CN216851201U - Cable pre-clamping operation box - Google Patents

Cable pre-clamping operation box Download PDF

Info

Publication number
CN216851201U
CN216851201U CN202220220622.5U CN202220220622U CN216851201U CN 216851201 U CN216851201 U CN 216851201U CN 202220220622 U CN202220220622 U CN 202220220622U CN 216851201 U CN216851201 U CN 216851201U
Authority
CN
China
Prior art keywords
clamp
clamping
cable
fixed
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220220622.5U
Other languages
Chinese (zh)
Inventor
雷涛
邹义平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Kaisitai Automatic Electric Control Equipment Co ltd
Original Assignee
Wuhan Kaisitai Automatic Electric Control Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Kaisitai Automatic Electric Control Equipment Co ltd filed Critical Wuhan Kaisitai Automatic Electric Control Equipment Co ltd
Priority to CN202220220622.5U priority Critical patent/CN216851201U/en
Application granted granted Critical
Publication of CN216851201U publication Critical patent/CN216851201U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The application relates to a cable pre-clamping operation box, which relates to the field of automation equipment control devices and comprises a mounting plate, a stand column and a mounting box, wherein the mounting plate is horizontally fixed on a support foundation, the stand column is fixedly connected to the mounting plate, the mounting box is fixedly connected to the top of the stand column, the mounting plate, the stand column and the mounting box are sequentially communicated, and the cable pre-clamping operation box further comprises a fixing clamp and a movable clamp; the fixing clamp is fixedly connected in the installation box, the movable clamp is detachably connected to the fixing clamp, and a clamping area is formed between the fixing clamp and the movable clamp to clamp the cable bundle. This application has the effect that improves the wiring convenience.

Description

Cable pre-clamping operation box
Technical Field
The application relates to the field of automation equipment control devices, in particular to a cable pre-clamping operation box.
Background
In automation equipment, a large number of electronic modules are required for controlling the equipment, which are usually mounted in a control box for easy handling and protection.
At present, an operation box generally comprises a mounting plate, a stand column and a mounting box; a plurality of mounting holes are formed in the edge of the mounting plate, and foundation bolts can penetrate through the mounting holes to fix the mounting plate on a support foundation; the stand is along vertical direction fixed connection on the mounting panel, and install bin fixed connection is at the top of stand.
The mid portion of mounting panel part is equipped with the through wires hole, and the equal cavity of stand and install bin sets up, and mounting panel, stand and install bin communicate in proper order.
In view of the above-mentioned related art, the inventors found that the following drawbacks exist: under the general condition, when a workshop worker fixedly connects a control box to a supporting foundation, firstly, a stand column is laid down, a cable to be used is inserted into an installation box, then, the stand column is erected, and then, an installation plate is fixedly connected to the supporting foundation by using foundation bolts; when waiting professional electrician to connect the electricity, some cables slide into the stand from the install bin, and electrician need pull the cable of landing into in the install bin again and just can continue the wiring, comparatively inconvenient.
SUMMERY OF THE UTILITY MODEL
In order to improve the convenience of wiring work, this application provides a cable centre gripping operation panel in advance.
The application provides a cable centre gripping control box in advance adopts following technical scheme:
a cable pre-clamping operation box comprises a mounting plate, a stand column and a mounting box, wherein the mounting plate is horizontally fixed on a support foundation, the stand column is fixedly connected to the mounting plate, the mounting box is fixedly connected to the top of the stand column (2), the mounting plate, the stand column and the mounting box are sequentially communicated, and the cable pre-clamping operation box further comprises a fixing clamp and a movable clamp; the fixing clamp is fixedly connected in the installation box, the movable clamp is detachably connected to the fixing clamp, and a clamping area is formed between the fixing clamp and the movable clamp to clamp the cable bundle.
By adopting the technical scheme, when a workshop worker fixedly connects the installation box to the supporting foundation, the stand column is firstly laid down, the cable is inserted into the installation box, then the cable is inserted into a space between the movable clamp and the fixed clamp and pulled out for a certain length, then the movable clamp is fixed on the fixed clamp, the cable bundle is clamped and fixed between the clamping part and the fixed clamp, after the work is finished, the stand column is erected, and the installation plate is fixedly connected to the supporting foundation; treat professional electrician and carry out the wiring during operation, the cable is restrainted and is all located the install bin, can directly connect the signal line to the electronic module who corresponds on, improved the convenience of wiring work.
Optionally, two relative draw-in grooves have been seted up on the fixation clamp, the draw-in groove seals along vertical direction and bottom, the both sides of activity clamp are passed through the draw-in groove from top to bottom the joint on the fixation clamp.
By adopting the technical scheme, when a worker fixes the cable bundle, the movable clamp is firstly arranged above the fixed clamp, the cable bundle penetrates out from the space between the movable clamp and the fixed clamp, then the two sides of the movable clamp respectively correspond to the two sliding grooves, then the two ends of the movable clamp are completely pushed into the sliding grooves from top to bottom, and the cable bundle can be fixed between the clamping part and the fixed clamp; the movable clamp is convenient and quick to fix.
Optionally, a first fixing groove is formed in the fixing clamp, a second fixing groove is formed in the movable clamp, and the first fixing groove and the second fixing groove are combined to form a 'article' shaped clamping area for clamping three single-core cables.
Through adopting above-mentioned technical scheme, make things convenient for the fixed connection of three single core cables.
Optionally, a rubber pad is fixedly connected to an inner wall corresponding to a clamping area formed between the fixed clamp and the movable clamp.
Through adopting above-mentioned technical scheme, the frictional force between the inner wall of cable and centre gripping region increases for the fixed of cable is more firm.
Optionally, the rubber pad covers the edge of the clamping area.
Through adopting above-mentioned technical scheme, the outer layer of difficult wearing and tearing cable of centre gripping area's edge.
Optionally, the inner wall of the movable clamp is fixedly connected with two elastic parts, the elastic parts are arched from the movable clamp to the fixed clamp, and a clamping area is formed between the elastic parts and the fixed clamp.
Through adopting above-mentioned technical scheme, when the cable was fixed between two elastic component and fixation clamp, elastic component can elastic deformation for the centre gripping area is variable, can adapt to the cable bundle of different thicknesses.
Optionally, three flexible clamping sleeves are arranged in clamping areas of the fixed clamp and the movable clamp, and the outer side walls of the three clamping sleeves are tangent to each other in pairs.
By adopting the technical scheme, when the three single-core cables are clamped and fixed on the clamping sleeve, the clamping sleeve not only protects the outer layer of the cable, but also has firm and reliable connection.
Optionally, a plurality of protrusions are arranged in the inner side wall of the clamping sleeve at intervals along the length direction of the clamping sleeve.
Through adopting above-mentioned technical scheme, the firm nature that single core cable was fixed has been strengthened.
In summary, the present application includes at least one of the following beneficial technical effects:
1. after the worker clamps and fixes the cable between the movable clamp and the fixed clamp, the cable is not easy to slide when an electrician works for wiring, and the convenience of wiring work is improved;
2. the inner wall of the movable clamp is fixedly connected with the two elastic parts arched from the movable clamp to the fixed clamp, so that the clamping area is variable, and the cable bundle can adapt to cable bundles with different thicknesses;
3. through set up two liang tangent flexible centre gripping covers in the centre gripping region, not only formed the protection to the skin of cable, firm in connection is reliable moreover.
Drawings
FIG. 1 is a schematic view of the overall structure of embodiment 1 of the present application;
fig. 2 is a schematic view showing the connection of a fixed clip and a movable clip in embodiment 1 of the present application;
fig. 3 is a schematic view showing the connection of the fixed clip and the movable clip in embodiment 2 of the present application;
fig. 4 is a schematic view showing the connection of the fixed clip and the movable clip in embodiment 3 of the present application;
FIG. 5 is a schematic view showing the connection between a fixed clip and a movable clip in embodiment 4 of the present application;
fig. 6 is a schematic view showing the connection between the fixed clip and the movable clip in embodiment 5 of the present application.
Reference numerals: 1. mounting a plate; 2. a column; 3. installing a box; 31. a box body; 32. a box door; 321. a door lock; 322. a window; 323. mounting holes; 4. a fixing clip; 41. a card slot; 42. a first fixing groove; 5. a movable clamp; 51. a clamping portion; 511. an elastic portion; 52. an installation part; 521. a bolt; 53. a second fixing groove; 6. a rubber layer; 7. a clamping sleeve; 71. and (4) protruding.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses cable centre gripping control box in advance.
Example 1:
referring to fig. 1, the cable pre-clamping operation box comprises a mounting plate 1, a stand column 2, a mounting box 3, a fixing clamp 4 and a movable clamp 5; the mounting plate 1 is fixedly connected with a support foundation, the upright post 2 is vertically and fixedly connected with the mounting plate 1, and the mounting box 3 is fixedly connected with the top of the upright post 2; fixed clamp 4 fixed connection is in install bin 3, and movable clamp 5 detachable connects on fixed clamp 4, forms the centre gripping region in order to carry out the centre gripping to the cable bundle between fixed clamp 4 and the movable clamp 5.
Offer the through wires hole that is used for the threading in the centre of mounting panel 1, a plurality of fixed orificess have been seted up to the border department of mounting panel 1, can wear to establish rag bolt 521 in the fixed orifices with mounting panel 1 fixed connection subaerial.
The upright post 2 is arranged in a hollow way, and the cavity of the upright post 2 corresponds to the threading hole.
The installation box 3 comprises a box body 31 and a box door 32; the box body 31 is hollow, one side of the box body is open, a wiring bottom plate for wiring is fixedly connected inside the box body 31, and wire outlet holes for wire outlet are formed in the corresponding positions of the box body 31 and the upright posts 2; the box door 32 is rotatably connected to the opening of the box body 31, one side of the box door is hinged to the box body 31, and the other side of the box door is provided with a door lock 321 to be fixedly connected to the box body 31; a window 322 for viewing the display screen is formed at an upper portion of the door 32, and a plurality of mounting holes 323 for mounting operation keys are formed at a lower portion thereof.
Referring to fig. 1 and 2, the fixing clip 4 is rectangular and is fixedly connected to the position of the wiring bottom plate corresponding to the wire outlet hole.
Referring to fig. 2, the movable clip 5 includes a clamping portion 51 and a mounting portion 52; the clamping part 51 is arched, and the opening faces the fixing clamp 4; two mounting portions 52 are respectively fixedly connected to two sides of the clamping portion 51 and are integrally formed; the clamping portion 51 is provided with an installation hole 323, a bolt 521 is arranged in the installation hole 323, and the bolt 521 is screwed on the fixing clamp 4 through the installation hole 323.
Referring to fig. 2, the rubber layer 6 is adhered to the inner side wall of the clamping portion 51, so that the friction force between the clamping portion 51 and the cable bundle is increased, and the cable bundle is fixed more firmly; the rubber layer 6 covers the edge of the clamping part 51, which is beneficial to protecting the insulating layer of the cable.
The implementation principle of the embodiment 1 of the application is as follows: when workshop staff fixedly connect the installation box 3 on the supporting foundation, firstly, the upright column 2 is laid down, the box door 32 is opened, then the cable is inserted from the threading hole, passes through the upright column 2 and penetrates out from the wire outlet hole, then the cable is inserted into the space between the clamping part 51 and the fixing clamp 4 and is pulled out for a certain length, then the bolt 521 on the clamping part 51 is screwed, the cable bundle is clamped and fixed between the clamping part 51 and the fixing clamp 4, after the work is finished, the upright column 2 is erected, and the installation plate 1 is fixedly connected on the supporting foundation by using the foundation bolt 521; treat professional electrician and carry out the wiring during operation, the cable is restrainted and is all located install bin 3, can directly connect the signal line to the electronic module who corresponds on, improved the convenience of wiring work.
Example 2:
referring to fig. 3, the present embodiment is different from embodiment 1 in that a movable clip 5 is engaged with a fixed clip 4.
Referring to fig. 3, two opposite clamping grooves 41 are formed in the fixing clip 4, the two clamping grooves 41 are both in the vertical direction, the width of the clamping groove 41 is matched with the thickness of the mounting portion 52, and the bottom ends of the clamping grooves 41 are closed; when the staff fixes the cable bundle, arrange movable clamp 5 in the top of fixation clamp 4 earlier, wear out the cable bundle from between movable clamp 5 and the fixation clamp 4, then correspond two installation departments 52 with two spouts respectively, again top-down pushes installation department 52 into draw-in groove 41 completely, and the cable bundle can be fixed between clamping part 51 and fixation clamp 4.
Each operating box is equipped with several different sizes of movable clamps 5 to meet the requirements of the staff for different sizes of cable bundles.
Example 3:
referring to fig. 4, the present embodiment is different from embodiment 1 in that two elastic parts 511 are symmetrically and fixedly connected to the inner side wall of the clamping part 51.
The elastic part 511 is arched, and both ends of the elastic part are fixedly connected to the inner side wall of the clamping part 51 and arched from the clamping part 51 to the direction of the fixing clip 4; the two elastic portions 511 and the fixing clip 4 form an elastic clamping area for clamping the cable bundle therebetween.
When the worker fixes the cable bundle, the cable is inserted between the two elastic parts 511 and the fixing clamp 4, and then the bolt 521 on the clamping part 51 is screwed down to complete the fixation of the cable bundle; the elastic portion 511 can be elastically deformed to accommodate cable bundles of different sizes.
Example 4:
the automation equipment usually uses three-phase electricity, sometimes the staff will penetrate three single-core cables into the box 31, in order to fix three single-core cables more conveniently, refer to fig. 5, the difference between this embodiment and embodiment 1 is that the clamping area between the fixed clamp 4 and the movable clamp 5 is in a shape of a Chinese character pin.
A first fixing groove 42 is formed in one side, opposite to the movable clamp 5, of the fixing clamp 4, and the first fixing groove 42 is matched with the two single-core cables; a second fixing groove 53 is formed on the side of the clamping part 51 opposite to the fixing clip 4, and the second fixing groove 53 is matched with a single-core cable.
When the staff fixes three-phase single core cable, earlier with movable clamp 5 through bolt 521 connect on fixation clamp 4, leave certain clearance between the two, then penetrate the cable from fixation clamp 4 and movable clamp 5 between, screw up bolt 521 at last again, three cables are pressed from both sides tightly and are fixed in "article" font clamping area for three single core cable's fixed is comparatively convenient.
Example 5:
referring to fig. 6, the present embodiment is different from embodiment 4 in that three flexible clamping sleeves 7 are distributed in a "pin" shape in the clamping area between the fixed clamp 4 and the movable clamp 5.
In order to increase the fixing reliability of the single core cable, a plurality of protrusions 71 are arranged at intervals along the length direction of each clamping sleeve 7.
When the staff fixes three-phase single core cable, unscrew bolt 521 earlier, remove the extrusion of activity clamp 5 to centre gripping cover 7, then penetrate every single core cable in the centre gripping cover 7 and wear out certain length with the cable from the centre gripping cover 7, tighten bolt 521 again, the cable is fixed in centre gripping cover 7, has not only formed the protection to the skin of cable, firm in connection is reliable moreover.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a cable centre gripping control box in advance, includes mounting panel (1), stand (2) and install bin (3), mounting panel (1) level is fixed on supporting the basis, stand (2) fixed connection is on mounting panel (1), install bin (3) fixed connection is at the top of stand (2), mounting panel (1), stand (2) and install bin (3) communicate its characterized in that in proper order: the device also comprises a fixed clamp (4) and a movable clamp (5);
fixation clamp (4) fixed connection is in install bin (3), activity clamp (5) detachable connects on fixation clamp (4), form clamping area between fixation clamp (4) and the activity clamp (5) and carry out the centre gripping in order to restrainting the cable.
2. A cable pre-clamping cassette as defined in claim 1, wherein: two relative draw-in grooves (41) have been seted up on fixation clamp (4), draw-in groove (41) are sealed along vertical direction and bottom, the both sides that the activity pressed from both sides (5) are passed through draw-in groove (41) from top to bottom the joint on fixation clamp (4).
3. A cable pre-clamping cassette as defined in claim 1, wherein: the cable clamp is characterized in that a first fixing groove (42) is formed in the fixing clamp (4), a second fixing groove (53) is formed in the movable clamp (5), and the first fixing groove (42) and the second fixing groove (53) are combined to form a 'pin' -shaped clamping area for clamping three single-core cables.
4. A cable pre-clamping cassette according to any one of claims 1 to 3, wherein: and a rubber pad is fixedly connected to the inner wall corresponding to a clamping area formed between the fixed clamp (4) and the movable clamp (5).
5. A cable pre-clamping cassette according to claim 4, wherein: the rubber pad coats the edge of the clamping area.
6. A cable pre-clamping cassette as defined in claim 1, wherein: the inner wall fixedly connected with two elastic parts (511) of activity clamp (5), elastic part (511) are by activity clamp (5) to fixation clamp (4) hunch-up, two form the centre gripping region between elastic part (511) and the fixation clamp (4).
7. A cable pre-clamping cassette according to claim 1, wherein: the clamping areas of the fixed clamp (4) and the movable clamp (5) are internally provided with three flexible clamping sleeves (7), and the outer side walls of the three clamping sleeves (7) are tangent to each other in pairs.
8. A cable pre-clamping cassette as defined in claim 7, wherein: a plurality of bulges (71) are arranged at intervals in the inner side wall of the clamping sleeve (7) along the length direction of the clamping sleeve (7).
CN202220220622.5U 2022-01-26 2022-01-26 Cable pre-clamping operation box Expired - Fee Related CN216851201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220220622.5U CN216851201U (en) 2022-01-26 2022-01-26 Cable pre-clamping operation box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220220622.5U CN216851201U (en) 2022-01-26 2022-01-26 Cable pre-clamping operation box

Publications (1)

Publication Number Publication Date
CN216851201U true CN216851201U (en) 2022-06-28

Family

ID=82086818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220220622.5U Expired - Fee Related CN216851201U (en) 2022-01-26 2022-01-26 Cable pre-clamping operation box

Country Status (1)

Country Link
CN (1) CN216851201U (en)

Similar Documents

Publication Publication Date Title
EP1570557A1 (en) Structured cabling system and method
CN216851201U (en) Cable pre-clamping operation box
CN219760570U (en) Deconcentrator
CN211126952U (en) Switch net twine fixing device
CN109462203B (en) Cable branch box convenient to wiring
CN211790656U (en) Mine cable hook fastening device
CN116204042A (en) Data security server convenient to maintain and overhaul
CN215004679U (en) Be used for inserting formula wire harness soon and draw test fixture
CN212258320U (en) Wiring duct for electrical installation
CN205248736U (en) Bus slot
CN205489013U (en) Modularization batch meter
CN211405349U (en) Bridge installation fixing support
CN210016200U (en) Easy plug reason line frame
CN202957546U (en) Novel top cable groove for communication cabinet
CN218549357U (en) Engineering wiring of easy dismouting is with installation auxiliary structure
CN113595003A (en) Controllable type cable clamp of many cable intervals
CN213151482U (en) Fixing-line device convenient to overhaul operation
CN217334524U (en) Weak current engineering wiring protection mechanism based on it is intelligent
CN205724738U (en) A kind of distribution box termination
CN217088323U (en) Electrical cabinet convenient to install and maintain
CN220605477U (en) Spliced cable bridge convenient to install
CN216162207U (en) Management device for power transformation switching operation of electric power system
CN217010245U (en) Branch line tool box for engineering electrical equipment
CN213782790U (en) A multi-functional wiring groove structure for intelligent power cabinet
CN217469142U (en) Rubber electrical protection sleeve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220628

CF01 Termination of patent right due to non-payment of annual fee