CN217007318U - Geological survey equipment for hydraulic engineering - Google Patents

Geological survey equipment for hydraulic engineering Download PDF

Info

Publication number
CN217007318U
CN217007318U CN202220617672.7U CN202220617672U CN217007318U CN 217007318 U CN217007318 U CN 217007318U CN 202220617672 U CN202220617672 U CN 202220617672U CN 217007318 U CN217007318 U CN 217007318U
Authority
CN
China
Prior art keywords
equipment
hydraulic engineering
make
rod
hinge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220617672.7U
Other languages
Chinese (zh)
Inventor
李国台
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Yishui Construction Engineering Co ltd
Original Assignee
Fujian Yishui Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Yishui Construction Engineering Co ltd filed Critical Fujian Yishui Construction Engineering Co ltd
Priority to CN202220617672.7U priority Critical patent/CN217007318U/en
Application granted granted Critical
Publication of CN217007318U publication Critical patent/CN217007318U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Earth Drilling (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to the technical field of hydraulic engineering and discloses geological survey equipment for hydraulic engineering. This equipment is surveyed to hydraulic engineering land used quality, can be so that survey equipment has fine supporting role, do not need the artifical equipment of holding, it is more convenient when using, it is quicker to make it survey when the sample, can make and be convenient for fold the bracing piece and accomodate through the connecting axle, thereby make and reduce its occupation space when not using, it is more convenient when the transport to make it, the slipmat makes its increase with the frictional force on ground, make it more stable, and the mutually supporting of clamp and hinge uses, make and be convenient for splice the bracing piece, thereby can highly splice it according to the user demand, thereby make the result of use better, satisfy user's demand.

Description

Geological survey equipment for hydraulic engineering
Technical Field
The utility model relates to the technical field of hydraulic engineering, in particular to geological exploration equipment for hydraulic engineering.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential to human production and life, but the naturally existing state of the water does not completely meet the needs of human beings, and only when water conservancy projects are built, water flow can be controlled, flood disasters are prevented, and water quantity is regulated and distributed to meet the needs of the people's life and production on water resources.
Present hydraulic engineering land used quality survey equipment, most of need the workman to hold equipment and survey it taking a sample to it when using, and is extremely inconvenient when using, brings the degree of difficulty for work, causes work efficiency extremely low to make the practicality of equipment obtain reducing, it is necessary consequently to design a hydraulic engineering land used quality survey equipment.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides geological survey equipment for hydraulic engineering, which aims to solve the problems that most of equipment needs to be taken by workers to carry out sampling survey when in use, is extremely inconvenient to use, brings difficulty to work, causes extremely low working efficiency and reduces the practicability of the equipment in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model provides the following technical scheme: a geological survey device for hydraulic engineering comprises a bottom plate, wherein a survey mechanism is arranged on one side of the bottom plate, an electric lifting sleeve rod is fixedly arranged on one side of the bottom plate, a supporting mechanism is arranged at one end of the electric lifting sleeve rod, the supporting mechanism comprises a supporting plate, a connecting shaft, a supporting rod, an anti-slip pad, a hinge, a clamp, a fixed block and a fixing screw rod, and the connecting shaft is arranged on one side of the supporting plate;
one side of connecting axle is provided with the bracing piece, the bottom of bracing piece is provided with the slipmat, one side of bracing piece is provided with the hinge, one side of hinge is provided with the clamp, one side fixed mounting of clamp has the fixed block, the inner wall of fixed block runs through there is fixing screw, one side of supporting mechanism is provided with moving mechanism.
Preferably, survey the mechanism and include motor, electric drill rod and survey the head, the motor sets up the one side at the bottom plate, the output shaft of motor has electric drill rod through shaft coupling fixed mounting, electric drill rod's one end fixed mounting has the reconnaissance gauge head, and this structure makes the operation sample quicker, light labour saving and time saving to make work efficiency obtain great improvement, also make the practicality of equipment promote simultaneously.
Preferably, the bracing piece passes through the connecting axle and constitutes beta structure with the backup pad, and the bracing piece sets up with the axis symmetry of backup pad, and this structure can be so that fold the bracing piece and accomodate through the connecting axle to make and reduce its occupation space when not using, make it more convenient when the transport.
Preferably, the clamp and the hinge constitute revolution mechanic, and the center line of clamp and hinge coincides mutually, and this structure makes to be convenient for splice the bracing piece, makes it more convenient that it uses, does not have the limitation.
Preferably, the moving mechanism includes connecting block, electric putter, spliced pole and universal wheel, connecting block fixed mounting is in outer wall one side of bracing piece, one side fixed mounting of connecting block has electric putter, electric putter's one end is provided with the spliced pole, the one end fixed mounting of spliced pole has the universal wheel, and this structure makes equipment move more convenient when using for remove work swift laborsaving more, bring very big convenience for the user.
Preferably, the universal wheel passes through electric putter and the connecting block constitutes elevation structure, and electric putter and connecting block be vertical distribution, and this structure makes to be convenient for adjust the position of universal wheel, makes it more convenient to use.
Preferably, universal wheel and spliced pole fixed connection, and constitute detachable construction through the screw between universal wheel and the spliced pole, this structure makes to be convenient for carry out the position to this equipment and removes for it is more swift to remove work, labour saving and time saving.
(III) advantageous effects
Compared with the prior art, the utility model provides the geological exploration equipment for the hydraulic engineering, which has the following beneficial effects:
1. this equipment is surveyed to hydraulic engineering land used quality, through being provided with the backup pad, the connecting axle, the bracing piece, the slipmat, the hinge, the clamp, fixed block and clamping screw, can make surveying equipment have fine supporting role, do not need artifical equipment of holding, make it more convenient when using, make it more quick when the sample is surveyed, can make being convenient for fold the bracing piece and accomodate through the connecting axle, thereby make and reduce its occupation space when not using, it is more convenient when the transport to make it, the slipmat makes its frictional force that increases and ground, make it more stable, and the mutually supporting of clamp and hinge uses, make being convenient for splice the bracing piece, thereby can highly splice it according to the user demand, thereby make the result of use better, satisfy user's demand.
2. This equipment is surveyed to hydraulic engineering geology through being provided with the connecting block, electric putter, spliced pole and universal wheel, equipment when using, needs survey the geology in different places, need constantly carry out the position to equipment and remove, and the universal wheel can make equipment move more convenient when using for the removal work is swift more laborsaving, brings very big convenience for the user, also makes the practicality of this equipment obtain great promotion simultaneously.
3. This equipment is surveyed to hydraulic engineering land used quality through being provided with motor, electric drill rod and reconnaissance head, drives the electric drill rod motion through the motor to make the reconnaissance head carry out the sample detection to the geology, make the operation sample quicker, light labour saving and time saving, thereby make work efficiency obtain great improvement, also make the practicality of equipment obtain promoting simultaneously.
Drawings
FIG. 1 is a schematic front sectional view of the present invention;
FIG. 2 is a schematic view of a survey mechanism of the present invention;
FIG. 3 is a schematic structural view of a support mechanism according to the present invention;
FIG. 4 is a schematic view of the hinge, the clamp, the fixing block and the fixing screw according to the present invention;
FIG. 5 is a schematic structural diagram of a moving mechanism according to the present invention.
In the figure: 1. a base plate; 2. a survey mechanism; 201. a motor; 202. an electric drill rod; 203. surveying a probe; 3. an electric lifting loop bar; 4. a support mechanism; 401. a support plate; 402. a connecting shaft; 403. a support bar; 404. a non-slip mat; 405. a hinge; 406. clamping a hoop; 407. a fixed block; 408. fixing the screw rod; 5. a moving mechanism; 501. connecting blocks; 502. an electric push rod; 503. connecting columns; 504. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, a geological survey device for hydraulic engineering comprises a base plate 1, a survey mechanism 2 is arranged on one side of the base plate 1, an electric lifting loop bar 3 is fixedly arranged on one side of the base plate 1, a support mechanism 4 is arranged at one end of the electric lifting loop bar 3, the support mechanism 4 comprises a support plate 401, a connecting shaft 402, a support bar 403, an anti-slip pad 404, a hinge 405, a hoop 406, a fixed block 407 and a fixed screw 408, and the connecting shaft 402 is arranged on one side of the support plate 401;
one side of the connecting shaft 402 is provided with a supporting rod 403, the bottom end of the supporting rod 403 is provided with a non-slip mat 404, one side of the supporting rod 403 is provided with a hinge 405, one side of the hinge 405 is provided with a clamp 406, one side of the clamp 406 is fixedly provided with a fixed block 407, the inner wall of the fixed block 407 is penetrated by a fixed screw 408, one side of the supporting mechanism 4 is provided with a moving mechanism 5, the surveying mechanism 2 comprises a motor 201, an electric drill rod 202 and a surveying head 203, the motor 201 is arranged at one side of the bottom plate 1, the output shaft of the motor 201 is fixedly provided with the electric drill rod 202 through a coupler, one end of the electric drill rod 202 is fixedly provided with the surveying head 203, the structure enables the operation and sampling to be faster, the operation and the time and labor to be saved, thereby greatly improving the working efficiency and simultaneously improving the practicability of the equipment, the supporting rod 403 and the supporting plate 401 form a foldable structure through the connecting shaft 402, the supporting rods 403 are symmetrically arranged around the central axis of the supporting plate 401, the structure can facilitate the folding and storage of the supporting rods 403 through the connecting shaft 402, so that the occupied space is reduced when the supporting rods are not used, the carrying is more convenient, the hoop 406 and the hinge 405 form a rotating structure, the hoop 406 and the central line of the hinge 405 coincide, the structure facilitates the splicing of the supporting rods 403, the use is more convenient and the structure is not limited, the moving mechanism 5 comprises a connecting block 501, an electric push rod 502, a connecting column 503 and a universal wheel 504, the connecting block 501 is fixedly arranged on one side of the outer wall of the supporting rods 403, the electric push rod 502 is fixedly arranged on one side of the connecting block 501, the connecting column 503 is arranged on one end of the electric push rod 502, the universal wheel 504 is fixedly arranged on one end of the connecting column 503, the structure enables the movement of the equipment to be more convenient when the equipment is used, and the moving work to be faster and more labor-saving, bring very big convenience for the user, universal wheel 504 passes through electric putter 502 and connection block 501 constitution elevation structure, and electric putter 502 and connection block 501 are vertical distribution, this structure makes the position to universal wheel 504 of being convenient for adjust, it is more convenient to make it use, universal wheel 504 and spliced pole 503 fixed connection, and constitute detachable construction through the screw between universal wheel 504 and the spliced pole 503, this structure makes and is convenient for carry out the position removal to this equipment, make the removal work more swift, time saving and labor saving.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
The working principle is as follows: firstly, an external power supply is switched on, the electric lifting sleeve rod 3 is adjusted to a proper height, then a switch of a motor 201 is switched on, so that an electric drill rod 202 is driven to move, the electric drill rod 202 drives an exploration head 203 to move downwards, so that the exploration head surveys the geology, when the equipment needs to be moved, a switch of an electric push rod 502 is switched on, so that a connecting column 503 is driven to move downwards, the connecting column 503 drives a universal wheel 504 to move downwards, so that the universal wheel 504 is in parallel contact with the ground, then a supporting plate 401 is pushed, so that the universal wheel 504 rotates, so that the position of the equipment is changed, when the equipment does not need to be used, a supporting rod 403 is pulled, so that a connecting shaft 402 rotates, so that the supporting rod is rotated and folded, when the supporting rod needs to be spliced, a clamp 406 is pulled, so that a hinge 405 rotates, then the supporting rod 403 needing to be spliced is clamped, and finally the supporting rod 403 is screwed and fixed by a fixing screw 408, thus, the whole using process of the geological exploration equipment for the hydraulic engineering is completed.
To sum up, this geological survey equipment for hydraulic engineering, can make survey equipment have fine supporting role, do not need the manual work to hold equipment, it is more convenient to make when using, it is quicker to make it survey when the sample surveys, can make to be convenient for fold bracing piece 403 and accomodate through connecting axle 402, thereby make and reduce its occupation space when not using, it is more convenient to make it when the transport, slipmat 404 makes its increase and the frictional force on ground, it is more stable to make it, and the mutually supporting of clamp 406 and hinge 405 uses, make and be convenient for splice bracing piece 403, thereby can highly splice it according to the user demand, thereby make the result of use better, satisfy user's demand.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a geological survey equipment for hydraulic engineering, includes bottom plate (1), its characterized in that: a surveying mechanism (2) is arranged on one side of the bottom plate (1), an electric lifting sleeve rod (3) is fixedly mounted on one side of the bottom plate (1), a supporting mechanism (4) is mounted at one end of the electric lifting sleeve rod (3), the supporting mechanism (4) comprises a supporting plate (401), a connecting shaft (402), a supporting rod (403), an anti-slip pad (404), a hinge (405), a hoop (406), a fixing block (407) and a fixing screw (408), and the connecting shaft (402) is arranged on one side of the supporting plate (401);
one side of connecting axle (402) is provided with bracing piece (403), the bottom of bracing piece (403) is provided with slipmat (404), one side of bracing piece (403) is provided with hinge (405), one side of hinge (405) is provided with clamp (406), one side fixed mounting of clamp (406) has fixed block (407), the inner wall of fixed block (407) runs through has set screw (408), one side of supporting mechanism (4) is provided with moving mechanism (5).
2. The equipment for geological survey for hydraulic engineering according to claim 1, characterized in that: survey mechanism (2) including motor (201), electric drill rod (202) and survey head (203), motor (201) set up the one side at bottom plate (1), the output shaft of motor (201) passes through shaft coupling fixed mounting and has electric drill rod (202), the one end fixed mounting of electric drill rod (202) has investigation head (203).
3. The geological survey equipment for hydraulic engineering of claim 1, characterized in that: the support rod (403) and the support plate (401) form a foldable structure through the connecting shaft (402), and the support rod (403) is symmetrically arranged with the central axis of the support plate (401).
4. The geological survey equipment for hydraulic engineering of claim 1, characterized in that: the hoop (406) and the hinge (405) form a rotating structure, and the central lines of the hoop (406) and the hinge (405) coincide with each other.
5. The equipment for geological survey for hydraulic engineering according to claim 1, characterized in that: moving mechanism (5) include connecting block (501), electric putter (502), spliced pole (503) and universal wheel (504), connecting block (501) fixed mounting is in outer wall one side of bracing piece (403), one side fixed mounting of connecting block (501) has electric putter (502), the one end of electric putter (502) is provided with spliced pole (503), the one end fixed mounting of spliced pole (503) has universal wheel (504).
6. The geological survey equipment for hydraulic engineering of claim 5, characterized in that: the universal wheel (504) and the connecting block (501) form a lifting structure through the electric push rod (502), and the electric push rod (502) and the connecting block (501) are vertically distributed.
7. The equipment for geological survey for hydraulic engineering according to claim 5, characterized in that: the universal wheel (504) is fixedly connected with the connecting column (503), and the universal wheel (504) and the connecting column (503) form a detachable structure through screws.
CN202220617672.7U 2022-03-18 2022-03-18 Geological survey equipment for hydraulic engineering Active CN217007318U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220617672.7U CN217007318U (en) 2022-03-18 2022-03-18 Geological survey equipment for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220617672.7U CN217007318U (en) 2022-03-18 2022-03-18 Geological survey equipment for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN217007318U true CN217007318U (en) 2022-07-19

Family

ID=82370252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220617672.7U Active CN217007318U (en) 2022-03-18 2022-03-18 Geological survey equipment for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN217007318U (en)

Similar Documents

Publication Publication Date Title
CN217007318U (en) Geological survey equipment for hydraulic engineering
CN220960659U (en) Portable soil sample collection system
CN209743956U (en) Surveying instrument support for measurement
CN213813137U (en) Building material detection device
CN211114712U (en) Lifting platform for highway construction
CN214787443U (en) Adjustable multifunctional self-propelled hanging waterproof board trolley
CN210079579U (en) Quality of water soil mud sampling equipment rack
CN212201969U (en) Multifunctional concrete drilling and core-taking machine
CN213479601U (en) Novel bridge engineering is with surveying equipment
CN213871894U (en) Righting device based on oil development survey equipment
CN221004591U (en) Survey device fixed bolster is used in urban and rural planning
CN220599989U (en) Slurry pump for drilling construction
CN220815067U (en) Stable steel structure support
CN212823021U (en) Steel pipe fixed length cutting auxiliary fixture for building
CN212342123U (en) Pipeline sectional area adjustable hydrodynamics laboratory bench
CN214089815U (en) Rod pit tamping device for electric power engineering construction
CN220851334U (en) Topography exploration device for building engineering design
CN216740767U (en) Detachable material table based on building economy
CN219221935U (en) Portable mapping tool table
CN211314104U (en) Efficient drilling machine
CN212479089U (en) Hydrogeology drilling equipment
CN211916627U (en) Auxiliary device for installing long-distance pipeline
CN210858708U (en) Handheld soil sampling drilling machine
CN215489176U (en) Lighting device for geological exploration
CN212798989U (en) Wire and cable suspension device for temporary power utilization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant