CN216896198U - Precast concrete underground water delivery pipe - Google Patents
Precast concrete underground water delivery pipe Download PDFInfo
- Publication number
- CN216896198U CN216896198U CN202220624031.4U CN202220624031U CN216896198U CN 216896198 U CN216896198 U CN 216896198U CN 202220624031 U CN202220624031 U CN 202220624031U CN 216896198 U CN216896198 U CN 216896198U
- Authority
- CN
- China
- Prior art keywords
- upper plate
- pipe wall
- plate groove
- underground water
- precast concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model relates to a precast concrete underground water delivery pipe which comprises a U-shaped pipe wall precast by ultra-high performance concrete, wherein a U-shaped upper plate groove precast by the ultra-high performance concrete is arranged at the top of the opening side of the pipe wall, and the upper plate groove and the pipe wall are detachably connected or integrally formed; common concrete or muck is poured in the grooves of the upper plate grooves to form top plates; and a stiffening rib is arranged between the included angle between the upper plate groove and the pipe wall, and the stiffening rib and the pipe wall are integrally formed. The pipe wall, the upper plate groove and the stiffening ribs are prefabricated by adopting ultra-high performance concrete, so that the utility model has the advantages of light self weight, high bearing capacity, good crack resistance, small size of the section of the member, good durability and high construction speed.
Description
Technical Field
The utility model belongs to the technical field of underground engineering, and particularly relates to a precast concrete underground water delivery pipe which is suitable for municipal construction engineering under complex geological conditions.
Background
In recent years, due to the change of ecological environment, many domestic areas frequently suffer from drought and flood disasters, and it is very important to establish a complete and sound water supply and drainage system. The water delivery pipe is positioned below the ground, and the safety of the water delivery pipe is related to the safety of the whole city water supply. However, the municipal water pipe is often broken due to insufficient strength, poor durability, no inspection and maintenance for a long time and other factors, and once the municipal water supply and drainage pipe is broken, water sources are wasted, economic losses are caused, and even a series of more serious problems occur. Therefore, the water pipe must have sufficient strength to withstand external loads and internal water pressure, erosion resistance, corrosion resistance, and good impact resistance, and corresponding plasticity and hardness, so that the pipe is not damaged during transportation and construction. At present, municipal water supply and drainage pipes commonly used at home and abroad are common concrete pipes, but due to the defects of low tensile strength, weak corrosion resistance and poor durability of common concrete, practical problems of water leakage caused by cracking or replacement required due to short service life and the like often occur in some important conveying pipes.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model provides a precast concrete underground water delivery pipe.
A precast concrete underground water delivery pipe comprises a U-shaped pipe wall precast by ultra-high performance concrete, wherein a U-shaped upper plate groove precast by the ultra-high performance concrete is arranged at the top of the opening side of the pipe wall, and the upper plate groove and the pipe wall are detachably connected or integrally formed; common concrete or muck is poured into the grooves of the upper plate groove to form a top plate; and stiffening ribs are arranged between the included angles between the upper plate grooves and the pipe wall and are integrally formed with the pipe wall.
When the upper plate groove is detachably connected with the pipe wall, the stiffening ribs are pre-embedded with pre-embedded bolts, and pre-embedded bolt holes are correspondingly formed in the upper plate groove.
The embedded bolts are arranged in a plurality along the length direction of the pipe wall.
The width of the pipe wall is larger than that of the upper plate groove.
When the upper plate groove and the pipe wall are integrally formed, the width of the upper plate groove is consistent with that of the pipe wall.
The utility model has the beneficial effects that: the utility model provides a precast Concrete underground water pipe which is manufactured by adopting Ultra-High Performance Concrete (Ultra-High Performance Concrete) by comprehensively considering the problems in the use of municipal water pipes and the development of the current building materials. According to the actual engineering condition, the water conveying pipes with different sizes can be manufactured, when the engineering with larger water conveying quantity is needed, the water conveying pipes can be prefabricated in blocks, and the pipes with smaller conveying quantity can be integrally prefabricated. The compressive strength of the ultra-high performance concrete can reach more than 3 times of that of common concrete, the flexural strength of the ultra-high performance concrete is more than 10 times of that of the common concrete, the elastic modulus of the ultra-high performance concrete is more than 1.2 times of that of the common concrete, and the ultra-long durability of the ultra-high performance concrete can reach more than 200 years.
Drawings
Fig. 1 is a schematic cross-sectional view of a precast concrete underground water pipe provided in embodiment 1 of the present invention;
FIG. 2 is an exploded view of FIG. 1;
FIG. 3 is a cross-sectional view taken along line A-A of FIG. 1;
FIG. 4 is a cross-sectional view taken along line C-C of FIG. 1;
FIG. 5 is a cross-sectional view taken along line B-B of FIG. 1;
fig. 6 is a schematic view of an upper plate groove in a precast concrete underground water pipe provided in example 1 of the present invention;
fig. 7 is a schematic cross-sectional view of a precast concrete underground water pipe provided in embodiment 2 of the present invention;
fig. 8 is a schematic view of a pipe body part prefabricated by the precast concrete underground water pipe provided in embodiment 2 of the present invention;
wherein the content of the first and second substances,
1-pipe wall, 2-top plate, 3-stiffening rib, 4-embedded bolt, 5-upper plate groove and 6-embedded bolt hole.
Detailed Description
For better understanding of the present invention, the technical solutions and effects of the present invention will be described in detail by the following embodiments with reference to the accompanying drawings.
Example 1
As shown in fig. 1-3, a precast concrete underground water pipe comprises a U-shaped pipe wall 1 precast by ultra-high performance concrete, as shown in fig. 4, a U-shaped upper plate groove 5 precast by ultra-high performance concrete is arranged at the top of the opening side of the pipe wall 1, and the upper plate groove 5 is detachably connected with the pipe wall 1; ordinary concrete or muck is poured into the grooves of the upper plate groove 5 to form the top plate 2. And a stiffening rib 3 is arranged between the included angle between the upper plate groove 5 and the pipe wall 1, and the stiffening rib 3 and the pipe wall 1 are integrally formed.
A plurality of embedded bolts 4 are embedded in the stiffening ribs 3, and the embedded bolts 4 are arranged along the length direction of the pipe wall 1, as shown in fig. 5; the upper plate groove 5 is correspondingly provided with pre-buried bolt holes 6, as shown in fig. 6.
The width of the pipe wall 1 is larger than that of the upper plate groove 5.
The construction process of the precast concrete underground water delivery pipe specifically comprises the following steps:
the method comprises the following steps: manufacturing a template of a pipe wall 1 and an upper plate groove 5 according to design requirements, pouring ultrahigh-performance concrete into the template to form the pipe wall 1 and the upper plate groove 5, wherein a stiffening rib 3 and an embedded bolt 4 are arranged in the pipe wall 1, and an embedded bolt hole 6 is arranged in the upper plate groove 5;
step two: during construction, the prefabricated pipe wall 1 and the upper plate groove 5 are transported to a construction site for installation. Placing the pipe wall 1 at a fixed position according to design requirements, hoisting an upper plate groove 5 to the upper surface of the pipe wall 1, and connecting and fixing the upper plate groove 5 and the pipe wall 1 through an embedded bolt 4 to form a detachable classified type pipe body of the water pipe;
step three: and after the pipe body connected in the second step is fixed, pouring common concrete or muck in the groove of the upper plate groove 5 to form a top plate 2 so as to meet the flatness requirement of the upper building and form an underground water delivery pipe.
Example 2
As shown in fig. 7-8, a precast concrete underground water pipe comprises a U-shaped pipe wall 1 precast by ultra-high performance concrete, a U-shaped upper plate groove 5 precast by ultra-high performance concrete is arranged at the top of the opening side of the pipe wall 1, and the upper plate groove 5 and the pipe wall 1 are integrally formed; ordinary concrete or muck is poured into the grooves of the upper plate groove 5 to form the top plate 2. The stiffening rib 3 is arranged between the included angle between the upper plate groove 5 and the pipe wall 1, and the stiffening rib 3 and the pipe wall 1 are integrally formed, that is, the stiffening rib 3, the pipe wall 1 and the upper plate groove 5 are integrally formed in the embodiment.
The upper plate groove 5 is consistent with the width of the pipe wall 1.
The construction process of the precast concrete underground water delivery pipe specifically comprises the following steps:
the method comprises the following steps: manufacturing a template according to design requirements, and pouring an integrally formed pipe wall 1 with stiffening ribs 3 and an upper plate groove 5 in the template to form an integral water pipe body;
step two: during construction, the prefabricated integral water pipe body with the integrally formed pipe wall 1 with the stiffening ribs 3 and the upper plate groove 5 is directly transported to a construction site and placed at a designed position;
step three: after the integral water pipe body is fixed, common concrete or muck is poured in the groove of the upper plate groove 5 to form the top plate 2, so that the flatness requirement of the upper building is met, and an underground water pipe is formed.
Claims (5)
1. The utility model provides a precast concrete underground raceway which characterized in that: the pipe wall opening side is provided with a U-shaped upper plate groove prefabricated by the ultra-high performance concrete, and the upper plate groove and the pipe wall are detachably connected or integrally formed; common concrete or muck is poured into the grooves of the upper plate groove to form a top plate; and stiffening ribs are arranged between the included angles between the upper plate grooves and the pipe wall and are integrally formed with the pipe wall.
2. The precast concrete underground water pipe according to claim 1, wherein: when the upper plate groove is detachably connected with the pipe wall, the stiffening ribs are pre-embedded with pre-embedded bolts, and pre-embedded bolt holes are correspondingly formed in the upper plate groove.
3. The precast concrete underground water pipe according to claim 2, wherein: the embedded bolts are arranged in a plurality along the length direction of the pipe wall.
4. The precast concrete underground water pipe according to claim 2, wherein: the width of the pipe wall is larger than that of the upper plate groove.
5. The precast concrete underground water pipe according to claim 1, wherein: when the upper plate groove and the pipe wall are integrally formed, the width of the upper plate groove is consistent with that of the pipe wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220624031.4U CN216896198U (en) | 2022-03-22 | 2022-03-22 | Precast concrete underground water delivery pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220624031.4U CN216896198U (en) | 2022-03-22 | 2022-03-22 | Precast concrete underground water delivery pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216896198U true CN216896198U (en) | 2022-07-05 |
Family
ID=82191678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220624031.4U Active CN216896198U (en) | 2022-03-22 | 2022-03-22 | Precast concrete underground water delivery pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216896198U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114592739A (en) * | 2022-03-22 | 2022-06-07 | 辽宁省城乡市政工程集团有限责任公司 | Semi-assembly type ultra-deep superposed water storage tank and construction process |
-
2022
- 2022-03-22 CN CN202220624031.4U patent/CN216896198U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114592739A (en) * | 2022-03-22 | 2022-06-07 | 辽宁省城乡市政工程集团有限责任公司 | Semi-assembly type ultra-deep superposed water storage tank and construction process |
CN114592739B (en) * | 2022-03-22 | 2024-04-26 | 辽宁省城乡市政工程集团有限责任公司 | Semi-assembled ultra-deep superposed water storage tank and construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201232197Y (en) | Combined inspection well | |
CN104947709A (en) | Pre-assembled single-compartment municipal tunnel and construction method thereof | |
CN204690783U (en) | A kind of prefabricated assembled single cabin municipal administration synthesis pipe gallery | |
CN216896198U (en) | Precast concrete underground water delivery pipe | |
CN111305266A (en) | Light-duty underground comprehensive pipe gallery structure of prefabricated pin-connected panel of piecemeal | |
CN108867844A (en) | Combined-type sewage well prefabricated component | |
CN106760514A (en) | Downcomer hole to be provided service sleeve and built-in process | |
CN213508795U (en) | Concrete module type inspection well shaft structure and concrete module brick | |
CN112900294A (en) | Lining structure for box culvert repair and construction method thereof | |
CN201362857Y (en) | Combined type concrete inspection well | |
CN102296633A (en) | Prefabricating pipe shaft | |
CN210343347U (en) | Assembled pipe jacking back wall | |
CN111347537A (en) | Production process and assembly method of shield tunnel segment | |
CN209925759U (en) | Double-barrelled structure of laying in river course | |
CN210482379U (en) | Highway underpass pipe gallery structure | |
CN209975580U (en) | Prefabricated assembled anticorrosive concrete inspection shaft | |
CN112113029A (en) | Pipe jacking construction method under silty soil geological condition | |
CN210622813U (en) | Underground pressure shield water delivery tunnel lining structure | |
CN214090251U (en) | Modular drainage inspection shaft | |
CN210238713U (en) | Assembled steel system drainage inspection shaft | |
CN215518857U (en) | Be used for prosthetic inside lining structure of box culvert | |
CN216339683U (en) | Novel pipeline horse riding well | |
CN215594433U (en) | Novel steel sleeve for floor penetrating | |
CN216813219U (en) | Anti-leakage concrete pipeline | |
CN209620109U (en) | A kind of municipal administration underground piping inspection shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |