Prevent to add bearing protector that air pocket block brick hoist and mount were fallen
Technical Field
The utility model relates to the technical field of protective devices, in particular to a bearing protective device for preventing aerated block bricks from being hoisted and falling.
Background
The aerated block brick is also called an aerated concrete block, and the aerated concrete block is a novel wall material prepared by using mountain flour, cement and lime as main raw materials through the steps of raw material preparation, pouring, cutting and forming and high-pressure steam curing. The aerated brick is mainly applied to non-bearing wall masonry and frame structure filling, is a light material popularized and applied in the fields of national ministry of construction and national science commission key industry and civilian use, has elasticity because of the hollow characteristic, is supported by a reinforced concrete structure as a main building body, and only plays a filling role. When an earthquake occurs, the reinforced concrete structure can deform accordingly, and if the reinforced concrete structure is a solid brick, the reinforced concrete structure can not stretch and contract everywhere when deformed and accumulated, and can burst and collapse. The hollow bricks can be used for leaving a good telescopic space for the reinforced concrete structure.
Present air entrainment block brick is when transporting to required floor, generally directly shelve on the loading board and lift by crane, and the operation will lead to the fragment of brick to fall like this, and consequently the safety risk is great, can't adjust the hoist and mount quantity that bears the air entrainment block brick in addition, consequently needs a to prevent that the hoist and mount of air entrainment block brick from falling bears protector and solves above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects in the prior art, provides a bearing protection device for preventing aerated block bricks from being hoisted and falling, and effectively overcomes the defects in the prior art.
The purpose of the utility model is realized by the following technical scheme: the utility model provides a prevent to add bear protector that air pocket brick hoist and mount were fallen, includes the support column, one side fixedly connected with loading board of support column, one side of loading board is provided with protective member, protective member includes the protective frame, one side fixedly connected with connecting plate of protective frame, one side of connecting plate is provided with the fixed column, one side of protective frame is rotated and is connected with the screw thread post, one side threaded connection of screw thread post has the regulation frame, adjust one side fixedly connected with gusset plate of frame, one side fixedly connected with hoist and mount ring of gusset plate.
Optionally, the number of the supporting columns is a plurality, and the plurality of supporting columns are symmetrically distributed on one side of the bearing plate.
It is optional, the spread groove has been seted up to one side of loading board, the quantity of spread groove is a plurality of, a plurality of spread groove symmetric distribution is in one side of loading board, the shape and the big or small looks adaptation of size and connecting plate of spread groove, when carrying out the hoist and mount of air entrainment brick, at first move the loading board to the hoist and mount place, place the support column at smooth subaerial afterwards, place the air entrainment brick on the loading board afterwards, add to suitable back when the air entrainment brick, insert inside the spread groove with the connecting plate, fix the protective frame on the loading board through the fixed column afterwards, can in time protect the air entrainment brick of hoist and mount, prevent that the air entrainment brick from taking place when hoist and mount and falling, very big improvement the factor of safety of loading board.
Optionally, a plurality of fixing holes are formed in one side of the connecting plate, the plurality of fixing holes are symmetrically distributed in one side of the connecting plate, and the diameter of each fixing hole is equal to that of each fixing column.
Optionally, the spout has been seted up to one side of protective frame, one side fixedly connected with of adjusting the frame adjusts the post, the quantity of adjusting the post is a plurality of, a plurality of adjust the post symmetric distribution in one side of adjusting the frame, the shape and the size of adjusting the post and the shape and the size looks adaptation of spout.
Optionally, threaded holes are formed in one side of the adjusting frame, the number of the threaded holes is a plurality of, and the threaded holes are symmetrically distributed in one side of the adjusting frame, the thread pitch of the threaded holes is matched with the thread pitch of the threaded columns, when the number of the lifted aerated bricks is required to be adjusted, the bearing plate and the protective frame are firstly assembled, bricks are added into the protective frame, the adjusting frame is inserted into the protective frame after the bricks are added to a proper amount, then the threaded columns are rotated, the threaded columns can perform linear motion through thread transmission, the adjusting frame can be fixed on the protective frame, finally, the bricks are lifted to a proper floor through the lifting rings, and the number of the bricks can be adjusted in time.
Optionally, the number of the reinforcing plates is several, and several reinforcing plates are linearly arrayed on one side of the adjusting frame.
The utility model has the following advantages:
1. this prevent bearing protection device that air entrainment piece brick hoist and mount were fallen, through the support column, the loading board, the protective frame, the connecting plate, cooperation setting between spread groove and the fixed column, when the hoist and mount of air entrainment brick are carried out, at first move the loading board to hoist and mount place, place the support column subaerially smooth afterwards, place the air entrainment brick on the loading board afterwards, add proper amount back when the air entrainment brick, insert inside the spread groove with the connecting plate, fix the protective frame on the loading board through the fixed column afterwards, can in time protect the air entrainment brick of hoist and mount, prevent that the air entrainment brick from taking place to fall when hoist and mount, very big improvement the factor of safety of loading board.
2. This prevent to add bear protector that air entrainment lump brick hoist and mount were fallen, through the protective frame, adjust the frame, the screw thread post, the screw hole, cooperation setting between gusset plate and the hoist and mount ring, when the quantity of hoist and mount air entrainment brick is adjusted to needs, at first assemble loading board and protective frame, add the fragment of brick to the protective frame is inside afterwards, insert the protective frame with the frame of adjusting after adding suitable volume inside, rotate the screw thread post afterwards, can make the screw thread post carry out linear motion through screw thread transmission, and then can fix the frame of adjusting on the protective frame, hang the fragment of brick to suitable floor through the hoist and mount ring at last, and can in time adjust the quantity of fragment of brick.
Drawings
FIG. 1 is a schematic structural diagram of an assembly according to a first embodiment of the present invention;
FIG. 2 is a schematic view of a carrier structure according to a first embodiment of the utility model;
FIG. 3 is a schematic structural diagram of a protection frame according to a first embodiment of the present invention;
FIG. 4 is a schematic structural diagram of an adjustment frame according to a first embodiment of the present invention;
fig. 5 is a schematic structural diagram of an adjusting frame according to a second embodiment of the present invention.
In the figure: 1-supporting column, 2-bearing plate, 3-protective component, 301-protective frame, 302-connecting plate, 303-fixing column, 304-threaded column, 305-adjusting frame, 306-reinforcing plate, 307-hoisting ring, 4-connecting groove, 5-fixing hole, 6-sliding groove, 7-adjusting column and 8-threaded hole.
Detailed Description
The utility model will be further described with reference to the accompanying drawings, but the scope of the utility model is not limited to the following.
The first embodiment is as follows: as shown in fig. 1 to 4, a prevent to add bearing protector that gas block brick hoist and mount fall, including support column 1, one side fixedly connected with loading board 2 of support column 1, one side of loading board 2 is provided with protective member 3, protective member 3 includes protective frame 301, one side fixedly connected with connecting plate 302 of protective frame 301, one side of connecting plate 302 is provided with fixed column 303, one side of protective frame 301 is rotated and is connected with screw thread post 304, one side threaded connection of screw thread post 304 has adjusting frame 305, one side fixedly connected with gusset plate 306 of adjusting frame 305, one side fixedly connected with hoisting ring 307 of gusset plate 306.
As an optional technical scheme of the utility model: the quantity of support column 1 is a plurality of, and a plurality of support column 1 symmetric distribution is in one side of loading board 2.
As an optional technical scheme of the utility model: connecting groove 4 has been seted up to one side of loading board 2, the quantity of connecting groove 4 is a plurality of, 4 symmetric distribution of a plurality of connecting groove are in one side of loading board 2, the shape and the size looks adaptation of size and connecting plate 302 of connecting groove 4, when carrying out the hoist and mount of air entrainment brick, at first move loading board 2 to hoist and mount place, place support column 1 on smooth subaerial afterwards, place the air entrainment brick on loading board 2 afterwards, add proper amount back when the air entrainment brick, inside inserting connecting plate 302 connecting groove 4, fix protective frame 301 on loading board 2 through fixed column 303 afterwards.
As an optional technical scheme of the utility model: fixing hole 5 has been seted up to one side of connecting plate 302, and the quantity of fixing hole 5 is a plurality of, and the 5 symmetric distribution of a plurality of fixing hole are in one side of connecting plate 302, and the diameter size of fixing hole 5 equals with the diameter size of fixed column 303.
As an optional technical scheme of the utility model: spout 6 has been seted up to one side of protective frame 301, and one side fixedly connected with of adjusting frame 305 adjusts post 7, and the quantity of adjusting post 7 is a plurality of, and a plurality of adjusts post 7 symmetric distribution in one side of adjusting frame 305, adjusts the shape and the size of post 7 and the shape and the size looks adaptation of spout 6.
As an optional technical scheme of the utility model: threaded hole 8 has been seted up to one side of adjusting frame 305, threaded hole 8's quantity is a plurality of, 8 symmetric distribution of a plurality of threaded hole are in one side of adjusting frame 305, threaded hole 8's screw thread pitch and the screw thread pitch looks adaptation of screw thread post 304, when the quantity of hoist and mount air entrainment brick is adjusted to needs, at first assemble loading board 2 and protection frame 301, later to the inside fragment of brick that adds of protection frame 301, insert inside protection frame 301 with adjusting frame 305 after adding suitable volume, rotate screw thread post 304 afterwards, can make screw thread post 304 carry out linear motion through screw thread transmission, and then can fix adjusting frame 305 on protection frame 301, hang the fragment of brick to suitable floor through hoisting ring 307 at last.
As an optional technical scheme of the utility model: the number of the reinforcing plates 306 is several, and several reinforcing plates 306 are linearly arrayed on one side of the adjusting frame 305.
The working process of the utility model is as follows: when the utility model is used by a user,
s1: when the aerated brick is hoisted, the bearing plate 2 is firstly moved to a hoisting place, then the supporting column 1 is placed on the flat ground, then the aerated brick is placed on the bearing plate 2, after the aerated brick is added to a proper amount, the connecting plate 302 is inserted into the connecting groove 4, and then the protective frame 301 is fixed on the bearing plate 2 through the fixing column 303.
S2: when the number of the lifted aerated bricks is required to be adjusted, the bearing plate 2 and the protection frame 301 are assembled, bricks are added into the protection frame 301, the adjusting frame 305 is inserted into the protection frame 301 until the bricks are added into a proper amount, the threaded columns 304 are rotated, the threaded columns 304 can perform linear motion through threaded transmission, the adjusting frame 305 can be fixed on the protection frame 301, and finally the bricks are lifted to a proper floor through the lifting rings 307.
The second embodiment: as shown in fig. 5, a prevent to add bear protector that air pocket block brick hoist and mount were fallen, including support column 1, one side fixedly connected with loading board 2 of support column 1, one side of loading board 2 is provided with protective member 3, protective member 3 includes protection frame 301, one side fixedly connected with connecting plate 302 of protection frame 301, one side of connecting plate 302 is provided with fixed column 303, one side of protection frame 301 is rotated and is connected with threaded column 304, one side threaded connection of threaded column 304 has adjusting frame 305, one side fixedly connected with gusset plate 306 of adjusting frame 305, one side fixedly connected with hoisting ring 307 of gusset plate 306.
The working process of the utility model is as follows: when the utility model is used by a user,
when the quantity of hoisting air entrainment brick needs to be adjusted, at first assemble loading board 2 and protection frame 301, later to the inside fragment of brick that adds of protection frame 301, insert inside protection frame 301 with adjusting frame 305 after adding suitable volume, screw thread post 304 rotates afterwards, can make screw thread post 304 carry out linear motion through screw thread transmission, and then can fix adjusting frame 305 on protection frame 301, hang the fragment of brick to suitable floor through hoist ring 307 at last, and can in time adjust the quantity of fragment of brick, compare in embodiment one, embodiment two has increased the quantity of hoist ring 307, can make hoist and mount more stable.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.