FTU box
CN214847365U (en) Non-intrusive power load perception demonstration device
CN218829252U (en) Intelligent monitoring device for box-type substation
CN213519650U (en) Dual-power transfer switch
CN213071726U (en) Remote maintenance device for transformer substation
CN215449450U (en) Distributed interface device of relay protection debugging instrument
CN213211374U (en) Intelligent pure electric vehicle alternating current motor comprehensive system training platform
CN217405971U (en) Direct current feeder device and direct current feeder cabinet
CN211505795U (en) Intelligent switchgear fault simulation test device
CN209658096U (en) A kind of small-sized adaptive polarizing memory voltage time constant that can quickly check failure
CN214627684U (en) Safe type PLC control box
CN215643314U (en) Switching operation simulation rehearsal system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant