CN216839544U - Protective structure for rapid assembly and removal of building construction tower footing foundation - Google Patents

Protective structure for rapid assembly and removal of building construction tower footing foundation Download PDF

Info

Publication number
CN216839544U
CN216839544U CN202220300262.XU CN202220300262U CN216839544U CN 216839544 U CN216839544 U CN 216839544U CN 202220300262 U CN202220300262 U CN 202220300262U CN 216839544 U CN216839544 U CN 216839544U
Authority
CN
China
Prior art keywords
support
protective
removal
protective structure
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220300262.XU
Other languages
Chinese (zh)
Inventor
雷俊清
刘定国
雷奇灵
余洋
韩江渝
雷金洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jingli Construction Engineering Co ltd
Original Assignee
Hubei Jingli Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jingli Construction Engineering Co ltd filed Critical Hubei Jingli Construction Engineering Co ltd
Priority to CN202220300262.XU priority Critical patent/CN216839544U/en
Application granted granted Critical
Publication of CN216839544U publication Critical patent/CN216839544U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a protective structure to building construction tower footing basis fast assembly and removal, it is including supporting the mound, support column and protective frame, peg graft with supporting the mound through the support column, the cardboard of protective frame both sides cooperates with the stopper on the support column, a plurality of support columns and a plurality of support mounds constitute a plurality of supporting unit, a plurality of protective frames constitute confined protective frame body with a plurality of supporting unit, protective frame body encloses and forms the protection around the tower footing basis, avoid deposit and personnel to get into tower crane equipment district and pipe network district, effective protective equipment and pipe network, be favorable to improving the safety protection performance of personnel and equipment, the installation with remove convenient and fast, and easy operation.

Description

Protective structure for rapid assembly and removal of building construction tower footing foundation
Technical Field
The utility model belongs to the technical field of the construction protection, a protective structure to building construction column foot basis fast assembly and removal is related to.
Background
When high-rise building construction, need build the column foot basis, the column foot basis is used for bearing the tower crane, the tower crane is before using, need the switch on power supply to the tower crane power supply, power supply unit or distribution equipment and relevant pipe network lay around the column foot, the problem of existence is, column foot basis bottom personnel flow volume is great, accumulational accessory is more, if do not protect equipment and pipe network around the column foot basis, lead to equipment impaired easily, cause the hidden danger to personnel's safety.
Disclosure of Invention
The utility model aims to solve the technical problem that a protective structure to building construction tower footing basis fast assembly and removal is provided, adopt the support column to peg graft with supporting the mound, the stopper cooperation on the cardboard of protective frame both sides and the support column, a plurality of support columns and a plurality of supporting units of supporting the mound constitution, a plurality of protective frames constitute confined protective framework with a plurality of supporting units, protective framework encloses to close and forms the protection around the tower footing basis, avoid deposit and personnel to get into tower crane equipment district and pipe network district, effective protective equipment and pipe network, be favorable to improving the safety protection performance of personnel and equipment, the installation with remove convenient and fast, and is simple in operation.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is: a protective structure aiming at rapid assembly and removal of a building construction tower footing foundation comprises support piers, support columns and a protective frame; the lower end of the supporting column is inserted into a supporting tube of the supporting pier, and a clamping plate on the side surface of the protective frame is matched with a limiting block on the supporting column; a plurality of support units are formed by the support columns and the support piers, and a closed protection frame body is formed by the protection frames and the support units.
The support pier comprises a support pipe in the center of the pipe section and filler positioned in the pipe section.
The support column is a hollow rectangular pipe and limiting blocks which are positioned at two adjacent sides of two ends of the rectangular pipe and connected with each other.
The limiting block is a rectangular block body, a sliding groove is formed in one side of the limiting block, grooves are formed in two ends of the sliding groove, and one side of the opening of the sliding groove is connected with the supporting column.
The protective frame comprises a steel wire mesh connected in the rectangular frame and clamping plates connected on two sides of the rectangular frame.
The cardboard is the flat board, is located one side and sets up the lug, and the lug is connected with the rectangle frame.
The beneficial effects of the utility model reside in that:
the support pier is formed by combining the filler in the pipe section and the support pipe into a whole, the pipe section can be processed by adopting a waste pipe in building construction, and the filler is concrete.
Two adjacent sides at both ends set up the stopper of mutual symmetry about the support column, and the commonality is good, and the support column is hollow rectangular pipe, and both ends all can peg graft with the stay tube from top to bottom, and the commonality is good, has improved the installation and has removed the efficiency when removing.
The cardboard that the side at rectangle frame both ends set up cooperates with the stopper, has improved protection frame body overall structure's stability.
The spout both sides of stopper set up the recess, and the lug and the recess cooperation of cardboard side avoid building construction in-process debris to get into the spout.
Drawings
The invention will be further explained with reference to the following figures and examples:
fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural diagram of the supporting unit of the present invention.
Fig. 3 is a schematic structural view of the support pier of the present invention.
Fig. 4 is a schematic structural view of the protection frame of the present invention.
Figure 5 is the utility model discloses cardboard and stopper complex structure schematic diagram.
In the figure: support pier 1, pipeline section 11, stay tube 12, support column 2, stopper 21, protection frame 3, rectangular frame 31, wire net 32, cardboard 33.
Detailed Description
As shown in fig. 1 to 5, a protective structure for fast assembling and removing a foundation of a building construction tower foundation comprises support piers 1, support columns 2 and protective frames 3; the lower end of the support column 2 is inserted into the support tube 12 of the support pier 1, and the clamping plate 33 on the side surface of the protective frame 3 is matched with the limiting block 21 on the support column 2; a plurality of support columns 2 and a plurality of support piers 1 form a plurality of support units, and a plurality of protective frames 3 and a plurality of support units form a closed protective frame body. During the use, the protection framework encloses and closes around the column foot basis and forms the protection, avoids deposit and personnel to get into tower crane equipment district and pipe network district, effective protection equipment and pipe network are favorable to improving the safety protection performance of personnel and equipment, installation and removal convenient and fast, easy operation.
In a preferred embodiment, the support pier 1 comprises a support tube 12 in the center of the pipe section 11 and a filler located in the pipe section 11. During manufacturing, the pipe section 11 is made of a waste pipe in the building construction process, the pipe section 11 is formed after cutting, the filler is made of concrete, the supporting pipe 12 is located in the center of the pipe section 11, and the supporting pier 1 is formed after the concrete is filled to be solid.
Preferably, the support tube 12 is rectangular in cross-section.
In the preferred scheme, the supporting column 2 is a hollow rectangular pipe and the limiting blocks 21 are located at two adjacent sides of two ends of the rectangular pipe and connected with each other. During the preparation, stopper 21 is located and connects fixedly on two adjacent sides in support column 2 both ends, and mutual symmetry, and support column 2 is hollow rectangle tubular product, and both ends all can peg graft with stay tube 12 about the rectangle tubular product, efficiency when improving the installation and removing.
In the preferred scheme, the limiting block 21 is a rectangular block, a sliding groove is formed in one side of the limiting block, grooves are formed in two ends of the sliding groove, and one side of an opening of the sliding groove is connected with the supporting column 2. During manufacturing, one side of the limiting block 21 with the sliding groove is fixedly connected with the supporting column 2.
In a preferred embodiment, the protection frame 3 includes a steel wire mesh 32 connected in a rectangular frame 31, and clamping plates 33 connected at two sides of the rectangular frame 31. During the use, cardboard 33 and the stopper 21 cooperation on the support column 2 connect into a whole with support column 2 and protective frame 3.
In a preferred embodiment, the clamping plate 33 is a flat plate, and a protrusion is disposed on one side of the flat plate and connected to the rectangular frame 31. During the use, behind cardboard 33 inserted the spout of stopper 21, the protruding block on the cardboard 33 and the recess cooperation on the stopper 21 avoid debris to get into and lead to the card stopper in the recess.
The above embodiments are merely preferred technical solutions of the present invention, and should not be considered as limitations of the present invention, and the features in the embodiments and the examples in the present application may be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be defined by the claims and the technical solutions described in the claims, including the technical features of the equivalent alternatives as the protection scope. Namely, equivalent alterations and modifications within the scope of the invention are also within the scope of the invention.

Claims (6)

1. The utility model provides a protective structure to building construction column foot basis fast assembly and removal which characterized by: the device comprises a support pier (1), a support column (2) and a protective frame (3); the lower end of the support column (2) is inserted into the support tube (12) of the support pier (1), and a clamping plate (33) on the side surface of the protective frame (3) is matched with a limiting block (21) on the support column (2); a plurality of support units are formed by the support pillars (2) and the support piers (1), and a closed protective frame body is formed by the protective frames (3) and the support units.
2. The protective structure for the rapid assembly and removal of a foundation of a construction tower according to claim 1, wherein: the support pier (1) comprises a support pipe (12) in the center of the pipe section (11) and filler in the pipe section (11).
3. The protective structure for rapid assembly and removal of a foundation of a construction tower according to claim 1, wherein: the support column (2) is a hollow rectangular pipe and limiting blocks (21) which are positioned at two adjacent sides of two ends of the rectangular pipe and connected with each other.
4. The protective structure for the rapid assembly and removal of a foundation of a construction tower according to claim 3, wherein: the limiting block (21) is a rectangular block body, a sliding groove is formed in one side of the limiting block, grooves are formed in two ends of the sliding groove, and one side of the opening of the sliding groove is connected with the supporting column (2).
5. The protective structure for the rapid assembly and removal of a foundation of a construction tower according to claim 1, wherein: the protective frame (3) comprises a steel wire mesh (32) connected in a rectangular frame (31) and clamping plates (33) connected to two sides of the rectangular frame (31).
6. The protective structure for the rapid assembly and removal of a foundation of a construction tower according to claim 5, wherein: the clamping plate (33) is a flat plate, a convex block is arranged on one side of the flat plate, and the convex block is connected with the rectangular frame (31).
CN202220300262.XU 2022-02-15 2022-02-15 Protective structure for rapid assembly and removal of building construction tower footing foundation Active CN216839544U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220300262.XU CN216839544U (en) 2022-02-15 2022-02-15 Protective structure for rapid assembly and removal of building construction tower footing foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220300262.XU CN216839544U (en) 2022-02-15 2022-02-15 Protective structure for rapid assembly and removal of building construction tower footing foundation

Publications (1)

Publication Number Publication Date
CN216839544U true CN216839544U (en) 2022-06-28

Family

ID=82087944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220300262.XU Active CN216839544U (en) 2022-02-15 2022-02-15 Protective structure for rapid assembly and removal of building construction tower footing foundation

Country Status (1)

Country Link
CN (1) CN216839544U (en)

Similar Documents

Publication Publication Date Title
CN216839544U (en) Protective structure for rapid assembly and removal of building construction tower footing foundation
CN107804016A (en) A kind of waste and old paint kettle retracting device
CN206916695U (en) A kind of water conservancy slope protection net for being used to fix vegetation
CN206567301U (en) A kind of knocking barrel of cement cleaning equipment for building
CN202689585U (en) Ground fitting up assembly mould of large steel truss
CN116024860A (en) Tensile water permeability concrete pavement structure for repairing
CN107119559A (en) A kind of rain drainage structure of bridge
CN205000564U (en) Environmental protection roof greening remains water collecting board
CN210850215U (en) Detachable and turnover reinforcing steel bar finished product stacking support
CN203603527U (en) Adjustable sliding block oblique beam steel frame canopy guard structure for brickwork house
CN203891117U (en) Rainwater collection module
CN213773098U (en) Novel municipal afforestation frame
CN220813909U (en) Arch slope protection device for preventing water and soil loss
CN218713180U (en) Water conservancy design construction cofferdam device
CN107012959B (en) Straw flexible space flood control device and installation method
CN213898213U (en) Variable pitch construction steel platform guardrail
CN214657560U (en) Novel drainage channel for forest culture and management
CN216615693U (en) Movable combined flood prevention water baffle
CN218812952U (en) Prevent subsiding pavement brick
CN216689226U (en) Emergency dam for hydraulic engineering
CN215331929U (en) Urban construction traffic construction is with enclosing fender device convenient to accomodate
CN215331931U (en) Detachable simple and easy splashproof guardrail in dregs pond
CN213741124U (en) Municipal drainage pipeline foundation pit protective structure
CN215669105U (en) Deep landslide prevention and cure structure
CN209779520U (en) Guard fence applied to local railway and special railway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant