CN216829405U - Climb a guide rail extension fixed length welding frock - Google Patents

Climb a guide rail extension fixed length welding frock Download PDF

Info

Publication number
CN216829405U
CN216829405U CN202220017609.XU CN202220017609U CN216829405U CN 216829405 U CN216829405 U CN 216829405U CN 202220017609 U CN202220017609 U CN 202220017609U CN 216829405 U CN216829405 U CN 216829405U
Authority
CN
China
Prior art keywords
guide rail
fixed
panel
climb
fixed length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220017609.XU
Other languages
Chinese (zh)
Inventor
高渭泉
胡燕江
雍杰
李小杰
刘海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Zhite New Material Technology Co ltd
Original Assignee
Hubei Zhite New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Zhite New Material Technology Co ltd filed Critical Hubei Zhite New Material Technology Co ltd
Priority to CN202220017609.XU priority Critical patent/CN216829405U/en
Application granted granted Critical
Publication of CN216829405U publication Critical patent/CN216829405U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a climb a guide rail extension fixed length welding frock, including a support, the support top is fixed with the panel, and fixed surface has the slide rail on the panel, and sliding connection has the slip table on the slide rail, and the slip table top is fixed with square pipe, and the through-hole has been seted up on the square pipe top. The utility model has the advantages of can improve welding production efficiency, make production more tend to standardize etc.

Description

Climb a guide rail extension fixed length welding frock
Technical Field
The utility model belongs to the technical field of building material processing equipment, a climb a guide rail extension fixed length welding frock is related to.
Background
Along with the high-speed development of the building industry, high-rise and super high-rise buildings are more and more, an integral lifting scaffold is widely adopted in construction, the integral lifting scaffold (also called a climbing frame) becomes an externally hung scaffold construction technology which is widely applied in high-rise and super high-rise building construction in recent years due to the characteristics of simple structure, convenient operation, economy and practicability, and a climbing frame guide rail is a core component of the climbing frame.
When the guide rails are arranged around a building, the upper guide rail and the lower guide rail need to be in tight butt joint, and the connection strength of the upper guide rail and the lower guide rail needs to be ensured; therefore, the guide rail body and the channel steel for supporting the guide rail body are often arranged in a staggered mode, so that the upper guide rail and the lower guide rail are in tight butt joint and firm in connection. Therefore, when the guide rails are welded, an extension part needs to be reserved at one end of each guide rail, but the extension parts of the guide rails are different in length, so that a tool needs to be designed, the length of the extension parts of the guide rails can be determined, the guide rails can be produced in batch, and the extension parts are all the same.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the above-mentioned problem that prior art exists, provide a climb a guide rail extension fixed length welding frock, the utility model aims to solve the technical problem that a section is used for guide rail extension fixed length welding frock to make its length that can decide guide rail extension, the follow-up welding process of being convenient for.
The purpose of the utility model can be realized by the following technical proposal: the utility model provides a climb a guide rail extension fixed length welding frock, its characterized in that, this frock includes a support, the support top is fixed with the panel, fixed surface has the slide rail on the panel, sliding connection has the slip table on the slide rail, the slip table top is fixed with square pipe, the through-hole has been seted up on square pipe top.
Preferably, a scale is arranged on one side of the sliding rail on the panel; and a fixing bolt is in threaded connection with one side of the sliding rail at the bottom of the sliding table.
This welding frock simple structure, it can decide the length of guide rail extension, and batch production, and each extension is all unanimous for the staff adopts its welding process efficiency to climbing a guide rail to improve greatly, and makes this company more become standardized to the production of climbing a guide rail.
Drawings
Fig. 1 is a schematic perspective view of a workbench on which the welding tool is arranged.
Fig. 2 is an enlarged view of a portion a in fig. 1.
Fig. 3 is a perspective view of the climbing frame guide rail.
Fig. 4 is a schematic view of an application scenario of the welding tool.
In the figure, 11, a table body; 12. a frame; 13. a guide rail; 131. a limiting groove; 14. a clamping block; 141. a first indent; 142. a second pressing groove; 143. a screw; 144. pressing a plate; 145. a handle; 15. a limiting plate; 16. a fixing member; 161. a base; 162. a "T" shaped panel; 163. an operation panel; 164. a connecting plate; 165. adjusting the bolt; 17. a support; 171. a panel; 172. a slide rail; 173. a sliding table; 174. a square tube; 175. a fixing bolt; 18. a limiting block; 21. channel steel; 22. a circular tube; 23. connecting sheets; 24. a guide rail body; 25. an end plate; 26. a step surface.
Detailed Description
The following are specific embodiments of the present invention and the accompanying drawings are used to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
As shown in fig. 1 and 2, a welding workbench for a climbing frame guide rail comprises a workbench body 11 and a plurality of rectangular frames 12 extending to one side of the workbench body 11, wherein a welding tool is arranged at the top end of the workbench body 11; the welding tool comprises a guide rail 13 and a plurality of clamping blocks 14, a plurality of limiting grooves 31 are transversely formed in the guide rail 13, each clamping block 14 stretches across the guide rail 13, and one end of each clamping block 14 is hinged to the workbench body 11; the bottom of each clamping block 14 is provided with a first indent 141 and a second indent 142.
As shown in fig. 3, the climbing frame guide rail comprises two parallel channel steel 21, a plurality of round pipes 22 are welded between the two channel steel 21, a plurality of connecting pieces 23 are welded between the top ends of the two channel steel 21, a guide rail body 24 is welded on the top end of each connecting piece 23, a plurality of through holes are formed in the guide rail body 24 in the vertical direction, end plates 25 are further welded between the two channel steel 21 at the head end and the tail end of the two channel steel 21, one end of the guide rail body 24 extends out of the channel steel 21, and the extending end of the guide rail body is provided with a step surface 26 for butt joint.
As shown in fig. 4, before the welding operation starts, channel steel 21, round pipe 22, guide rail body 24, connecting piece 23 and end plate 25 with proper sizes are machined according to relevant size requirements; then, opening each clamping block 14, and placing a channel steel 21 at the top end of the workbench body 11 and at two sides of the guide rail 13 respectively; then, the round pipes 22 are placed at the top end of the guide rail 13 and in each limiting groove 31; then, placing a connecting sheet 23 on the bracket at the top ends of the two channel steels 21; then, placing a guide rail body 24 on the top of each connecting sheet 23, and placing end plates 25 at the head end and the tail end of the two channel steels 21; finally, the clamping block 14 is closed, so that the first pressing groove 141 presses the top of the guide rail body 24, and the two sides of the second pressing groove 142 clamp the two channel steel 21, thereby realizing the limiting, clamping and fixing of each component of the climbing frame guide rail. After fixing each component of the climbing frame guide rail, a worker can perform electric welding on the climbing frame guide rail to form a whole, then open the clamping block 14, perform reinforcing welding on the clamping block, turn over the clamping block and perform reinforcing welding again. Thus, the welding processing of the whole climbing frame guide rail is completed. This weldment work platform simple structure, the welding frock on it is high with the structure degree of agreeing with of climbing a guide rail, can realize spacing, centre gripping, fixed to each component of climbing a guide rail for the staff adopts its welding process efficiency to climbing a guide rail to improve greatly, and makes this company more become the standardization to the production of climbing a guide rail.
