CN216843386U - Pressure pipeline laying device for town gas engineering - Google Patents

Pressure pipeline laying device for town gas engineering Download PDF

Info

Publication number
CN216843386U
CN216843386U CN202220007609.1U CN202220007609U CN216843386U CN 216843386 U CN216843386 U CN 216843386U CN 202220007609 U CN202220007609 U CN 202220007609U CN 216843386 U CN216843386 U CN 216843386U
Authority
CN
China
Prior art keywords
seat
hoist
track
laying device
town gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220007609.1U
Other languages
Chinese (zh)
Inventor
林泽浩
李天时
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220007609.1U priority Critical patent/CN216843386U/en
Application granted granted Critical
Publication of CN216843386U publication Critical patent/CN216843386U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a pressure pipeline laying device of town gas engineering, including the track with remove the seat, the equal fixed mounting in orbital both ends has the pier base, removes seat slidable mounting on the track, and the top of removing the seat is provided with electronic flexible pillar, and the last fixed surface who removes the seat is connected with the installation riser, and the side threaded mounting of installation riser has first bolt, and the outer jacket portion of electronic flexible pillar through first bolt and installation riser fixed connection, and the expansion end of electronic flexible pillar rotates and is connected with and supports the cover, supports the inside slip of cover and inserts and be equipped with the hoist and mount arm. This pressure pipeline laying device of town gas engineering, through setting up the hoist and mount arm, utilize the jacking effect of electronic flexible pillar, can will bind the pipeline hoist at hoist and mount arm, hoist and mount arm can rotate along with supporting the cover moreover to and along with removing the seat along track direction round trip movement, conveniently put into underground ditch inslot suitable position with the pipeline to realize the effect of supplementary installation pipeline.

Description

Pressure pipeline laying device for town gas engineering
Technical Field
The utility model relates to a municipal works technical field specifically is a pipeline under pressure laying device of town gas engineering.
Background
The natural gas resource is a cleaner resource, and by virtue of the advantages of green and environment-friendly natural gas and low exploitation cost, the proportion of the natural gas in the life and industrial production of residents in China is increased gradually in recent years. Especially, in daily life of urban residents, the use of gas stoves and natural gas water heaters is gradually popularized.
In the laying of pipeline, need use large-scale hoist and mount machinery, the in-service use process not only can cause the influence to town road traffic, moreover, receives the restriction in space to and the interference of eminence bill-board, high-voltage line, many situations hoist and mount machinery is too big, can't exert effects, finally still need the manual work to go the transport, brings a great deal of inconvenience for pipe laying, in order to solve this problem, this application provides a simple and easy, can assist the laying device of artifical transport pipeline.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pressure pipeline laying device of town gas engineering to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pressure pipeline laying device of town gas engineering, includes the track and removes the seat, the equal fixed mounting in orbital both ends has the pier base, remove seat slidable mounting on the track, the top of removing the seat is provided with electronic flexible pillar, the last fixed surface who removes the seat is connected with the installation riser, the side screw thread of installation riser installs first bolt, the outer jacket portion of electronic flexible pillar, through first bolt and installation riser fixed connection, the expansion end of electronic flexible pillar rotates and is connected with and supports the cover, the inside slip of supporting the cover is inserted and is equipped with the hoisting arm, the tip of hoisting arm is provided with the hoist and mount rope.
Preferably, orbital quantity is two, and two track parallel arrangement have seted up the through hole on the upper surface of removal seat, and the bottom of electronic flexible pillar passes the through hole extends to the below of removing the seat to fixed mounting has the translation backing plate.
Preferably, the upper surface of the mounting vertical plate is provided with a placing open slot, the supporting sleeve can be clamped into the placing open slot, the front side and the rear side of the mounting vertical plate are both provided with second bolts in a threaded manner, and the supporting sleeve can be fixed in the placing open slot through the second bolts.
Preferably, a plurality of limiting holes are formed in the front face of the hoisting arm and are arranged in a straight line shape at equal intervals, a third bolt is installed on the outer surface of the supporting sleeve in a threaded mode, and the threaded end of the third bolt can be inserted into the limiting holes.
Preferably, one end of the hoisting arm is fixedly connected with a handle ring, and the other end of the hoisting arm is rotatably connected with a hoisting cross beam.
Preferably, the upper end of the hoisting rope is bound on the hoisting beam, and the bottom end of the hoisting rope is provided with a binding belt for binding the pipeline.
Advantageous effects
The utility model provides a pressure pipeline laying device of town gas engineering possesses following beneficial effect:
1. this pressure pipeline laying device of town gas engineering, through setting up the hoist and mount arm, utilize the jacking effect of electronic flexible pillar, can will bind the pipeline hoist at hoist and mount arm, hoist and mount arm can rotate along with supporting the cover moreover to and along with removing the seat along track direction round trip movement, conveniently put into underground ditch inslot suitable position with the pipeline to realize the effect of supplementary installation pipeline.
2. This pressure pipeline laying device of town gas engineering, through setting up track and pier base, even the unevenness in workplace, also can provide a smooth removal plane for removing the seat, it is steady to make the removal seat remove, moreover, utilize electronic flexible pillar to push down translation backing plate, can with the whole lifting of track and pier base, drop with ground, conveniently remove the position of pier base, or let the pier base of one side stride across the slot of burying the pipeline underground, conveniently change the device position of standing upright, solve the problem that is difficult for artifical removal the device to and set up the inconvenient slot of strideing across of gyro wheel, or the problem of the inconvenient removal of ground unevenness.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
fig. 3 is the schematic diagram of the transfer track and the squatting position of the utility model.
In the figure: 1 track, 2 removal seats, 3 pier seats, 4 electronic flexible pillars, 5 installation risers, 6 first bolts, 7 support cover, 8 hoist and mount arms, 9 hoist and mount ropes, 10 translation backing plates, 11 place open slot, 12 second bolts, 13 spacing holes, 14 third bolts, 15 handle rings, 16 hoist and mount crossbeams.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a pressure pipeline laying device of town gas engineering, include track 1 and removal seat 2, the equal fixed mounting in track 1's both ends has pier base 3, track 1's quantity is two, 1 parallel arrangement in two tracks, remove 2 slidable mounting on track 1 of seat, the top of removing seat 2 is provided with electric telescopic prop 4, the last fixed surface who removes seat 2 is connected with installation riser 5, first bolt 6 is installed to the side screw thread of installation riser 5, the outer jacket portion of electric telescopic prop 4, through first bolt 6 and 5 fixed connection of installation riser, the expansion end of electric telescopic prop 4 rotates and is connected with and supports cover 7.
Support the inside slip of cover 7 and insert and be equipped with hoist and mount arm 8, the spacing hole 13 of a plurality of has been seted up in the front of hoist and mount arm 8, the spacing hole 13 of a plurality of is a word equidistance and arranges, the surface screw thread of supporting cover 7 installs third bolt 14, the screw thread end of third bolt 14 can insert in spacing hole 13, the tip of hoist and mount arm 8 is provided with hoist and mount rope 9, the one end fixedly connected with handle ring 15 of hoist and mount arm 8, the other end of hoist and mount arm 8 rotates and is connected with hoist and mount crossbeam 16, the upper end of hoist and mount rope 9 is binded on hoist and mount crossbeam 16, the bottom of hoist and mount rope 9 is provided with the bandage of binding the pipeline.
Through setting up hoist and mount arm 8, utilize the jacking effect of electronic flexible pillar 4, can hoist the pipeline of binding at hoist and mount arm 8, hoist and mount arm 8 can rotate along with supporting cover 7 moreover to and along with removing seat 2 along track 1 direction round trip movement, conveniently put into the suitable position in the underground ditch inslot with the pipeline, thereby realize the effect of supplementary installation pipeline.
The upper surface of the movable seat 2 is provided with a through hole, the bottom end of the electric telescopic strut 4 passes through the through hole and extends to the lower part of the movable seat 2, a translation backing plate 10 is fixedly installed, a placing open slot 11 is formed in the upper surface of the installation vertical plate 5, the support sleeve 7 can be clamped in the placing open slot 11, second bolts 12 are installed on the front side and the rear side of the installation vertical plate 5 in a threaded mode, the supporting sleeve 7 can be fixed in the open slot 11 by the second bolt 12, and a flat moving plane can be provided for the moving seat 2 even if the working place is uneven by arranging the track 1 and the pier seat 3, so that the moving seat 2 can move stably, moreover, the electric telescopic prop 4 is utilized to push down the translation backing plate 10, so that the track 1 and the pier seat 3 can be integrally lifted and fall off the ground, the position of the pier seat 3 is convenient to move, or the pier seat 3 on one side spans the groove of the buried pipeline, so that the standing position of the device is conveniently changed.
The working principle is as follows: when the pressure pipeline laying device for the town gas engineering is used, a pipeline is bound by using the hoisting rope 9, the electric telescopic support column 4 extends, the hoisting arm 8 is lifted, an operator holds the handle ring 15 by hand, the angle of the hoisting arm 8 can be rotated, or the position of the seat 2 is moved in a sliding manner along the direction of the track 1, the pipeline is placed at a proper position in a groove on the ground, the effect of hoisting and placing the pipeline is achieved, when the position is required to be moved, the support sleeve 7 falls into the placing open slot 11, the first bolt 6 is loosened, the second bolt 12 is screwed, the support sleeve 7 is fixedly placed in the open slot 11 by using the second bolt 12, the electric telescopic support column 4 is started, the electric telescopic support column 4 extends, the translation cushion plate 10 is pushed downwards, the track 1 and the pier seat 3 can be integrally lifted and fall off the ground, the pier seat 3 is dragged, the pier seat 3 on one side can cross the groove of the buried pipeline by sliding left and right of the track 1, conveniently change the device standing position, solve the problem that is difficult for artifical removal the device to and set up the inconvenient slot of strideing across of gyro wheel, or the inconvenient problem of removing of ground unevenness, the device simple structure, it is convenient to remove, alleviates the artifical burden of laying the pipeline greatly.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pressure pipeline laying device of town gas engineering, includes track (1) and removes seat (2), its characterized in that: the equal fixed mounting in both ends of track (1) has mound seat (3), remove seat (2) slidable mounting on track (1), the top of removing seat (2) is provided with electric telescopic prop (4), the last fixed surface who removes seat (2) is connected with installation riser (5), the side screw thread of installation riser (5) installs first bolt (6), the overcoat portion of electric telescopic prop (4), through first bolt (6) and installation riser (5) fixed connection, the expansion end of electric telescopic prop (4) rotates and is connected with and supports cover (7), the inside slip of supporting cover (7) is inserted and is equipped with hoisting arm (8), the tip of hoisting arm (8) is provided with hoist and mount rope (9).
2. The pressure pipe laying device for town gas engineering according to claim 1, wherein: the quantity of track (1) is two, and two track (1) parallel arrangement have seted up the through hole, and the bottom of electronic flexible pillar (4) is passed the through hole extends to the below of removing seat (2) to fixed mounting has translation backing plate (10), and the upper surface of removing seat (2) has seted up the through hole.
3. The pressure pipe laying device for town gas engineering according to claim 2, characterized in that: the upper surface of the mounting vertical plate (5) is provided with a placing open slot (11), the supporting sleeve (7) can be clamped into the placing open slot (11), second bolts (12) are mounted on the front side and the rear side of the mounting vertical plate (5) in a threaded mode, and the supporting sleeve (7) can be fixed in the placing open slot (11) through the second bolts (12).
4. The pressure pipe laying device for town gas engineering according to claim 1, wherein: a plurality of limiting holes (13) are formed in the front face of the hoisting arm (8), the plurality of limiting holes (13) are arranged in a straight line shape at equal intervals, a third bolt (14) is installed on the outer surface threads of the supporting sleeve (7), and the threaded end of the third bolt (14) can be inserted into the limiting holes (13).
5. The pressure pipe laying device for town gas engineering according to claim 1, wherein: one end of the hoisting arm (8) is fixedly connected with a handle ring (15), and the other end of the hoisting arm (8) is rotatably connected with a hoisting cross beam (16).
6. The pressure pipe laying device for town gas engineering according to claim 5, wherein: the upper end of the hoisting rope (9) is bound on the hoisting beam (16), and the bottom end of the hoisting rope (9) is provided with a binding belt for binding the pipeline.
CN202220007609.1U 2022-01-05 2022-01-05 Pressure pipeline laying device for town gas engineering Active CN216843386U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220007609.1U CN216843386U (en) 2022-01-05 2022-01-05 Pressure pipeline laying device for town gas engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220007609.1U CN216843386U (en) 2022-01-05 2022-01-05 Pressure pipeline laying device for town gas engineering

Publications (1)

Publication Number Publication Date
CN216843386U true CN216843386U (en) 2022-06-28

Family

ID=82115228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220007609.1U Active CN216843386U (en) 2022-01-05 2022-01-05 Pressure pipeline laying device for town gas engineering

Country Status (1)

Country Link
CN (1) CN216843386U (en)

Similar Documents

Publication Publication Date Title
CN202090572U (en) Wall plastering machine for decorating building
CN201554369U (en) Fast-transported petroleum drilling rig capable of transporting large module integrally and automatically traveling
CN208687098U (en) A kind of jacking construction structure
CN210293742U (en) Earth taking machine for geological exploration
CN216843386U (en) Pressure pipeline laying device for town gas engineering
CN201042639Y (en) High-efficiency pipe-chute peripheral transmission thickener
CN208415253U (en) A kind of foundation pit anchor cable cutter
CN111609209A (en) Supporting device for pipe jacking construction
CN217394177U (en) Pipeline welding frame
CN111006067A (en) Pipeline transportation and socket installation device in narrow space and use method thereof
CN216590248U (en) Municipal administration is pipe-laying auxiliary device for water supply and drainage
CN215862076U (en) Supporting device for connecting drainage engineering pipelines
CN205893897U (en) Be applied to flexible float tube bridge of floating pump station
CN205089334U (en) C type gate -type tunnel bed board machine
CN212804558U (en) Strutting arrangement is used in town road pipeline construction
CN210049914U (en) Coal mine way is with safety protection support frame
CN210890360U (en) Automatic pipe lowering device
CN211735679U (en) Urban sewage pipeline treatment device
CN211285299U (en) Protective bracket for bridge construction
CN208633654U (en) A kind of holding tube machine
CN216279760U (en) Pipeline butt joint auxiliary device for natural gas engineering construction
CN214220671U (en) Safety device is used in hydraulic engineering construction
CN216446451U (en) High-efficient house decoration is laid with tiling and is used iron stand based on it is automatic
CN219892814U (en) Support frame for municipal construction
CN219671572U (en) Pre-buried structure is used in municipal administration sewer installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant