CN216923432U - Adjustable scaffold for water conservancy construction - Google Patents

Adjustable scaffold for water conservancy construction Download PDF

Info

Publication number
CN216923432U
CN216923432U CN202220567118.2U CN202220567118U CN216923432U CN 216923432 U CN216923432 U CN 216923432U CN 202220567118 U CN202220567118 U CN 202220567118U CN 216923432 U CN216923432 U CN 216923432U
Authority
CN
China
Prior art keywords
plate
slide bar
water conservancy
limiting
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220567118.2U
Other languages
Chinese (zh)
Inventor
谭万开
陈亮
周代涛
陈兆军
杨超平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 10 Co Ltd
Original Assignee
Sinohydro Bureau 10 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 10 Co Ltd filed Critical Sinohydro Bureau 10 Co Ltd
Priority to CN202220567118.2U priority Critical patent/CN216923432U/en
Application granted granted Critical
Publication of CN216923432U publication Critical patent/CN216923432U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an adjustable scaffold for water conservancy construction, which belongs to the technical field of water conservancy, and adopts the technical scheme that the scaffold comprises two main body plates, wherein two fixing plates and connecting rods are fixedly connected between opposite sides of the two main body plates respectively; stop gear includes spacing chamber, limiting plate, gag lever post and spacing spring, spacing spring all is located the inside in spacing chamber with the limiting plate, has solved current pipeline when the construction, generally all can use the support frame, but current support frame generally is one row, when adjusting, can only control to adjust and can not adjust from top to bottom, leads to when the pipeline supports, only can one step installation to the problem of construction progress has been influenced.

Description

Adjustable scaffold for water conservancy construction
Technical Field
The utility model relates to the technical field of water conservancy, in particular to an adjustable scaffold for water conservancy construction.
Background
The scaffold is a device widely applied to the field of building construction, and particularly, the scaffold is frequently required to be built or constructed because the scaffold needs to be moved and ascended for indoor decoration and electromechanical installation.
Current pipeline is when the construction, generally all can use the support frame, but current support frame is generally one row, when adjusting, can only control and adjust and can not adjust from top to bottom, leads to when the pipeline supports, can only one step of installation to the problem of construction progress has been influenced.
SUMMERY OF THE UTILITY MODEL
The utility model provides an adjustable scaffold for water conservancy construction, and aims to solve the problem that the construction progress is influenced because the existing support frames are generally used during construction of the existing pipelines, but the existing support frames are generally arranged in a row, and can only be adjusted left and right but cannot be adjusted up and down during adjustment, so that the pipelines can only be installed one by one during pipeline support.
The utility model discloses an adjustable scaffold for water conservancy construction, which comprises two main body plates, wherein two fixing plates and two connecting rods are fixedly connected between opposite sides of the two main body plates respectively;
limiting mechanism includes spacing chamber, limiting plate, gag lever post and spacing spring, spacing spring and limiting plate all are located the inside in spacing chamber, one side and limiting plate fixed connection that spacing spring is close to the limiting plate, one side that spacing spring kept away from the limiting plate and the inner wall fixed connection in spacing chamber, one side and gag lever post fixed connection that spacing spring was kept away from to the limiting plate, one side that the limiting plate was kept away from to the gag lever post is passed spacing hole and is extended to the outside of second bracing piece, the bottom in first bracing piece inside is seted up in spacing chamber.
In order to achieve the effect of facilitating the sliding of the first supporting plate on the surface of the second slide bar, the adjustable scaffold for water conservancy construction is preferably used, the right side of the second supporting bar is fixedly connected with the second slide bar, the inside of the second slide bar is slidably connected with the slide block, the surface of the second slide bar is slidably connected with the first supporting plate, and one side, close to the slide block, of the first supporting plate is fixedly connected with the slide block.
In order to achieve the effect of supporting the pipeline, the scaffold for adjustable water conservancy construction is preferably used, the second supporting plate is connected to the inside of the first supporting plate in a sliding mode, and the surface of the first supporting plate is fixedly connected with a plurality of placing blocks.
In order to achieve the effect of fixing the fixing block and the fixing plate on the wall, the adjustable scaffold for water conservancy construction is preferably used, the fixing block is fixedly connected to the right side of the second supporting plate, a plurality of first fixing holes are formed in the surface of the fixing block, and a plurality of second fixing holes are formed in the top of the fixing plate.
In order to achieve the effect of facilitating the sliding of the first support rod at the bottom of the main body plate, the adjustable scaffold for water conservancy construction is preferably used, the bottom of the main body plate is provided with a sliding groove, a first sliding rod is connected inside the sliding groove in a sliding manner, the bottom of the first sliding rod penetrates through the sliding groove and extends to the outer side of the main body plate, and the bottom of the first sliding rod is fixedly connected with the first support rod.
In order to achieve the effect of supporting the first supporting plate, the adjustable scaffold for water conservancy construction is preferably used, the bottom of the first supporting plate is fixedly connected with a third supporting plate, and one side, far away from the first supporting plate, of the third supporting plate is sleeved on the surface of the second sliding rod and is in sliding connection with the second sliding rod.
Compared with the prior art, the utility model has the beneficial effects that:
this adjustable scaffold for water conservancy construction, according to the height that the pipeline needs was installed, press the gag lever post, the gag lever post passes through limiting plate extrusion limiting spring, limiting spring is extruded and enters into the inside of second bracing piece with the gag lever post, stimulates the second bracing piece, when reaching the height of needs, stops to stimulate the second bracing piece, and the gag lever post passes the outside that spacing hole extended to the second bracing piece through limiting spring's extrusion with the gag lever post, carries on spacingly to the second bracing piece.
Drawings
Fig. 1 is an overall structural view of an adjustable scaffold for water conservancy construction according to the present invention;
FIG. 2 is a schematic view of the connection between the main body plate and the first support plate according to the present invention;
FIG. 3 is a schematic structural view of a fixing block according to the present invention;
FIG. 4 is a partial schematic view of a second support bar, a first support plate and a second slide bar according to the present invention;
FIG. 5 is a partial cross-sectional view of the body panel of the present invention;
FIG. 6 is a schematic view of the connection between a first support plate and a second support plate according to the present invention;
FIG. 7 is a plan sectional view of the first support bar and the second support bar of the present invention;
FIG. 8 is a partial cross-sectional view of the first support bar and the second support bar of the present invention.
In the figure, 1, a main body plate; 2. a limiting mechanism; 201. a limiting cavity; 202. a limiting plate; 203. a limiting rod; 204. a limiting spring; 3. a fixing plate; 4. a second fixing hole; 5. a connecting rod; 6. a fixed block; 7. a second support bar; 8. a second slide bar; 9. a third support plate; 10. a first support plate; 11. placing the blocks; 12. a first fixing hole; 13. a slider; 14. a chute; 15. a first slide bar; 16. a second support plate; 17. a first support bar; 18. and a limiting hole.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on those shown in the drawings, and are merely for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, are not to be construed as limiting the present invention. Further, in the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
Referring to fig. 1-8, the present invention provides the following technical solutions: an adjustable scaffold for water conservancy construction comprises two main body plates 1, wherein two fixed plates 3 and connecting rods 5 are fixedly connected between opposite sides of the two main body plates 1 respectively, a first supporting rod 17 is arranged at the bottom of each main body plate 1, a second supporting rod 7 is sleeved on the surface of each first supporting rod 17, a limiting mechanism 2 is arranged at the bottom inside each first supporting rod 17, and a plurality of limiting holes 18 are formed in the surface of each second supporting rod 7;
limiting mechanism 2 includes spacing chamber 201, limiting plate 202, gag lever post 203 and spacing spring 204, spacing spring 204 all is located the inside in spacing chamber 201 with limiting plate 202, one side and limiting plate 202 fixed connection that limiting spring 204 is close to limiting plate 202, one side and the inner wall fixed connection in spacing chamber 201 that limiting plate 202 was kept away from to spacing spring 204, one side and gag lever post 203 fixed connection that limiting spring 204 was kept away from to limiting plate 202, one side that limiting plate 202 was kept away from to gag lever post 203 passes spacing hole 18 and extends to the outside of second bracing piece 7, spacing chamber 201 is seted up in the inside bottom of first bracing piece 17.
In this embodiment: through the height that needs the installation according to the pipeline, press gag lever post 203, gag lever post 203 extrudees spacing spring 204 through limiting plate 202, spacing spring 204 is extruded and enters into the inside of second bracing piece 7 with gag lever post 203, stimulate second bracing piece 7, when reaching required height, stop to stimulate second bracing piece 7, gag lever post 203 passes spacing hole 18 with gag lever post 203 through the extrusion of spacing spring 204 and extends to the outside of second bracing piece 7, it is spacing to carry out second bracing piece 7.
As a technical optimization scheme of the utility model, a second slide bar 8 is fixedly connected to the right side of a second support bar 7, a slide block 13 is slidably connected inside the second slide bar 8, a first support plate 10 is slidably connected to the surface of the second slide bar 8, and one side of the first support plate 10, which is close to the slide block 13, is fixedly connected with the slide block 13.
In this embodiment: through setting up second slide bar 8, slider 13 and first backup pad 10, remove first backup pad 10, first backup pad 17 slides through slider 13 in second slide bar 8 inside and drives first backup pad 10 and slide on second slide bar 8 surface, when sliding to the assigned position, stops sliding, reaches the gliding effect in second slide bar 8 surface of convenience first backup pad 10.
As the technical optimization scheme of the utility model, the second support plate 16 is connected inside the first support plate 10 in a sliding manner, and a plurality of placing blocks 11 are fixedly connected to the surface of the first support plate 10.
In this embodiment: through setting up second backup pad 16 and placing piece 11, stimulate first backup pad 10, first backup pad 10 slides in inside through second bracing piece 7, slowly keeps away from fixed block 6, places the pipeline and carries out the pipeline construction placing piece 11 surfaces, reaches the effect that supports the pipeline.
As a technical optimization scheme of the utility model, the right side of the second supporting plate 16 is fixedly connected with a fixing block 6, the surface of the fixing block 6 is provided with a plurality of first fixing holes 12, and the top of the fixing plate 3 is provided with a plurality of second fixing holes 4.
In this embodiment: through setting up fixed block 6, first fixed orifices 12 and second fixed orifices 4, fix fixed plate 3 on the roof through second fixed orifices 4, align fixed block 6 with the wall, fix fixed block 6 on the wall through first fixed orifices 12, reach the effect of fixing fixed block 6 and fixed plate 3 on the wall.
As the technical optimization scheme of the utility model, the bottom of the main body plate 1 is provided with a sliding groove 14, the inside of the sliding groove 14 is connected with a first sliding rod 15 in a sliding manner, the bottom of the first sliding rod 15 penetrates through the sliding groove 14 and extends to the outer side of the main body plate 1, and the bottom of the first sliding rod 15 is fixedly connected with a first supporting rod 17.
In this embodiment: through setting up spout 14 and first slide bar 15, pulling first bracing piece 17, first bracing piece 17 passes through first slide bar 15 and slides in spout 14 inside, reaches the effect that makes things convenient for first bracing piece 17 to slide in main part board 1 bottom.
As a technical optimization scheme of the utility model, the bottom of the first support plate 10 is fixedly connected with a third support plate 9, and one side of the third support plate 9, which is far away from the first support plate 10, is sleeved on the surface of the second slide bar 8 and is in sliding connection with the second slide bar 8.
In this embodiment: through setting up third backup pad 9, when first backup pad 10 is gliding, first backup pad 10 drives third backup pad 9 and slides on second slide bar 8, reaches the effect of supporting first backup pad 10.
The working principle is as follows: firstly, according to the height required for installing the pipeline, the limiting rod 203 is pressed, the limiting rod 203 extrudes the limiting spring 204 through the limiting plate 202, the limiting spring 204 is extruded to enable the limiting rod 203 to enter the inside of the second supporting rod 7, the second supporting rod 7 is pulled, when the required height is reached, the second supporting rod 7 is stopped to be pulled, the limiting rod 203 penetrates through the limiting hole 18 to extend to the outer side of the second supporting rod 7 through the extrusion of the limiting spring 204 to limit the second supporting rod 7, the first supporting plate 10 is moved, the first supporting rod 17 slides in the second sliding rod 8 through the sliding block 13 to drive the first supporting plate 10 to slide on the surface of the second sliding rod 8, when the first supporting plate 10 slides to a specified position, the sliding is stopped, the first supporting plate 10 drives the third supporting plate 9 to slide on the second sliding rod 8 at the same time of the sliding of the first supporting plate 10, and the fixed block 6 is aligned with the wall surface, fix fixed block 6 on the wall through first fixed orifices 12, stimulate first bracing piece 17, first bracing piece 17 slides in spout 14 inside through first slide bar 15, it slides in inside to drive first bracing piece 10 through second bracing piece 7, slowly keep away from fixed block 6, when reaching needs support pipeline quantity, stop to stimulate first bracing piece 10, fix fixed plate 3 on the roof through second fixed orifices 4, place the pipeline and carry out the pipeline construction on placing 11 surfaces of piece, reach the effect of convenient regulation.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides an adjustable is scaffold for water conservancy construction, includes two main part boards (1), its characterized in that: two fixing plates (3) and connecting rods (5) are fixedly connected between opposite sides of the two main body plates (1), a first supporting rod (17) is arranged at the bottom of each main body plate (1), a second supporting rod (7) is sleeved on the surface of each first supporting rod (17), a limiting mechanism (2) is arranged at the bottom inside each first supporting rod (17), and a plurality of limiting holes (18) are formed in the surface of each second supporting rod (7);
stop gear (2) are including spacing chamber (201), limiting plate (202), gag lever post (203) and spacing spring (204), spacing spring (204) all are located the inside in spacing chamber (201) with limiting plate (202), one side and limiting plate (202) fixed connection that limiting spring (204) are close to limiting plate (202), one side and the inner wall fixed connection in spacing chamber (201) of limiting plate (202) are kept away from in spacing spring (204), one side and gag lever post (203) fixed connection of limiting spring (204) are kept away from in limiting plate (202), one side that limiting plate (202) were kept away from in gag lever post (203) passes spacing hole (18) and extends to the outside of second bracing piece (7), the bottom in first bracing piece (17) inside is seted up in spacing chamber (201).
2. The adjustable scaffold for water conservancy construction according to claim 1, wherein: the right side fixedly connected with second slide bar (8) of second bracing piece (7), the inside sliding connection of second slide bar (8) has slider (13), the surperficial sliding connection of second slide bar (8) has first backup pad (10), one side and slider (13) fixed connection that first backup pad (10) are close to slider (13).
3. The scaffold for adjustable water conservancy construction according to claim 2, wherein: the inside sliding connection of first backup pad (10) has second backup pad (16), the fixed surface of first backup pad (10) is connected with a plurality of and places piece (11).
4. The adjustable scaffold for water conservancy construction according to claim 3, wherein: the right side fixedly connected with fixed block (6) of second backup pad (16), a plurality of first fixed orifices (12) have been seted up on the surface of fixed block (6), a plurality of second fixed orifices (4) have been seted up at the top of fixed plate (3).
5. The adjustable scaffold for water conservancy construction according to claim 1, wherein: spout (14) have been seted up to the bottom of main part board (1), the inside sliding connection of spout (14) has first slide bar (15), spout (14) and the outside that extends to main part board (1) are passed to the bottom of first slide bar (15), the bottom and first bracing piece (17) fixed connection of first slide bar (15).
6. The adjustable scaffold for water conservancy construction according to claim 2, wherein: the bottom of the first supporting plate (10) is fixedly connected with a third supporting plate (9), one side, far away from the first supporting plate (10), of the third supporting plate (9) is sleeved on the surface of the second slide bar (8) and is in sliding connection with the second slide bar (8).
CN202220567118.2U 2022-03-15 2022-03-15 Adjustable scaffold for water conservancy construction Active CN216923432U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220567118.2U CN216923432U (en) 2022-03-15 2022-03-15 Adjustable scaffold for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220567118.2U CN216923432U (en) 2022-03-15 2022-03-15 Adjustable scaffold for water conservancy construction

Publications (1)

Publication Number Publication Date
CN216923432U true CN216923432U (en) 2022-07-08

Family

ID=82226221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220567118.2U Active CN216923432U (en) 2022-03-15 2022-03-15 Adjustable scaffold for water conservancy construction

Country Status (1)

Country Link
CN (1) CN216923432U (en)

Similar Documents

Publication Publication Date Title
CN216923432U (en) Adjustable scaffold for water conservancy construction
CN212583336U (en) Shear force wall replacement reinforcement equipment
CN206809218U (en) Adjustable bath article frame
CN219011994U (en) Assembled wall body locating rack for assembled building
CN210288855U (en) A various steel furred ceiling for toilet
CN211818309U (en) Police kiosk for expressway crossing
CN220896574U (en) Photovoltaic building fixing device
CN112610042A (en) Computer room maintenance and repair operation device
CN220954642U (en) Adjustable profile for external wall tongue-and-groove
CN207177315U (en) A kind of build concrete hollow brick masonry device
CN219138951U (en) House maintenance support frame convenient to fix
CN215858447U (en) Connecting structure of double-layer curtain wall
CN216731606U (en) Be used for supplementary installation dismounting device of interior electrical apparatus of cabinet
CN218234154U (en) Structure is adjusted in installation of building decorative panel
CN219605183U (en) Novel window railing
CN218375546U (en) Formwork mounting rack convenient to height adjusting
CN215564425U (en) Adjustable plate lowering tool
CN218668615U (en) Building wall auxiliary device is built in room
CN219931627U (en) Unilateral formwork construction device of basement outer wall
CN219548294U (en) Impact assembly for firm tile
CN220910689U (en) Heating and ventilation pipeline mounting bracket
CN215330850U (en) Color steel plate with connecting beam structure for suspended ceiling
CN215767356U (en) Building site real-time noise monitoring devices
CN220433918U (en) Quick-spliced container type mobile house
CN219247757U (en) Photovoltaic power generation board installation base

Legal Events

Date Code Title Description
GR01 Patent grant