CN217028111U - Building facade bracing structure - Google Patents

Building facade bracing structure Download PDF

Info

Publication number
CN217028111U
CN217028111U CN202220740794.5U CN202220740794U CN217028111U CN 217028111 U CN217028111 U CN 217028111U CN 202220740794 U CN202220740794 U CN 202220740794U CN 217028111 U CN217028111 U CN 217028111U
Authority
CN
China
Prior art keywords
support rod
pipe
rod
rotating
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220740794.5U
Other languages
Chinese (zh)
Inventor
许超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Yuneng Construction And Installation Engineering Co ltd
Original Assignee
Chongqing Yuneng Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yuneng Construction And Installation Engineering Co ltd filed Critical Chongqing Yuneng Construction And Installation Engineering Co ltd
Priority to CN202220740794.5U priority Critical patent/CN217028111U/en
Application granted granted Critical
Publication of CN217028111U publication Critical patent/CN217028111U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses an outer facade bracing structure of building, relate to building wallboard support technical field, including supporting mechanism, supporting mechanism includes first bracing piece and second bracing piece, the second bracing piece is articulated with the bottom of wall body, first bracing piece is articulated with the wall body, the one end thread bush of second bracing piece is equipped with the sleeve pipe, the one end thread bush that the second bracing piece was kept away from to the sleeve pipe is equipped with the butt pole, the one end that the second bracing piece was kept away from to the butt pole articulates there is the fixing base, it is equipped with the swinging head to rotate the cover on the butt pole, be equipped with the screw thread on the lateral wall of swinging head, the one end thread bush that the wall body was kept away from to first bracing piece is equipped with the commentaries on classics pipe, the one end screw thread that first bracing piece was kept away from to the commentaries on classics pipe is equipped with the connecting rod, be equipped with on the connecting pipe and be used for the fastening bolt fixed with the connecting rod, the thread bush is equipped with the lantern ring on the swinging head on the rotating pipe, the connecting pipe, the one end that the connecting rod was kept away from the connecting rod is articulated with the lantern ring. This application makes the regulation of the support angle of bracing piece more convenient.

Description

建筑物外立面斜撑结构Diagonal bracing structure of building facade

技术领域technical field

本申请涉及建筑墙体支撑技术领域,尤其是涉及建筑物外立面斜撑结构。The present application relates to the technical field of building wall support, and in particular, to a diagonal bracing structure for building facades.

背景技术Background technique

随着建筑装配式混凝土结构被大量采用,建筑业整体在由传统的作业方式向建筑工业化方式升级和转型。各种预制装配式混凝土墙板得到广泛应用,预制混凝土墙板在安放后,需要通过拉梁及支撑件来保证整面墙体的混凝土墙板都能处于同一平面内,不发生倾斜、倾覆。With the mass adoption of prefabricated concrete structures in buildings, the construction industry as a whole is upgrading and transforming from traditional operation methods to construction industrialization methods. Various prefabricated concrete wall panels are widely used. After the prefabricated concrete wall panels are placed, beams and supports are required to ensure that the concrete wall panels of the entire wall can be in the same plane without tilting or overturning.

双斜撑杆结构是最常见的墙体模板斜撑装置, 斜撑装置通过调节两个斜撑杆的长度保证墙体模板的垂直度,对墙体模板进行支撑,将两根斜撑杆抵紧在墙体上,另一端一般通过螺栓固定在地面,但是当需要调整支撑杆的支撑角度时,需要将螺栓从地面拆下,调整好距离后在使用螺栓固定,操作比较麻烦。The double diagonal strut structure is the most common wall formwork diagonal bracing device. The diagonal bracing device ensures the verticality of the wall formwork by adjusting the length of the two diagonal bracing rods, supports the wall formwork, and pushes the two diagonal bracing rods against each other. Tightly on the wall, the other end is generally fixed to the ground by bolts, but when the support angle of the support rod needs to be adjusted, the bolts need to be removed from the ground, and the bolts are used after adjusting the distance, which is troublesome to operate.

实用新型内容Utility model content

为了改善调整支撑角度时操作比较麻烦的问题,本申请提供一种建筑物外立面斜撑结构。In order to improve the troublesome operation when adjusting the support angle, the present application provides a diagonal bracing structure for the facade of a building.

本申请提供的建筑物外立面斜撑结构采用以下技术方案。The diagonal bracing structure of the building facade provided by this application adopts the following technical solutions.

一种建筑物外立面斜撑结构,包括支撑机构,所述支撑机构包括第一支撑杆和第二支撑杆,所述第二支撑杆倾斜设置且一端与墙体的底部铰接,所述第一支撑杆倾斜设置且一端与墙体铰接,所述第一支撑杆位于第二支撑杆的上方,所述第二支撑杆远离墙体的一端螺纹套设有套管,所述套管远离第二支撑杆的一端螺纹套设有抵接杆,所述抵接杆远离第二支撑杆的一端铰接有与地面固定的固定座,所述抵接杆上转动套设有转动管,所述转动管的外侧壁上设有螺纹,所述第一支撑杆远离墙体的一端螺纹套设有转管,所述转管远离第一支撑杆的一端螺纹设有连接杆,所述连接杆远离转管的一端滑动连接有连接管,所述连接管上设有用于将连接杆固定的紧固螺栓,所述转动管上螺纹套设有套环,所述连接管远离连接杆的一端与套环铰接。A diagonal bracing structure for the facade of a building, comprising a support mechanism, the support mechanism includes a first support rod and a second support rod, the second support rod is inclined and one end is hinged with the bottom of the wall, the first support rod is A support rod is inclined and one end is hinged to the wall, the first support rod is located above the second support rod, and the end of the second support rod away from the wall is threadedly sleeved with a sleeve, and the sleeve is far from the first support rod. One end of the two support rods is threadedly sleeved with an abutment rod, and one end of the abutment rod away from the second support rod is hinged with a fixed seat fixed to the ground, and a rotating tube is rotatably sleeved on the abutment rod. The outer side wall of the pipe is provided with threads, the end of the first support rod away from the wall is threadedly sleeved with a rotating pipe, and the end of the rotating pipe away from the first support rod is threaded with a connecting rod, and the connecting rod is away from the rotating pipe. One end of the pipe is slidably connected with a connecting pipe, the connecting pipe is provided with a fastening bolt for fixing the connecting rod, the rotating pipe is threadedly sleeved with a collar, and one end of the connecting pipe away from the connecting rod and the collar are Hinged.

通过采用上述技术方案,将连接管上的紧固螺栓松下后,转动管转动使套环在转动管上移动,连接管在连接杆上移动,能够使第一支撑杆在墙体上转动,调节第一支撑杆的支撑角度,角度调节合适后将紧固螺栓紧固在连接管上,将连接管和连接杆固定,使得第一支撑杆的支撑角度改变,能够使第一支撑杆对墙体的支撑效果更好,转动套管和转管能够调节第一支撑杆和第二支撑杆对墙体的支撑力,使得墙体始终与地面保持垂直状态。By adopting the above technical solution, after loosening the fastening bolts on the connecting pipe, the rotating pipe rotates to make the collar move on the rotating pipe, and the connecting pipe moves on the connecting rod, so that the first support rod can be rotated on the wall, and the adjustment The support angle of the first support rod, after the angle is adjusted properly, fasten the fastening bolts on the connecting pipe, and fix the connecting pipe and the connecting rod, so that the supporting angle of the first support rod can be changed, and the first support rod can be connected to the wall. The supporting effect is better, and rotating the sleeve and the rotating tube can adjust the supporting force of the first support rod and the second support rod to the wall, so that the wall is always kept vertical to the ground.

可选的,所述连接管上沿自身长度方向开设有固定孔,所述紧固螺栓穿过固定孔将连接杆固定。Optionally, the connecting pipe is provided with a fixing hole along its own length direction, and the fastening bolt passes through the fixing hole to fix the connecting rod.

通过采用上述技术方案,调节第一支撑杆的支撑角度时,只需将紧固螺栓拧松,使得紧固螺栓能够在固定孔内移动,避免将紧固螺栓拆下后丢失。By adopting the above technical solution, when adjusting the support angle of the first support rod, only the tightening bolts need to be loosened, so that the tightening bolts can move in the fixing holes and avoid losing the tightening bolts after being removed.

可选的,所述转动管的两端设有用于挡住套环的限位板。Optionally, both ends of the rotating tube are provided with limit plates for blocking the collar.

通过采用上述技术方案,限位板能够将套环挡住,能够避免套环在转动管上移动式脱离转动管的情况出现,使得套环只能够在转动管上移动。By adopting the above technical solution, the limiting plate can block the collar and avoid the situation that the collar moves away from the rotating tube on the rotating tube, so that the collar can only move on the rotating tube.

可选的,其中一个所述限位板的两侧设有用于使转动管转动的握杆。Optionally, both sides of one of the limiting plates are provided with grip rods for rotating the rotating tube.

通过采用上述技术方案,通过限位板两侧的握杆使得转动管的转动操作更加方便。By adopting the above technical solution, the rotating operation of the rotating tube is made more convenient by the holding rods on both sides of the limiting plate.

可选的,所述墙体靠近底部的位置设有安装板,所述安装板上沿自身长度方向滑动设有滑块,所述第二支撑杆的一端与滑块铰接,所述滑块通过螺栓固定在安装板上。Optionally, the wall body is provided with a mounting plate near the bottom, and the mounting plate is provided with a sliding block sliding along its own length direction, one end of the second support rod is hinged with the sliding block, and the sliding block passes through the sliding block. Bolts are attached to the mounting plate.

通过采用上述技术方案,在安装第二支撑杆时,通过滑块在安装板上滑动,能够调节第二支撑杆的支撑角度,使得第二支撑杆的支撑效果更好。By adopting the above technical solution, when the second support rod is installed, the sliding block slides on the mounting plate, so that the support angle of the second support rod can be adjusted, so that the support effect of the second support rod is better.

可选的,所述安装板上沿竖直方向设有滑槽,所述滑块滑动设置于滑槽内,所述安装板位于滑槽的两侧沿竖直方向设有腰形孔,螺栓穿过腰形孔与滑块螺纹连接。Optionally, the mounting plate is provided with a chute along the vertical direction, the slider is slidably arranged in the chute, the mounting plate is provided with waist-shaped holes along the vertical direction on both sides of the chute, and the bolts Through the waist hole, it is threaded with the slider.

通过采用上述技术方案,第二支撑杆的支撑角度调节好后,通过腰形孔使用螺栓将滑块固定在安装板上,使得滑块的固定操作更加方便。By adopting the above technical solution, after the supporting angle of the second support rod is adjusted, the slider is fixed on the mounting plate with bolts through the waist-shaped hole, so that the fixing operation of the slider is more convenient.

可选的,所述转管的周侧上设有握把。Optionally, a handle is provided on the peripheral side of the rotating tube.

通过采用上述技术方案,通过握把使得转管的转动更加方便。By adopting the above technical solution, the rotation of the rotating tube is more convenient through the handle.

可选的,所述套管的周侧上设有把手。Optionally, a handle is provided on the peripheral side of the sleeve.

通过采用上述技术方案,通过套管上的把手使得套管的转动操作更加方便。By adopting the above technical solution, the rotation operation of the sleeve is more convenient through the handle on the sleeve.

综上所述,本申请包含以下至少一种有益效果:To sum up, the present application contains at least one of the following beneficial effects:

1.转动管转动使套环在转动管上移动,能够使第一支撑杆在墙体模板上转动,调节第一支撑杆的支撑角度,将连接管和连接杆固定,使得第一支撑杆的支撑角度改变,能够使第一支撑杆对墙体模板的支撑效果更好;1. The rotation of the rotating pipe makes the collar move on the rotating pipe, which can make the first support rod rotate on the wall formwork, adjust the support angle of the first support rod, and fix the connecting pipe and the connecting rod, so that the The change of the support angle can make the support effect of the first support rod on the wall formwork better;

2.在安装第二支撑杆时,通过滑块在安装板上滑动,能够调节第二支撑杆的支撑角度,使得第二支撑杆的支撑效果更好。2. When installing the second support rod, by sliding the slider on the mounting plate, the support angle of the second support rod can be adjusted, so that the support effect of the second support rod is better.

附图说明Description of drawings

图1是本申请实施例建筑物外立面斜撑结构的结构示意图。FIG. 1 is a schematic structural diagram of a diagonal bracing structure on a building facade according to an embodiment of the present application.

图2是图1中A部分的放大图。FIG. 2 is an enlarged view of part A in FIG. 1 .

附图标记说明:Description of reference numbers:

1、支撑机构;11、第一支撑杆;111、转管;112、连接杆;113、连接管;114、紧固螺栓;115、固定孔;116、握把;12、第二支撑杆;121、套管;122、抵接杆;123、转动管;124、限位板;125、握杆;126、把手;13、套环;2、墙体;21、安装板;22、滑块;23、滑槽;24、腰形孔;3、固定座。1. Supporting mechanism; 11. First support rod; 111, Turning pipe; 112, Connecting rod; 113, Connecting pipe; 114, Fastening bolt; 115, Fixing hole; 116, Grip; 12, Second support rod; 121, sleeve; 122, abutment rod; 123, rotating tube; 124, limit plate; 125, grip rod; 126, handle; 13, collar; 2, wall body; 21, mounting plate; 22, slider ; 23, chute; 24, waist-shaped hole; 3, fixed seat.

具体实施方式Detailed ways

以下结合附图1-2对本申请作进一步详细说明。The present application will be further described in detail below in conjunction with accompanying drawings 1-2.

本申请实施例公开一种建筑物外立面斜撑结构。参照图1,建筑物外立面斜撑结构包括支撑机构1,支撑机构1包括第一支撑杆11和第二支撑杆12,第一支撑杆11倾斜设置且较高的一端与墙体2铰接,第二支撑杆12倾斜设置且一端与墙体2靠近底部的位置铰接,第一支撑杆11位于第二支撑杆12的上方。第二支撑杆12远离墙体2的一端螺纹套设有套管121,套管121远离第二支撑杆12的一端螺纹插设有抵接杆122,抵接杆122远离套管121的一端铰接有固定座3,固定座3通过螺栓与地面固定,套管121上设置有把手126,通过把手126方便对套管121进行转动。The embodiment of the present application discloses a diagonal bracing structure for the facade of a building. Referring to FIG. 1 , the diagonal bracing structure of the building facade includes a support mechanism 1 , and the support mechanism 1 includes a first support rod 11 and a second support rod 12 . The first support rod 11 is inclined and the higher end is hinged to the wall 2 , the second support rod 12 is inclined and one end is hinged with the wall 2 near the bottom, and the first support rod 11 is located above the second support rod 12 . One end of the second support rod 12 away from the wall 2 is threadedly sleeved with a sleeve 121 , one end of the sleeve 121 away from the second support rod 12 is threadedly inserted with an abutment rod 122 , and one end of the abutment rod 122 away from the sleeve 121 is hinged There is a fixing base 3 , the fixing base 3 is fixed to the ground by bolts, and a handle 126 is provided on the sleeve 121 , and the sleeve 121 can be easily rotated through the handle 126 .

参照图1和图2,第一支撑杆11远离墙体2的一端螺纹套设有转管111,转管111远离第一支撑杆11的一端螺纹插设有连接杆112,连接杆112远离转管111的一端滑动套设有连接管113,连接管113的侧壁上沿自身长度方向开设有固定孔115,连接管113上通过固定孔115穿设有紧固螺栓114,紧固螺栓114穿过连接杆112,将连接杆112固定在连接管113内。抵接杆122上转动套设有转动管123,转动管123的外侧壁上设置有螺纹,在转动管123的外侧壁上螺纹套设有套环13,连接管113远离第一支撑杆11的一端与套环13铰接。Referring to FIGS. 1 and 2 , one end of the first support rod 11 away from the wall 2 is threadedly sleeved with a rotating pipe 111 , and one end of the rotating pipe 111 away from the first support rod 11 is threadedly inserted with a connecting rod 112 , and the connecting rod 112 is away from the rotating pipe. One end of the pipe 111 is slidably sleeved with a connecting pipe 113, the side wall of the connecting pipe 113 is provided with a fixing hole 115 along its own length direction, and the connecting pipe 113 is provided with a fastening bolt 114 through the fixing hole 115, and the fastening bolt 114 passes through it. Through the connecting rod 112 , the connecting rod 112 is fixed in the connecting pipe 113 . A rotating tube 123 is rotatably sleeved on the abutting rod 122 , a thread is set on the outer side wall of the rotating tube 123 , a collar 13 is threadedly sleeved on the outer side wall of the rotating tube 123 , and the connecting tube 113 is away from the first support rod 11 . One end is hinged to the collar 13 .

需要调节第一支撑杆11的支撑角度时,将连接管113上的紧固螺栓114松下后,转动管123转动使套环13在转动管123上移动,连接管113在连接杆112上移动,能够使第一支撑杆11在墙体2上转动,调节第一支撑杆11的支撑角度,角度调节合适后将紧固螺栓114紧固在连接管113上,将连接管113和连接杆112固定,使得第一支撑杆11的支撑角度改变,能够使第一支撑杆11对墙体2的支撑效果更好,转动转管111和套管121能够调节第一支撑杆11和第二支撑杆12对墙体的支撑力,使得墙体2始终与地面保持垂直状态,减小墙体2出现倾斜或者倒塌的可能。When the support angle of the first support rod 11 needs to be adjusted, after loosening the fastening bolts 114 on the connecting pipe 113, the rotating pipe 123 rotates to make the collar 13 move on the rotating pipe 123, and the connecting pipe 113 moves on the connecting rod 112. The first support rod 11 can be rotated on the wall 2, the supporting angle of the first support rod 11 can be adjusted, and after the angle is adjusted properly, the fastening bolts 114 are fastened on the connecting pipe 113, and the connecting pipe 113 and the connecting rod 112 are fixed. , so that the support angle of the first support rod 11 is changed, so that the first support rod 11 can better support the wall 2 , and the rotating pipe 111 and the sleeve 121 can adjust the first support rod 11 and the second support rod 12 The supporting force for the wall body keeps the wall body 2 in a vertical state with the ground all the time, reducing the possibility of the wall body 2 being inclined or collapsing.

为了能够使转管111的转动操作更加方便,在转管111的侧壁上设置有握把116,通过握把116方便对转管111进行转动,使得操作更加方便。In order to make the rotating operation of the rotating pipe 111 more convenient, a handle 116 is provided on the side wall of the rotating pipe 111, and the rotating pipe 111 can be easily rotated through the handle 116, which makes the operation more convenient.

为了避免套环13在转动管123上移动时脱离转动管123,在转动管123的两端设置有限位板124,本实施例中限位板124位圆形板,且限位板124与转动管123同轴设置,限位板124能够将套环13挡住,使得套环13只能够在转动管123上移动。In order to prevent the collar 13 from detaching from the rotating pipe 123 when it moves on the rotating pipe 123 , limit plates 124 are provided at both ends of the rotating pipe 123 . The tube 123 is coaxially arranged, and the limiting plate 124 can block the collar 13 so that the collar 13 can only move on the rotating tube 123 .

为了使转动管123转动时操作更加方便,在其中一块限位板124的两侧均设置有握杆125,本实施例中握杆125设置在靠近固定座3一侧的限位板124上。握杆125与转动管123平行,通过转动两根握杆125能够使转动管123转动,能够使得转动管123的转动操作更加省力方便。In order to make the operation of the rotating tube 123 more convenient when rotating, gripping rods 125 are provided on both sides of one of the limiting plates 124 . The gripping rod 125 is parallel to the rotating tube 123 , and the rotating tube 123 can be rotated by rotating the two gripping rods 125 , which can make the rotating operation of the rotating tube 123 more labor-saving and convenient.

参照图1,在安装第二支撑杆12时,为了方便对第二支撑杆12的支撑角度进行调节,在墙体2靠近底部的位置用螺栓固定有安装板21,安装板21上沿竖直方向开设有滑槽23,本实施例中滑槽23使用的是T型槽,在滑槽23内滑动设置有滑块22,本实施例中滑块22使用的是T型块。第二支撑杆12与滑块22铰接,使得通过滑动滑块22能够调节第二支撑杆12的支撑角度。安装板21位于滑槽23的两侧沿竖直方向开设有腰形孔24,安装板21上设置有螺栓,螺栓穿过腰形孔24螺纹插设于滑块22内,将滑块22固定在安装板21上。1, when installing the second support rod 12, in order to facilitate the adjustment of the support angle of the second support rod 12, a mounting plate 21 is fixed with bolts at a position near the bottom of the wall 2, and the upper edge of the mounting plate 21 is vertically A sliding groove 23 is provided in the direction. In this embodiment, the sliding groove 23 uses a T-shaped groove, and a sliding block 22 is slidably arranged in the sliding groove 23. In this embodiment, the sliding block 22 uses a T-shaped block. The second support rod 12 is hinged with the slider 22 , so that the support angle of the second support rod 12 can be adjusted by sliding the slider 22 . The mounting plate 21 is located on both sides of the chute 23 and is provided with waist-shaped holes 24 along the vertical direction. The mounting plate 21 is provided with bolts, and the bolts pass through the waist-shaped holes 24 and are threadedly inserted into the slider 22 to fix the slider 22 on the mounting plate 21 .

该种建筑物外立面斜撑结构的实施原理如下:安装第二支撑杆12时滑动滑块22,调节第二支撑杆12的支撑角度,调节好后将固定座3用螺栓固定在地面。转动握杆125使转动管123转动,套环13在转动管123上移动,使第一支撑杆11在墙体2上转动,第一支撑杆11的角度调整好后,使用紧固螺栓114将连接杆112固定在连接管113内,转动转管111和套管121调节第一支撑杆11和第二支撑杆12对墙体2的支撑力。The implementation principle of this kind of building facade diagonal bracing structure is as follows: when installing the second support rod 12, slide the slider 22, adjust the support angle of the second support rod 12, and fix the fixed seat 3 on the ground with bolts after adjustment. Rotating the handle 125 makes the rotating tube 123 rotate, the collar 13 moves on the rotating tube 123, so that the first support rod 11 rotates on the wall 2, after the angle of the first support rod 11 is adjusted, use the fastening bolt 114 to The connecting rod 112 is fixed in the connecting pipe 113 , and the rotating pipe 111 and the sleeve 121 are rotated to adjust the supporting force of the first support rod 11 and the second support rod 12 to the wall 2 .

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore: all equivalent changes made according to the structure, shape and principle of the present application should be covered within the scope of the present application. Inside.

Claims (8)

1.一种建筑物外立面斜撑结构,包括支撑机构(1),其特征在于:所述支撑机构(1)包括第一支撑杆(11)和第二支撑杆(12),所述第二支撑杆(12)倾斜设置且一端与墙体(2)的底部铰接,所述第一支撑杆(11)倾斜设置且一端与墙体(2)铰接,所述第一支撑杆(11)位于第二支撑杆(12)的上方,所述第二支撑杆(12)远离墙体(2)的一端螺纹套设有套管(121),所述套管(121)远离第二支撑杆(12)的一端螺纹套设有抵接杆(122),所述抵接杆远离第二支撑杆(12)的一端铰接有与地面固定的固定座(3),所述抵接杆(122)上转动套设有转动管(123),所述转动管(123)的外侧壁上设有螺纹,所述第一支撑杆(11)远离墙体(2)的一端螺纹套设有转管(111),所述转管(111)远离第一支撑杆(11)的一端螺纹设有连接杆(112),所述连接杆(112)远离转管(111)的一端滑动连接有连接管(113),所述连接管(113)上设有用于将连接杆(112)固定的紧固螺栓(114),所述转动管(123)上螺纹套设有套环(13),所述连接管(113)远离连接杆(112)的一端与套环(13)铰接。1. A diagonal bracing structure for a building facade, comprising a support mechanism (1), characterized in that: the support mechanism (1) comprises a first support rod (11) and a second support rod (12), the The second support rod (12) is inclined and one end is hinged with the bottom of the wall (2), the first support rod (11) is inclined and one end is hinged with the wall (2), the first support rod (11) ) is located above the second support rod (12), one end of the second support rod (12) away from the wall (2) is threadedly sleeved with a sleeve (121), and the sleeve (121) is away from the second support One end of the rod (12) is threadedly sleeved with an abutment rod (122), and one end of the abutment rod away from the second support rod (12) is hinged with a fixing seat (3) fixed to the ground, the abutment rod ( 122) A rotating tube (123) is set on the upper rotating sleeve, the outer side wall of the rotating tube (123) is provided with threads, and the end of the first support rod (11) away from the wall (2) is threadedly sleeved with a rotating tube. A pipe (111), one end of the rotating pipe (111) away from the first support rod (11) is threadedly provided with a connecting rod (112), and one end of the connecting rod (112) away from the rotating pipe (111) is slidably connected with a connection A pipe (113), the connecting pipe (113) is provided with a fastening bolt (114) for fixing the connecting rod (112), and the rotating pipe (123) is threadedly sleeved with a collar (13), so One end of the connecting pipe (113) away from the connecting rod (112) is hinged with the collar (13). 2.根据权利要求1所述的建筑物外立面斜撑结构,其特征在于:所述连接管(113)上沿自身长度方向开设有固定孔(115),所述紧固螺栓(114)穿过固定孔(115)将连接杆(112)固定。2. The diagonal bracing structure of building facade according to claim 1, characterized in that: the connecting pipe (113) is provided with a fixing hole (115) along its own length direction, and the fastening bolt (114) Fix the connecting rod (112) through the fixing hole (115). 3.根据权利要求1所述的建筑物外立面斜撑结构,其特征在于:所述转动管(123)的两端设有用于挡住套环(13)的限位板(124)。3 . The diagonal bracing structure of building facade according to claim 1 , wherein the two ends of the rotating pipe ( 123 ) are provided with limit plates ( 124 ) for blocking the collar ( 13 ). 4 . 4.根据权利要求3所述的建筑物外立面斜撑结构,其特征在于:其中一个所述限位板(124)的两侧设有用于使转动管(123)转动的握杆(125)。The diagonal bracing structure of building facade according to claim 3, characterized in that: both sides of one of the limiting plates (124) are provided with grip rods (125) for rotating the rotating tube (123). ). 5.根据权利要求1所述的建筑物外立面斜撑结构,其特征在于:所述墙体(2)靠近底部的位置设有安装板(21),所述安装板(21)上沿自身长度方向滑动设有滑块(22),所述第二支撑杆(12)的一端与滑块(22)铰接,所述滑块(22)通过螺栓固定在安装板(21)上。5 . The diagonal bracing structure of building facade according to claim 1 , wherein the wall ( 2 ) is provided with a mounting plate ( 21 ) at a position close to the bottom, and an upper edge of the mounting plate ( 21 ) is provided. 6 . A sliding block (22) is provided for sliding in its own length direction, one end of the second support rod (12) is hinged with the sliding block (22), and the sliding block (22) is fixed on the mounting plate (21) by bolts. 6.根据权利要求5所述的建筑物外立面斜撑结构,其特征在于:所述安装板(21)上沿竖直方向设有滑槽(23),所述滑块(22)滑动设置于滑槽(23)内,所述安装板(21)位于滑槽(23)的两侧沿竖直方向设有腰形孔(24),螺栓穿过腰形孔(24)与滑块(22)螺纹连接。6 . The diagonal bracing structure of building facade according to claim 5 , characterized in that: the mounting plate ( 21 ) is provided with a chute ( 23 ) along the vertical direction, and the sliding block ( 22 ) slides It is arranged in the chute (23), the mounting plate (21) is located on both sides of the chute (23) and is provided with waist-shaped holes (24) along the vertical direction, and the bolt passes through the waist-shaped hole (24) and the slider (22) Threaded connection. 7.根据权利要求1所述的建筑物外立面斜撑结构,其特征在于:所述转管(111)的周侧上设有握把(116)。7. The diagonal bracing structure of building facade according to claim 1, characterized in that: a handle (116) is provided on the peripheral side of the rotating pipe (111). 8.根据权利要求1所述的建筑物外立面斜撑结构,其特征在于:所述套管(121)的周侧上设有把手(126)。8 . The diagonal bracing structure of building facade according to claim 1 , wherein a handle ( 126 ) is provided on the peripheral side of the sleeve ( 121 ). 9 .
CN202220740794.5U 2022-03-31 2022-03-31 Building facade bracing structure Expired - Fee Related CN217028111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220740794.5U CN217028111U (en) 2022-03-31 2022-03-31 Building facade bracing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220740794.5U CN217028111U (en) 2022-03-31 2022-03-31 Building facade bracing structure

Publications (1)

Publication Number Publication Date
CN217028111U true CN217028111U (en) 2022-07-22

Family

ID=82414838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220740794.5U Expired - Fee Related CN217028111U (en) 2022-03-31 2022-03-31 Building facade bracing structure

Country Status (1)

Country Link
CN (1) CN217028111U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116005993A (en) * 2022-12-23 2023-04-25 王胜济 Cement precast slab support frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116005993A (en) * 2022-12-23 2023-04-25 王胜济 Cement precast slab support frame

Similar Documents

Publication Publication Date Title
CN109779270B (en) A prefabricated column installation device
CN217028111U (en) Building facade bracing structure
CN214783976U (en) Foundation pit support structure
CN205591117U (en) Outer web strutting arrangement to one side of concrete bridge flange
CN202000651U (en) Adjustable wall-mounted supporting device for reinforcing upright columns
CN207228671U (en) A kind of building scaffold support device
CN211143708U (en) An adjustable top bracket
CN217874520U (en) C-shaped steel combined type support hanger
CN209653434U (en) A kind of prefabricated post mounting device convenient for lifting
CN219975797U (en) Building pipeline antidetonation gallows
CN217379696U (en) A simple inclined support device for mobile portal scaffolding that can be turned around
CN111677268A (en) A fair-faced concrete single-side support formwork system suitable for side walls of underground engineering
CN207144474U (en) A kind of reinforcement tools for oblique circular cylinder formwork reinforcement
CN214533065U (en) Tunnel stock anchor effect detection device
CN216340793U (en) Novel triangular support device for external scaffold
CN214466631U (en) Water pipe is with holding in palm cantilever crane convenient to installation
CN213710503U (en) A steel structure bearing frame for construction engineering
CN223294393U (en) A building hanger for assembled buildings
CN221742149U (en) A support safety protection device for water conservancy project construction
CN218623480U (en) A wall reinforcement device for industrial and civil buildings
CN222389391U (en) Convenient mounting tool for foundation pit supporting hanging bars
CN220934805U (en) Cable hook for secondary structure construction
CN211899819U (en) Steel structure support frame
CN211229509U (en) A quick-release support screw
CN206000167U (en) Adjustable Alminum Project slab form support meanss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220722