CN216839542U - Mounting structure in tower crane foundation construction - Google Patents

Mounting structure in tower crane foundation construction Download PDF

Info

Publication number
CN216839542U
CN216839542U CN202123343072.0U CN202123343072U CN216839542U CN 216839542 U CN216839542 U CN 216839542U CN 202123343072 U CN202123343072 U CN 202123343072U CN 216839542 U CN216839542 U CN 216839542U
Authority
CN
China
Prior art keywords
mounting
tower crane
dead lever
fixed
foundation construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123343072.0U
Other languages
Chinese (zh)
Inventor
唐年平
荣跃平
范方昌
宋国营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shunhongda Mechanical Equipment Co ltd
Original Assignee
Shenzhen Shunhongda Mechanical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Shunhongda Mechanical Equipment Co ltd filed Critical Shenzhen Shunhongda Mechanical Equipment Co ltd
Priority to CN202123343072.0U priority Critical patent/CN216839542U/en
Application granted granted Critical
Publication of CN216839542U publication Critical patent/CN216839542U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a mounting structure in tower crane foundation construction: comprises a concrete base, a mounting plate and a mounting frame; install a plurality of reinforcing bars among the concrete base, the mounting panel is installed on the concrete base, the mounting panel lower extreme is fixed with a plurality of dead levers, the dead lever with the reinforcing bar is crisscross each other, the dead lever is connected with the fixing base, the fixing base with dead lever fixed mounting is in inside the concrete base, the mounting bracket of tower crane is installed to the mounting panel upper end, the utility model discloses a crisscross installation of a plurality of reinforcing bars and a plurality of dead lever to fixing base fixed mounting through reinforcing bar, dead lever and dead lever connection is in the concrete base, and the fixed mounting panel is fixed effectual, improves the stability of tower crane mounting bracket, and the practicality is good.

Description

Mounting structure in tower crane foundation construction
Technical Field
The utility model relates to a tower crane base's technical field specifically is a mounting structure in tower crane foundation construction.
Background
The tower crane is the most common hoisting equipment in construction sites, also known as tower crane, and is used for hoisting construction raw materials such as reinforcing steel bars, wood ridges, concrete, steel pipes and the like for construction. The tower crane is an indispensable device on a construction site.
At present, tower cranes are divided into an independent type and an attached type according to installation modes, the independent type height can reach 60 meters, and the attached type height can be adjusted without limit according to the height of a building. Therefore, the tower crane has considerable requirements on the inclination of the tower crane, the tower crane foundation has the largest influence on the inclination of the tower crane, the existing tower crane foundation is directly formed by pouring reinforced concrete, and the tower crane steel bar in the concrete has a simple structure, relatively poor fixing effect and relatively poor stability.
SUMMERY OF THE UTILITY MODEL
Directly adopting reinforced concrete to pour into a mould in order to improve current tower crane foundation and forming, the tower hangs steel bar structure simple in the concrete, and fixed effect is relatively poor, the relatively poor problem of stability, the utility model provides an installation structure in the tower crane foundation construction.
The utility model adopts the following technical proposal:
a mounting structure in tower crane foundation construction: comprises a concrete base, a mounting plate and a mounting frame; install a plurality of reinforcing bars in the concrete base, the mounting panel is installed on the concrete base, the mounting panel lower extreme is fixed with a plurality of dead levers, the dead lever with the reinforcing bar is crisscross each other, the dead lever is connected with the fixing base, the fixing base with dead lever fixed mounting is in inside the concrete base, the mounting bracket of tower crane is installed to the mounting panel upper end.
Adopt above-mentioned technical scheme, through the crisscross installation of a plurality of reinforcing bars and a plurality of dead lever to fixing base fixed mounting through reinforcing bar, dead lever and dead lever connection is in the concrete base, and the fixed mounting board, fixed effectual improves the stability of tower crane mounting bracket, and the practicality is good.
Further, the reinforcing bar includes first reinforcing bar and second reinforcing bar, first reinforcing bar with the crisscross installation of second reinforcing bar is in the concrete foundation.
Adopt above-mentioned technical scheme, through the crisscross installation of first reinforcing bar and second reinforcing bar, guarantee concrete foundation's stability.
Furthermore, the first steel bars and the second steel bars are respectively crisscrossed with the fixing rods.
Adopt above-mentioned technical scheme, through first reinforcing bar and second reinforcing bar respectively with dead lever vertically and horizontally staggered, improve the fixed effect of dead lever, improve stability, prevent that the dead lever skew from leading to the tower crane slope.
Furthermore, the upper end of the fixing seat is fixedly connected with the fixing rods.
Adopt above-mentioned technical scheme, it is fixed with a plurality of dead levers through the fixing base upper end, improve fixed effect to improve stability.
Furthermore, a plurality of reinforcing steel bar teeth are installed on the lower end face of the fixing seat, and the first reinforcing steel bars penetrate through the reinforcing steel bar teeth.
Adopt above-mentioned technical scheme, it has first reinforcing bar to run through between a plurality of fixed teeth, guarantees that the position of reinforcing bar and fixing base is unchangeable, improves stability.
Furthermore, the shape of the fixing seat is a regular frustum pyramid shape.
By adopting the technical scheme, the contact area is increased through the regular frustum-shaped fixing seat, so that the fixing seat can achieve a better fixing effect.
Further, a plurality of diaphragms, bracing piece and auxiliary rod are installed to the mounting bracket, diaphragm and mounting bracket fixed connection, the bracing piece with the mounting bracket with diaphragm fixed connection, the auxiliary rod with the mounting bracket with diaphragm fixed connection.
By adopting the technical scheme, the stability of the mounting frame is ensured through the transverse plate, the supporting rod and the auxiliary rod.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through the crisscross installation of a plurality of reinforcing bars and a plurality of dead lever to fixing base fixed mounting through reinforcing bar, dead lever and dead lever connection is in the concrete base, and the fixed mounting panel, fixed effectual improves the stability of tower crane mounting bracket, and the practicality is good.
2. The first steel bars and the second steel bars are installed in a staggered mode, and the stability of the concrete base is guaranteed; through first reinforcing bar and second reinforcing bar respectively with dead lever vertically and horizontally staggered, improve the fixed effect of dead lever, improve stability, prevent that the dead lever skew from leading to the tower crane slope.
3. Through diaphragm, bracing piece and auxiliary rod, guarantee the stability of mounting bracket.
The present invention will be explained in detail with reference to the drawings and specific embodiments.
Drawings
FIG. 1 is a front sectional view of the overall structure of the present invention;
FIG. 2 is a left side sectional view of the overall structure of the present invention;
FIG. 3 is a schematic top view of the fixing base of the present invention;
fig. 4 is a schematic bottom view of the fixing base of the present invention.
In the figure: 1. a concrete base; 11. a first reinforcing bar; 12. a second reinforcing bar; 2. mounting a plate; 21. fixing the rod; 22. a fixed seat; 23. reinforcing steel bar teeth; 3. a mounting frame; 31. a transverse plate; 32. a support bar; 33. an auxiliary rod.
Detailed Description
In order to facilitate understanding of the present invention, the present invention will be described more fully with reference to the accompanying drawings, in which several embodiments of the present invention are shown, but the present invention can be implemented in different forms, and is not limited to the embodiments described in the text, but rather, these embodiments are provided to make the disclosure of the present invention more thorough and comprehensive.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may be present, and when an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present, as the terms "vertical", "horizontal", "left", "right" and the like are used herein for descriptive purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, and the use of the terms herein in the specification of the present invention are for the purpose of describing particular embodiments only and are not intended to limit the present invention, and the use of the term "and/or" herein includes any and all combinations of one or more of the associated listed items.
The first embodiment is as follows:
please refer to fig. 1-4, an installation structure in tower crane foundation construction: the concrete base comprises a concrete base 1, a mounting plate 2 and a mounting frame 3; install a plurality of reinforcing bars in the concrete base 1, install mounting panel 2 on the concrete base 1, 2 lower extremes of mounting panel are fixed with a plurality of dead levers 21, dead lever 21 with the reinforcing bar is crisscross each other, dead lever 21 is connected with fixing base 22, fixing base 22 with dead lever 21 fixed mounting is in inside the concrete base 1, mounting bracket 3 of tower crane is installed to 2 upper ends of mounting panel.
Please refer to fig. 1-4, the reinforcing bars include first reinforcing bars 11 and second reinforcing bars 12, the first reinforcing bars 11 and the second reinforcing bars 12 are installed in the concrete base 1 in a staggered manner, the first reinforcing bars 11 and the second reinforcing bars 12 are respectively criss-cross with the fixing rods 21, the upper end of the fixing seat 22 is fixedly connected with the fixing rods 21, a plurality of reinforcing bar teeth 23 are installed on the lower end surface of the fixing seat 22, the first reinforcing bars 11 penetrate through the reinforcing bar teeth 23, and the fixing seat 22 is in a regular frustum shape.
Referring to fig. 1-2 again, the mounting frame 3 is provided with a plurality of transverse plates 31, support rods 32 and auxiliary rods 33, the transverse plates 31 are fixedly connected with the mounting frame 3, the support rods 32 are fixedly connected with the mounting frame 3 and the transverse plates 31, and the auxiliary rods 33 are fixedly connected with the mounting frame 3 and the transverse plates 31.
The embodiment of the utility model provides a mounting structure's among tower crane foundation construction implementation principle does:
first reinforcing bar 11 and the crisscross installation of second reinforcing bar 12 guarantee concrete base 1's solidification back stability and fixed effect, and first reinforcing bar 11 and second reinforcing bar 12 are from traversing between the fixed pole 21 respectively, and first reinforcing bar 11 still runs through between the reinforcing bar tooth 23 of fixed fixing base 22, improves the stability and the fixed effect of dead lever 21, fixing base 22 to improve the stability of mounting panel 2, guarantee the stability of ann tower crane mounting bracket 3.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above-mentioned manner, if the method and the technical solution of the present invention are adopted, the present invention can be directly applied to other occasions without substantial improvement, and the present invention is within the protection scope of the present invention.

Claims (7)

1. The utility model provides a mounting structure in tower crane foundation construction which characterized in that: comprises a concrete base (1), a mounting plate (2) and a mounting frame (3);
install a plurality of reinforcing bars in concrete base (1), install mounting panel (2) on concrete base (1), mounting panel (2) lower extreme is fixed with a plurality of dead levers (21), dead lever (21) with the reinforcing bar is crisscross each other, dead lever (21) are connected with fixing base (22), fixing base (22) with dead lever (21) fixed mounting is in inside concrete base (1), mounting bracket (3) of tower crane are installed to mounting panel (2) upper end.
2. The mounting structure of claim 1 in tower crane foundation construction, characterized in that: the reinforcing steel bars comprise first reinforcing steel bars (11) and second reinforcing steel bars (12), and the first reinforcing steel bars (11) and the second reinforcing steel bars (12) are installed in the concrete base (1) in a staggered mode.
3. The mounting structure of claim 2 in tower crane foundation construction, characterized in that: the first steel bars (11) and the second steel bars (12) are criss-cross with the fixing rods (21) respectively.
4. The mounting structure of claim 3 in tower crane foundation construction, characterized in that: the upper end of the fixed seat (22) is fixedly connected with the plurality of fixed rods (21).
5. The mounting structure of claim 4 in tower crane foundation construction, characterized in that: a plurality of reinforcing steel bar teeth (23) are installed to fixing base (22) lower terminal surface, it has to run through between reinforcing steel bar tooth (23) first reinforcing steel bar (11).
6. The mounting structure of claim 5 in tower crane foundation construction, characterized in that: the fixing seat (22) is in the shape of a regular frustum pyramid.
7. The mounting structure of claim 1 in tower crane foundation construction, characterized in that: a plurality of diaphragm (31), bracing piece (32) and auxiliary rod (33) are installed to mounting bracket (3), diaphragm (31) and mounting bracket (3) fixed connection, bracing piece (32) with mounting bracket (3) with diaphragm (31) fixed connection, auxiliary rod (33) with mounting bracket (3) with diaphragm (31) fixed connection.
CN202123343072.0U 2021-12-28 2021-12-28 Mounting structure in tower crane foundation construction Active CN216839542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123343072.0U CN216839542U (en) 2021-12-28 2021-12-28 Mounting structure in tower crane foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123343072.0U CN216839542U (en) 2021-12-28 2021-12-28 Mounting structure in tower crane foundation construction

Publications (1)

Publication Number Publication Date
CN216839542U true CN216839542U (en) 2022-06-28

Family

ID=82112830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123343072.0U Active CN216839542U (en) 2021-12-28 2021-12-28 Mounting structure in tower crane foundation construction

Country Status (1)

Country Link
CN (1) CN216839542U (en)

Similar Documents

Publication Publication Date Title
WO2022142999A1 (en) Hoisting device for bridge water surface pile tie beam and construction method therefor
CN216839542U (en) Mounting structure in tower crane foundation construction
CN201605724U (en) Reinforcing steel bar barricade capable of turning over
CN208982781U (en) Air hose mounting bracket in truss
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN209758781U (en) Novel construction elevator attaches wall frame
CN206607706U (en) A kind of drawing shore for shear wall construction
CN110212843B (en) Reinforcing device of photovoltaic support template and positioning method thereof
CN210886958U (en) Bridge assembled bent cap installation support stores pylon
CN210530084U (en) Open type steel reinforced concrete composite truss floor
CN209816675U (en) A assembled bracket for construction of 0# piece of rectangle mound
CN214784720U (en) Support structure of green building center pillar
CN215749906U (en) Box girder die pedestal adjusting device
CN211114847U (en) Bracing structure of aluminium membrane
CN218292018U (en) Unsettled tower crane foundation base supports reinforced structure
CN215165767U (en) Integrated bottom bearing platform foundation with splicing, pouring and shaping functions
CN104988941B (en) Large bearing platform type foundation hanging formwork and construction method thereof
CN214243569U (en) Guardrail device for mounting and fixing tower crane standard knot
CN216691095U (en) Adjustable triangular support for arc-shaped top plate
CN211080287U (en) Assembled tower crane cushion cap basis festival standard height controlling means
CN221073471U (en) Circulated template strutting arrangement of haunching roof beam
CN218671962U (en) Stability street light pole and pre-buried base
CN212078696U (en) Novel combination formula building templates fixed knot constructs
CN216766848U (en) Shear wall framework reinforcing mechanism for wall construction
CN217500334U (en) A assembled otter board structure for building bottom plate construction joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant