CN216920885U - Stone material fixed mounting structure - Google Patents

Stone material fixed mounting structure Download PDF

Info

Publication number
CN216920885U
CN216920885U CN202220431969.4U CN202220431969U CN216920885U CN 216920885 U CN216920885 U CN 216920885U CN 202220431969 U CN202220431969 U CN 202220431969U CN 216920885 U CN216920885 U CN 216920885U
Authority
CN
China
Prior art keywords
stone
hanging piece
buckle hanging
keel
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220431969.4U
Other languages
Chinese (zh)
Inventor
尹浩洋
王孝俊
陈静
潘炯炯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Original Assignee
China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Decoration Engineering Co Ltd filed Critical China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Priority to CN202220431969.4U priority Critical patent/CN216920885U/en
Application granted granted Critical
Publication of CN216920885U publication Critical patent/CN216920885U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a stone fixing and mounting structure, which is used for mounting stone on the outer side of a building main body, and comprises: the device comprises a transverse keel, a vertical keel, an installation block, a buckle hanging piece and a cushion block; the vertical keels are vertically arranged on the outer side of the building main body, and a plurality of transverse keels are transversely arranged between every two adjacent vertical keels; the mounting block is detachably mounted on the cross keel, and a C-shaped bayonet is arranged at the position, far away from the cross keel, of the mounting block; the buckle hanging piece is clamped in the C-shaped clamping opening of the mounting block, the bottom of the buckle hanging piece extends in the direction far away from the transverse keel to form a supporting platform for supporting the stone, one end, far away from the transverse keel, of the supporting platform is bent upwards corresponding to the stone to form a limiting end, and a groove is formed in the position, corresponding to the limiting end, of the stone; the cushion block is inserted between the stone and the buckle hanging piece to tightly plug the gap between the stone and the buckle hanging piece.

Description

Stone material fixed mounting structure
Technical Field
The utility model relates to the field of building material installation, in particular to a stone fixing and installing structure.
Background
The stone dry hanging is a construction process of building external wall, and the process is characterized by that the facing stone material can be directly mounted on the external surface of building structure by means of connecting piece and bolt, and between the stone material and structure a certain space is left. Compared with the traditional wet operation process, the process avoids the grouting process, not only can shorten the construction period, reduce the self weight of the building and improve the anti-seismic performance, but also effectively prevents pigments such as salt alkali and the like in the grouting from permeating and polluting the stone, and improves the appearance quality and the decorative effect.
At present, the stone is hung in a dry mode and is usually installed in a back bolt mode or a hanging piece mode, the back bolt mode needs to pass through professional hole opening equipment, a large conical round hole in the back of the stone is accurately machined, a small conical round hole in the outside is implanted into a hole, an unstressed convex combination is formed, and the stone is fixed on a keel through a connecting piece. Because the stone needs secondary processing, the stone deviation is great in the course of working, and especially the thickness of the stone is inconsistent, and the overall strength and the installation quality are influenced. The back bolt type requires extremely high hole opening precision and is difficult to control. The pendant type is that a round hole is accurately processed at the edge of the stone through professional hole-opening equipment, a pin is implanted into the hole, and special glue is filled to fix the stone on the keel through a connecting piece. The hanging type conventional method has large glue consumption for stone, causes environmental pollution and improves construction cost. And the installation mode has undetachable reuse, causes certain wasting of resources. The strength requirement on the pin is high during the use process.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects of the prior art and provides a stone fixing and mounting structure.
The technical scheme who realizes above-mentioned purpose is a stone material fixed mounting structure for install the stone material in the building subject outside, mounting structure includes: the device comprises a transverse keel, a vertical keel, a mounting block, a buckle hanging piece and a cushion block;
the vertical keels are vertically arranged on the outer side of the building main body, and a plurality of transverse keels are transversely arranged between every two adjacent vertical keels;
the mounting block is detachably mounted on the cross keel, and a C-shaped bayonet is arranged at the position, far away from the cross keel, of the mounting block;
the buckle hanging piece is clamped in the C-shaped clamping opening of the mounting block, the bottom of the buckle hanging piece extends in the direction far away from the transverse keel to form a supporting platform for supporting the stone, one end, far away from the transverse keel, of the supporting platform is bent upwards corresponding to the stone to form a limiting end, and a groove is formed in the position, corresponding to the limiting end, of the stone;
the cushion block is inserted between the stone and the buckle hanging piece to tightly plug the gap between the stone and the buckle hanging piece.
Further, the mounting block is fixed to the cross keel by using a stainless steel bolt.
Furthermore, the upper opening part of the C-shaped bayonet extends downwards to form a hooked first clamping end, and the lower opening part of the C-shaped bayonet extends upwards to form a hooked second clamping end;
the buckle hanging piece corresponds to the first clamping end and the second clamping end to form a hooked first clamping end and a hooked second clamping end.
Furthermore, the cushion block is in a right-angled triangle shape, the right-angled edge of the cushion block props against the stone, and the bevel edge of the cushion block props against the buckle hanging piece.
Furthermore, a plurality of installation blocks are arranged on the transverse keel.
Furthermore, the mounting block corresponds to a buckle pendant of joint, and is a plurality of the buckle pendant supports one jointly the stone material.
Furthermore, the mounting block, the buckle hanging piece and the cushion block are made of aluminum alloy materials.
Furthermore, an isolation gasket is arranged between the cross keel and the mounting block.
Compared with the prior art, the utility model has the following beneficial effects:
1. by using the special-shaped structure, the utility model can be detachably arranged on the outer side of the building main body, the installation is quick and convenient, the components can be detached and used for multiple times, and the construction cost is reduced; in the utility model, the cushion blocks are arranged and can support the stone, thereby improving the uneven stress bearing of the stone caused by different thicknesses.
2. According to the utility model, through the matching of the pieces, the use of special glue for the stone is reduced, the environmental pollution is effectively avoided, and the construction is green and environment-friendly.
Drawings
Fig. 1 is a side view of a stone fixing and mounting structure according to the present invention.
Fig. 2 is a top view of a stone fixing and mounting structure according to the present invention.
Illustration of the drawings: 1. a vertical keel; 2. a transverse keel; 3. mounting blocks; 4. a buckle hanging piece; 5. cushion blocks; 6. a stainless steel bolt; 7. stone materials; 8. and (4) an isolation gasket.
Detailed Description
The utility model is further described with reference to the following figures and specific examples.
Referring to fig. 1, a stone fixing and mounting structure for mounting a stone on an outer side of a building body, the mounting structure includes: the device comprises a transverse keel 2, a vertical keel 1, a mounting block 3, a buckle hanger 4 and a cushion block 5; the vertical keels 1 are vertically arranged on the outer side of the building main body, and a plurality of transverse keels 2 are transversely arranged between every two adjacent vertical keels 1; the mounting block 3 is detachably mounted on the cross keel 2, and a C-shaped bayonet is arranged at the position, far away from the cross keel 2, of the mounting block 3; the buckle hanging piece 4 is clamped in the C-shaped clamping opening of the mounting block 3, the bottom of the buckle hanging piece 4 extends towards the direction far away from the transverse keel 2 to form a supporting platform for supporting the stone, one end, far away from the transverse keel 2, of the supporting platform is bent upwards corresponding to the stone 7 to form a limiting end, and a groove is formed in the position, corresponding to the limiting end, of the stone; the cushion block 5 is inserted between the stone 7 and the buckle hanging piece 4 to tightly plug a gap between the stone and the buckle hanging piece.
In the present invention, a preferred embodiment is: installing the installation block 3 on the outer side of the cross keel 2, wherein the opening of the C-shaped bayonet of the installation block 3 faces away from the building main body; the buckle hanging piece 4 is clamped in the C-shaped clamping opening, the supporting end of the buckle hanging piece 4 is matched with the groove of the stone 7, and the groove of the stone 7 is fixed on the supporting end and is placed on the supporting platform. The cushion block 5 is inserted into the stone 7 and the buckling hanging piece 4 to support the stone 7, a vertical supporting surface is provided for the stone 7, the stone 7 is prevented from deflecting towards the direction of the vertical keel 1 to cause the possible installation quality problem of the stone 7, and further the appearance of the building main body can be improved.
Further, the mounting block 3 is fixed to the cross keel 2 by using a stainless steel bolt.
Furthermore, the upper opening part of the C-shaped bayonet extends downwards to form a hooked first clamping end, and the lower opening part of the C-shaped bayonet extends upwards to form a hooked second clamping end; the buckle hanging piece 4 forms a first buckle end and a second buckle end corresponding to the first buckle end and the second buckle end; the first clamping end and the first buckle end are mutually buckled to form a first lock catch end, the second clamping end and the second buckle end are mutually buckled to form a second lock catch end, and the first lock catch end and the second lock catch end fix the buckle hanging piece on the mounting block 3.
Furthermore, the cushion block 5 is in a right triangle shape, the right-angle side of the cushion block 5 is propped against the stone 7, and the bevel edge of the cushion block 5 is propped against the buckle hanging piece 4. Because the thickness of the stone 7 is often different in the installation process of the stone 7, the cushion block 5 of the right triangle can adjust the position of the contact point between the bevel edge and the buckle hanging piece 4 according to the thickness of the stone 7, so that the stone 7 can be better supported. In the present invention, a preferred embodiment is: and anti-skid grains are arranged on the surface of the cushion block 5.
Furthermore, a plurality of installation blocks 3 are arranged on the cross keel 2. The plurality of mounting blocks 3 can better disperse the weight of the stone 7, save materials and can also exactly disperse the weight of the stone 7.
Referring to fig. 2, further, the mounting block 3 is correspondingly clamped with a fastening hanger 4, and the fastening hangers 4 support one stone 7. One installation block 3 is installed corresponding to one buckling hanging piece 4, and the stone 7 can be better fixed by the plurality of buckling hanging pieces 4, and materials are saved.
Further, the mounting block 3, the buckle hanging piece 4 and the cushion block 5 are made of aluminum alloy materials. The aluminum alloy material can guarantee the strength of the installation block 3, the buckle hanging piece 4 and the cushion block 5.
Further, cross keel 2 with be provided with isolation gasket 8 between installation piece 3, isolation gasket 8 can prevent cross keel 2 with installation piece 3 rusts fast because the material is different and lead to.
The following is a description of the operation of the stone fixing and mounting structure of the present invention.
Arranging the vertical keels 1 on the outer side of the building main body, transversely arranging a plurality of transverse keels 2 between every two adjacent vertical keels 1, arranging a plurality of drilled holes on the transverse keels 2, arranging mounting holes on the mounting blocks 3 corresponding to the drilled holes, and inserting the bolts 6 in the drilled holes and the mounting holes; in order to prevent the installation block 3 and the cross keel 2 from rusting due to different materials, the cross keel 2 and the installation block 3 are provided with isolation gaskets 8. The mounting blocks 3 are fixed on the cross keels 2, a plurality of mounting blocks 3 are arranged on the cross keels 2, and the buckle hangers 4 are clamped in C-shaped clamping openings of the mounting blocks 3; the groove of the stone 7 is arranged on the supporting end of the buckle hanging piece 4, at the moment, due to the thickness problem of the stone 7, the stone 7 can deviate towards the direction of the transverse keel 2, the cushion block 5 is inserted between the buckle hanging piece 4 and the stone 7, and the cushion block 5 can well support the stone 7.
While the present invention has been described in detail and with reference to the embodiments thereof as illustrated in the accompanying drawings, it will be apparent to one skilled in the art that various changes and modifications can be made therein. Therefore, certain details of the embodiments are not to be interpreted as limiting, and the scope of the utility model is to be determined by the appended claims.

Claims (8)

1. The utility model provides a stone material fixed mounting structure for install the stone material in the building main part outside, characterized by: the mounting structure includes: the device comprises a transverse keel, a vertical keel, a mounting block, a buckle hanging piece and a cushion block;
the vertical keels are vertically arranged on the outer side of the building main body, and a plurality of transverse keels are transversely arranged between every two adjacent vertical keels;
the mounting block is detachably mounted on the cross keel, and a C-shaped bayonet is arranged at the position, far away from the cross keel, of the mounting block;
the buckle hanging piece is clamped in the C-shaped clamping opening of the mounting block, the bottom of the buckle hanging piece extends in the direction far away from the transverse keel to form a supporting platform for supporting the stone, one end, far away from the transverse keel, of the supporting platform is bent upwards corresponding to the stone to form a limiting end, and a groove is formed in the position, corresponding to the limiting end, of the stone;
the cushion block is inserted between the stone and the buckle hanging piece to tightly plug the gap between the stone and the buckle hanging piece.
2. The stone fixing and mounting structure as claimed in claim 1, wherein: the mounting block is fixed on the cross keel by using a stainless steel bolt.
3. The stone fixing and mounting structure as claimed in claim 1, wherein: the upper opening part of the C-shaped bayonet extends downwards to form a hooked first clamping end, and the lower opening part of the C-shaped bayonet extends upwards to form a hooked second clamping end;
the buckle hanging piece corresponds to the first clamping end and the second clamping end to form a hooked first clamping end and a hooked second clamping end.
4. The stone fixing and mounting structure as claimed in claim 1, wherein: the cushion block is in a right-angled triangle shape, the right-angled edge of the cushion block props against the stone, and the bevel edge of the cushion block props against the buckle hanging piece.
5. The stone fixing and mounting structure as claimed in claim 1, wherein: the transverse keel is provided with a plurality of mounting blocks.
6. A stone fixed mounting structure as claimed in claim 5, wherein: the mounting block corresponds to a buckle hanging piece in clamping connection, and the buckle hanging piece supports one stone material jointly.
7. The stone fixing and mounting structure as claimed in claim 1, wherein: the mounting block, the buckle hanging piece and the cushion block are made of aluminum alloy materials.
8. A stone fixing and mounting structure as claimed in claim 1, wherein: and an isolation gasket is arranged between the transverse keel and the mounting block.
CN202220431969.4U 2022-03-01 2022-03-01 Stone material fixed mounting structure Active CN216920885U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220431969.4U CN216920885U (en) 2022-03-01 2022-03-01 Stone material fixed mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220431969.4U CN216920885U (en) 2022-03-01 2022-03-01 Stone material fixed mounting structure

Publications (1)

Publication Number Publication Date
CN216920885U true CN216920885U (en) 2022-07-08

Family

ID=82225852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220431969.4U Active CN216920885U (en) 2022-03-01 2022-03-01 Stone material fixed mounting structure

Country Status (1)

Country Link
CN (1) CN216920885U (en)

Similar Documents

Publication Publication Date Title
CN202194345U (en) Structural component capable of fast installing wood veneer
CN201062389Y (en) Latch hook type curtain wall column mounting regulating structure
CN216920885U (en) Stone material fixed mounting structure
CN107119876B (en) Embedded wallboard
CN211421507U (en) Stone curtain wall connecting structure
CN112267638A (en) Wall connecting fastener, connecting fastener and self-locking mounting structure of heat-insulation decorative plate
CN2499464Y (en) Dovetail hanging piece for stone curtain wall
CN111962789A (en) Wall surface hanging flush joint system and mounting method thereof
CN112554486A (en) Indoor wall surface ceramic tile dry hanging assembly and application method thereof
CN210240538U (en) Double-sealing wallboard
CN210316353U (en) Wall surface leveling-free wallboard assembly
CN210263733U (en) Stone dry-hanging structure
CN111962792A (en) Wall surface hanging system and mounting method
CN212427869U (en) Wall surface hanging flush joint system
CN214658433U (en) Hanging part system
CN212641998U (en) Composite glass wall surface
CN211690943U (en) Stone curtain wall hanging structure
CN212405851U (en) Wall body calcium silicate veneer hangs assembly system futilely
CN211115411U (en) Door pocket
CN217128840U (en) Efficient assembled wall hanging plate part for decoration engineering
CN210369775U (en) Vertical ornamental strip of outer wall for building curtain
CN218374910U (en) Wall mounting structure hangs futilely
CN209891645U (en) Assembled hangs stone material space compression mounting structure futilely
CN215858800U (en) Keel hoop assembly
CN217353342U (en) Plate dry hanging structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant