CN216921279U - Scaffold is built in interim room - Google Patents

Scaffold is built in interim room Download PDF

Info

Publication number
CN216921279U
CN216921279U CN202220684921.4U CN202220684921U CN216921279U CN 216921279 U CN216921279 U CN 216921279U CN 202220684921 U CN202220684921 U CN 202220684921U CN 216921279 U CN216921279 U CN 216921279U
Authority
CN
China
Prior art keywords
rods
supporting
platform
vertical
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220684921.4U
Other languages
Chinese (zh)
Inventor
常伟峰
张璐明
梁进军
代冶强
常帅
邵佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Junda Construction Co ltd
Original Assignee
Henan Huida Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Huida Construction Engineering Co ltd filed Critical Henan Huida Construction Engineering Co ltd
Priority to CN202220684921.4U priority Critical patent/CN216921279U/en
Application granted granted Critical
Publication of CN216921279U publication Critical patent/CN216921279U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The application relates to the technical field of scaffolds, in particular to a scaffold for temporary building, which comprises a platform, wherein two support frames are arranged at the lower side of the platform, each support frame comprises two vertical rods arranged on the platform, sleeves are respectively sleeved on the two vertical rods in a sliding manner, and the two sleeves are connected through a connecting plate; the lower ends of the two vertical rods are rotatably connected with supporting rods, the planes formed by the supporting rods during rotation are parallel to the vertical plane, and the diameters of the supporting rods are the same as those of the vertical rods; a cavity for the support rod to be rotatably embedded is arranged between the two vertical rods, the two vertical rods positioned in the same support frame have different lengths, and the length difference of the two vertical rods is larger than or equal to the diameter of the support rod. This application can make things convenient for the loading transportation of scaffold frame.

Description

Scaffold is built in interim room
Technical Field
The application relates to the technical field of scaffolds, in particular to a scaffold for temporary building.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out.
Present scaffold includes the platform, and the downside of platform is equipped with two carriage, and the upper end at two carriages is fixed to the platform. The two supporting frames support the platform, and a worker stands on the platform to construct.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: the whole occupied space of the scaffold is large, and loading and transportation are inconvenient, so that improvement is needed.
Disclosure of Invention
In order to facilitate loading and transporting of the scaffold, the application provides a scaffold is built in interim room.
The application provides a pair of scaffold is built in interim room adopts following technical scheme: a scaffold for temporary building comprises a platform, wherein two supporting frames are arranged on the lower side of the platform, each supporting frame comprises two vertical rods arranged on the platform, sleeves are respectively sleeved on the two vertical rods in a sliding mode, and the two sleeves are connected through a connecting plate; the lower ends of the two vertical rods are rotatably connected with supporting rods, a plane formed by the rotating supporting rods is parallel to the vertical surface, and the diameter of each supporting rod is the same as that of each vertical rod; a cavity for the support rod to be rotatably embedded is arranged between the two vertical rods, the two vertical rods positioned in the same support frame have different lengths, and the length difference of the two vertical rods is larger than or equal to the diameter of the support rod.
Through adopting above-mentioned technical scheme, in the use of scaffold frame, the bracing piece will be vertical setting and support subaerial, and the sleeve will be established on the bracing piece, and two spinal branch vaulting poles that the connecting plate will be arranged in same carriage are connected for the rotation takes place for the difficult relative montant of bracing piece, has guaranteed the stability of platform. When a worker slides the sleeve onto the vertical rod, the two support rods can be rotatably embedded into the cavity; because of the length difference of the two vertical rods is more than or equal to the diameter of the support rods, the two support rods can not generate position interference after being embedded into the cavity and can be stacked together, the scaffold is folded, and loading and transportation of the scaffold are facilitated.
Optionally, the sleeve is provided with a bolt for tightly abutting against the side wall of the vertical rod or the side wall of the support rod in a threaded fit manner.
Through adopting above-mentioned technical scheme, the bolt can be with the sleeve spacing fix on montant or bracing piece, has guaranteed the stability of scaffold frame when using and when transporting.
Optionally, an embedding groove for the bolt to be embedded in a rotating manner is formed in the side wall of the supporting rod.
Through adopting above-mentioned technical scheme, in the use of scaffold frame, the bolt will rotate to be embedded into and establish the inslot, has improved the stability of sleeve on the bracing piece.
Optionally, two support rods in one of the support frames are connected to the adjacent support rod in the other support frame through a connecting rod.
Through adopting above-mentioned technical scheme, the connecting rod has realized the synchronous rotation of two adjacent bracing pieces, has made things convenient for the use and the folding of scaffold frame.
Optionally, four in the montant, be located two spinal branch vaulting poles on the longer two montants of length and go up the rotation and be connected with same cat ladder, the plane that the cat ladder formed when rotating is on a parallel with vertical face.
Through adopting above-mentioned technical scheme, in the use of scaffold frame, the cat ladder will be the slope setting and support subaerial, has improved the stability of scaffold frame, and is convenient for the workman to climb on the platform. After the bracing piece rotated to be embedded into the cavity, the cat ladder will also rotate to be embedded into the cavity, has realized accomodating of cat ladder.
Optionally, the ladder further comprises two limiting rods, and when the supporting rods and the ladder stand are accommodated at the bottom of the platform, the limiting rods penetrate through the ladder stand and the two supporting rods and the platform in the same supporting frame in a sliding mode.
Through adopting above-mentioned technical scheme, the gag lever post will be spacing the fixing in the bottom of platform of carriage and cat ladder, has improved the stability of scaffold frame after being folded.
Optionally, the limiting rod is connected to the crawling ladder through a spring; when the spring is in a natural state, the limiting rod penetrates through the ladder stand, the two supporting rods in the same supporting frame and the platform.
Through adopting above-mentioned technical scheme, the spring will make the gag lever post with the spacing bottom of fixing at the platform of carriage and cat ladder, further improved the stability of scaffold frame after being folded.
Optionally, a notch is formed in the sleeve, through which the connecting rod can slide, and the notch penetrates through the inner wall, the outer wall, the upper end and the lower end of the sleeve.
Through adopting above-mentioned technical scheme for the sleeve can break away from sliding on the bracing piece, so that telescopic dismouting.
Drawings
FIG. 1 is a schematic structural view showing a scaffold in use in an embodiment of the present application;
fig. 2 is a schematic structural view showing the folded scaffold in the embodiment of the present application.
Reference numerals are as follows: 1. a platform; 2. a support frame; 21. a vertical rod; 22. a sleeve; 221. a notch; 23. a connecting plate; 24. a support bar; 241. embedding a groove; 25. a cavity; 26. a bolt; 27. a connecting rod; 3. climbing a ladder; 31. a spring; 32. a limiting rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses scaffold is built in interim room. As shown in fig. 1, the scaffold for temporary building comprises a platform 1, two support frames 2 are arranged on the lower side of the platform 1, and the same ladder stand 3 is installed on the two support frames 2.
The supporting frame 2 comprises two vertical rods 21 fixed on the lower surface of the platform 1, sleeves 22 are sleeved on the two vertical rods 21 in a sliding mode, and the two sleeves 22 are connected through a connecting plate 23; the lower ends of the two vertical rods 21 are rotatably connected with supporting rods 24, planes formed by the supporting rods 24 and the ladder stand 3 during rotation are parallel to a vertical plane, and the diameter of each supporting rod 24 is the same as that of each vertical rod 21; a cavity 25 is arranged between the two vertical rods 21.
In the use of scaffold frame, bracing piece 24 will be vertical setting and support subaerial, and sleeve 22 will overlap and establish on bracing piece 24, and connecting plate 23 will be located two spinal branch vaulting poles 24 of same carriage 2 and connect for bracing piece 24 is difficult for montant 21 relatively to take place to rotate, and cat ladder 3 will be the slope setting and support subaerial, has guaranteed platform 1's stability, and workman's accessible cat ladder 3 climbs on platform 1.
As shown in fig. 2, the sleeve 22 is provided with a notch 221, the notch 221 penetrates through the inner wall, the outer wall, the upper end and the lower end of the sleeve 22, the notch 221 can avoid the ladder stand 3, so that the sleeve 22 is slidably sleeved on the vertical rod 21, the two support rods 24 and the ladder stand 3 can be rotatably embedded into the cavity 25, the folding of the scaffold is realized, and the loading and the transportation of the scaffold are facilitated.
It is worth to be noted that the lengths of the two vertical rods 21 in the same supporting frame 2 are different, and the difference between the lengths of the two vertical rods 21 is greater than or equal to the diameter of the supporting rod 24, so that the two supporting rods 24 will not interfere with each other and are stacked together after being embedded into the cavity 25, so that the folded scaffold can occupy a smaller space; the crawling ladder 3 is rotatably connected with the two support rods 24 on the two vertical rods 21 with longer lengths, so that the support rods 24 on the vertical rods 21 with shorter lengths are not easy to interfere with the crawling ladder 3 to be rotatably embedded into the cavity 25.
As shown in fig. 1 and 2, the sleeve 22 is screwed with the bolt 26, and the side wall of the support rod 24 is provided with an insertion groove 241. In the use process of the scaffold, the bolt 26 is rotatably embedded into the embedding groove 241, so that the stability of the sleeve 22 on the supporting rod 24 is improved, and the stability of the supporting rod 24 in the process of supporting the platform 1 is ensured; after the scaffold is folded, the bolt 26 is tightly abutted against the side wall of the vertical rod 21, so that the sleeve 22 is limited and fixed on the vertical rod 21, and the stability of the scaffold after being folded is ensured.
The two support rods 24 in one support frame 2 are connected to the adjacent support rods 24 in the other support frame 2 through the connecting rods 27, the connecting rods 27 realize the synchronous rotation of the two adjacent support rods 24, and the use and folding of the scaffold are facilitated; the connecting rod 27 can be slidably inserted into the notch 221, so that the sleeve 22 can be slidably separated from the supporting rod 24, and the sleeve 22 can be conveniently assembled and disassembled.
Be connected with two gag lever posts 32 through two springs 31 on cat ladder 3, when bracing piece 24 and cat ladder 3 were accomodate in platform 1 bottom, spring 31 will make gag lever post 32 slide and wear to locate cat ladder 3, two bracing pieces 24 in same carriage 2, connecting plate 23 and platform 1 for carriage 2 and cat ladder 3 are by spacing bottom of fixing at platform 1, have improved the stability of scaffold frame after being folded.
The implementation principle of scaffold is built in interim room in this application embodiment is: in the use of scaffold frame, bracing piece 24 will be vertical setting and support subaerial, and sleeve 22 will overlap and establish on bracing piece 24, and bolt 26 will inlay and establish in inlaying and establishing groove 241, and connecting plate 23 will be located two spinal branch vaulting poles 24 of same carriage 2 and connect, and cat ladder 3 will be the slope setting and support subaerial, has guaranteed the stability of platform 1, and workman's accessible cat ladder 3 climbs on platform 1.
When a worker slides the sleeve 22 onto the vertical rod 21, the two support rods 24 and the ladder stand 3 can be rotatably embedded into the cavity 25, so that the scaffold is folded, and the scaffold is convenient to load and transport; the spring 31 will make the stop lever 32 to slide through the two support rods 24, the connecting plate 23 and the platform 1 in the ladder stand 3 and the same support frame 2, so that the support frame 2 and the ladder stand 3 are fixed at the bottom of the platform 1 in a limited manner, and the stability of the folded scaffold is improved.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a scaffold frame is built in interim room, includes platform (1), and the downside of platform (1) is equipped with two carriage (2), its characterized in that: the supporting frame (2) comprises two vertical rods (21) arranged on the platform (1), sleeves (22) are sleeved on the two vertical rods (21) in a sliding mode, and the two sleeves (22) are connected through a connecting plate (23); the lower ends of the two vertical rods (21) are rotatably connected with supporting rods (24), a plane formed by the rotating supporting rods (24) is parallel to a vertical plane, and the diameter of each supporting rod (24) is the same as that of each vertical rod (21); a cavity (25) for the support rod (24) to be embedded in a rotating manner is arranged between the two vertical rods (21), the lengths of the two vertical rods (21) in the same support frame (2) are different, and the length difference of the two vertical rods (21) is greater than or equal to the diameter of the support rod (24).
2. A temporary housing construction scaffold according to claim 1, wherein: and a bolt (26) for tightly abutting against the side wall of the vertical rod (21) or the side wall of the supporting rod (24) is in threaded fit with the sleeve (22).
3. A temporary housing construction scaffold according to claim 2, wherein: the side wall of the supporting rod (24) is provided with an embedding groove (241) for the rotary embedding of the bolt (26).
4. A temporary housing construction scaffolding according to claim 1, wherein: two supporting rods (24) in one supporting frame (2) are connected to the supporting rods (24) adjacent to the supporting rods in the other supporting frame (2) through connecting rods (27).
5. A temporary housing construction scaffold according to claim 4, wherein: in four among the montant (21), be located two spinal branch vaulting poles (24) on two montants (21) that length is longer and rotate and be connected with same cat ladder (3), the plane that cat ladder (3) formed when rotating is on a parallel with vertical face.
6. A temporary housing construction scaffold according to claim 5, wherein: the ladder is characterized by further comprising two limiting rods (32), wherein when the supporting rods (24) and the ladder stand (3) are accommodated at the bottom of the platform (1), the limiting rods (32) penetrate through the two supporting rods (24) and the platform (1) in the ladder stand (3) and the same supporting frame (2) in a sliding mode.
7. A temporary housing construction scaffold according to claim 6, wherein: the limiting rod (32) is connected to the crawling ladder (3) through a spring (31); when the spring (31) is in a natural state, the limiting rod (32) penetrates through the ladder (3), the two support rods (24) in the same support frame (2) and the platform (1).
8. A temporary housing construction scaffold according to claim 4, wherein: the sleeve (22) is provided with a notch (221) for the connecting rod (27) to penetrate through in a sliding manner, and the notch (221) penetrates through the inner wall, the outer wall, the upper end and the lower end of the sleeve (22).
CN202220684921.4U 2022-03-28 2022-03-28 Scaffold is built in interim room Active CN216921279U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220684921.4U CN216921279U (en) 2022-03-28 2022-03-28 Scaffold is built in interim room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220684921.4U CN216921279U (en) 2022-03-28 2022-03-28 Scaffold is built in interim room

Publications (1)

Publication Number Publication Date
CN216921279U true CN216921279U (en) 2022-07-08

Family

ID=82228210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220684921.4U Active CN216921279U (en) 2022-03-28 2022-03-28 Scaffold is built in interim room

Country Status (1)

Country Link
CN (1) CN216921279U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370113A (en) * 2022-10-21 2022-11-22 徐州千帆标识系统工程有限公司 Scaffold for signboard installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370113A (en) * 2022-10-21 2022-11-22 徐州千帆标识系统工程有限公司 Scaffold for signboard installation

Similar Documents

Publication Publication Date Title
CN216921279U (en) Scaffold is built in interim room
US20100096216A1 (en) Scaffolding
KR101314928B1 (en) Folding stairs table
CN110295736B (en) Foldable scaffold convenient to fold and unfold
CN107268963B (en) Scaffold capable of being built on inclined plane and provided with movable platform
CN216787785U (en) Scaffold for building
US3891055A (en) Self-elevating scaffold construction
CN218815057U (en) Construction scaffold for building
CN211172977U (en) Scaffold frame that building engineering used
CN215978356U (en) Scaffold frame supporting platform for building
CN216616784U (en) Scaffold for high slope
CN214995779U (en) Improvement type scaffold frame for interior decoration design
CN216042475U (en) Climbing frame combined structure for building scaffold
CN215978362U (en) Strutting arrangement is used in building engineering construction
CN211058267U (en) Scaffold frame is used to fitment
CN216587610U (en) Scaffold with stair climbing fixing mechanism
CN214402652U (en) Ascending ladder for building construction
CN211775612U (en) Suspended type outer frame core filling operation platform
CN217759868U (en) Scaffold frame for collapsible building construction
CN211037736U (en) Door type scaffold
CN219773544U (en) Scaffold for building engineering
CN214195459U (en) High platform for construction that stability is strong
CN215631435U (en) Scaffold for building site
CN221461753U (en) Building construction frame
CN216380498U (en) Over-and-under type construction platform for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240205

Address after: No. 52 Huayuan, Xiguan Village, Chengguan Town, Xiayi County, Shangqiu City, Henan Province, 476400

Patentee after: Li Jianti

Country or region after: China

Address before: 471000 500m south of dongmagou village, sunqitun Township, high tech Zone, Luoyang City, Henan Province

Patentee before: Henan Huida Construction Engineering Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240223

Address after: 455000, 4th Floor, Zhuoyue Sun City, Kaiyuan Street, Linzhou City, Anyang City, Henan Province

Patentee after: Junda Construction Co.,Ltd.