CN217053445U - Base that marine beacon was used - Google Patents

Base that marine beacon was used Download PDF

Info

Publication number
CN217053445U
CN217053445U CN202220458279.8U CN202220458279U CN217053445U CN 217053445 U CN217053445 U CN 217053445U CN 202220458279 U CN202220458279 U CN 202220458279U CN 217053445 U CN217053445 U CN 217053445U
Authority
CN
China
Prior art keywords
base
block
blocks
negative weight
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220458279.8U
Other languages
Chinese (zh)
Inventor
武文昊
朱振宇
李政谦
牛森
宗传刚
凌家诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Maritime University
Original Assignee
Dalian Maritime University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Maritime University filed Critical Dalian Maritime University
Priority to CN202220458279.8U priority Critical patent/CN217053445U/en
Application granted granted Critical
Publication of CN217053445U publication Critical patent/CN217053445U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a base that marine lighthouse was used, including negative weight piece and four base prefabricated sections, two through-holes that the symmetry set up are seted up to one side of base prefabricated section, the inside of base prefabricated section is provided with the fixed subassembly that is used for fixed two adjacent base prefabricated sections, the negative weight piece uses with the cooperation of four base prefabricated sections, the bottom fixedly connected with second of negative weight piece inserts the pole, the arc wall that uses with the cooperation of second insert pole is seted up to one side of base prefabricated section, the utility model discloses simple structure through four fixed base prefabricated sections of installation piece, utilizes the block of draw-in groove and kelly simultaneously to and the cooperation of rectangular channel and rectangular section realizes once more that the base prefabricated section is fixed, can separately transport a plurality of articles to the scene, reduces workman's work load, convenient transportation, convenient to use.

Description

Base that marine beacon was used
Technical Field
The utility model relates to a beacon technical field especially relates to a base that marine beacon was used.
Background
The lighthouse is a high tower-shaped building, and light equipment is arranged on the top of the tower, the position of the lighthouse is obvious, and the lighthouse is required to have a specific building shape, is easy to distinguish by ships and becomes one of the highest points of a port. Because the earth surface is a curved surface, the tower body needs to have sufficient height, so that the light can be observed by a long-distance ship, and the general sight distance is 15-25 nautical miles; but the light is not too high to avoid the shielding of high cloud. The lighthouse can be watched by people or unattended according to the size and the location of the lighthouse, and important lighthouses should be watched by people.
The existing lighthouse base needs to transport the whole base during transportation, so that the transportation is difficult, the whole size is large, the transportation is difficult, meanwhile, when the lighthouse base is installed, the great workload is required, the lighthouse base is difficult to carry, and large-scale machinery needs to be matched, so that the base for the offshore lighthouse is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the lighthouse base that exists among the prior art and need transporting whole base when the transportation, lead to transporting the difficulty, whole volume is great, is difficult to transport, also needs very big work load when the installation simultaneously, is difficult to carry, needs to cooperate the shortcoming of large-scale machinery, and the base that a marine lighthouse was used that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a base for an offshore lighthouse comprises a negative weight block and four base precast blocks, wherein two through holes are symmetrically formed in one side of each base precast block, and a fixing assembly for fixing two adjacent base precast blocks is arranged in each base precast block;
the negative weight block is matched with the four base precast blocks for use, the second insertion rod is fixedly connected to the bottom of the negative weight block, and an arc-shaped groove matched with the second insertion rod for use is formed in one side of the base precast block.
Preferably, the fixing assembly comprises four mounting blocks matched with the base precast blocks for use, two first insertion rods symmetrically arranged are fixedly connected to one side of each mounting block, and the first insertion rods are matched with the through holes for use and used for fixing two adjacent base precast blocks.
Preferably, four cement pouring holes are formed in the negative weight block, and are used for enhancing the stability of the device.
Preferably, the bottom of the installation block is provided with a rectangular groove, and the bottom inner wall of the base precast block is fixedly connected with two rectangular blocks which are symmetrically arranged and clamped with the rectangular groove for fixing the installation block and the base precast block again.
Preferably, the bottom inner wall fixedly connected with kelly of base prefabricated section, a plurality of draw-in grooves with kelly looks block are seted up to the bottom of burden pouring weight for fixed burden pouring weight and base prefabricated section.
Preferably, a plurality of threaded rods are fixedly connected to the top of the negative weight block and used for mounting other devices.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in the utility model, four base precast blocks are placed together, so that four arc-shaped grooves form a complete circle, at the moment, four installation blocks are sequentially stretched into the four base precast blocks, the rectangular grooves are clamped with the rectangular blocks on the two adjacent base precast blocks, and two first insertion rods on the installation blocks are stretched out through the through holes on the two base precast blocks simultaneously, so as to enhance the stability of the device;
2. the utility model discloses in, go into the inside of four base prefabricated sections with the heavy burden piece card at last to make the second insert the pole and insert between the circle that four arc slot forms, draw-in groove and corresponding kelly block guarantee the stability of burden pouring weight, burden pouring weight supports tight four installation pieces simultaneously, avoids the condition that the pine takes off to appear in the device, pours the hole with the water congeals through cement again and pours the inside of pouring into the base prefabricated section for accomplish the installation of base.
The utility model discloses simple structure through four fixed base prefabricated sections of installation piece, utilizes the block of draw-in groove and kelly simultaneously to and the cooperation of rectangular channel and rectangular block realizes once more fixed to the base prefabricated section, can separately transport a plurality of articles to the scene, reduces workman's work load, and the transportation is convenient, convenient to use.
Drawings
Fig. 1 is a schematic three-dimensional structure diagram of a base for an offshore lighthouse according to the present invention;
fig. 2 is a schematic three-dimensional structure diagram of the middle base prefabricated block and the mounting block of the present invention;
FIG. 3 is a schematic three-dimensional structure of the weight block of the present invention;
FIG. 4 is a schematic diagram of the three-dimensional structure of the middle base prefabricated section of the present invention;
fig. 5 is a schematic diagram of a three-dimensional structure of the middle mounting block of the present invention.
In the figure: 1. a base precast block; 2. a through hole; 3. a first insert rod; 4. a threaded rod; 5. a negative weight block; 6. pouring holes with cement; 7. a rectangular block; 8. mounting blocks; 9. a clamping rod; 10. an arc-shaped slot; 11. a card slot; 12. a second insert rod; 13. a rectangular groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example one
Referring to fig. 1-5, a base for an offshore lighthouse comprises a negative weight block 5 and four base precast blocks 1, wherein two through holes 2 are symmetrically arranged on one side of each base precast block 1, and a fixing component for fixing two adjacent base precast blocks 1 is arranged inside each base precast block 1.
The negative weight 5 is used with the cooperation of four base prefabricated sections 1, and the bottom fixedly connected with second inserted bar 12 of negative weight 5, and arc wall 10 that uses with the cooperation of second inserted bar 12 has been seted up to one side of base prefabricated section 1.
Example two
Referring to fig. 1-5, a base for an offshore lighthouse comprises a negative weight block 5 and four base precast blocks 1, wherein two through holes 2 are symmetrically formed in one side of each base precast block 1, fixing assemblies used for fixing the two adjacent base precast blocks 1 are arranged inside the base precast blocks 1, each fixing assembly comprises four mounting blocks 8 matched with the base precast blocks 1 for use, two first insertion rods 3 symmetrically formed in one side of each mounting block 8 are fixedly connected with the two first insertion rods 3, and the first insertion rods 3 are matched with the through holes 2 for use and used for fixing the two adjacent base precast blocks 1.
Negative weight piece 5 uses with the cooperation of four base prefabricated section 1, the bottom fixedly connected with second insert pole 12 of negative weight piece 5, arc wall 10 that uses with the cooperation of second insert pole 12 is seted up to one side of base prefabricated section 1, hole 6 has been seted up to the inside of heavy weight piece 5, a stability for strengthening the device, rectangular channel 13 has been seted up to the bottom of installation piece 8, two rectangular blocks 7 with rectangular channel 13 looks block that the bottom inner wall fixedly connected with symmetry of base prefabricated section 1 set up, be used for fixed mounting piece 8 and base prefabricated section 1 once more, the bottom inner wall fixedly connected with kelly 9 of base prefabricated section 1, the bottom of heavy weight piece 5 is seted up a plurality of draw-in grooves 11 with kelly 9 looks block, a plurality of draw-in grooves 11 for fixing negative weight piece 5 and base prefabricated section 1, a plurality of threaded rods 4 of top fixedly connected with of negative weight piece 5, be used for install other devices.
The working principle is as follows: when in use, the four base precast blocks 1 are placed together, so that the four arc-shaped grooves 10 form a complete circle, at the moment, the four installation blocks 8 sequentially extend into the four base precast blocks 1, the rectangular grooves 13 are clamped with the rectangular blocks 7 on the two adjacent base precast blocks 1, the two first insertion rods 3 on the installation blocks 8 extend out through the through holes 2 on the two base precast blocks 1 for enhancing the stability of the device, finally, the negative weight blocks 5 are clamped into the four base precast blocks 1, the second insertion rods 12 are inserted between the circles formed by the four arc-shaped grooves 10, the clamping grooves 11 are clamped with the corresponding clamping rods 9 to ensure the stability of the negative weight blocks 5, the negative weight blocks 5 tightly support the four installation blocks 8 to avoid the loosening of the device, and then, the hydraulic water is injected into the base precast blocks 1 through the cement pouring holes 6, for completing the installation of the base.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A base for an offshore lighthouse comprises a negative weight block (5) and four base precast blocks (1), and is characterized in that two through holes (2) which are symmetrically arranged are formed in one side of each base precast block (1), and a fixing component for fixing two adjacent base precast blocks (1) is arranged in each base precast block (1);
the weight (5) is matched with the four base precast blocks (1) for use, the bottom of the weight (5) is fixedly connected with a second insert rod (12), and one side of each base precast block (1) is provided with an arc-shaped groove (10) matched with the second insert rod (12) for use.
2. Base for an offshore lighthouse according to claim 1, characterized in that the fixing assembly comprises four mounting blocks (8) cooperating with the base prefabricated block (1), two symmetrically arranged first insertion rods (3) are fixedly connected to one side of the mounting blocks (8), and the first insertion rods (3) cooperate with the through holes (2).
3. A foundation for an offshore lighthouse according to claim 1, characterized in that the negative weight (5) has four cement pouring holes (6) formed therein.
4. A base for an offshore lighthouse according to claim 2, characterized in that the bottom of the mounting block (8) is provided with a rectangular groove (13), and the inner wall of the bottom of the base precast block (1) is fixedly connected with two symmetrically arranged rectangular blocks (7) which are clamped with the rectangular groove (13).
5. A base for an offshore lighthouse according to any of claims 1 to 3, characterized in that a clamping rod (9) is fixedly connected to the inner bottom wall of the base precast block (1), and a plurality of clamping grooves (11) which are clamped with the clamping rod (9) are formed at the bottom of the negative weight (5).
6. A foundation for an offshore lighthouse according to claim 1, characterized in that a plurality of threaded rods (4) are fixedly connected to the top of the negative weight (5).
CN202220458279.8U 2022-03-03 2022-03-03 Base that marine beacon was used Expired - Fee Related CN217053445U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220458279.8U CN217053445U (en) 2022-03-03 2022-03-03 Base that marine beacon was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220458279.8U CN217053445U (en) 2022-03-03 2022-03-03 Base that marine beacon was used

Publications (1)

Publication Number Publication Date
CN217053445U true CN217053445U (en) 2022-07-26

Family

ID=82488476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220458279.8U Expired - Fee Related CN217053445U (en) 2022-03-03 2022-03-03 Base that marine beacon was used

Country Status (1)

Country Link
CN (1) CN217053445U (en)

Similar Documents

Publication Publication Date Title
CN207121928U (en) A kind of new prefabricated assembled piping lane
CN210395435U (en) Collapse-proof supporting device for open excavation method construction of urban underground comprehensive pipe gallery
CN217053445U (en) Base that marine beacon was used
CN210597127U (en) Be applicable to rural highway guardrail device of low grade
CN211004188U (en) Municipal construction lifting device
CN213508447U (en) Anchor rod lifting device for fan foundation construction
CN211873804U (en) Concrete building template for civil engineering
CN209243668U (en) Sludge solidification system
CN203334347U (en) Box culvert type outfall structure
CN110714653A (en) Tower structure and method for distribution line water area emergency training
CN216553316U (en) Urban and rural planning land reclamation device
CN220336586U (en) Novel concrete pole structure
CN212027398U (en) Civil engineering construction rail guard device
CN213927658U (en) 3D prints dry pail latrine convenient to fast assembly
CN221609460U (en) Adjustable bearing stores pylon
CN215052350U (en) Night warning device is used in bridge construction
CN210480682U (en) Special deck crane of boats and ships convenient to installation
CN221809811U (en) Prevent heavy stone device of buoy drift
CN219601577U (en) Assembled waterborne lighthouse
CN219364706U (en) Independent column structure for supporting overhead electric power corridor
CN211143955U (en) Communication tower fixing device for electronic information engineering
CN215554007U (en) Monitoring floating boat with quickly-installed floating barrels
CN219235625U (en) T-beam prefabricated steel template
CN212559101U (en) Integral hoisting frame of workover rig
CN219060879U (en) Pouring frame fixing structure for civil construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220726