CN217000653U - Toilet through-laying floor structure - Google Patents

Toilet through-laying floor structure Download PDF

Info

Publication number
CN217000653U
CN217000653U CN202220633819.1U CN202220633819U CN217000653U CN 217000653 U CN217000653 U CN 217000653U CN 202220633819 U CN202220633819 U CN 202220633819U CN 217000653 U CN217000653 U CN 217000653U
Authority
CN
China
Prior art keywords
floor
toilet
vestibule
bathroom
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220633819.1U
Other languages
Chinese (zh)
Inventor
许振�
张轶然
王子诚
马哲权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deformable Building Block Beijing Technology Co ltd
Original Assignee
Deformable Building Block Beijing Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deformable Building Block Beijing Technology Co ltd filed Critical Deformable Building Block Beijing Technology Co ltd
Priority to CN202220633819.1U priority Critical patent/CN217000653U/en
Application granted granted Critical
Publication of CN217000653U publication Critical patent/CN217000653U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application relates to a toilet through-laying floor structure, and relates to the field of indoor decoration technology. The integrated floor comprises a vestibule floor and an integrally prefabricated and integrally formed bathroom floor, wherein the vestibule floor penetrates through a bathroom door and is smoothly connected with the bathroom floor. This application is with the smooth concatenation in bathroom floor and vestibule floor to the condition that falls down appears when having reduced the inconvenient old man of user's family's legs and feet or child discrepancy bathroom.

Description

Toilet through-laying floor structure
Technical Field
The application relates to the field of interior decoration technology, in particular to a toilet through-laying floor structure.
Background
The indoor decoration is a process of personalized decoration of style, layout and decoration in a room according to the preference of a user, and is focused on decoration construction in a building, so that the user is more comfortable and comfortable when living.
When laying and decorating the floor at the position of an indoor sanitary door opening, a door passing stone is usually arranged at the position of a door opening of a toilet, so that the condition that water flow in the toilet flows out of the interior of the toilet onto the floor of a hallway is reduced.
In view of the above-mentioned related art, the inventor has found that when an old person or a child with inconvenience in legs and feet is present in a user's home, a situation of falling down is often caused by a door stone passing through a doorway of a toilet.
SUMMERY OF THE UTILITY MODEL
In order to reduce the inconvenient old man of user's family leg foot or the condition that appears falling down when child discrepancy bathroom, this application provides a bathroom leads to and spreads floor structure.
The application provides a bathroom leads to spreads floor structure adopts following technical scheme:
a toilet floor structure comprises a vestibule floor and a integrally prefabricated and integrally formed toilet floor, wherein the vestibule floor penetrates through a toilet door and is smoothly spliced with the toilet floor.
Through adopting above-mentioned technical scheme, integrated into one piece's bathroom floor has guaranteed the prevention of seepage performance on bathroom floor, and the accessible level and smooth concatenation on bathroom floor and vestibule floor can effectively reduce the condition that the inconvenient old man of user's family's legs and feet or child appear falling down when cominging in and going out the bathroom.
Optionally, an annular structure groove used for installing the wall plate is formed in the toilet floor along the edge of the toilet floor, a waterproof flanging with the upper surface higher than the vestibule floor is integrally arranged on the outer edge of the toilet floor, a position yielding opening is formed in the position of the toilet door opening through the waterproof flanging, and the vestibule floor is embedded and laid in the position yielding opening and then arranged in parallel and level with the toilet floor.
By adopting the technical scheme, when ponding is generated in the toilet, the waterproof flanging can prevent the ponding from reaching the space between the waterproof flanging and the wall body under a certain condition, and the wall body is corroded.
Optionally, the upper surface of the toilet floor is arranged in an inclined manner, the toilet floor is highest at the position of the toilet door opening, and the first drainage pipe is arranged at the position of the lowest point of the toilet floor.
Through adopting above-mentioned technical scheme, the rivers in the bathroom can keep away from the bathroom door opening more fast, and flow to the position department of first drain pipe with ponding discharge, reduced the interior ponding of bathroom and reached the condition in vestibule through bathroom door opening.
Optionally, the bottom wall of the structural groove is an inclined surface, and a second drain pipe communicated with the first drain pipe is arranged at the lowest point of the structural groove.
By adopting the technical scheme, water permeating into the structural groove can be collected to the position of the gate of the second drain pipe more quickly and enters the first drain pipe through the second drain pipe, so that the water in the structural groove is drained.
Optionally, a supporting member for supporting the vestibule floor is fixedly connected to the bottom wall of the structural groove.
Through adopting above-mentioned technical scheme, support piece can support the part that the vestibule floor stretched into the bathroom to improve the stability and the atress performance on vestibule floor, reduced the part that the vestibule floor stretched into in the bathroom in the use and produced the condition of damage owing to trampling.
Optionally, an area in the structure groove is divided into an annular mounting area and a flow guide area, the mounting area is located on the inner side of the flow guide area, the mounting area is used for mounting a wallboard and a support, the flow guide area is used for guiding water flow in the structure groove to a second drain pipe, and the second drain pipe is directly communicated with the flow guide area.
Through adopting above-mentioned technical scheme, reduced the hindrance that the in-groove rivers of structure formed after the wallboard installation for the rivers in the structure inslot can be stably and smoothly guided to the second drain pipe.
Optionally, a splicing gap exists between the toilet floor and the vestibule floor, the supporting piece is of a long strip-shaped structure, and the bottom end of the supporting piece is provided with a plurality of drainage holes for communicating the flow guide area with the splicing gap.
By adopting the technical scheme, when water flows pass through a gap between the toilet floor and the vestibule floor, the water flows enter the structural groove through the drain holes, then enter the first drain pipe along the inclined bottom wall of the structural groove to finish the drainage of the water flows in the structural groove, and therefore the condition of accumulated water generated in the structural groove is reduced.
Optionally, a padding is fixed on the floor of the floor right below the part, extending into the toilet, of the vestibule floor, the upper surface of the padding is abutted against the vestibule floor, and one side, facing the toilet floor, of the padding is abutted against the toilet floor.
By adopting the technical scheme, the support performance of the toilet door opening is improved, the deformation and even damage of the toilet floor caused by treading in the using process are reduced, and the toilet floor is positioned, so that a worker can install the toilet floor at a preset position more easily.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the vestibule floor is laid into the toilet door opening, so that the vestibule floor and the toilet floor are spliced in a flush manner, the condition that obstacles are arranged between the toilet and the vestibule is reduced, and the falling phenomenon of old people or children with inconvenient legs and feet in a user when entering or exiting the toilet is reduced;
2. through dividing into the installing zone and the water conservancy diversion district that the function does not influence each other with the structure groove, reduced the influence that the wallboard installation back caused to the structure inslot water flow, ensured the drainage performance of structure groove.
Drawings
Fig. 1 is a schematic view of an installation structure of a toilet to a hallway position in the embodiment of the present application.
Fig. 2 is a sectional view of a portion a-a in fig. 1.
Fig. 3 is an enlarged view of a portion B in fig. 2.
Description of reference numerals: 1. a toilet floor; 11. a structural groove; 111. an installation area; 112. a flow guide area; 113. a support member; 1131. a drain hole; 12. waterproof flanging; 121. a let position port; 13. a first drain pipe; 14. a second drain pipe; 2. a vestibule floor; 3. splicing gaps; 4. and (7) padding.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses bathroom leads to and spreads floor structure. Referring to fig. 1 and 2, the floor structure includes a bathroom floor 1 and a hallway floor 2, a falling board groove structure is provided on the floor in the bathroom, the bathroom floor 1 is embedded in the falling board groove structure after being integrally pressed and molded, the hallway floor 2 is horizontally laid outside the bathroom, the hallway floor 2 passes through a bathroom door opening and is smoothly connected with the bathroom floor 1, no obstacle is provided at the position of the bathroom door opening between the bathroom floor 1 and the hallway floor 2, and thereby the condition that the old or the child who has inconvenient legs and feet in the user's home falls down when getting in or out the bathroom is reduced.
Wherein, bathroom floor 1 is the floor structure of whole prefabrication one piece, and the ceramic tile that 1 surperficial laying in bathroom floor is the integral type ceramic tile that does not have the amalgamation gap, and such ceramic tile has guaranteed bathroom floor 1's prevention of seepage water performance to a certain extent.
In order to facilitate the embedding of the toilet floor 1, the length and the width of the toilet floor 1 are slightly smaller than the length and the width of an inner cavity of the toilet. Namely, after the bathroom floor 1 is installed and fixed on the floor of the bathroom, an installation gap exists between the bathroom floor 1 and the inner wall of the bathroom wall.
Referring to fig. 1 and 2, an annular structural groove 11 is formed in the toilet floor 1 along the edge of the toilet floor 1, a waterproof flange 12 is integrally arranged on the outer edge of the toilet floor 1, the upper surface of the waterproof flange is higher than that of the vestibule floor 2, a position-giving opening 121 is formed in the position of the toilet door opening of the waterproof flange 12, and the vestibule floor 2 is embedded in the position-giving opening 121 and then flush with the edge of the toilet floor 1.
The structural groove 11 improves the water storage capacity of the toilet floor 1 to a certain extent, so that the liquid level height of accumulated water on the toilet floor 1 is reduced to a certain extent; the arrangement mode that the height of waterproof turn-ups 12 is higher than vestibule floor 2 can effectively reduce the ponding in the bathroom and spill over between waterproof turn-ups 12 and the wall body from between wallboard and bathroom floor 1 to the erosion that causes the bathroom wall body.
In order to reduce the condition that accumulated water in the toilet flows out of the toilet and reaches the hallway, the upper surface of the toilet floor 1 is obliquely arranged, the height of the toilet floor 1 is the highest at the position closer to the door opening of the toilet, and a first drainage pipe 13 is arranged at the position of the lowest point of the toilet floor 1.
When the water in the toilet is more, the water flow is far away from the door opening of the toilet along the inclined upper surface of the toilet floor 1 and is discharged through the first water discharge pipe 13, so that the situation that the water flow in the toilet enters the hallway through the door opening of the toilet is reduced.
The annular bottom wall in the structural groove 11 is also provided as an inclined surface gradually decreasing in height in a direction away from the doorway of the toilet, and a second drain pipe 14 communicating with the first drain pipe 13 is installed at the lowest point of the structural groove 11.
When water is accumulated in the toilet, the accumulated water permeates into the structural groove 11, then is gathered along the inclined surface and enters the first drainage pipe 13 through the second drainage pipe 14 to finish drainage in the structural groove 11, so that the drainage efficiency of the toilet floor 1 is improved to a certain extent, and the condition that water flow in the toilet enters the hallway through the toilet door opening is reduced.
Referring to fig. 2 and 3, the region in the structural groove 11 may be divided into an annular mounting region 111 and a flow guiding region 112 according to function, and the flow guiding region 112 is located at the periphery of the mounting region 111.
The vestibule floor 2 is fixedly installed on the floor of the vestibule, a part of the vestibule floor 2 passes through the let position opening 121 and then is horizontally arranged right above the structure groove 11 to shield the part of the structure groove 11, a square strip-shaped support member 113 for supporting the vestibule floor 2 is fixedly connected to the bottom wall of the installation area 111 right below the vestibule floor 2, the upper surface of the support member 113 is abutted against the vestibule floor 2, the support member 113 improves the pressure bearing capacity of the vestibule floor 2 passing through the let position opening 121 and extending into the toilet, and the situation that the part of the vestibule floor 2 extending into the toilet is broken and damaged due to treading in the use process is reduced.
In the installation area 111, areas other than the support members 113 are used for installing the wall panel. The wall board is vertically upwards clamped between the mounting area 111 and the top plate of the toilet to separate the wall body of the toilet from the central area of the toilet, and the flow guide area 112 is arranged in a hollow mode and is used for bearing the functions of water storage and flow guide, guiding water flow entering the structural groove 11 to the second water discharge pipe 14 and then discharging the water flow from the first water discharge pipe 13.
Referring to fig. 2 and 3, a joint gap 3 is formed between positions where the toilet floor 1 and the vestibule floor 2 abut against each other, and after finishing, the joint gap 3 is filled with a caulking compound so that the toilet floor 1 and the vestibule floor 2 are hermetically connected by the caulking compound. During long-term use, the seam filling gap is corroded to generate a leakage phenomenon, and when water in a toilet passes through the seam filling agent, the water permeates the seam filling agent to reach the structural groove 11 and then passes through the flow guide area 112 to be discharged through the second drainage pipe 14.
As an optional technical solution, in order to improve the efficiency of the water flow penetrating through the seam beautifying agent to reach the flow guide area 112, a plurality of drainage holes 1131 for communicating the flow guide area 112 with the splicing gap 3 are uniformly formed at the bottom end of the supporting member 113. The water penetrating the beauty agent reaches the flow guide region 112 through the plurality of water discharge holes 1131 and then is discharged out of the toilet through the second water discharge pipe 14 and the first water discharge pipe 13 in sequence.
Referring to fig. 2 and 3, a cured concrete cushion 4 is fixed on the floor of the floor slab right below the part of the vestibule floor 2 extending into the toilet, and the upper surface of the cushion 4 is abutted against the vestibule floor 2 to support the vestibule floor 2 to a certain extent; one side of the padding 4 facing the toilet floor 1 is abutted to the toilet floor 1, so that the toilet floor 1 is installed to a certain positioning effect, and a worker can install and fix the toilet floor 1 conveniently.
The implementation principle of the toilet through-laying floor structure provided by the embodiment of the application is as follows: a worker firstly pours and fixes the padding 4 at a preset position at the position of the toilet door opening to be fixed and molded, then places the toilet floor 1 in the plate descending groove structure, adjusts the position of the toilet floor 1 to enable the toilet floor 1 to be abutted against the padding 4, and enables the position of the first drainage pipe 13 to be far away from the toilet door opening.
Then, after a relief opening 121 is formed in the waterproof flanging 12, a vestibule floor 2 is laid, when the vestibule floor 2 is horizontally laid into a toilet, one end of the vestibule floor 2 passes through the relief opening 121 and then is lapped on the supporting piece 113, the mutually close edges of the vestibule floor 2 and the toilet floor 1 are flush, then the toilet wall plate is installed in the installation area 111 of the structural groove 11, further decoration plugging work is carried out on structural gaps between the toilet inner wall plate and the bottom plate and between the toilet floor 1 and the vestibule floor 2, and the splicing gap 3 is filled by using a crack sealer, so that the toilet floor 1 and the vestibule floor 2 are smoothly spliced, and decoration work on the toilet inner wall is completed.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (6)

1. The utility model provides a bathroom leads to and spreads floor structure which characterized in that: the bathroom floor comprises a vestibule floor (2) and an integrally prefabricated and integrally formed bathroom floor (1), wherein the vestibule floor (2) penetrates through a bathroom door and is smoothly spliced with the bathroom floor (1);
an annular structure groove (11) for installing a wall plate is formed in the toilet floor (1) along the edge of the toilet floor (1), a waterproof flanging (12) with the upper surface higher than that of the vestibule floor (2) is integrally arranged on the outer edge of the toilet floor (1), a position yielding opening (121) is formed in the position of a door opening of the toilet through the waterproof flanging (12), and the vestibule floor (2) is embedded into the position yielding opening (121) and then is arranged in parallel with the toilet floor (1);
the upper surface of the toilet floor (1) is obliquely arranged, the toilet floor (1) is highest at the position close to a toilet door opening, and a first drainage pipe (13) is arranged at the position of the lowest point of the toilet floor (1).
2. A toilet parquet floor structure as claimed in claim 1, wherein: the bottom wall of the structure groove (11) is an inclined surface, and a second drain pipe (14) communicated with the first drain pipe (13) is arranged at the lowest point of the structure groove (11).
3. A lavatory through-floor structure according to claim 1, wherein: and a supporting piece (113) for supporting the vestibule floor (2) is fixedly connected to the bottom wall of the structural groove (11).
4. A toilet parlor floor structure according to claim 3, wherein: the area in the structural groove (11) is divided into an annular mounting area (111) and a flow guide area (112), the mounting area (111) is located on the inner side of the flow guide area (112), the mounting area (111) is used for mounting a wall plate and a supporting piece (113), the flow guide area (112) is used for guiding water flow in the structural groove (11) to the second water discharge pipe (14), and the second water discharge pipe (14) is directly communicated with the flow guide area (112).
5. The toilet through-laid floor structure according to claim 4, wherein: there is concatenation clearance (3) between bathroom floor (1) and vestibule floor (2), support piece (113) are rectangular form structure, and the bottom of support piece (113) is seted up a plurality of wash ports (1131) that communicate diversion district (112) and concatenation clearance (3).
6. A lavatory through-floor structure according to claim 1, wherein: and padding (4) is fixed on the floor right below the part, extending into the toilet, of the vestibule floor (2), the upper surface of the padding (4) is abutted against the vestibule floor (2), and one side, facing the toilet floor (1), of the padding (4) is abutted against the toilet floor (1).
CN202220633819.1U 2022-03-22 2022-03-22 Toilet through-laying floor structure Active CN217000653U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220633819.1U CN217000653U (en) 2022-03-22 2022-03-22 Toilet through-laying floor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220633819.1U CN217000653U (en) 2022-03-22 2022-03-22 Toilet through-laying floor structure

Publications (1)

Publication Number Publication Date
CN217000653U true CN217000653U (en) 2022-07-19

Family

ID=82370128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220633819.1U Active CN217000653U (en) 2022-03-22 2022-03-22 Toilet through-laying floor structure

Country Status (1)

Country Link
CN (1) CN217000653U (en)

Similar Documents

Publication Publication Date Title
AU2017203666B2 (en) Linear drain assemblies and methods of use
JP4612983B2 (en) Building structure having floor drainage and floor drainpipe
US6571406B2 (en) Supporting body for a shower tub
EP1988807A1 (en) Prefab element
CN217000653U (en) Toilet through-laying floor structure
KR100913781B1 (en) Drain Equipment For Bathroom Floor Coupled With Drain Pipe System Laid On Floor
JP2009526149A (en) Siphon system obtained directly during the molding of sanitary ware
KR101081970B1 (en) Construction method for On-floor drainage piping system of bathroom in multistory building
CN215670791U (en) Assembled integral waterproof tray
CN211622749U (en) Caisson type toilet
KR200480115Y1 (en) Assembly of Flange, Socket and Drainpipe for Piping Above Slab of Toilet Bow
CN219240795U (en) Accessible double drainage floor drain suitable for overhead ground
CN214169499U (en) Water-stopping dam leakage-proof device in decoration waterproof construction
CN220225635U (en) Assembled barrier-free floor drain
CN214530929U (en) Drainage device of assembled bathroom
KR101089087B1 (en) Drainage For Drain Pipe System Laid On Floor
CN213653704U (en) Side-row assembly without descending for assembled toilet
JPH0137008Y2 (en)
CN110403501A (en) Steady type integral bathroom base plate mounting structure and its integral bathroom chassis
CN116043981A (en) Accessible double drainage floor drain suitable for overhead ground
KR200341856Y1 (en) Tranch with draining structure
KR200348061Y1 (en) V-Shaped Section Drain Pipe
CN110353546A (en) The integral bathroom mounting structure and integral bathroom of preventing water leakage, integral bathroom chassis
KR101630236B1 (en) waterproof cap for draining trap
CN116220176A (en) Assembled barrier-free floor drain

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant