CN216868091U - Building construction management device based on BIM - Google Patents

Building construction management device based on BIM Download PDF

Info

Publication number
CN216868091U
CN216868091U CN202220531726.8U CN202220531726U CN216868091U CN 216868091 U CN216868091 U CN 216868091U CN 202220531726 U CN202220531726 U CN 202220531726U CN 216868091 U CN216868091 U CN 216868091U
Authority
CN
China
Prior art keywords
management device
fixedly connected
sliding
construction management
buffer spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220531726.8U
Other languages
Chinese (zh)
Inventor
程宏亮
王新红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220531726.8U priority Critical patent/CN216868091U/en
Application granted granted Critical
Publication of CN216868091U publication Critical patent/CN216868091U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building construction management device based on BIM, belonging to the technical field of building construction management, wherein the building construction management device comprises a box body, a base and a management device body, wherein two sides of the inner wall of the box body are respectively provided with a first sliding groove, an electric push rod is arranged in the box body, the top of the electric push rod is fixedly connected with a lifting plate, a function cavity is arranged in the lifting plate, a double-shaft motor is arranged in the function cavity, and one end of an output shaft of the double-shaft motor is fixedly connected with a rotating shaft. Through the setting of slide bar, sliding sleeve, first buffer spring, second connecting seat and bumper shock absorber etc. realize first connecting seat, second connecting seat, sliding sleeve, first buffer spring and second buffer spring cooperation bumper shock absorber and cushion the vibrations of construction management device removal in-process, prevent to shake and lead to the damage of the inside management device body of box, increased construction management device's life.

Description

Building construction management device based on BIM
Technical Field
The utility model relates to the technical field of building construction management, in particular to a building construction management device based on BIM.
Background
The BIM is a fully-named building information model, which is established by taking various relevant information data of a building engineering project as a model basis, and simulates real information of a building through digital information simulation. The method has five characteristics of visualization, coordination, simulation, optimization and graphing. With the continuous development of science and technology, the BIM technology is introduced to the aspect of building construction management.
As disclosed in chinese patent literature, a building construction management device based on BIM has the following publication numbers: CN215345546U, published date: 20211228, although the problems of inconvenient storage and poor heat dissipation performance of the existing building construction management device based on BIM are solved, the problem that the construction management device is inconvenient to absorb shock is not solved, and the problem that the construction management device is inconvenient to detach and install is not solved, therefore, aiming at the problems, the building construction management device based on BIM is specially provided.
SUMMERY OF THE UTILITY MODEL
(1) Technical problem to be solved
Aiming at the defects in the prior art, the utility model aims to provide a building construction management device based on BIM, which has the characteristics of convenience in shock absorption and disassembly and assembly.
(2) Technical scheme
In order to achieve the purpose, the utility model provides a building construction management device based on BIM, which comprises a box body, a base and a management device body, wherein two sides of the inner wall of the box body are respectively provided with a first sliding groove, an electric push rod is arranged in the box body, the top of the electric push rod is fixedly connected with a lifting plate, the interior of the lifting plate is provided with a function cavity, a double-shaft motor is arranged in the function cavity, one end of an output shaft of the double-shaft motor is fixedly connected with a rotating shaft, one end of the rotating shaft is fixedly connected with a threaded rod, one end of the threaded rod is movably connected to one side of the inner wall of the function cavity through a connecting shaft and a bearing, the outer surface of the threaded rod is in threaded connection with a threaded sleeve, the top of the threaded sleeve is fixedly connected with a connecting plate, the lifting plate is provided with a second sliding groove, one side of the connecting plate passes through the second sliding groove and is fixedly connected with a fixing plate, the bottom groove has been seted up to the bottom of box, the inside of bottom groove is provided with the slide bar, the surface of slide bar is provided with two sliding sleeves, first buffer spring and second buffer spring have been cup jointed to the surface of slide bar, the bottom fixedly connected with second connecting seat of sliding sleeve, swing joint has the connecting rod on the second connecting seat, the top of base is provided with first connecting seat and bumper shock absorber, the one end swing joint of connecting rod is on first connecting seat, the top fixed connection of bumper shock absorber is in the bottom of box.
Use this technical scheme's during construction management device based on BIM, electric putter passes through the lifter plate and drives the management device body and withdraw into in the box under the spacing of first sliding tray, so that accomodate the management device body, first connecting seat, the second connecting seat, the sliding sleeve, first buffer spring and second buffer spring cooperation bumper shock absorber cushion the vibrations of construction management device removal in-process, prevent that vibrations from leading to the damage of the inside management device body of box, and the biax motor passes through the axis of rotation and drives the threaded rod rotation, and the rotation of threaded rod drives the fixed plate through thread bush and connecting plate and draws close together each other, fix the management device body with this realization fixed plate.
Further, one side of box is provided with pushing hands and control panel, there is the case lid top through hinge swing joint, and the top fixedly connected with handle of case lid.
Further, the bottom of base is provided with a plurality of wheels that remove, and a plurality of wheels that remove set up the four corners at the base respectively.
Furthermore, the lifting plate is connected in the first sliding groove in a sliding mode, and the connecting plate is connected in the second sliding groove in a sliding mode.
Furthermore, the management device body is lapped on the top of the lifting plate, the fixing plate is lapped on the management device body, and the management device body is movably arranged in the box body.
Furthermore, both ends of the first buffer spring are respectively and fixedly connected to the sliding sleeve, one end of the second buffer spring is fixedly connected to the sliding sleeve, and the other end of the second buffer spring is fixedly connected to one side of the inner wall of the bottom groove.
(3) Advantageous effects
In conclusion, the utility model has the following beneficial effects:
1. through the arrangement of the sliding rod, the sliding sleeve, the first buffer spring, the second connecting seat, the shock absorber and the like, the first connecting seat, the second connecting seat, the sliding sleeve, the first buffer spring and the second buffer spring are matched with the shock absorber to buffer the shock in the moving process of the construction management device, the damage of a management device body in the box body caused by the shock is prevented, and the service life of the construction management device is prolonged;
2. through the arrangement of the double-shaft motor, the threaded rod, the threaded sleeve, the connecting plate, the fixing plate and the like, the double-shaft motor drives the threaded rod to rotate through the rotating shaft, the threaded rod rotates to drive the fixing plate to be close to each other through the threaded sleeve and the connecting plate, so that the fixing of the fixing plate on the management device body is realized, and the using effect of the construction management device is improved;
3. through the setting of box, electric putter, first sliding tray and lifter plate etc. realize that electric putter passes through the lifter plate and drives the management device body and withdraw into the box under the spacing of first sliding tray to this is accomodate the management device body, has increased construction management device's practicality.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, it is obvious that the drawings in the following description are only one embodiment of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic front sectional view of the present invention;
fig. 3 is a schematic diagram of a lifting plate structure according to the present invention.
The labels in the figures are:
1. a box body; 2. a base; 3. a first sliding groove; 4. an electric push rod; 5. a lifting plate; 6. a first connecting seat; 7. a bottom groove; 8. a slide bar; 9. a sliding sleeve; 10. a second connecting seat; 11. a connecting rod; 12. a first buffer spring; 13. a second buffer spring; 14. a shock absorber; 15. a functional cavity; 16. a double-shaft motor; 17. a rotating shaft; 18. a threaded rod; 19. a threaded sleeve; 20. a connecting plate; 21. a second sliding groove; 22. a fixing plate; 23. managing the device body.
Detailed Description
In order to make the technical means, the original characteristics, the achieved purposes and the effects of the utility model easily understood and obvious, the technical solutions in the embodiments of the present invention are clearly and completely described below to further illustrate the utility model, and obviously, the described embodiments are only a part of the embodiments of the present invention, but not all the embodiments.
Example (b):
the present invention is described in further detail below with reference to figures 1-3.
Referring to fig. 1-3, the present invention provides a technical solution: a building construction management device based on BIM comprises a box body 1, a base 2 and a management device body 23, wherein first sliding grooves 3 are formed in two sides of the inner wall of the box body 1, an electric push rod 4 is arranged in the box body 1, a lifting plate 5 is fixedly connected to the top of the electric push rod 4, the first sliding grooves 3, the lifting plate 5 and the like are arranged to enable the electric push rod 4 to drive the management device body 23 to retract into the box body 1 under the limiting of the first sliding grooves 3 through the lifting plate 5, so that the management device body 23 is convenient to store, the practicability of the construction management device is improved, a function cavity 15 is formed in the lifting plate 5, a double-shaft motor 16 is arranged in the function cavity 15, a rotating shaft 17 is fixedly connected to one end of an output shaft of the double-shaft motor 16, a threaded rod 18 is fixedly connected to one end of the rotating shaft 17, one end of the threaded rod 18 is movably connected to one side of the inner wall of the function cavity 15 through a connecting shaft and a bearing, the outer surface of the threaded rod 18 is in threaded connection with a threaded sleeve 19, the top of the threaded sleeve 19 is fixedly connected with a connecting plate 20, a second sliding groove 21 is formed in the lifting plate 5, one side of the connecting plate 20 penetrates through the second sliding groove 21 and is fixedly connected with a fixing plate 22, the double-shaft motor 16, the threaded rod 18, the threaded sleeve 19, the connecting plate 20, the fixing plate 22 and the like are arranged, the double-shaft motor 16 drives the threaded rod 18 to rotate through a rotating shaft 17, the threaded rod 18 rotates to drive the fixing plate 22 to be close to each other through the threaded sleeve 19 and the connecting plate 20, so that the fixing of the fixing plate 22 to the management device body 23 is realized, the using effect of the construction management device is increased, a bottom groove 7 is formed in the bottom of the box body 1, a sliding rod 8 is arranged inside the bottom groove 7, two sliding sleeves 9 are arranged on the outer surface of the sliding rod 8, and a first buffer spring 12 and a second buffer spring 13 are sleeved on the outer surface of the sliding rod 8, bottom fixedly connected with second connecting seat 10 of sliding sleeve 9, swing joint has connecting rod 11 on the second connecting seat 10, the top of base 2 is provided with first connecting seat 6 and bumper shock absorber 14, the one end swing joint of connecting rod 11 is on first connecting seat 6, the top fixed connection of bumper shock absorber 14 is in the bottom of box 1, through slide bar 8, sliding sleeve 9, first buffer spring 12, second buffer spring 13, the setting of second connecting seat 10 and bumper shock absorber 14 etc., realize first connecting seat 6, second connecting seat 10, sliding sleeve 9, first buffer spring 12 and second buffer spring 13 cooperation bumper shock absorber 14 cushion the vibrations of construction management device removal in-process, prevent that vibrations from leading to the damage of 1 inside management device body 23 of box, construction management device's life has been increased.
Specifically, one side of box 1 is provided with pushing hands and control panel, and there is the case lid at the top of box 1 through hinge swing joint, and the top fixedly connected with handle of case lid, and base 2's bottom is provided with a plurality of removal wheels, and a plurality of removal wheels set up respectively in base 2's four corners, and 5 sliding connection of lifter plate are in first sliding tray 3, and 20 sliding connection of connecting plate are in second sliding tray 21.
Through adopting above-mentioned technical scheme, the pushing hands are convenient for remove construction management device through the removal wheel of base 2 to and the handle is convenient for open box 1, and the chamber door of opening is convenient for stretch out management device body 23, first sliding tray 3 is convenient for carry on spacingly to lifter plate 5, makes lifter plate 5's removal more stable, and second sliding tray 21 is convenient for carry on spacingly to connecting plate 20, prevents that connecting plate 20 from taking place the pivoted trend under the drive of thread bush 19.
Specifically, management device body 23 overlap joint is at the top of lifter plate 5, and fixed plate 22 overlap joint is on management device body 23, and management device body 23 activity is in box 1, and first buffer spring 12's both ends are fixed connection respectively on sliding sleeve 9, and second buffer spring 13's one end fixed connection is on sliding sleeve 9, and second buffer spring 13's other end fixed connection is on inner wall one side of kerve 7.
Through adopting above-mentioned technical scheme, management device body 23 overlap joint is convenient for accomodate and stretch out management device body 23 at the top of lifter plate 5 to and fixed plate 22 is convenient for fixed to lifter plate 5 top management device body 23, and first buffer spring 12 and second buffer spring 13 are convenient for cushion the vibrations of construction management device removal in-process.
The working principle of the utility model is as follows:
when the device is used, the pushing handle is pushed to move the construction management device to a place to be used, in the moving process of the construction management device, the buffer force generated by the forced contraction of the first buffer spring 12 and the second buffer sliding sleeve 9 is utilized to effectively buffer the collision between the moving wheel and the ground, so that the vibration phenomenon in the moving process of the construction management device can be reduced, the situation that the management device body 23 is damaged is avoided, then the box cover is opened through the handle, the electric push rod 4 is controlled through the control panel to drive the management device body 23 at the top of the lifting plate 5 to extend out of the box body 1, the extended management device body 23 is used, when the management device body 23 at the top of the lifting plate 5 needs to be disassembled, the control panel controls the double-shaft motor 16 to work, and the double-shaft motor 16 drives the threaded rod 18 to rotate through the rotating shaft 17, the rotation of the threaded rod 18 drives the two fixing plates 22 away through the threaded sleeve 19 and the connecting plate 20, so that the fixing plates 22 are separated from the two sides of the management device body 23, and then the management device body 23 is taken off from the lifting plate 5.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a construction management device based on BIM, includes box (1), base (2) and management device body (23), its characterized in that: the improved multifunctional box is characterized in that first sliding grooves (3) are formed in two sides of the inner wall of the box body (1), an electric push rod (4) is arranged inside the box body (1), a lifting plate (5) is fixedly connected to the top of the electric push rod (4), a functional cavity (15) is formed inside the lifting plate (5), a double-shaft motor (16) is arranged inside the functional cavity (15), a rotating shaft (17) is fixedly connected to one end of an output shaft of the double-shaft motor (16), a threaded rod (18) is fixedly connected to one end of the rotating shaft (17), one end of the threaded rod (18) is movably connected to one side of the inner wall of the functional cavity (15) through a connecting shaft and a bearing, a threaded sleeve (19) is connected to the outer surface of the threaded rod (18) in a threaded manner, a connecting plate (20) is fixedly connected to the top of the threaded sleeve (19), and a second sliding groove (21) is formed in the lifting plate (5), one side of the connecting plate (20) passes through the second sliding groove (21) and is fixedly connected with a fixing plate (22), a bottom groove (7) is arranged at the bottom of the box body (1), a sliding rod (8) is arranged inside the bottom groove (7), two sliding sleeves (9) are arranged on the outer surface of the sliding rod (8), a first buffer spring (12) and a second buffer spring (13) are sleeved on the outer surface of the sliding rod (8), the bottom of the sliding sleeve (9) is fixedly connected with a second connecting seat (10), the second connecting seat (10) is movably connected with a connecting rod (11), the top of the base (2) is provided with a first connecting seat (6) and a shock absorber (14), one end of the connecting rod (11) is movably connected on the first connecting seat (6), the top of the shock absorber (14) is fixedly connected to the bottom of the box body (1).
2. The BIM-based construction management device according to claim 1, wherein: one side of the box body (1) is provided with a pushing handle and a control panel, the top of the box body (1) is movably connected with a box cover through a hinge, and the top of the box cover is fixedly connected with a handle.
3. The BIM-based construction management device according to claim 1, wherein: the bottom of base (2) is provided with a plurality of removal wheels, and a plurality of removal wheels set up the four corners in base (2) respectively.
4. The BIM-based construction management device according to claim 1, wherein: the lifting plate (5) is connected in the first sliding groove (3) in a sliding mode, and the connecting plate (20) is connected in the second sliding groove (21) in a sliding mode.
5. The BIM-based construction management device according to claim 1, wherein: the management device body (23) is lapped on the top of the lifting plate (5), the fixing plate (22) is lapped on the management device body (23), and the management device body (23) is movable in the box body (1).
6. The BIM-based construction management device according to claim 1, wherein: the two ends of the first buffer spring (12) are respectively fixedly connected to the sliding sleeve (9), one end of the second buffer spring (13) is fixedly connected to the sliding sleeve (9), and the other end of the second buffer spring (13) is fixedly connected to one side of the inner wall of the bottom groove (7).
CN202220531726.8U 2022-03-11 2022-03-11 Building construction management device based on BIM Active CN216868091U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220531726.8U CN216868091U (en) 2022-03-11 2022-03-11 Building construction management device based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220531726.8U CN216868091U (en) 2022-03-11 2022-03-11 Building construction management device based on BIM

Publications (1)

Publication Number Publication Date
CN216868091U true CN216868091U (en) 2022-07-01

Family

ID=82122366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220531726.8U Active CN216868091U (en) 2022-03-11 2022-03-11 Building construction management device based on BIM

Country Status (1)

Country Link
CN (1) CN216868091U (en)

Similar Documents

Publication Publication Date Title
CN212183249U (en) Small-size motor convenient to back lid lock dismouting
CN110273847B (en) Handheld fan convenient to deposit
CN216868091U (en) Building construction management device based on BIM
CN212990643U (en) Automatic display device of official working
CN108356776B (en) Draw-out type tool box
CN213922181U (en) Information archive storage device based on computer application technology
CN211092599U (en) File storage cabinet with dustproof function
CN212685053U (en) A statistics board for engineering cost
CN211882906U (en) Project cost filing cabinet
CN212869075U (en) High-speed intelligent printing machine with shock attenuation effect
CN209180088U (en) The oscillating mechanism of household electrical appliance
CN208979372U (en) A kind of environmental monitoring unmanned plane draw off gear
CN210760691U (en) Vehicle body cleaning device
CN215987159U (en) Reinforced computer with waterproof shock-absorbing function
CN105595393A (en) Shaking, stir-frying and drying device for cut tobacco of cigarettes
CN216093809U (en) Portable mechatronic laboratory bench
CN220482908U (en) Printer and flip structure with shielding function
CN216698609U (en) Electric scooter's battery mounting structure
CN218023252U (en) Gene detection equipment mobile box
CN210279226U (en) Motor PLC experiment cabinet convenient to equipment removes
CN218288592U (en) Landscape environment design model strorage device of environmental protection
CN221394695U (en) Anti-abrasion storage box for single crystal assembly
CN221409064U (en) Multifunctional audio processor
CN219734887U (en) Portable high-definition projector supporting stream streaming function
CN216494120U (en) A antifouling type drawing device for art design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant