CN216942477U - Ornament hanging piece - Google Patents

Ornament hanging piece Download PDF

Info

Publication number
CN216942477U
CN216942477U CN202220494143.2U CN202220494143U CN216942477U CN 216942477 U CN216942477 U CN 216942477U CN 202220494143 U CN202220494143 U CN 202220494143U CN 216942477 U CN216942477 U CN 216942477U
Authority
CN
China
Prior art keywords
plate
telescopic
flexible rope
telescopic frame
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220494143.2U
Other languages
Chinese (zh)
Inventor
陈菲尔
肖泽理
陈闻昊
张燕
伊学君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu College of University of Electronic Science and Technology of China
Original Assignee
Chengdu College of University of Electronic Science and Technology of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu College of University of Electronic Science and Technology of China filed Critical Chengdu College of University of Electronic Science and Technology of China
Priority to CN202220494143.2U priority Critical patent/CN216942477U/en
Application granted granted Critical
Publication of CN216942477U publication Critical patent/CN216942477U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pinball Game Machines (AREA)

Abstract

The utility model discloses an ornament hanging piece, which relates to the technical field of ornament hanging pieces and comprises a hanging piece main body, wherein a first telescopic rope penetrates through one end of the hanging piece main body, a rubber gasket is arranged at the connecting part of the first telescopic rope and the hanging piece main body, a spring buckle is fixedly connected with one end of the first telescopic rope, a telescopic frame is fixedly connected with one end of the first telescopic rope, which is far away from the spring buckle, and a second telescopic rope penetrates through the inner wall of the telescopic frame. The operation of adjusting the whole length of the first telescopic rope and the second telescopic rope is realized.

Description

Ornament hanging piece
Technical Field
The utility model relates to the technical field of ornament hanging pieces, in particular to an ornament hanging piece.
Background
With the pursuit of people on the quality of life, decoration needs to be perfected in many occasions, and the ornament hanging piece can play a role in embellishing in the decoration and has the effect of convenient decoration, so that the ornament hanging piece is popular with people, and the ornament hanging piece is needed.
Because the problem of unstable fixation occurs when the ornament pendant is used at present, the ornament pendant is easy to fall off and damaged, and the problem that the length of a hanging rope cannot be adjusted occurs when the ornament pendant is used, the ornament pendant is uncomfortable to wear or is not matched highly when being hung in a room, and the requirement of people cannot be met, so that the ornament pendant is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an ornament hanging piece to solve the problems that the fixing is unstable and the length of a hanging rope cannot be adjusted in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides an ornaments pendant, includes the pendant main part, the one end of pendant main part runs through there is first flexible rope, the position of being connected of first flexible rope and pendant main part is provided with the rubber packing ring, the one end fixedly connected with snak link of first flexible rope, the one end fixedly connected with telescoping frame that the snak link was kept away from to first flexible rope, the inner wall of telescoping frame runs through there is the flexible rope of second, the top fixedly connected with connector link of the flexible rope of second, the holding ring has been cup jointed to one side that the position of being connected of first flexible rope and the flexible rope of second is located telescoping frame.
Preferably, telescopic frame's inner wall fixedly connected with work spring, and work spring's top fixedly connected with lifter block, the one end fixedly connected with upset guide pillar of lifter block, upset guide pillar outer wall swing joint has the upset orifice plate of connecing soon with telescopic frame inner wall, and the position of being connected of upset orifice plate and upset guide pillar is provided with the upset guide slot, the one end of upset orifice plate has connect soon and has pressed from both sides tight even board, and presss from both sides the lateral wall fixedly connected with of even board and the flexible rope stationary blade of laminating mutually of second, press from both sides the one end that tight even board kept away from the upset orifice plate and have connect soon with telescopic frame inner wall's returning face plate, and the position of being connected of returning face plate has connect soon and connect even board, the outer wall fixedly connected with of connecting the board extends to the outside shifting block of telescopic frame.
In order to realize the stable fixed operation of pendant main part, first flexible rope is provided with two sets ofly, and two sets of first flexible ropes are connected through the snak link, the flexible rope of second is provided with two sets ofly, and just two sets of flexible ropes of second be connected through the connector link.
In order to realize the adjustment operation to the whole length of first flexible rope and the flexible rope of second, telescopic frame is provided with two sets ofly, and two sets of telescopic frame sets up the top at first flexible rope and the bottom of the flexible rope of second.
In order to realize the control operation of the rotation of the turnover hole plate, the lifting block and the telescopic frame form a lifting structure through the working spring, and the turnover hole plate and the telescopic frame form a rotating structure through the turnover guide pillar and the turnover guide groove.
In order to realize the control operation of the rotation of the turnover plate, the turnover plate forms a rotating structure through the turnover hole plate and the connecting plate and the telescopic frame, and the turnover plate is parallel to the turnover hole plate.
In order to realize the control operation of the close fitting of the fixed plate and the second telescopic rope, the fixed plate forms a clamping structure through the turnover plate and the turnover hole plate and the second telescopic rope, and the clamping connecting plate is parallel to the connecting plate.
The utility model provides an ornament hanging piece, which has the beneficial effects that compared with the prior art:
1. through setting up the flexible rope of first flexible rope and second, pass the rubber packing ring in the pendant main part with first flexible rope, the rubber packing ring prevents that wearing and tearing from appearing in first flexible rope when using, then connects two sets of first flexible ropes through the snak link, connects two sets of flexible ropes of second through the connector link, realizes the stable fixed operation to the pendant main part.
2. Through setting up the stationary blade, the vertical slip of elevator drives upset guide pillar synchronous slip, and the upset guide pillar slides and drives the upset orifice plate through the upset guide slot and rotate, and the upset orifice plate rotates and drives the tight even board motion of clamp, and the upset orifice plate rotates simultaneously and drives the returning face plate rotation through connecting even board, rotates through the returning face plate and drives the tight stationary blade and the flexible rope of second that link the board outer wall of clamp and closely laminate, realizes the regulation operation to the whole length of first flexible rope and the flexible rope of second.
Drawings
FIG. 1 is a schematic view of an overall structure of an ornament hanging member according to the present invention;
FIG. 2 is a schematic view of a connection structure of a first retractable rope and a second retractable rope of the ornament hanging member according to the present invention;
FIG. 3 is a schematic cross-sectional view of the connection between the first retractable cord and the second retractable cord of the ornament hanging member according to the present invention;
fig. 4 is a schematic cross-sectional view of a telescopic frame of the ornament hanging member according to the present invention.
In the figure: 1. a pendant main body; 2. a first retractable cord; 3. a rubber gasket; 4. a spring buckle; 5. a telescoping frame; 6. a second retractable cord; 7. a connecting buckle; 8. a working spring; 9. a lifting block; 10. turning over the guide pillar; 11. turning over the pore plate; 12. turning over the guide groove; 13. clamping the connecting plate; 14. a fixing sheet; 15. a turnover plate; 16. connecting the connecting plate; 17. shifting blocks; 18. a retaining ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides an ornament pendant, including pendant main part 1, the one end of pendant main part 1 runs through there is first flexible rope 2, first flexible rope 2 is provided with rubber packing ring 3 with the position of being connected of pendant main part 1, the one end fixedly connected with snak link 4 of first flexible rope 2, the one end fixedly connected with telescoping frame 5 of snak link 4 is kept away from to first flexible rope 2, the inner wall of telescoping frame 5 runs through there is the flexible rope 6 of second, the top fixedly connected with connector link 7 of the flexible rope 6 of second, the holding ring 18 has been cup jointed to one side that the connecting portion of first flexible rope 2 and the flexible rope 6 of second is located telescoping frame 5.
Further, the inner wall of the telescopic frame 5 is fixedly connected with a working spring 8, the top end of the working spring 8 is fixedly connected with a lifting block 9, one end of the lifting block 9 is fixedly connected with an overturning guide pillar 10, the outer wall of the overturning guide pillar 10 is movably connected with an overturning pore plate 11 which is screwed with the inner wall of the telescopic frame 5, the connecting part of the overturning pore plate 11 and the overturning guide pillar 10 is provided with an overturning guide groove 12, one end of the overturning pore plate 11 is screwed with a clamping connecting plate 13, the side wall of the clamping connecting plate 13 is fixedly connected with a fixing plate 14 which is jointed with the second telescopic rope 6, one end of the clamping connecting plate 13, far away from the overturning pore plate 11, is screwed with an overturning plate 15 which is screwed with the inner wall of the telescopic frame 5, the connecting part of the overturning plate 15 and the overturning pore plate 11 is screwed with a connecting plate 16, the outer wall of the connecting plate 16 is fixedly connected with a shifting block 17 which extends to the outside the telescopic frame 5, by arranging the telescopic frame 5, be favorable to work spring 8 work to drive elevator 9 along the vertical slip of the inner wall of telescopic frame 5, elevator 9 vertical slip drives upset guide pillar 10 synchronous slip, upset guide pillar 10 slides and drives upset orifice plate 11 through upset guide slot 12 and rotate, upset orifice plate 11 rotates and drives and press from both sides tight even board 13 motion, upset orifice plate 11 rotates simultaneously and drives upset board 15 through connecting even board 16 and rotate, rotate through upset board 15 and overturn orifice plate 11 and rotate and drive the stationary blade 14 that presss from both sides tight even board 13 outer wall and closely laminate with the flexible rope 6 of second, the realization is to the regulation operation of the flexible rope 6 whole length of first flexible rope 2 and second.
Further, first flexible rope 2 is provided with two sets ofly, and two sets of first flexible rope 2 is connected through snak link 4, and the flexible rope 6 of second is provided with two sets ofly, and two sets of flexible rope 6 of second is connected through connector link 7, through setting up two sets of first flexible rope 2 and two sets of flexible rope 6 of second, is favorable to realizing the stable fixed operation to pendant main part 1.
Further, telescopic frame 5 is provided with two sets ofly, and two sets of telescopic frame 5 sets up at the top of first flexible rope 2 and the bottom of the flexible rope 6 of second, through setting up telescopic frame 5, is favorable to realizing the regulation operation to the flexible rope 6 overall length of first flexible rope 2 and second.
Further, the elevator 9 passes through and constitutes elevation structure between work spring 8 and the telescoping frame 5, upset orifice plate 11 constitutes revolution mechanic through overturning guide pillar 10 and overturning guide slot 12 and between the telescoping frame 5, be favorable to work spring 8 work to drive elevator 9 along the vertical slip of inner wall of telescoping frame 5, the vertical slip of elevator 9 drives upset guide pillar 10 synchronous slip, upset guide pillar 10 slides and drives upset orifice plate 11 through overturning guide slot 12 and rotate, realize 11 pivoted control operations of upset orifice plate.
Further, the turnover plate 15 forms a rotating structure through the turnover hole plate 11 and the connecting plate 16 and the telescopic frame 5, the turnover plate 15 is parallel to the turnover hole plate 11, the turnover hole plate 11 is favorable for rotating, the connecting plate 16 drives the turnover plate 15 to rotate, and the control operation of the rotation of the turnover plate 15 is realized.
Further, the stationary blade 14 passes through the returning face plate 15 and constitutes between the flexible rope 6 of upset orifice plate 11 and second and press from both sides tight structure, presss from both sides tight even board 13 and connects even board 16 and parallel, is favorable to rotating through returning face plate 15 and overturns orifice plate 11 and rotates the stationary blade 14 that drives the tight even board 13 outer wall of clamp and closely laminates with the flexible rope 6 of second, realizes the control operation that stationary blade 14 and the flexible rope 6 of second closely laminate.
The working principle is as follows: when the telescopic rope hanger is used, the first telescopic rope 2 penetrates through the rubber gasket 3 in the hanger main body 1, then the two groups of first telescopic ropes 2 are connected through the spring fastener 4, and the two groups of second telescopic ropes 6 are connected through the connecting fastener 7.
Finally, the overall length of the first telescopic rope 2 and the second telescopic rope 6 is adjusted, in the telescopic frame 5, a user pulls the shifting block 17 to enable the fixing piece 14 to be far away from the second telescopic rope 6, then the user drives the telescopic frame 5 to slide along the outer wall of the second telescopic rope 6, after the adjustment is finished, the shifting block 17 is loosened to enable the working spring 8 to work to drive the lifting block 9 to vertically slide along the inner wall of the telescopic frame 5, the lifting block 9 vertically slides to drive the overturning guide post 10 to synchronously slide, the overturning guide post 10 slides to drive the overturning orifice plate 11 to rotate through the overturning guide groove 12, the overturning orifice plate 11 rotates to drive the clamping connecting plate 13 to move, meanwhile, the overturning orifice plate 11 rotates to drive the overturning plate 15 to rotate through the connecting plate 16, the fixing piece 14 of the outer wall of the clamping connecting plate 13 is driven to be tightly attached to the second telescopic rope 6 through the rotation of the overturning plate 15 and the overturning orifice plate 11, the operation of adjusting the overall length of the first telescopic rope 2 and the second telescopic rope 6 is realized.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an ornaments pendant, includes the pendant main part, its characterized in that: first flexible rope has been run through to the one end of pendant main part, the position of being connected of first flexible rope and pendant main part is provided with the rubber packing ring, the one end fixedly connected with snak link of first flexible rope, the one end fixedly connected with telescopic frame that the snak link was kept away from to first flexible rope, telescopic frame's inner wall has run through the flexible rope of second, the top fixedly connected with connector link of the flexible rope of second, the holding ring has been cup jointed to the position of being connected that first flexible rope and the flexible rope of second lie in one side of telescopic frame.
2. The ornament hanging element according to claim 1, wherein: the inner wall fixedly connected with work spring of telescopic frame, and the top fixedly connected with lifter block of work spring, the one end fixedly connected with upset guide pillar of lifter block, upset guide pillar outer wall swing joint has the upset orifice plate that connects soon with the telescopic frame inner wall, and the position of being connected of upset orifice plate and upset guide pillar is provided with the upset guide slot, the one end of upset orifice plate has connect soon and presss from both sides tight even board, and presss from both sides the stationary blade that the lateral wall fixedly connected with that presss from both sides tight even board laminated mutually with the flexible rope of second, the one end that presss from both sides tight even board and keep away from the upset orifice plate has connect soon with the returning face plate that connects soon with the telescopic frame inner wall, and the position of being connected of returning face plate has connect soon and has connected even board, the outer wall fixedly connected with who connects even board extends to the outside shifting block of telescopic frame.
3. The ornament hanging element according to claim 1, wherein: the first telescopic rope is provided with two sets, and two sets of first telescopic ropes are connected through the snak link, the second telescopic rope is provided with two sets, and two sets of second telescopic ropes are connected through the connector link.
4. The ornament hanging element according to claim 1, wherein: the telescopic frame is provided with two sets, and two sets of telescopic frame set up the top at first flexible rope and the bottom of the flexible rope of second.
5. The ornamental article hanger of claim 2, wherein: the lifting block and the telescopic frame form a lifting structure through the working spring, and the overturning pore plate and the telescopic frame form a rotating structure through the overturning guide pillar and the overturning guide groove.
6. The ornamental article hanger of claim 2, wherein: the turnover plate forms a rotating structure between the turnover hole plate and the connecting plate and the telescopic frame, and the turnover plate is parallel to the turnover hole plate.
7. The ornamental article hanger of claim 2, wherein: the fixed piece forms a clamping structure through the turnover plate, the turnover hole plate and the second telescopic rope, and the clamping connecting plate is parallel to the connecting plate.
CN202220494143.2U 2022-03-01 2022-03-01 Ornament hanging piece Expired - Fee Related CN216942477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220494143.2U CN216942477U (en) 2022-03-01 2022-03-01 Ornament hanging piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220494143.2U CN216942477U (en) 2022-03-01 2022-03-01 Ornament hanging piece

Publications (1)

Publication Number Publication Date
CN216942477U true CN216942477U (en) 2022-07-12

Family

ID=82294872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220494143.2U Expired - Fee Related CN216942477U (en) 2022-03-01 2022-03-01 Ornament hanging piece

Country Status (1)

Country Link
CN (1) CN216942477U (en)

Similar Documents

Publication Publication Date Title
CN201202937Y (en) Television set elevator
CN216942477U (en) Ornament hanging piece
CN209710963U (en) A kind of edible fungus stick culture apparatus
CN201628068U (en) Guiderail type television rack
CN215407245U (en) Ceramic tile seam beautifying auxiliary assembly that fitment was used
CN208280510U (en) A kind of lightweight synthetic stone wall module
CN208632048U (en) It is a kind of to facilitate architecture indoor finishing hoistable platform
CN206110342U (en) Fitting -up wallboard that can splice
CN205348694U (en) Door and window or curtain close device
CN201700982U (en) Novel clamping pothook
CN108814174B (en) Mural hanging auxiliary device
CN214463544U (en) Composite door plant of granule glues covers architectural surface device
CN216831444U (en) Special-shaped body edge banding machine convenient to adjust
CN205330505U (en) Herringbone ladder
CN212066360U (en) Mounting frame convenient to use
CN211272956U (en) Oxygen bag fixing and pressurizing device
CN217993977U (en) Can replace goods of furniture for display rather than for use of embellishment
CN214643579U (en) Interior decoration fitment is with marking device that has angle modulation function
CN206380728U (en) A kind of full dress for being conveniently replaceable decoration shoulder belt
CN208319108U (en) A kind of aluminium alloy mirror cabinet with side mirror plate
CN2437789Y (en) Inside-corner decoration aluminium alloy sections
CN205337893U (en) Ornaments part
CN217293522U (en) PVC decorative board protective film durability realization device
CN215670092U (en) Large-span steel structure net rack
CN220744381U (en) Automatic feeding device for wood splints

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220712