As shown in fig. 2, the welding tool further includes a plurality of limiting plates 15 for limiting the non-hinged end of the clamping block 14, and each limiting plate 15 is fixed to the top end of the workbench body 11; a fixing piece 16 is arranged near each limit plate 15; each fixing piece 16 comprises a base 161, a T-shaped plate 162, an operation plate 163 and a connecting plate 164, wherein one end of the bottom of each T-shaped plate 162 is hinged with the base 161, and the other end of the bottom of each T-shaped plate 162 is hinged with one end of the operation plate 163; one end of each connecting plate 164 is hinged to the base 161, and the other end of each connecting plate 164 is hinged to the middle of the operating plate 163; the top end of each "T" shaped plate 162 is connected with an adjusting bolt 165 through screw threads. In the present fixing member 16, the operation plate 163 is preferably set in a "V" shape having one leg long and one leg section; the inflection point of the operation board 163 is hinged on the base 161 through the connection board 164, one end of the bottom of the "T" shaped board 162 is also hinged on the base 161, the short leg of the operation board 163 is hinged with the other end of the bottom of the "T" shaped board 162, the long leg of the operation is pulled, the short leg drives the "T" shaped board 162 to rotate, the top of the "T" shaped board 162 is driven to rotate, and the clamping block 14 is pressed tightly, so that the components of the climbing frame guide rail are fixedly and tightly butted. And the presence of the adjustment bolt 165 allows the operator to adjust the degree of compression of the clamp block 14 by the fixture 16.
As shown in fig. 2, a screw 143 is threadedly connected to the top of the first pressure groove 141 and one side of the second pressure groove 142 of each clamping block 14, and a pressure plate 144 and a handle 145 are fixedly connected to both ends of the screw 143. Because the clamping block 14 is hinged to the top end of the workbench body 11, the inner diameters of the first pressing groove 141 and the second pressing groove 142 on the clamping block cannot be exactly matched with the outer diameter of the climbing frame guide rail, and the clamping block 14 can be smoothly closed only by slightly enlarging the inner diameters; however, in order to make the clamping block 14 press and tightly clamp the components of the climbing frame, the screw 143, the pressing plate 144 and the handle 145 are disposed on the top of the first pressing groove 141 and one side of the second pressing groove 142 on the clamping block 14, so that the worker can drive the screw 143 to advance by screwing the handle 145, and further press and clamp the components of the climbing frame guide rail by the pressing plate 144.
As shown in fig. 1 and 2, the welding tool further comprises a support 17 fixedly connected to one end of the workbench body 11, a panel 171 is fixed to the top of the support 17, a sliding rail 172 is fixed to the upper surface of the panel 171, a sliding table 173 is slidably connected to the sliding rail 172, a square tube 174 is fixed to the top end of the sliding table 173, and a through hole is formed in the top end of the square tube 174. A scale is arranged on one side of the sliding rail 172 on the panel 171; a fixing bolt 175 is screwed on one side of the sliding rail 172 at the bottom of the sliding table 173.
When the guide rails 13 are arranged around a building, the upper guide rail 13 and the lower guide rail 13 need to be in tight butt joint, and the connection strength of the upper guide rail and the lower guide rail needs to be ensured; therefore, the guide rail body and the channel steel for supporting the guide rail body are often arranged in a staggered mode, so that the upper guide rail and the lower guide rail are in tight butt joint and firm in connection. An extension is provided at one end thereof, and a step surface 26 is provided at the front end of the extension to abut the end of the next rail. Therefore, when the guide rails are welded, an extension part needs to be reserved at one end of each guide rail, but the extension parts of the guide rails are different in length, so that a tool needs to be designed, the length of the extension parts of the guide rails can be determined, the guide rails can be produced in batch, and the extension parts are all the same. We can slide the sliding table 173 to a proper position according to the reserved length of the guide rail body 24 and a reference scale, and then screw the fixing bolt 175 to fix the sliding table 173 at the proper position of the sliding rail 172, so that in subsequent operations, the step surface 26 of the guide rail body 24 is inserted into the square tube 174, the end surface specification of the square tube 174 is completely consistent with the tail of the guide rail body 24, thereby realizing the pre-butt joint of the step surface 26 and the tail of the guide rail body 24, and being beneficial to the actual installation of the guide rail 13.
As shown in fig. 1, a plurality of limiting blocks 18 are fixed on the top of each frame 12; the frames 12 and the workbench body 11 are arranged in a comb shape, and welding stations are formed on the supports 17 of the frames 12, so that the workbench can be used for multi-person cooperative welding. The climbing frame guide rail is a workpiece with larger size and weight, and the processing efficiency can be just improved by multi-person cooperative operation. Between the stopper 18 on the top of each frame 12, a material stacking place is formed, which is suitable for stacking long-strip-shaped materials such as the channel steel 21 and the guide rail body 24, and is convenient for a worker to take.
For convenience of description, the terms "lateral, transverse, bottom, top," and the like, if any, in the present disclosure shall only be construed as indicating any illustrated lateral, transverse, bottom, top, etc., orientation of the figures themselves, and shall not be construed as limiting the structure, but merely as facilitating the description of the disclosure and simplifying the description, rather than indicating or implying that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and shall not be construed as limiting the disclosure.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein may be made by those skilled in the art without departing from the spirit of the invention or exceeding the scope of the invention as defined in the accompanying claims.

Claims (2)

1. The utility model provides a climb a guide rail extension fixed length welding frock, a serial communication port, this frock includes a support (17), support (17) top is fixed with panel (171), panel (171) upper surface is fixed with slide rail (172), sliding connection has slip table (173) on slide rail (172), slip table (173) top is fixed with square pipe (174), the through-hole has been seted up on square pipe (174) top.
2. The creeper guide rail extension fixed-length welding tool according to claim 1, wherein a scale is arranged on one side of the sliding rail (172) on the panel (171); and a fixing bolt (175) is connected to the bottom of the sliding table (173) at one side of the sliding rail (172) through threads.
CN202220017609.XU 2022-01-05 2022-01-05 Climb a guide rail extension fixed length welding frock Active CN216829405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220017609.XU CN216829405U (en) 2022-01-05 2022-01-05 Climb a guide rail extension fixed length welding frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220017609.XU CN216829405U (en) 2022-01-05 2022-01-05 Climb a guide rail extension fixed length welding frock

Publications (1)

Publication Number Publication Date
CN216829405U true CN216829405U (en) 2022-06-28

Family

ID=82115323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220017609.XU Active CN216829405U (en) 2022-01-05 2022-01-05 Climb a guide rail extension fixed length welding frock

Country Status (1)

Country Link
CN (1) CN216829405U (en)

Similar Documents

Publication Publication Date Title
CN111075212B (en) H shaped steel roof beam installation interfacing apparatus of two-way regulation
CN216829405U (en) Climb a guide rail extension fixed length welding frock
CN213671270U (en) Stretch bender
CN217412940U (en) Climb a guide rail weldment work platform
CN210475171U (en) Stamping equipment capable of fixing machined part
CN215697282U (en) Rectangular pipe punching equipment
CN210334890U (en) Welding fixture for guide rail of attached lifting scaffold
KR100890831B1 (en) A structure clamping equipment of drilling machine
CN213614466U (en) Cutting device for metal pipes
CN214816235U (en) Pipeline welding device
CN212822899U (en) Flange plate punching clamp
CN210616803U (en) Positioning device for wood processing
CN202906284U (en) Cable maintaining fixing device
CN105773039A (en) Board welding bench
CN205630359U (en) Automatic rectify flat -nose pliers
CN215786101U (en) Full-automatic punching connecting device for cold-drawn elevator guide rail
CN215846552U (en) Chamfer template processing welding equipment
CN219254840U (en) Clamp tool with reinforcing structure
CN213259113U (en) Machining device capable of rapidly clamping bridge steel mould
CN214816780U (en) Steel construction drilling equipment convenient to location
CN211192418U (en) Auxiliary device for grooving of semi-automatic flame cutting machine
CN220848059U (en) Plug-in type fixed slot pulling plate
CN214212410U (en) Galvanized square tube fixing clamp
CN210025410U (en) Rubber tube guillootine
CN220970929U (en) Metal material processing cutting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant