CN217027054U - Secondary grouting concrete tubular pile construction device - Google Patents

Secondary grouting concrete tubular pile construction device Download PDF

Info

Publication number
CN217027054U
CN217027054U CN202220655559.8U CN202220655559U CN217027054U CN 217027054 U CN217027054 U CN 217027054U CN 202220655559 U CN202220655559 U CN 202220655559U CN 217027054 U CN217027054 U CN 217027054U
Authority
CN
China
Prior art keywords
fixedly connected
tubular pile
pipe pile
pile construction
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220655559.8U
Other languages
Chinese (zh)
Inventor
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Huayuan Construction Engineering Co ltd
Original Assignee
Sichuan Huayuan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Huayuan Construction Engineering Co ltd filed Critical Sichuan Huayuan Construction Engineering Co ltd
Priority to CN202220655559.8U priority Critical patent/CN217027054U/en
Application granted granted Critical
Publication of CN217027054U publication Critical patent/CN217027054U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to the technical field of pipe pile construction, in particular to a secondary grouting concrete pipe pile construction device which comprises a fixed base, wherein a construction assembly is arranged on the fixed base, an adjusting assembly is arranged on the fixed base, the construction assembly comprises a first rotary crane rotationally connected with the top of the fixed base, the top of the fixed base is rotationally connected with the first rotary crane, the top of a second rotary crane is fixedly connected with a hook, the outer side of the hook is movably connected with a pipe pile body, and the bottom of the second rotary crane is fixedly provided with a first motor. This secondary slip casting concrete tubular pile construction equipment through setting up adjusting part and restriction subassembly, can be stable to the tubular pile in the tubular pile work progress, and the tubular pile receives equipment dead weight and removes the influence when preventing to construct, and the tubular pile receives the easy skew of extrusion, avoids influencing the work progress, makes construction quality remain stable, and the person of facilitating the use's use improves the practicality of device.

Description

Secondary grouting concrete tubular pile construction device
Technical Field
The utility model relates to the technical field of pipe pile construction, in particular to a secondary grouting concrete pipe pile construction device.
Background
The existing construction pile foundation construction mostly adopts the tubular pile with the diameter below 600, if the tubular pile construction encounters a stratum with large soil density or hard geology and is difficult to be communicated, a cast-in-place pile is generally adopted or a diesel hammer hammering machine with great environmental pollution is adopted for construction for avoiding the damage of the tubular pile, and the secondary damage can be carried out on the building foundation nearby due to the soil squeezing effect, so that the application range of the tubular pile is limited.
The cast-in-place pile construction process is adopted all the time, the tubular pile and the wall of a soil hole basically have no friction force, the existing tubular pile construction device is inconvenient to keep the tubular pile stable, the tubular pile is easily influenced by the self weight and movement of equipment during construction, the tubular pile is easily deviated by extrusion and influences the construction process, and therefore the secondary cast-in-place concrete tubular pile construction device is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
To prior art's not enough, this application provides a secondary slip casting concrete tubular pile construction equipment, possesses advantages such as support stability, has solved the inconvenient tubular pile construction equipment that has now and has kept stable to the tubular pile, very easily during the construction equipment dead weight and remove the influence, the problem that produces the influence to the work progress.
In order to achieve the purpose, the utility model provides the following technical scheme: a secondary grouting concrete pipe pile construction device comprises a fixed base, wherein a construction assembly is arranged on the fixed base, an adjusting assembly is arranged on the fixed base, and a limiting assembly is arranged on the fixed base;
restriction subassembly include quantity be two and with unable adjustment base top fixed connection's fixed storehouse, include the second dwang of being connected with the bottom wall rotation in the fixed storehouse, the outside fixedly connected with of second dwang and the driven awl tooth of initiative awl tooth meshing, the outside fixedly connected with pulley of second dwang, the outside of pulley is around rolling up there being the stay cord, the stay cord is close to one side fixedly connected with limiting plate of screw conveying pole, the spring has been cup jointed in the outside of limiting plate.
Through adopting above-mentioned technical scheme, conveniently hoist tubular pile body and screw feed pole and remove when using.
Further, the construction subassembly includes rotates the first crane that turns round of being connected with the unable adjustment base top, unable adjustment base's top is rotated and is connected with the second crane that turns round, the top fixedly connected with couple of first crane that turns round, the outside swing joint of couple has the tubular pile body, the bottom fixed mounting of the second crane that turns round has first motor, the first pivot pole of output shaft fixedly connected with of first motor, the bottom fixedly connected with spiral conveying rod of first pivot pole.
Through adopting above-mentioned technical scheme, two initiative awl teeth rotate simultaneously when the convenience is used.
Further, the adjusting part includes that quantity is two and equal fixed mounting is in the backup pad at unable adjustment base top, the left side fixed mounting who is close to the backup pad of first gyration crane has the second motor, the output shaft fixedly connected with third transfer line of second motor, the outside fixedly connected with quantity of third transfer line is two initiative awl teeth.
By adopting the technical scheme, the pipe pile body is conveniently kept stable by the limiting plate when in use.
Further, the bottom swing joint of unable adjustment base has the track that quantity is two, the activity through-hole with the screw feed pole size looks adaptation is seted up at unable adjustment base's top.
Through adopting above-mentioned technical scheme, the track drive arrangement removes at the construction ground when convenient using.
Furthermore, one end of the third transmission rod penetrates through the left side supporting plate and is rotatably connected with the left side of the right side supporting plate, and the second rotating rod is located on the back face of the third transmission rod.
Through adopting above-mentioned technical scheme, the convenience is the third transfer line remain stable when using.
Furthermore, the one end of stay cord and the inner wall fixed connection that fixed storehouse is close to backup pad one side, and the one end of second dwang is run through and is extended to the fixed storehouse outside.
Through adopting above-mentioned technical scheme, the convenience is in the removal of stay cord pulling limiting plate when using.
Furthermore, one end of the spring is fixedly connected with one side, close to the spiral conveying rod, of the fixed bin, and the other end of the spring is fixedly connected with the outer side of the limiting plate.
By adopting the technical scheme, the limiting plate can be conveniently reset by utilizing the elasticity of the spring when in use.
Further, fixed storehouse is inside hollow cuboid, two the mobile through hole with the big or small looks adaptation of restriction board is all seted up to the relative one side in fixed storehouse.
Through adopting above-mentioned technical scheme, conveniently restrict the restriction board when using, make it at the downthehole horizontal migration that moves.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. this secondary slip casting concrete tubular pile construction equipment through setting up adjusting part and restriction subassembly, can be stable to the tubular pile in the tubular pile work progress, and the tubular pile receives equipment dead weight and removes the influence when preventing to construct, and the tubular pile receives the easy skew of extrusion, avoids influencing the work progress, makes construction quality remain stable, and the person of facilitating the use's use improves the practicality of device.
2. This secondary slip casting concrete tubular pile construction equipment through setting up the construction subassembly, drills to the underground, and the auger delivery pole is with the hack through rotatory helical blade discharge ground, and the back is accomplished in drilling, puts into the tubular pile downtheholely, through the construction of hammering machine, and the hammering is located about one meter from ground to the tubular pile top to be equipped with follow-up pile extension, increase the practicality of device.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
FIG. 2 is an enlarged view of the structure of FIG. 1 at A according to the present invention.
In the figure: the tubular pile fixing device comprises a fixed base 1, a crawler 2, a first rotary crane 3, a second rotary crane 4, a hook 5, a tubular pile body 6, a first motor 7, a first rotating rod 8, a spiral conveying rod 9, a supporting plate 10, a second motor 11, a third rotating rod 12, a driving bevel gear 13, a fixed bin 14, a second rotating rod 15, a pulley 16, a pull rope 17, a limiting plate 18, a spring 19 and a driven bevel gear 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the secondary grouting concrete pipe pile construction device in this embodiment includes a fixed base 1, two caterpillar bands 2 are movably connected to the bottom of the fixed base 1, and the caterpillar bands 2 can drive the whole construction device to move. The fixed base 1 is provided with a construction assembly, and the fixed base 1 is provided with an adjusting assembly.
The construction assembly comprises a first rotary crane 3 connected with the top of the fixed base 1 in a rotating mode, a second rotary crane 4 is connected with the top of the fixed base 1 in a rotating mode, a hook 5 is fixedly connected to the top of the first rotary crane 3, and a tubular pile body 6 is hung at the lower end of the hook 5. The bottom fixed mounting of second gyration crane 4 has first motor 7, and the output shaft fixedly connected with of first motor 7 changes pole 8, and the bottom fixedly connected with auger delivery pole 9 of first rotation pole 8, and the activity through-hole with auger delivery pole 9 size looks adaptation is seted up at unable adjustment base 1's top.
Specifically, first gyration crane 3 hoists tubular pile body 6, and second gyration crane 4 hoists screw conveyer 9, and first gyration crane 3 and second gyration crane 4 can rotate and go up and down, drive tubular pile body 6 and screw conveyer 9 and remove, and the activity through-hole makes things convenient for screw conveyer 9 to drill to the underground, and screw conveyer 9 discharges the ground through rotatory helical blade with the hack.
Referring to fig. 1, the adjusting assembly includes two supporting plates 10 which are fixedly mounted on the top of the fixing base 1, a second motor 11 is fixedly mounted on the left side of the supporting plate 10 close to the first rotary crane 3, an output shaft of the second motor 11 is fixedly connected with a third transmission rod 12, and one end of the third transmission rod 12 penetrates through the left supporting plate 10 and is rotatably connected with the left side of the right supporting plate 10. The outer side of the third transmission rod 12 is fixedly connected with two driving bevel gears 13, the top of the fixed base 1 is fixedly connected with two fixed bins 14, and the fixed bins 14 are provided with limiting components.
Specifically, the third transmission rod 12 can drive the two driving bevel gears 13 to rotate synchronously when rotating, and the fixed bin 14 can facilitate the operation of the limiting assembly.
Referring to fig. 2, the limiting assembly includes a second rotating rod 15 rotatably connected to the inner bottom wall of the fixed bin 14, the second rotating rod 15 is located at the back of the third transmission rod 12, the outer side of the second rotating rod 15 is fixedly connected to a driven bevel gear 20 engaged with the driving bevel gear 13, the outer side of the second rotating rod 15 is fixedly connected to a pulley 16, a pull rope 17 is wound around the outer side of the pulley 16, one end of the pull rope 17 is fixedly connected to the inner wall of the fixed bin 14 near one side of the supporting plate 10, one end of the second rotating rod 15 penetrates through and extends to the outer side of the fixed bin 14, and a limiting plate 18 is fixedly connected to one side of the pull rope 17 near the spiral conveying rod 9. Fixed storehouse 14 is inside hollow cuboid, and the removal through-hole with the 18 size looks adaptations of limiting plate has all been seted up to one side that two fixed storehouses 14 are relative, and spring 19 has been cup jointed in limiting plate 18's the outside, and spring 19's one end and fixed storehouse 14 are close to one side fixed connection of screw conveying pole 9, spring 19's the other end and limiting plate 18's outside fixed connection.
Specifically, drive limiting plate 18 when stay cord 17 contracts and move to being close to second dwang 15 one side, make things convenient for tubular pile body 6 to place auger delivery pole 9 downthehole at the underground boring, through spring 19's tension, make limiting plate 18 automatic to keeping away from second dwang 15 one side motion, make tubular pile body 6 remain stable, avoid tubular pile body 6 to receive the extrusion to lead to the skew.
The electrical components presented herein are all electrically connected to a controller and a power supply, the control mode of the present invention is controlled by the controller, the control circuit of the controller can be realized by simple programming by a person skilled in the art, the supply of the power supply also belongs to the common knowledge in the art, and the present invention is mainly used for protecting mechanical devices, so the control mode and the circuit connection are not explained in detail in the present invention.
The working principle of the embodiment is as follows:
when the tubular pile driving device is used, the first motor 7 is started, the output shaft of the first motor 7 drives the first rotating rod 8 to rotate, the spiral conveying rod 9 starts to rotate, holes are drilled on the ground, after the holes are drilled, the spiral conveying rod 9 is taken out of the holes by the second rotary crane 4, the second motor 11 is started, the output shaft of the second motor 11 drives the third driving rod 12 to rotate, the driven bevel gear 20 drives the second rotating rod 15 to rotate under the action of the driving bevel gear 13, the pulley 16 drives the pull rope 17 to rotate, the pull rope 17 drives the limiting plate 18 to move towards the side close to the second rotating rod 15, the spring 19 stretches, the tubular pile body 6 is placed into the holes through the first rotary crane 3, the second motor 11 rotates reversely, the limiting plate 18 moves towards the side far away from the second rotating rod 15 through the tension of the spring 19 to clamp the tubular pile body 6, so that the tubular pile body 6 is kept stable and the tubular pile body 6 is prevented from being extruded to cause deflection, the construction process is influenced, and the pipe pile is constructed through a hammering machine, and is hammered to a position, about one meter away from the ground, of the top of the pipe pile body 6 for subsequent pile splicing.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a secondary slip casting concrete pipe pile construction equipment, includes unable adjustment base (1), its characterized in that: the fixed base (1) is provided with a construction assembly, the fixed base (1) is provided with an adjusting assembly, and the fixed base (1) is provided with a limiting assembly;
restriction subassembly includes quantity be two and with unable adjustment base (1) top fixed connection's fixed storehouse (14), include second dwang (15) of being connected with fixed storehouse (14) inner bottom wall rotation, the outside fixedly connected with of second dwang (15) and driven awl tooth (20) of initiative awl tooth (13) meshing, the outside fixedly connected with pulley (16) of second dwang (15), the outside of pulley (16) has stay cord (17) around rolling up, one side fixedly connected with restriction board (18) that stay cord (17) are close to screw conveying pole (9), spring (19) have been cup jointed in the outside of restriction board (18).
2. The secondary grouting concrete pipe pile construction device according to claim 1, characterized in that: the construction assembly comprises a first rotary crane (3) connected with the top of a fixing base (1) in a rotating mode, the top of the fixing base (1) is connected with a second rotary crane (4) in a rotating mode, the top of the first rotary crane (3) is fixedly connected with a hook (5), the outer side of the hook (5) is movably connected with a tubular pile body (6), the bottom of the second rotary crane (4) is fixedly provided with a first motor (7), the output shaft of the first motor (7) is fixedly connected with a first rotary rod (8), and the bottom of the first rotary rod (8) is fixedly connected with a spiral conveying rod (9).
3. The secondary grouting concrete pipe pile construction device according to claim 2, characterized in that: the adjusting part comprises two supporting plates (10) which are fixedly mounted at the top of the fixing base (1), a second motor (11) is fixedly mounted on the left side of each supporting plate (10) close to the first rotary crane (3), a third transmission rod (12) is fixedly connected with an output shaft of each second motor (11), and two driving bevel gears (13) are fixedly connected to the outer sides of the third transmission rods (12).
4. The secondary grouting concrete pipe pile construction device according to claim 3, characterized in that: the bottom swing joint of unable adjustment base (1) has track (2) that quantity is two, the activity through-hole with screw conveyor pole (9) size looks adaptation is seted up at the top of unable adjustment base (1).
5. The secondary grouting concrete pipe pile construction device according to claim 3, characterized in that: third transfer line (12) one end runs through left side backup pad (10) and rotates with the left side of right side backup pad (10) and be connected, second dwang (15) are located the back of third transfer line (12).
6. The secondary grouting concrete pipe pile construction device according to claim 3, characterized in that: one end of the pull rope (17) is fixedly connected with the inner wall of one side, close to the supporting plate (10), of the fixed bin (14), and one end of the second rotating rod (15) penetrates through and extends to the outer side of the fixed bin (14).
7. The secondary grouting concrete pipe pile construction device according to claim 1, characterized in that: one end of the spring (19) is fixedly connected with one side, close to the spiral conveying rod (9), of the fixed bin (14), and the other end of the spring (19) is fixedly connected with the outer side of the limiting plate (18).
8. The secondary grouting concrete pipe pile construction device according to claim 1, characterized in that: fixed storehouse (14) are inside hollow cuboid, two the removal through-hole with restriction board (18) size looks adaptation is all seted up to one side that fixed storehouse (14) is relative.
CN202220655559.8U 2022-03-24 2022-03-24 Secondary grouting concrete tubular pile construction device Active CN217027054U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220655559.8U CN217027054U (en) 2022-03-24 2022-03-24 Secondary grouting concrete tubular pile construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220655559.8U CN217027054U (en) 2022-03-24 2022-03-24 Secondary grouting concrete tubular pile construction device

Publications (1)

Publication Number Publication Date
CN217027054U true CN217027054U (en) 2022-07-22

Family

ID=82413141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220655559.8U Active CN217027054U (en) 2022-03-24 2022-03-24 Secondary grouting concrete tubular pile construction device

Country Status (1)

Country Link
CN (1) CN217027054U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117248783A (en) * 2023-08-29 2023-12-19 中铁上海工程局集团有限公司 Railway cylindrical prefabricated part installation assembly and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117248783A (en) * 2023-08-29 2023-12-19 中铁上海工程局集团有限公司 Railway cylindrical prefabricated part installation assembly and installation method
CN117248783B (en) * 2023-08-29 2024-04-09 中铁上海工程局集团有限公司 Railway cylindrical prefabricated part installation assembly and installation method

Similar Documents

Publication Publication Date Title
CN217027054U (en) Secondary grouting concrete tubular pile construction device
CN214832669U (en) Tubular pile perpendicularity regulating and controlling device
CN212077899U (en) Compacting and grouting device for municipal road and bridge construction
CN113027333B (en) Drilling and piling integrated rotary drilling rig and construction method thereof
CN201943066U (en) Screw rod pile machine
CN116591597B (en) Rotary drilling rig for highway bridge construction
CN210105897U (en) Throw stone layer stock pore-forming auxiliary device
CN103643677B (en) A kind of tubular pile core taking-out machine
CN114263181B (en) Main bridge pile foundation concrete super-casting height accurate control device and use method thereof
CN214836096U (en) Deep stirring pile machine suitable for dense sand layer environment
JPH11270266A (en) Pile-driving machine with cleaning structure
CN112761615B (en) Novel inclinometer system and using method thereof
CN214090853U (en) Portable support frame for power transmission and transformation engineering construction maintenance
CN210622694U (en) Telescopic swing mechanism of rotary spraying drilling machine
CN201843512U (en) Auger drill
CN112796321A (en) Construction engineering is with clear native machine in on-spot stake hole
CN201835747U (en) Drilling machine with screw anchor
CN116752538B (en) Automatic drilling of clearance hole soil fills stake mechanism
CN214940078U (en) Multidirectional multiaxis type soil cement mixing pile machine
CN220267671U (en) In-hole soil cleaning equipment for building site piles
CN105525674B (en) Mining bin clearing machine
CN217870433U (en) Well drilling and pipe lowering integrated equipment for water interception curtain construction
CN220081326U (en) House building engineering foundation ditch construction soil perforating device
CN219452059U (en) Osmometer fixing device
CN214889324U (en) Conveying pipeline erecting structure for building foundation construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant