CN217054625U - Zinc steel guardrail of auto-lock equipment mode - Google Patents

Zinc steel guardrail of auto-lock equipment mode Download PDF

Info

Publication number
CN217054625U
CN217054625U CN202220494798.XU CN202220494798U CN217054625U CN 217054625 U CN217054625 U CN 217054625U CN 202220494798 U CN202220494798 U CN 202220494798U CN 217054625 U CN217054625 U CN 217054625U
Authority
CN
China
Prior art keywords
thick bamboo
steel guardrail
auto
zinc
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220494798.XU
Other languages
Chinese (zh)
Inventor
陈佳
李沙沙
范玉娥
刘天宇
张硕
王尚任
李英叶
袁旭
赵闯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Chuangyou Metal Technology Co ltd
Original Assignee
Hebei Chuangyou Metal Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Chuangyou Metal Technology Co ltd filed Critical Hebei Chuangyou Metal Technology Co ltd
Priority to CN202220494798.XU priority Critical patent/CN217054625U/en
Application granted granted Critical
Publication of CN217054625U publication Critical patent/CN217054625U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a zinc steel guardrail of auto-lock equipment mode, which comprises a column, the stand sets up two sets ofly, it inserts a section of thick bamboo to be equipped with on the stand lateral wall, it is located stand bottom department and sets up a set ofly to insert a section of thick bamboo, it is located stand top department and arranges from top to bottom and sets up two sets ofly to insert a section of thick bamboo interpolation, it is equipped with the horizontal bar to insert a section of thick bamboo interpolation, evenly installed on the horizontal bar and erected the fence, it connects the setting through auto-lock equipment subassembly to erect fence and horizontal bar. The utility model belongs to the technical field of the zinc steel guardrail, specifically indicate a convenient dismantlement installation, can carry out the zinc steel guardrail of the auto-lock equipment mode of partial change when partial component damages.

Description

Zinc steel guardrail of auto-lock equipment mode
Technical Field
The utility model belongs to the technical field of the zinc steel guardrail, specifically indicate a zinc steel guardrail of auto-lock equipment mode.
Background
Assembled zinc steel guardrail: the base material of the assembled zinc steel guardrail sectional material is a high-temperature hot-dip zinc material, the hot-dip zinc means that high-quality steel is put into a zinc liquid pool with the temperature of several thousands of degrees, zinc liquid can permeate into the steel after soaking for a certain time, so that a special zinc steel alloy is formed, the surface of the hot-dip zinc material can be free of rusting for 30 years in a wild environment without any treatment, such as: the highway guardrail and the high-voltage electric tower are made of high-temperature hot-dip zinc materials, the rust prevention time is as long as 30 years, the problems of rust prevention, attractiveness and safety over the years are thoroughly solved, the assembled zinc steel guardrail accessories are made of modified high-strength engineering nylon with the service life of 50 years, the strength and the hardness are far higher than those of common steel materials, the square meter of the assembled zinc steel guardrail accessories can bear the pressure of more than 183MPA, the tensile force of 2729MPA can bear the high temperature of below 220 ℃, and the like, and the assembled zinc steel guardrail and the assembled high-voltage electric tower cannot deform. The existing common guard rails are all integrated guard rails taking steel as a main material, most of the integrated guard rails are inconvenient to disassemble and install and replace, and parts of the integrated guard rails are difficult to repair after being damaged. Therefore, the utility model provides a zinc steel guardrail of auto-lock equipment mode that easy dismounting installation can carry out the part when partial component damages is changed.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a zinc steel guardrail of auto-lock equipment mode that convenient dismantlement installation can carry out the part and change when partial component damages.
In order to realize the above functions, the utility model discloses the technical scheme who takes as follows: a zinc steel guardrail adopting a self-locking assembly mode comprises upright columns, wherein the upright columns are provided with two groups, inserting cylinders are arranged on the side walls of the upright columns, one group of inserting cylinders is arranged at the bottom ends of the upright columns, two groups of inserting cylinders are arranged at the top ends of the upright columns up and down, and rails are inserted into the inserting cylinders, so that the two groups of upright columns are spliced through the rails, vertical rails are uniformly arranged on the rails, the vertical rails and the rails are connected through self-locking assembly components, and the upright columns, the vertical rails and the rails can be detached and separated, so that partial replacement can be performed when partial elements are damaged, the cost is saved, and meanwhile, the installation and splicing are convenient; the auto-lock equipment subassembly includes flat pad, a card section of thick bamboo and jump ring, flat pad evenly runs through the setting of the two sets of horizontal bars that are located above, a card section of thick bamboo evenly runs through the setting of the horizontal bar that is located the bottom, a card section of thick bamboo both sides wall runs through and is equipped with the draw-in groove, the jump ring cover is located on erecting the fence, the jump ring top is equipped with the arch, arch and draw-in groove one-to-one setting will erect in fence and horizontal bar concatenation installation, will erect the fence and pass a card section of thick bamboo on the horizontal bar in, when the jump ring on erecting the fence is inserted in a card section of thick bamboo, arch on the jump ring is inserted and is established in the draw-in groove of a card section of thick bamboo, realizes the auto-lock to erect fence and horizontal bar installation concatenation fastening, convenient dismantlement installation, can carry out the part when damaging partial component and change.
Preferably, the height of the upright post is 1500 mm.
Preferably, the central points of the two groups of upright posts are spaced apart by 3000 mm.
As an optimized technical scheme of the utility model, it is adjacent the distance between the perpendicular fence is 120 mm.
As a preferred technical scheme of the utility model, the vertical column top sets up for sharp spear type structure.
The utility model adopts the above structure to obtain the beneficial effects as follows: the utility model provides a pair of zinc steel guardrail of auto-lock equipment mode passes through the setting of auto-lock equipment subassembly, when erecting fence and horizontal bar concatenation installation, to erect the fence and pass in the card section of thick bamboo on the horizontal bar, when jump ring on erecting the fence is inserted in a card section of thick bamboo, arch on the jump ring is inserted and is established in the draw-in groove of a card section of thick bamboo, realize the auto-lock, thereby to erect fence and horizontal bar installation concatenation fastening, the installation is conveniently dismantled, can carry out the part when partial component damages and change, through the setting of inserting a section of thick bamboo, two sets of stands insert through the horizontal bar both ends and splice in inserting a section of thick bamboo, it is convenient to install, can rethread screw with the tight reality of concatenation department installation.
Drawings
Fig. 1 is a schematic view of the overall structure of a zinc steel guardrail with a self-locking assembly manner according to the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
fig. 3 is a schematic structural view of a flat pad of a zinc steel guardrail in a self-locking assembly manner according to the present invention;
fig. 4 is a schematic structural view of a clamping cylinder of a zinc steel guardrail adopting a self-locking assembly manner according to the present invention;
fig. 5 is the utility model provides a structural schematic diagram of jump ring of zinc steel guardrail of auto-lock equipment mode.
The self-locking assembling device comprises a vertical column 1, an inserting cylinder 2, a transverse bar 3, a vertical bar 4, a vertical bar 5, a flat pad 6, a clamping cylinder 7, a clamping spring 8, a clamping groove 9, a protrusion 10 and a self-locking assembling assembly.
Detailed Description
The technical solutions of the present invention will be described more clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1-5, the utility model provides a zinc steel guardrail of self-locking assembly mode, including stand 1, stand 1 sets up two sets, stand 1 is 1500mm high, two sets of stand 1 central points are apart from 3000mm, be equipped with on the stand 1 lateral wall and insert a section of thick bamboo 2, insert a section of thick bamboo 2 and be located stand 1 bottom department and set up a set of, insert a section of thick bamboo 2 and be arranged two sets of from top to bottom in stand 1 top department, insert a section of thick bamboo 2 interpolation and be equipped with horizontal bar 3, evenly install vertical bar 4 on horizontal bar 3, vertical bar 4 top is sharp spear type structure setting, the distance between the adjacent vertical bar 4 is 120mm, vertical bar 4 and horizontal bar 3 connect the setting through self-locking assembly 10; auto-lock equipment subassembly 10 includes flat 5, a card section of thick bamboo 6 and jump ring 7 of filling up, and flat 5 evenly run through the setting of the horizontal bar 3 that is located two sets of above, and a card section of thick bamboo 6 evenly runs through the setting of the horizontal bar 3 that is located the bottom, and 6 both sides walls of a card section of thick bamboo run through and are equipped with draw-in groove 8, and jump ring 7 covers are located on erecting fence 4, and 7 tops of jump ring are equipped with arch 9, and arch 9 sets up with draw-in groove 8 one-to-one.
During the specific use, two sets of stands 1 insert through 3 both ends of horizontal bar and splice in inserting a section of thick bamboo 2, the rethread screw will splice the department installation tightly real, when will erecting 4 and 3 concatenation installations of horizontal bar, will erect 4 flat pads 5 that pass two sets of horizontal bars 3 of upper end, pass the card section of thick bamboo 6 that is located the bottom horizontal bar 3, jump ring 7 on erecting 4 inserts when calorie section of thick bamboo 6, arch 9 on jump ring 7 inserts in the draw-in groove 8 of establishing in a card section of thick bamboo 6, realize the auto-lock, thereby will erect 4 and 3 installation concatenation fastenings of horizontal bar.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (5)

1. The utility model provides a zinc steel guardrail of auto-lock assembled mode which characterized in that: the self-locking assembling device comprises two groups of upright columns, wherein two groups of upright columns are arranged, inserting cylinders are arranged on the side walls of the upright columns, one group of inserting cylinders is arranged at the bottom ends of the upright columns, two groups of inserting cylinders are arranged at the top ends of the upright columns in an up-and-down mode, transverse bars are inserted into the inserting cylinders, vertical bars are uniformly arranged on the transverse bars, and the vertical bars and the transverse bars are connected through self-locking assembling components; the auto-lock equipment subassembly includes flat pad, a card section of thick bamboo and jump ring, flat pad evenly runs through the setting of the horizontal bar that is located two sets of above, a card section of thick bamboo evenly runs through the setting of the horizontal bar that is located the bottom, a card section of thick bamboo both sides wall runs through and is equipped with the draw-in groove, the jump ring cover is located on erecting the fence, the jump ring top is equipped with the arch, arch and draw-in groove one-to-one setting.
2. The zinc-steel guardrail of claim 1, which is assembled by self-locking, and is characterized in that: the height of the upright post is 1500 mm.
3. The zinc-steel guardrail of claim 2, which is assembled in a self-locking manner, and is characterized in that: the distance between the central points of the two groups of upright posts is 3000 mm.
4. The zinc-steel guardrail of claim 3, which is assembled in a self-locking manner, and is characterized in that: the distance between adjacent vertical columns is 120 mm.
5. The zinc-steel guardrail of claim 4, which is assembled in a self-locking manner, and is characterized in that: the top end of the vertical column is provided with a spearhead-shaped structure.
CN202220494798.XU 2022-03-09 2022-03-09 Zinc steel guardrail of auto-lock equipment mode Active CN217054625U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220494798.XU CN217054625U (en) 2022-03-09 2022-03-09 Zinc steel guardrail of auto-lock equipment mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220494798.XU CN217054625U (en) 2022-03-09 2022-03-09 Zinc steel guardrail of auto-lock equipment mode

Publications (1)

Publication Number Publication Date
CN217054625U true CN217054625U (en) 2022-07-26

Family

ID=82488967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220494798.XU Active CN217054625U (en) 2022-03-09 2022-03-09 Zinc steel guardrail of auto-lock equipment mode

Country Status (1)

Country Link
CN (1) CN217054625U (en)

Similar Documents

Publication Publication Date Title
CN217054625U (en) Zinc steel guardrail of auto-lock equipment mode
CN208632965U (en) A kind of superelevation steel pipe support adjustable-angle formula cable wind system
CN211777140U (en) Be applicable to protector for water plant civil engineering
CN115787474A (en) Bridge pier column moving operation platform and construction method
CN210316466U (en) Lifting scaffold board and protective net system
CN210195457U (en) Safety protective guard is used in civil engineering
CN215927027U (en) Novel purse seine fence
KR101530062B1 (en) Support fence for architecture
CN211201366U (en) Rail guard convenient to ann tears open
CN208594510U (en) Assembled protective fence
CN211079905U (en) Construction protective fence for building bridge
US20050086882A1 (en) Masonry wall supported fence and method
CN215716694U (en) Assembled balcony guardrail
CN221236530U (en) Reinforced stone railing for river course gallery engineering
CN215248911U (en) Novel steel construction elevator well of building blocks
CN220378016U (en) Protective enclosure structure for building construction
CN214942675U (en) Rail guard simply assembles in bridge floor construction
CN217557206U (en) Stable assembly type building frame
CN216113888U (en) Assembled lamp stand basis
CN220183784U (en) Pedestrian iron chain suspension bridge
CN218293093U (en) Novel quick-release assembly type railing
CN215518404U (en) Anti-falling device for bridge construction
CN220450679U (en) Road and bridge construction strap structure
CN219196652U (en) Scaffold self-adaptation installation device
CN213840061U (en) Novel combined universal frame of parallel screw compressor unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant