CN217036567U - Electric power engineering is with maintenance device that cable laid - Google Patents

Electric power engineering is with maintenance device that cable laid Download PDF

Info

Publication number
CN217036567U
CN217036567U CN202220792051.2U CN202220792051U CN217036567U CN 217036567 U CN217036567 U CN 217036567U CN 202220792051 U CN202220792051 U CN 202220792051U CN 217036567 U CN217036567 U CN 217036567U
Authority
CN
China
Prior art keywords
power engineering
cable
base
hanging piece
engineering according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220792051.2U
Other languages
Chinese (zh)
Inventor
杨敏
朱国兵
韩立静
朱国安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Guoxin Power Engineering Co ltd
Original Assignee
Anhui Guoxin Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Guoxin Power Engineering Co ltd filed Critical Anhui Guoxin Power Engineering Co ltd
Priority to CN202220792051.2U priority Critical patent/CN217036567U/en
Application granted granted Critical
Publication of CN217036567U publication Critical patent/CN217036567U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses an overhauling device for laying a cable for power engineering, which comprises a base, wherein a lifting seat capable of lifting is arranged on the base, two ends of the front side of the lifting seat are respectively and fixedly connected with two cross rods extending forwards correspondingly, a hanging piece used for hanging the cable is arranged on each cross rod, the height of the hanging piece from the ground is adjustable, and the position of the hanging piece on the cross rod is adjustable. The hanging piece used by the utility model has adjustable ground clearance, the position of the hanging piece on the cross rod is adjustable, and after the ground clearance of the hanging piece and the position of the hanging piece on the cross rod are adjusted, the hanging piece descends along with the lifting seat to enter the cable trench and hang the cable, and then ascends along with the lifting seat to take the cable away from the cable trench, so that the detection of detection instruments and equipment is facilitated, and the normal development of detection work is facilitated.

Description

Electric power engineering is with maintenance device that cable laid
Technical Field
The utility model relates to the technical field of power engineering, in particular to a maintenance device for laying cables for power engineering.
Background
Electric power engineering is an engineering related to the production, transmission and distribution of electric energy, and broadly includes an engineering of applying electricity as power and energy in various fields, and also includes a transmission and transformation industry expansion engineering.
With the increasing demand of electric power, the application of power cables is also more extensive, and because the cables inevitably have faults due to various factors in long-term operation, the maintenance of the cables becomes an important aspect of electric power engineering. Because the cable is laid along the cable pit usually, and the space of cable pit often is comparatively narrow and small, the laying density of cable is great usually, and detects the signal line length of used instrument, equipment and have a limit, detect during parts (probe) etc. are difficult to direct stretch into the cable pit, consequently detection work often is difficult to launch.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects and shortcomings in the prior art, and provides the maintenance device for laying the cable for the power engineering, so that detection of detection instruments and equipment is facilitated, and normal development of detection work is facilitated.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides an electric power engineering is with overhaul device that cable laid, including the base, its characterized in that: the base on install the lift seat that can go up and down, the both ends of the front side of lift seat correspond two horizontal poles that fixedly connected with extends forward respectively, all install the pendant that is used for hanging the cable on every horizontal pole, the terrain clearance of pendant is adjustable, and the position of pendant on the horizontal pole is adjustable.
Furthermore, the base is fixedly connected with two stand columns respectively, the top ends of the two stand columns are fixedly connected with a mounting seat, a stud is rotatably mounted between the mounting seat and the base, the lifting seat is mounted on the stud in a threaded fit mode, and the two sides of the lifting seat are correspondingly mounted on the two stand columns respectively in a sliding fit mode.
Furthermore, the mounting seat is provided with a motor for driving the stud to rotate, and the motor can rotate positively and negatively.
Furthermore, each cross rod is provided with a through groove penetrating through the wall of the upper rod and the wall of the lower rod along the length direction of the cross rod.
Furthermore, the hanging piece comprises vertically arranged long screw rods, the two long screw rods respectively and correspondingly penetrate through the two through grooves from top to bottom and extend downwards, hooks are fixedly connected to the bottom ends of the long screw rods, and locking nuts are screwed on the upper sides of the cross rods on which the long screw rods are arranged.
Furthermore, a notch is formed in the front side of the base.
Furthermore, the four corners of the bottom of the base are provided with universal wheels with a braking function.
Compared with the prior art, the utility model has the beneficial effects that:
the hanging piece used by the utility model has adjustable ground clearance, the position of the hanging piece on the cross rod is adjustable, and after the ground clearance of the hanging piece and the position of the hanging piece on the cross rod are adjusted, the hanging piece descends along with the lifting seat to enter the cable trench and hang the cable, and then ascends along with the lifting seat to take the cable away from the cable trench, so that the detection of detection instruments and equipment is facilitated, and the normal development of detection work is facilitated.
Drawings
FIG. 1 is a schematic view of the present invention.
Fig. 2 is an enlarged schematic view of a portion a in fig. 1.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 and 2, the maintenance device for laying the cable for the power engineering comprises a base 1, wherein a lifting seat 2 capable of lifting is installed on the base 1, two ends of the front side of the lifting seat 2 are respectively and fixedly connected with two cross rods 3 extending forwards, a hanging piece 4 used for hanging the cable is installed on each cross rod, the height of the hanging piece 4 from the ground is adjustable, and the position of the hanging piece 4 on the cross rod is adjustable.
According to the utility model, two upright posts 5 are respectively and fixedly connected to a base 1, the top ends of the two upright posts 5 are fixedly connected with a mounting seat 6, a stud 7 is rotatably mounted between the mounting seat 6 and the base 1, a lifting seat 2 is mounted on the stud 7 through threaded fit, and two sides of the lifting seat 2 are respectively and correspondingly mounted on the two upright posts 5 through sliding fit.
In the utility model, the mounting seat 6 is provided with the motor 8 for driving the stud 7 to rotate, and the motor 8 can rotate positively and negatively.
Therefore, the motor 8 rotates forwards and backwards to drive the stud 7 to rotate forwards and backwards, so that the lifting seat 2 lifts along the stud 7 and the two upright posts 5, the hanging piece 4 is driven to lift, the cable is fed into the cable trench and hung, and the cable is taken away from the cable trench.
In the utility model, a through groove 9 penetrating through the upper and lower rod walls is arranged on each cross rod along the length direction of the cross rod.
In the utility model, the hanging member 4 comprises a long screw rod 41 which is vertically arranged, two long screw rods 41 respectively and correspondingly penetrate through the two through grooves 9 from top to bottom and extend downwards, the bottom ends of the long screw rods 41 are fixedly connected with hooks 42, and locking nuts 10 are screwed on the upper sides of the cross rods on which the long screw rods 41 are arranged.
Therefore, the height of the pendant 4 from the ground or the position of the pendant 4 on the cross bar can be adjusted by loosening the lock nut 10 and moving the long screw rod 41 up and down or back and forth (linear movement, non-screwing), and the pendant 4 can be fixed at the current position by tightening the lock nut 10.
In the utility model, the front side of the base 1 is provided with a notch 11. Thus, the long screw 41 can enter the cable trench through the notch 11 during the descending process.
In the utility model, universal wheels 12 with braking function are arranged at four corners of the bottom of the base 1. Thus, the base and the upper member thereof can be moved to a predetermined position and then parked.
The utility model is further described below with reference to the accompanying drawings:
when in use, the base 1 is moved to a designated position and then parked.
The locking nut 10 is unscrewed, the long screw rod 41 moves up and down or back and forth (linear movement, non-screwing movement), the ground clearance of the hanging piece 4 is adjusted or the position of the hanging piece 4 on the cross bar is adjusted, and then the locking nut 10 is screwed down to fix the hanging piece 4 at the current position.
And then, the motor 8 rotates reversely to drive the stud 7 to rotate reversely, so that the lifting seat 2 descends along the stud 7 and the two upright posts 5, and further the hanging piece 4 is driven to descend to enter the cable trench.
Then, the locking nut 10 is unscrewed again, the long screw rod 41 is slightly moved back and forth (linearly moved, not screwed), and the position of the hanging piece 4 on the cross rod is finely adjusted to ensure that the hook 42 can hang the cable.
Then, the motor 8 rotates forwards to drive the stud 7 to rotate forwards, so that the lifting seat 2 ascends along the stud 7 and the two upright posts 5, and further the hanging piece 4 is driven to ascend to take the cable away from the cable trench.
At this time, the relevant detection instrument, equipment, etc. is operated to detect the cable, i.e., the detection work is developed.
It should be noted that, when the number of cables laid in the cable trench is large, that is, the laying density is large, other cables around the cable trench need to be manually pulled or shifted to ensure that the hanger 4 can hang the target cable.
Although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such descriptions are provided for clarity, and it is understood that the specification is incorporated herein by reference, and the embodiments described in each embodiment may be combined as appropriate to form other embodiments, which will be apparent to those skilled in the art.
Therefore, the above description is only for the preferred embodiment of the present application and is not intended to limit the scope of the present application; all changes which come within the meaning and range of equivalency of the claims are to be embraced within their scope.

Claims (7)

1. The utility model provides an electric power engineering is with overhaul device that cable laid, including the base, its characterized in that: the base on install the lift seat that can go on going up and down, the both ends of the front side of lift seat correspond two horizontal poles that fixedly connected with extends forward respectively, all install the pendant that is used for hanging the cable on every horizontal pole, the terrain clearance of pendant is adjustable, and the position of pendant on the horizontal pole is adjustable.
2. An inspection device for cabling in power engineering according to claim 1, wherein: the base on respectively fixedly connected with two stands, the top fixedly connected with mount pad of two stands, mount pad and base between rotate and install the double-screw bolt, the lift seat through screw-thread fit install in on the double-screw bolt, the both sides of lift seat through sliding fit respectively correspond to install on two stands.
3. An inspection device for cabling in power engineering according to claim 2, wherein: the mounting seat is provided with a motor for driving the stud to rotate, and the motor can rotate positively and negatively.
4. An inspection device for cabling in power engineering according to claim 1, wherein: each cross rod is provided with a through groove penetrating through the upper rod wall and the lower rod wall along the length direction.
5. An inspection device for cabling in power engineering according to claim 4, wherein: the hanging piece comprises vertically arranged long screw rods, the two long screw rods respectively penetrate through the two through grooves from top to bottom and extend downwards, hooks are fixedly connected to the bottom ends of the long screw rods, and locking nuts are screwed on the upper sides of the cross rods on which the long screw rods are arranged.
6. An inspection device for cabling in power engineering according to claim 1, wherein: the front side of base is equipped with the breach.
7. The overhaul device for laying cables for power engineering according to claim 1, wherein: the four corners of the bottom of the base are provided with universal wheels with a braking function.
CN202220792051.2U 2022-04-07 2022-04-07 Electric power engineering is with maintenance device that cable laid Active CN217036567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220792051.2U CN217036567U (en) 2022-04-07 2022-04-07 Electric power engineering is with maintenance device that cable laid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220792051.2U CN217036567U (en) 2022-04-07 2022-04-07 Electric power engineering is with maintenance device that cable laid

Publications (1)

Publication Number Publication Date
CN217036567U true CN217036567U (en) 2022-07-22

Family

ID=82413966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220792051.2U Active CN217036567U (en) 2022-04-07 2022-04-07 Electric power engineering is with maintenance device that cable laid

Country Status (1)

Country Link
CN (1) CN217036567U (en)

Similar Documents

Publication Publication Date Title
CN217036567U (en) Electric power engineering is with maintenance device that cable laid
CN215756279U (en) Lifting platform for road and bridge construction
CN201234081Y (en) 220kV bus support column porcelain bottle inspection rack
CN206628798U (en) A kind of street code device of angle rotatable
CN111009849B (en) A operation support for insulator is changed
CN215925731U (en) Pile foundation reinforcing apparatus is used in public road bridge roof beam design
CN214835078U (en) Supporting structure of low energy consumption building
CN215101525U (en) Movable portal frame for installing power distribution cabinet
CN210682737U (en) Height-adjustable cable reel paying-off support convenient for labor-saving paying-off
CN210985420U (en) Mounting rack structure for quickly fixing switch cabinet
CN105953933B (en) Bus duct vertical temperature rise detection device and detection method
CN207098441U (en) Load transfer instrument and electric power maintenance equipment
CN215414326U (en) Electric power test equipment for climbing plate
CN206281916U (en) A kind of bus duct vertical temperature-rise test device
CN219957432U (en) Steel bar corrosion instrument
CN219136295U (en) Lifting device for electromechanical installation of building
CN220628841U (en) Power cable overhead support
CN216085965U (en) 10kV joins in marriage net non-power-failure operation multipurpose wire lifting means
CN212292561U (en) Hanging tool for maintaining generator
CN217711994U (en) Wire pole convenient to stringing
CN215497535U (en) Lightning arrester with real-time temperature measurement and alarm capability
CN216212708U (en) Combined transformer rack
CN212837050U (en) Supplementary installation device of street lamp
CN220984369U (en) Electric brake pull rod
CN215645607U (en) Intelligent power distribution grid structure of reliability

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant