CN216840702U - Positioning device capable of quickly mounting vertical component - Google Patents

Positioning device capable of quickly mounting vertical component Download PDF

Info

Publication number
CN216840702U
CN216840702U CN202123383131.7U CN202123383131U CN216840702U CN 216840702 U CN216840702 U CN 216840702U CN 202123383131 U CN202123383131 U CN 202123383131U CN 216840702 U CN216840702 U CN 216840702U
Authority
CN
China
Prior art keywords
fixed plate
fixed
install
fixation clamp
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123383131.7U
Other languages
Chinese (zh)
Inventor
李昦
万贤强
韩嫣然
黄梦玲
朱海强
陈宝良
宣鑫浒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Third Construction Group Co ltd
Anhui Jiangong Construction Industry Co ltd
Original Assignee
Anhui Jiangong Construction Industry Co ltd
Anhui Sanjian Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jiangong Construction Industry Co ltd, Anhui Sanjian Engineering Co Ltd filed Critical Anhui Jiangong Construction Industry Co ltd
Priority to CN202123383131.7U priority Critical patent/CN216840702U/en
Application granted granted Critical
Publication of CN216840702U publication Critical patent/CN216840702U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a can install positioner of vertical component fast, including first fixed plate and second fixed plate first fixed plate length direction on open and to have the fixed slotted hole of regulation the fixed slotted hole in install bolt screw assembly the one end of second fixed plate be equipped with the fixation clamp, install laser device in the fixation clamp to through fixation clamp bolt locking fixation clamp, install the air level on the middle part of second fixed plate, the other end of second fixed plate and a tip fixed connection of first fixed plate, the contained angle between first fixed plate and the second fixed plate is 90. The utility model provides a need personnel to use tools such as mirror to proofread the sleeve and be connected of reinforcing bar, the more difficult problem of operation when on-the-spot installation wallboard. The alignment of the sleeve and the steel bar is quickly determined by adopting the laser corresponding to the reference point, so that the installation efficiency is improved, and the potential safety hazard is eliminated. The utility model discloses device frock is efficient, the security is good.

Description

Positioning device capable of quickly mounting vertical component
Technical Field
The utility model relates to a prefabricated vertical component of assembled construction installation technical field especially relates to a can install vertical component's positioner fast.
Background
With the continuous development of building industrialization in China, more and more building houses adopt a prefabricated concrete structure form. The prefabricated wallboard is produced in an industrial mode, the quality of a product is effectively controlled, the mechanical property is excellent, the production efficiency is high, and the prefabricated wallboard is widely applied to buildings. However, in actual construction, because the splicing seams are too many and a plurality of steel bars are protruded out of the splicing seams of the wall board, the existing splicing method is to splice the embedded steel bars into the grouting sleeves at the bottom of the prefabricated wall board one by one, so that construction by a plurality of persons is needed, time and labor are wasted, the production efficiency is low, and alignment is not easy; need adopt secondary adjustment to make the wall parallel and level after the wallboard concatenation, wall surface roughness is difficult to confirm, and the construction progress is slow, and construction quality is poor, and how quick, high-efficient, accurate location of prefabricated wallboard is installed and is for the biggest difficult problem. The above problems are solved by a positioning device that allows for quick installation of vertical members.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the purpose is exactly in order to remedy prior art's defect, provides a positioner that can install vertical component fast, ensures that prefabricated vertical component can be quick, high-efficient, accurate installation, satisfies the needs of on-the-spot component installation.
The utility model discloses a realize through following technical scheme:
the utility model provides a can install positioner of vertical member fast, including first fixed plate and second fixed plate first fixed plate length direction on open and to have the fixed slotted hole of regulation the fixed slotted hole in install bolt screw assembly the one end of second fixed plate be equipped with the fixation clamp, install laser device in the fixation clamp to through fixation clamp bolt locking fixation clamp, install the air level on the middle part of second fixed plate, the other end of second fixed plate and an tip fixed connection of first fixed plate, the contained angle between first fixed plate and the second fixed plate is 90. The first fixing plate is fixedly connected with the prefabricated wall through pre-buried bolts in the screw prefabricated wall or reserved through holes.
The first fixing plate and the second fixing plate are both steel plates.
The first fixing plate and the second fixing plate are connected into a whole through welding.
And a gasket is arranged in the bolt and screw assembly.
The first fixing plate is made of a metal plate, and is 690mm long and 60mm high in size. The fixing groove hole is adjusted to be 450mm long and 20mm wide, and is used for penetrating a screw rod to enable the screw rod to be fixed on the wallboard.
The adjusting fixing slotted hole of the first fixing plate is pre-embedded with bolts or reserved with through holes on different walls, and the fixing positions of the adjusting screws are adjusted according to the positions of the adjusting fixing slotted hole and the side positions.
The second fixed plate metal plate is 210mm long and 60mm high in size, a level bubble is installed in the center of the second fixed plate metal plate, and a fixed clamp is arranged at the tail end of the second fixed plate metal plate.
First fixed plate and second fixed plate between be 90 contained angle welding, and the second fixed plate will bulge first fixed plate 20 mm.
The specification of the fixed screw is according to the specification of a reserved bolt on the wall plate or a reserved through hole, and the length of the screw of the reserved bolt is 20mm added to the sum of the thicknesses of the fixed plate and the gasket. The length of the screw rod of the reserved through hole is the sum of the thicknesses of the fixing plate and the two gaskets, and the thickness of the prefabricated wall plate is added by 40 mm.
The utility model has the advantages that: the utility model provides a need personnel to use tools such as mirror to proofread the sleeve and be connected of reinforcing bar, the more difficult problem of operation when on-the-spot installation wallboard. The alignment of the sleeve and the steel bar is quickly determined by adopting the laser corresponding reference points, so that the installation efficiency is improved, and the potential safety hazard is eliminated. The utility model discloses device frock is efficient, the security is good.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a side view of the present invention.
Fig. 3 is the utility model discloses with pre-buried bolted connection's in the wallboard installation top view.
Fig. 4 is the utility model discloses and reserve the installation top view of perforation connection in the wallboard.
Figure 5 is the utility model discloses and wallboard installation location picture.
Fig. 6 is a side view of the present invention installed and positioned with a wall panel.
Detailed Description
As shown in fig. 1-6, a positioning device for quickly mounting vertical components comprises a first fixing plate 1 and a second fixing plate 4. The first fixing plate 1 is 690mm long and 60mm wide, and an adjusting fixing slot hole 3 which is 450mm long and 18mm wide is reserved. The length of the second fixing plate 4 is 210mm, the width of the second fixing plate 4 is 60mm, a leveling bubble 9 is arranged in the second fixing plate 4, a fixing clamp 7 is arranged at the other end of the second fixing plate 4, the laser device 6 is arranged in the fixing clamp 7, and then a fixing clamp bolt 8 is screwed down. Wherein the first fixing plate 1 is welded at a position 20mm away from one end of the second fixing plate 4 at an included angle of 90 degrees at 90 degrees to form a whole.
The length of the bolt determines the specification and the installation scheme of the embedded bolt connecting screw according to the embedded bolt 10 of the wallboard 14 or the reserved through hole 15.
In the first installation scheme, the wall plate 14 is provided with embedded bolts 10
With contained angle and prefabricated wallboard corner between first fixed plate 1 and the second fixed plate 4 fixed, according to the high integral movement of buried bolt 10 and adjust, when the regulation fixed slot hole 3 in the first fixed plate 1 coincides with buried bolt 10 of wallboard, gasket 2 is installed, will pass gasket 2 and wallboard with the buried bolted connection screw rod 5 of wallboard again and be connected.
Mounting scheme two, wallboard 14 reserves to bury piece for buried bolt 15
The included angle between the first fixing plate 1 and the second fixing plate 4 is fixed with the corner of the prefabricated wall board, the whole height of the reserved through hole 15 is adjusted in a moving mode, when the adjusting fixing slotted hole 3 in the first fixing plate 1 is overlapped with the reserved through hole 15 of the wall board, the gasket 2 is installed, and the connecting screw rod 11 which is connected with the wall board reserved through hole 15 penetrates through the gasket 2 to be connected with the wall board. When the connecting screw 11 with the reserved through hole of the wallboard is used, the mounting gasket 13 is required to penetrate through the connecting screw 11 with the reserved through hole of the wallboard at the other end of the wallboard 14 and then is screwed by the bolt 12.
After the device to be positioned and the wallboard are installed, the leveling bubble 9 is observed, the device is adjusted to be horizontal and vertical, the laser device 6 is opened, the wallboard 14 is put down when the light beam is superposed with the preset site positioning point, and the installation of the wallboard 14 is completed.

Claims (4)

1. The utility model provides a can install vertical component's positioner fast which characterized in that: including first fixed plate and second fixed plate first fixed plate length direction on open and to have the fixed slotted hole of regulation the fixed slotted hole in install bolt screw rod subassembly the one end of second fixed plate be equipped with the fixation clamp, install laser device in the fixation clamp to through fixation clamp bolt locking fixation clamp, install the air level above the middle part of second fixed plate, the other end of second fixed plate and an tip fixed connection of first fixed plate, the contained angle between first fixed plate and the second fixed plate is 90.
2. The positioning device for the quick-mounting of the vertical member as claimed in claim 1, wherein: the first fixing plate and the second fixing plate are both steel plates.
3. The positioning device for the quick-mounting of the vertical member as claimed in claim 1, wherein: the first fixing plate and the second fixing plate are connected into a whole through welding.
4. The positioning device for the quick-mounting of the vertical member as claimed in claim 1, wherein: and a gasket is arranged in the bolt and screw assembly.
CN202123383131.7U 2021-12-30 2021-12-30 Positioning device capable of quickly mounting vertical component Active CN216840702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123383131.7U CN216840702U (en) 2021-12-30 2021-12-30 Positioning device capable of quickly mounting vertical component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123383131.7U CN216840702U (en) 2021-12-30 2021-12-30 Positioning device capable of quickly mounting vertical component

Publications (1)

Publication Number Publication Date
CN216840702U true CN216840702U (en) 2022-06-28

Family

ID=82112513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123383131.7U Active CN216840702U (en) 2021-12-30 2021-12-30 Positioning device capable of quickly mounting vertical component

Country Status (1)

Country Link
CN (1) CN216840702U (en)

Similar Documents

Publication Publication Date Title
CN108360683A (en) Section construction unit and construction and the method for transporting section construction unit
CN105672539B (en) A kind of stone material back of the body bolt suspension member and its application method
CN212249274U (en) Steel sheet shear force wall quick positioning connection structure in assembly type structure
CN214575809U (en) Auxiliary positioning device for assembled building joint bars
CN216840702U (en) Positioning device capable of quickly mounting vertical component
CN109296121A (en) A kind of assembled floor piece construction and its construction method
CN210530135U (en) Vertical concatenation node structure of partial cladding shaped steel concrete column
CN219825702U (en) Prefabricated building unit module
CN110700471A (en) Pre-buried positioning fixing device of floor water and electricity pipeline
CN111236681A (en) Hanging die for adding laminated slab at bottom of concrete slab and construction method thereof
CN214739017U (en) Steel tube bundle combined shear wall and steel beam connecting device
CN214579282U (en) Building electromechanical pipeline module frame
CN113279565A (en) Tool type supporting structure for reinforcing ultra-thick inner wall and construction method
CN210396138U (en) Pour and use section bar mounting structure
CN112525142A (en) Deformation detection and measurement device for field splicing construction of heavy arched beams and application method thereof
CN221073230U (en) Precast column reserved steel bar positioning device
CN111502298A (en) Steel column hoisting welding rapid positioning device
CN217353273U (en) Position controller for pre-embedded bolts of assembled stairs
CN221461560U (en) Heat preservation is exempted from to unpick form construction structures
CN214834717U (en) Special aluminum alloy template of assembled concrete shear wall structure
CN109403283B (en) Steel structure bracket for arc door
CN215595013U (en) Prefabricated wallboard positioning device
CN218263965U (en) Embedded part positioning device of recyclable tower crane
CN220732312U (en) Pump station cable bridge fixing device
CN214656519U (en) Positioning device for embedding embedded parts of foundation of highway sound barrier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 230001 northeast of the intersection of Jingyi road and Weisan road in Hefei Circular Economy Demonstration Park, Anhui Province

Patentee after: ANHUI JIANGONG CONSTRUCTION INDUSTRY CO.,LTD.

Country or region after: China

Patentee after: Anhui Construction Engineering Third Construction Group Co.,Ltd.

Address before: 230001 northeast of the intersection of Jingyi road and Weisan road in Hefei Circular Economy Demonstration Park, Anhui Province

Patentee before: ANHUI JIANGONG CONSTRUCTION INDUSTRY CO.,LTD.

Country or region before: China

Patentee before: ANHUI SANJIAN ENGINEERING Co.,Ltd.