CN216844126U - Auxiliary device for aluminum ceiling reinforcing ribs and suspension rods of LNG storage tank - Google Patents

Auxiliary device for aluminum ceiling reinforcing ribs and suspension rods of LNG storage tank Download PDF

Info

Publication number
CN216844126U
CN216844126U CN202122672669.3U CN202122672669U CN216844126U CN 216844126 U CN216844126 U CN 216844126U CN 202122672669 U CN202122672669 U CN 202122672669U CN 216844126 U CN216844126 U CN 216844126U
Authority
CN
China
Prior art keywords
storage tank
auxiliary device
lng storage
adjusting piece
checkpost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122672669.3U
Other languages
Chinese (zh)
Inventor
张月
胡家新
朱雷
张宝和
闫景鹏
魏雄标
郭太江
杨尚玉
薛洪利
王仝扣
李浩然
曹海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Offshore Oil Engineering Co Ltd
Original Assignee
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Oil Engineering Co Ltd filed Critical Offshore Oil Engineering Co Ltd
Priority to CN202122672669.3U priority Critical patent/CN216844126U/en
Application granted granted Critical
Publication of CN216844126U publication Critical patent/CN216844126U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses an auxiliary device for an aluminum suspended ceiling reinforcing rib and a suspension rod of an LNG storage tank, which comprises an adjusting piece and two locking assemblies respectively arranged at two ends of the adjusting piece, wherein a threaded hole penetrating from one end to the other end is formed in the adjusting piece, and each locking assembly comprises: one end with the one end threaded connection's of screw hole bolt, with the other end of bolt rotates the spill checkpost of connecting and having the recess and threaded connection be in the screw thread post of one side of spill checkpost. The auxiliary device is used for realizing assembly, so that the problem of base metal damage caused by the traditional assembly mode that welding lifting lugs are installed and removed is solved, the assembly efficiency and accuracy can be improved, and the labor intensity is reduced.

Description

Auxiliary device for aluminum ceiling reinforcing ribs and suspension rods of LNG storage tank
Technical Field
The utility model relates to the technical field of LNG storage tank assistance, in particular to an auxiliary device for an aluminum ceiling reinforcing rib and a hanger rod of an LNG storage tank.
Background
In the operation of LNG storage tank aluminium furred ceiling strengthening rib and aluminium furred ceiling jib group to, according to its group to the requirement for quality, traditional group to the mode is welding the lug on the jib, and the multiple spot is simultaneously to the storage tank aluminium furred ceiling jib in order to guarantee whole tens of meters diameter at its whole precision on the level.
And the multiple spot is simultaneously to group when the storage tank aluminium furred ceiling jib in order to guarantee whole tens meters diameter is at its whole precision on the level, then need a large amount of chain blocks cooperation just can accomplish, this kind of group leads to the base metal damage to the mode easily, and the group is to efficiency slow, the precision is low, intensity of labour is still high.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an auxiliary device for an aluminum ceiling reinforcing rib and a suspension rod of an LNG storage tank, and solve the problems that the existing assembly mode of the aluminum ceiling suspension rod and the aluminum ceiling reinforcing rib of the LNG storage tank is easy to cause damage to a base material, the assembly efficiency is low, the precision is low, and the labor intensity is high.
In order to solve the technical problem, the utility model provides an auxiliary device for an aluminum ceiling reinforcing rib and a suspension rod of an LNG storage tank, which comprises an adjusting piece and two locking assemblies respectively arranged at two ends of the adjusting piece, wherein a threaded hole penetrating from one end to the other end is formed in the adjusting piece.
The locking assembly includes: one end with the one end threaded connection's of screw hole bolt, with the other end of bolt rotates the spill checkpost of connecting and having the recess and threaded connection be in the screw thread post of one side of spill checkpost.
Furthermore, one end, far away from the regulating part, of the bolt is provided with a hanging ring, the locking assembly further comprises a U-shaped clamping ring arranged in the hanging ring in a penetrating mode and a connecting shaft connected with two ends of the U-shaped clamping ring, and the concave clamp is connected with the connecting shaft in a rotating mode.
Furthermore, one side of the concave clip, which is close to the connecting shaft, is provided with a clip lifting lug, and the clip lifting lug is rotatably connected with the connecting shaft.
Furthermore, a handle is arranged at one end, far away from the concave clamp, of the threaded column.
Furthermore, the inner groove walls on two sides of the groove are flat surfaces.
Further, the length of the threaded portion of the bolt is at least equal to half the distance between the two ends of the adjusting member.
Furthermore, the adjusting piece is of a rectangular structure, and the middle area of one side of the adjusting piece is inwards sunken to be communicated with the threaded hole.
The utility model has the technical effects that: through setting up the regulating part and setting up respectively two locking Assembly at the both ends of regulating part, thereby can be when LNG storage tank aluminium furred ceiling strengthening rib and aluminium furred ceiling jib need group time, place the base metal in the recess of sunken checkpost earlier, rethread screw thread post locking base metal, then, through rotating the regulating part alright with the bolt locking base metal that contracts both ends, thereby realize the take-up to the base metal, because one side of base metal has passed through screw thread post locking, therefore, when taking-up jib or strengthening rib again, the base metal at both ends just can dock automatically, and then realize the group to of jib and strengthening rib, this kind has solved traditional group to the problem that leads to the base metal damage when dismantling mode installation welding lug through auxiliary device realization group to right mode, and can improve group efficiency and precision, and reduce intensity of labour.
Drawings
Fig. 1 is a schematic perspective view of an auxiliary device for aluminum ceiling reinforcing ribs and suspension rods of an LNG storage tank according to an embodiment of the present invention.
Fig. 2 is a top view of an auxiliary device for aluminum ceiling reinforcing bars and suspension rods of an LNG storage tank according to an embodiment of the present invention.
Wherein, 1, adjusting piece; 2. a bolt; 21. a hoisting ring; 3. a U-shaped snap ring; 4. a connecting shaft; 5. a clip lifting lug; 6. a concave clip; 7. a threaded post; 8. a handle.
Detailed Description
The present invention is further described with reference to the following drawings and specific examples so that those skilled in the art can better understand the present invention and can practice the present invention, but the examples are not intended to limit the present invention.
The embodiment of the utility model provides an auxiliary device for an aluminum suspended ceiling reinforcing rib and a suspension rod of an LNG storage tank, which is shown by combining an attached drawing 1 and an attached drawing 2 and comprises an adjusting part 1 and two locking assemblies respectively arranged at two ends of the adjusting part 1, wherein a threaded hole penetrating from one end to the other end is formed in the adjusting part 1.
Specifically, the adjusting member 1 is a rectangular structure, and a middle region of one side is recessed inwards and communicated to the threaded hole, wherein the periphery of the recessed side of the adjusting member 1 is not recessed.
Specifically, the locking assembly includes: the bolt 2 is connected with one end of the threaded hole through threads, the concave clip 61 is connected with the other end of the bolt 2 in a rotating mode and provided with a groove, and the threaded column 7 is connected with one side of the concave clip 61 through threads and extends into the groove.
Wherein, the structure of two locking Assembly is the same or similar, and the bolt 2 threaded connection respectively in two locking Assembly is at the both ends of screw hole.
The groove is arranged on one side of the concave clip 61 far away from the side rotationally connected with the bolt 2, and the groove is of a U-shaped structure.
Specifically, one end of the bolt 2, which is far away from the adjusting part 1, is provided with a hanging ring 21, the locking assembly further comprises a U-shaped clamping ring 3 which is arranged in the hanging ring 21 in a penetrating manner, and a connecting shaft 4 which is connected with two ends of the U-shaped clamping ring 3, and the concave clamp 61 is rotatably connected with the connecting shaft 4. Through the arrangement of the U-shaped clamping ring 3 and the connecting shaft 4, the rotation connection of the concave clamp 61 and the bolt 2 can be better realized.
The concave clip 61 is rotatably connected with the connecting shaft 4, the connecting shaft 4 is arranged on the U-shaped snap ring 3, and the U-shaped snap ring 3 is arranged on the hanging ring 21 at one end of the bolt 2, so that the indirect rotary connection between the concave clip 61 and the bolt 2 is realized.
Specifically, one side of the concave clip 61 close to the connecting shaft 4 is provided with a clip lifting lug 5, and the clip lifting lug 5 is rotatably connected with the connecting shaft 4. This allows the distance between the female clip 61 and the connecting shaft 4 to be extended to avoid the female clip 61 being restricted by the hanging ring 21 or the U-shaped clasp 3 when rotated.
Need organize the time to at LNG storage tank aluminium furred ceiling strengthening rib and aluminium furred ceiling jib, place the base metal earlier in the recess of sunken checkpost, 7 locking and fixed base metals of rethread screw thread post, then, through rotating 1 alright with 2 locking base metals of bolt that shrink both ends, thereby realize the take-up to the base metal, because one side of base metal has been through 7 locking screw thread posts, therefore, when straining jib or strengthening rib again, the base metal at both ends just can dock automatically, and then realize the pairing of jib and strengthening rib.
Furthermore, the inner groove walls on the two sides of the groove are flat surfaces, so that the contact area between the inner groove walls and the base metal can be increased when the base metal is fixed, and the base metal can be better locked through the threaded column 7.
Further, the length of the portion of the bolt 2 threadedly coupled with the threaded hole is at least equal to half the distance between both ends of the adjusting member 1. The arrangement can improve the moving distance of the bolts 2 at the two ends of the adjusting piece 1, so that the base materials at the two ends of the adjusting piece 1 can be butted better.
Further, the end of the threaded stud 7 remote from the female clip 61 is provided with a handle 8. Therefore, when the threaded column 7 needs to be twisted, the threaded column can be directly twisted through the handle 8 without being twisted through an auxiliary tool.
According to the utility model, the problem of parent metal damage caused by the traditional assembly mode that welding lifting lugs are installed and removed in the assembly mode is solved through the auxiliary device, the assembly efficiency and accuracy can be improved, and the labor intensity is reduced.
The above-mentioned embodiments are merely preferred embodiments for fully illustrating the present invention, and the scope of the present invention is not limited thereto. The equivalent substitution or change made by the technical personnel in the technical field on the basis of the utility model is all within the protection scope of the utility model. The protection scope of the utility model is subject to the claims.

Claims (7)

1. The utility model provides an auxiliary device that is used for LNG storage tank aluminium furred ceiling strengthening rib and jib which characterized in that: the locking device comprises an adjusting piece and two locking assemblies respectively arranged at two ends of the adjusting piece, wherein a threaded hole penetrating from one end to the other end is formed in the adjusting piece;
the locking assembly includes: one end with the one end threaded connection's of screw hole bolt, with the other end of bolt rotates to be connected and has the notched spill checkpost and threaded connection one side of spill checkpost and stretch into the screw thread post in the recess.
2. The auxiliary device for the aluminum ceiling reinforcing bar and the suspension rod of the LNG storage tank as claimed in claim 1, wherein: the bolt is kept away from the one end of regulating part is provided with rings, locking Assembly still wears to establish U-shaped snap ring in the rings and connects the connecting axle at the both ends of U-shaped snap ring, the spill checkpost with the connecting axle rotates to be connected.
3. Auxiliary device for LNG storage tank aluminium ceiling stiffeners and booms according to claim 2, characterized in that: one side that the spill checkpost is close to the connecting axle is provided with the checkpost lug, the checkpost lug with the connecting axle rotates to be connected.
4. The auxiliary device for the aluminum ceiling reinforcing bar and the suspension rod of the LNG storage tank as claimed in claim 1, wherein: and a handle is arranged at one end of the threaded column, which is far away from the concave clamp.
5. The auxiliary device for the aluminum ceiling reinforcing bar and the suspension rod of the LNG storage tank as claimed in claim 1, wherein: and the inner groove walls on two sides of the groove are flat surfaces.
6. The auxiliary device for the aluminum ceiling reinforcing bar and the suspension rod of the LNG storage tank as claimed in claim 1, wherein: the length of the part of the bolt in threaded connection with the threaded hole is at least equal to half of the distance between two ends of the adjusting piece.
7. The auxiliary device for the aluminum ceiling reinforcing bar and the suspension rod of the LNG storage tank as claimed in claim 1, wherein: the adjusting piece is of a rectangular structure, and the middle area of one side of the adjusting piece is inwards sunken to be communicated with the threaded hole.
CN202122672669.3U 2021-11-03 2021-11-03 Auxiliary device for aluminum ceiling reinforcing ribs and suspension rods of LNG storage tank Active CN216844126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122672669.3U CN216844126U (en) 2021-11-03 2021-11-03 Auxiliary device for aluminum ceiling reinforcing ribs and suspension rods of LNG storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122672669.3U CN216844126U (en) 2021-11-03 2021-11-03 Auxiliary device for aluminum ceiling reinforcing ribs and suspension rods of LNG storage tank

Publications (1)

Publication Number Publication Date
CN216844126U true CN216844126U (en) 2022-06-28

Family

ID=82099108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122672669.3U Active CN216844126U (en) 2021-11-03 2021-11-03 Auxiliary device for aluminum ceiling reinforcing ribs and suspension rods of LNG storage tank

Country Status (1)

Country Link
CN (1) CN216844126U (en)

Similar Documents

Publication Publication Date Title
CN111940640B (en) Winch for straightening reinforcing steel bars
CN216844126U (en) Auxiliary device for aluminum ceiling reinforcing ribs and suspension rods of LNG storage tank
CN209443092U (en) A kind of small box fastener anti-drop device
CN103510739A (en) Multifunctional combinatorial insulation cross arm
CN212609068U (en) Vertical pipeline hoist device of clamp type
CN212849610U (en) Adjustable insulation pulley for live working of power transmission line
CN214243487U (en) Main bridge bored pile steel reinforcement cage hoist device
CN211815399U (en) Quick connecting device of paver screed extension section
CN212245913U (en) Suspension device for roof steel structure
CN209835491U (en) Rope winder threading mechanism for crane
CN106144881B (en) Side guide plate of recoiling machine liner plate hoisting fixture
CN113336081A (en) Steel reinforcement cage hangs muscle
CN214246691U (en) Anti-bending protective appliance for cement rod body
CN216549220U (en) Special clamp for hoisting prebaked anode green body
CN213738216U (en) Clamp for hoisting section bar
CN206051259U (en) Side guide plate of recoiling machine liner plate hoisting fixture
CN220886697U (en) I-steel hanging tongs
CN219239007U (en) Crane hook with adjustable hook opening spacing
CN211496722U (en) Can dismantle heavy powerful coaster
CN217102716U (en) Steel bar hoisting and clamping equipment for civil construction engineering
CN217352157U (en) Support equipment for municipal bridge construction
CN218843826U (en) Fixing device for improving service life and quality of iron tower
CN217201626U (en) Steel construction section bar hoist device
CN218058103U (en) Combined chain rigging
CN220432055U (en) Steel wire rope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant